Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Chiller plants”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Analytical Study to Use the Excess Digester Gas of Wastewater Treatment Plants

This study presents an analytical method that can be used to enhance the power production rate and the energy-saving at wastewater treatment plants. The digester used at wastewater treatment plants produces digester gas by anaerobic digestion, with which biofuel production can be achieved. Biofuels can be used to meet some of the energy requirements of the wastewater treatment facility through combined heat and power (CHP) gas engines (cogeneration). Using micro gas turbine (MGT), a CHP technology can be introduced in wastewater treatment plants (WWTPs). The combination of MGTs and absorption chillers is a promising technology as it produces electricity, heating, and cooling simultaneously. The study demonstrated how the waste heat of MGTs could be used to drive absorption chillers. In this analytical study, a detailed technical and economic analysis is provided on the trigeneration system, i.e., the integration of MGTs and absorption chillers driven by waste digester gas of the wastewater treatment plants. It can meet the heating and cooling demands of the plants, which promote the reduction of utility costs. The technology presented is also useful for other thermal energy users.

09 BIOMASS FUELS↗

Case Study: NREL Campus Chilled Water Storage Potential: Benchmark Datasets Development and Applications, Task 4 - Use Case Demonstration

The Benchmark Datasets Development and Applications project is a three-year collaboration between the National Renewable Energy Laboratory (NREL), Oak Ridge National Laboratory, Pacific Northwest National Laboratory, and Lawrence Berkeley National Laboratory. The project seeks to collect and curate high-resolution, well-calibrated time series of building operational and indoor/outdoor environmental data, which are crucial to understanding and optimizing building energy efficiency performance and demand flexibility capabilities as well as benchmarking energy algorithms. Project outcomes include approximately twelve high-fidelity building datasets, enhanced data representation tools, and four case studies to illustrate example applications. The goal of these case studies is to define and execute analyses that demonstrate how one or more datasets collected through this project can address a data gap or challenge historically faced by building stakeholders. This technical paper summarizes the findings of one of these case studies, in which we studied the operational efficiencies of the central cooling system at NREL. We looked at three years of data from the three chillers in the Field Test Laboratory Building (FTLB), from 2019 to 2021, to compare equipment operation and demand throughout the time period. Our analysis indicates that all three chillers are operating at or below the optimal loading conditions for most of the operation time, and thus there was no efficiency drop due to loading of the chillers at full capacity. Our recommendation is that no chiller capacity increase is needed; instead, the central plant could benefit from adopting advanced control logics for optimal sequencing of chillers during part load operations. Analysis of adding chilled water thermal storage to the central plant indicated 34% savings in demand cost and 24.5% savings in total cost (energy consumption and demand charge cost). The payback period is estimated to be 11-22 years with an assumed TES cost of $\$$100-$200 per ton. This case study shows how a selected dataset is used to solve a practical building problem - learning the operational status of its components, analyzing the effectiveness of a proposed new technique, and aiding decision-making for the building operations and maintenance team.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimizing Control for Efficient Load Shifting with Thermal Energy Storage in Existing HVAC Systems

This project developed the integration of a direct-contact heat exchanger (DCHX) based thermal energy storage (TES) system with a chiller–air handling unit (AHU) plant to evaluate its potential for reducing building energy costs. Detailed physical models of the TES unit, building envelope, and HVAC components were developed alongside simplified control-oriented models to support both high-fidelity simulation and real-time optimization. Two control strategies were implemented and compared: a rule-based control (RBC) aligned with utility time-of-use (ToU) rates, and a model predictive control (MPC) framework leveraging forecasts of building load, weather, and internal gains.Simulation results show that the RBC strategy reduced daily electricity costs by around 30% by shifting cooling production from on-peak to off-peak hours. In contrast, the MPC strategy achieved significantly greater performance, reducing daily operating costs by up to 44% and peak-hour costs by more than 60%. Both strategies maintained indoor thermal comfort within acceptable limits, with MPC further improving load distribution and reducing equipment cycling.The outcomes confirm that TES integration, particularly when coordinated with advanced predictive control, can provide substantial cost savings and on-peak demand reduction. . These findings directly support the U.S. Department of Energy’s goals for grid-interactive efficient buildings and demonstrate the potential of TES-enabled HVAC systems for scalable deployment across the commercial building.

99 GENERAL AND MISCELLANEOUS↗

Optimizing Control for Efficient Load Shifting with Thermal Energy Storage in Existing HVAC Systems

This project developed the integration of a direct-contact heat exchanger (DCHX) based thermal energy storage (TES) system with a chiller–air handling unit (AHU) plant to evaluate its potential for reducing building energy costs. Detailed physical models of the TES unit, building envelope, and HVAC components were developed alongside simplified control-oriented models to support both high-fidelity simulation and real-time optimization. Two control strategies were implemented and compared: a rule-based control (RBC) aligned with utility time-of-use (ToU) rates, and a model predictive control (MPC) framework leveraging forecasts of building load, weather, and internal gains. Simulation results show that the RBC strategy reduced daily electricity costs by around 30% by shifting cooling production from on-peak to off-peak hours. In contrast, the MPC strategy achieved significantly greater performance, reducing daily operating costs by up to 44% and peak-hour costs by more than 60%. Both strategies maintained indoor thermal comfort within acceptable limits, with MPC further improving load distribution and reducing equipment cycling. The outcomes confirm that TES integration, particularly when coordinated with advanced predictive control, can provide substantial cost savings and on-peak demand reduction. . These findings directly support the U.S. Department of Energy’s goals for grid-interactive efficient buildings and demonstrate the potential of TES-enabled HVAC systems for scalable deployment across the commercial building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Model predictive control for optimal dispatch of chillers and thermal energy storage tank in airports

Cost of energy consumption is one of the biggest operational cost for airports, and it is increasing from time to time as airports expand to support growing number of passengers. Various factors affect the energy consumption including efficiency of airport Heating Ventilation and Air conditioning (HVAC) systems, which in turn depends on the efficiency of individual subsystems. Here, in this paper, we present an optimal scheduling method for the central plant system at Dallas Fort Worth airport, involving chillers, pumps, and a thermal energy storage (TES) system. A model predictive control (MPC) problem is formulated to minimize both energy and demand charge costs while satisfying the cooling needs of the airport. The proposed Mixed-Integer Nonlinear Programming (MINLP) formulation includes performance curve based models for chillers and pumps and a simplified state of charge model for TES. The formulation also includes predictions of cooling load and chilled water return temperature. Simulation results for a month in summer show savings around 10% compared to the baseline. Initial recommendations based on insights from simulation results to the manual operation procedures resulted in significant savings. Field test results show a 7% chiller efficiency improvement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Distributed Intelligent Automated Demand Response Building Management System

The goal of the 2.5 year Distributed Intelligent Automated Demand Response (DIADR) project was to reduce peak electricity load of Sutardja Dai Hall at UC Berkeley by 30% while maintaining a healthy, comfortable, and productive environment for the occupants. We sought to bring together both central and distributed control to provide “deep” demand response1 at the appliance level of the building as well as typical lighting and HVAC applications. This project brought together Siemens Corporate Research and Siemens Building Technology (the building has a Siemens Apogee Building Automation System (BAS)), Lawrence Berkeley National Laboratory (leveraging their Open Automated Demand Response (openADR), Auto-­Demand Response, and building modeling expertise), and UC Berkeley (related demand response research including distributed wireless control, and grid-­to-­building gateway development). Sutardja Dai Hall houses the Center for Information Technology Research in the Interest of Society (CITRIS), which fosters collaboration among industry and faculty and students of four UC campuses (Berkeley, Davis, Merced, and Santa Cruz). The 141,000 square foot building, occupied in 2009, includes typical office spaces and a nanofabrication laboratory. Heating is provided by a district heating system (steam from campus as a byproduct of the campus cogeneration plant); cooling is provided by one of two chillers: a more typical electric centrifugal compressor chiller designed for the cool months (Nov-­ March) and a steam absorption chiller for use in the warm months (April-­October). Lighting in the open office areas is provided by direct-­indirect luminaries with Building Management System-­based scheduling for open areas, and occupancy sensors for private office areas. For the purposes of this project, we focused on the office portion of the building. Annual energy consumption is approximately 8053 MWh; the office portion is estimated as 1924 MWh. The maximum peak load during the study period was 1175 kW. Several new tools facilitated this work, such as the Smart Energy Box, the distributed load controller or Energy Information Gateway, the web-­based DR controller (dubbed the Central Load-­Shed Coordinator or CLSC), and the Demand Response Capacity Assessment & Operation Assistance Tool (DRCAOT). In addition, an innovative data aggregator called sMAP (simple Measurement and Actuation Profile) allowed data from different sources collected in a compact form and facilitated detailed analysis of the building systems operation. A smart phone application (RAP or Rapid Audit Protocol) facilitated an inventory of the building’s plug loads. Carbon dioxide sensors located in conference rooms and classrooms allowed demand controlled ventilation. The extensive submetering and nimble access to this data provided great insight into the details of the building operation as well as quick diagnostics and analyses of tests. For example, students discovered a short-­cycling chiller, a stuck damper, and a leaking cooling coil in the first field tests. For our final field tests, we were able to see how each zone was affected by the DR strategies (e.g., the offices on the 7th floor grew very warm quickly) and fine-­tune the strategies accordingly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Solar absorption cooling plant in Seville

A solar/gas cooling plant at the Engineering School of Seville (Spain) was tested during the period 2008-2009. The system is composed of a double-effect LiBr + water absorption chiller of 174 kW nominal cooling capacity, powered by: (1) a pressurized hot water flow delivered by mean of a 352 m{sup 2} solar field of a linear concentrating Fresnel collector and (2) a direct-fired natural gas burner. The objective of the project is to indentify design improvements for future plants and to serve as a guideline. We focused our attention on the solar collector size and dirtiness, climatology, piping heat losses, operation control and coupling between solar collector and chiller. The daily average Fresnel collector efficiency was 0.35 with a maximum of 0.4. The absorption chiller operated with a daily average coefficient of performance of 1.1-1.25, where the solar energy represented the 75% of generator's total heat input, and the solar cooling ratio (quotient between useful cooling and insolation incident on the solar field) was 0.44. (author)

14 SOLAR ENERGY↗

Geothermal Deep Direct Use for Turbine Inlet Cooling in East Texas

The National Renewable Energy Laboratory (NREL), the Southern Methodist University Geothermal Laboratory (SMU), Eastman Chemical (Longview, TX), and TAS (Houston, TX) evaluated the feasibility of using geothermal heat to improve the performance of a natural-gas power plant in East Texas. The area of interest is the Eastman Chemical plant in Longview, Texas, which is on the northwestern margin of a geologic region known as the Sabine Uplift. The feasibility study focused on determining the potential for accessing a subsurface hot-water geothermal resource within a 10-km radius of the site to provide thermal energy for absorption chillers. Wells within a 20-km radius are included for broader geological comparison to determine the heat flow, temperature-at-depth, field porosity and permeability. The lithologies of most interest are the Lower Cretaceous Trinity Group and Upper Jurassic Cotton Valley Group. The deeper Cotton Valley formations are hotter (averaging 117 to 130°C), yet permeability and porosity are low. The shallower Trinity Group contains more variability in permeability and porosity and lower temperatures averaging about 98 to 117°C. The shallower formations are considered despite the lower temperature because of increased ability to produce larger volumes of water and extract enough heat before reinjection. The complete SMU analysis is available in the National Geothermal Data System (NGDS). Tapping such deep geothermal sources for direct heating (as opposed to power generation) is known as geothermal deep direct use (DDU). Geothermal DDU has potential across a wide swath of the United States but is underutilized due to challenging project economics associated with developing a deep geothermal resource for what are typically small-scale, variable-demand projects. This project examines the feasibility of geothermal energy integration in a natural-gas combined cycle power station in East Texas. The DDU resource is tapped to drive absorption chillers (24/7) for production of chilled water at 5-10°C (41-50°F). This chilled water is stored until needed, which allows for continuous operation with a relatively small-capacity geothermal/absorption chiller system. When conditions are favorable, the chilled water is dispatched to cool the air entering the compressor stage of a gas combustion turbine. This process, known as turbine inlet cooling (TIC), boosts power production during periods of high temperature and high-power demand. Such systems can enhance grid reliability and reduce the cost for peak-demand power. A simulation model of the power plant was developed in IPSEpro software and validated against operational data from the plant. This model allowed the team to estimate the additional power that could be produced by applying TIC under different operating and ambient conditions. Absorption chiller performance was estimated from vendor sources to determine the production rate of chilled water from the geothermal resource. Geothermal drilling and development costs were estimated using NREL's GEOPHIRES 2.0. The expected lower drilling costs in this region led to an estimated cost of geothermal heat of about $4/MMBtu (1.4 cents/kWh t ). The estimated cost for the absorption chillers and TIC hardware were obtained from literature sources and project partners. Hourly data were obtained for weather, natural gas and electricity prices, and plant operating state for 2017, which served as a representative year. NREL estimated the capital cost, operating cost, and additional electricity production and revenue for different combinations of geothermal capacity, chiller capacity, and water storage-tank size. The analysis drove toward smaller geothermal and chiller systems to reduce equipment cost. A relatively low-cost water storage tank accumulated the near-continuous chilled water output for later use when TIC was most valued.

15 GEOTHERMAL ENERGY↗

Utilizing GEOPHIRES-X Beyond Electricity

The GEOPHIRES tool is a techno-economic simulator for evaluating the thermal performance and cost-competitiveness of geothermal plants for electricity, heating, and/or cooling. The tool combines reservoir, wellbore, and surface plant cost and performance models to estimate overall techno-economic metrics such as net present value or levelized cost of electricity, heating, or cooling. We recently upgraded the tool to an object-oriented Python framework, presented in an accompanying paper. As part of the upgrade, we enhanced the capability to simulate the performance of geothermal plants for heating and cooling, which is the topic of this paper. Specifically, we (1) integrated absorption chillers to investigate the performance of utilizing geothermal heat for cooling, (2) integrated a heat pump module to boost the geothermal temperature and thermal output, (3) integrated a district heating module to estimate heating demand for a district based on local weather data, and simulated heat supply with geothermal energy and peaking boilers, and (4) integrated GEOPHIRES as an engine in the dGeo simulator to perform a geospatial analysis of geothermal district heating feasibility across a large region (e.g., a state or the entire United States) utilizing resource and thermal demand maps. This paper presents background information and case studies for several of these heating and cooling end-use options in GEOPHIRES.

absorption chiller↗

Klickitat Valley Health Central Utility Plant Modernization

This project replaced legacy heating and cooling equipment at Klickitat Valley Health (KVH), a rural hospital in Goldendale, Washington. Work included constructing a new chiller building, installing modern hydronic piping systems, replacing the main Emergency Department air handler (Air Handlining Unit (AHU-1)), upgrading electrical systems, and converting the Emergency Department wing from electric reheat to hydronic heating and cooling. Commissioning, testing, adjusting, and balancing were completed under this grant. These upgrades improve energy efficiency, operational resilience, and system reliability while preparing the campus for future electrification and renewable energy integration. They also support growth in healthcare services for a rural population. The project directly reduces energy costs and provides a foundation for future decarbonization measures, including a FEMA-funded microgrid and a large-scale ground source heat pump (GSHP) project. These follow-on initiatives would not have been possible without the hydronic backbone built through this project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Deep Direct-Use for Industrial Applications: Producing Chilled Water for Gas-Turbine Inlet Cooling

Direct use of deep, low-temperature geothermal resources is underutilized due to challenging project economics associated with developing a deep geothermal resource for what are historically small-scale, variable-demand projects. This project assesses the feasibility of geothermal energy integration in natural-gas combined cycle power stations in the Sabine Uplift and Gulf Coast regions of Texas. The low-grade geothermal resource is tapped to drive absorption chillers for production of chilled water at 5-10 degrees C (41-50 degrees F). This chilled water is stockpiled and dispatched to provide turbine inlet cooling (TIC) at the inlet to the compressor of a natural-gas combined cycle power plant, thereby boosting power production during periods of high temperature and high-power demand. This presentation focuses on the system design related to geothermal well-site selection (proximity vs. resource quality), absorption chiller size and location, chilled-water storage capacity, and dispatch logic to realize the maximum financial benefit.

15 GEOTHERMAL ENERGY↗

Retrofit Energy Analysis and Central Thermal modeling (REACT) v1.0

REACT is a website designed to simplify the analysis and decision-making process for retrofitting existing central plant heating and cooling systems with advanced heat pump technologies. The tool evaluates the technical and economic viability of replacing traditional boilers with various options including water-to-water or air-to-water heat pumps, which can provide efficient and lower-cost heating and cooling. It allows users to compare current central plant configurations with retrofit scenarios, assessing energy consumption, life-cycle costs, and environmental impact. Retrofitting traditional boiler and chiller systems with water-to-water or air-to-water heat pumps can significantly reduce energy consumption and lower lifecycle costs. The REACT provides: User-Friendly Tools: A user friendly web interface for quick, intuitive analysis accessible to non-experts. Advanced Modeling: A Python-powered engine for detailed parametric studies, optimization, and research applications. Comprehensive Analysis: Lifecycle cost evaluation, energy consumption modeling, and environmental impact assessment. Visual Insights: A variety of plots to visualize system performance and design trade-offs. The engine for the website (REACT) bases on several Python libraries, and the website will be hosted on an ETA server.

Kim, Donghun [Lawrence Berkeley National Laborator↗

Case Study for the ARRA-Funded Ground Source Heat Pump Demonstration at Ball State University

With funding provided by the American Recovery and Reinvestment Act (ARRA), 26 ground-source heat pump (GSHP) projects were competitively selected in 2009 to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. One of the selected demonstration projects is a district central GSHP system installed at Ball State University (BSU) in Muncie, IN. Prior to implementing the district GSHP system, 47 major buildings in BSU were served by a central steam plant with four coal-fired and three natural-gas-fired steam boilers. Cooling was provided by five water-cooled centrifugal chillers at the District Energy Station South (DESS). The new district GSHP system replaced the existing coal-fired steam boilers and conventional water-cooled chillers. It uses ground-coupled heat recovery (HR) chillers to meet the simultaneous heating and cooling demands of the campus. The actual performance of the GSHP system was analyzed based on available measured data from August 2015 through July 2016, construction drawings, maintenance records, personal communications, and construction costs. Since Phase 1 was funded in part by the ARRA grant, it is the focus of this case study. The annual energy consumption of the GSHP system was calculated based on the available measured data and other related information. It was compared with the performance of a baseline scenario— a conventional water-cooled chiller and natural-gas-fired boiler system, both of which meet the minimum energy efficiencies allowed by the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE 90.1-2013). The comparison was made to determine source energy savings, energy cost savings, and CO2 emission reductions achieved by the GSHP system. A cost analysis was performed to evaluate the simple payback of the GSHP system. The following sections summarize the results of the analysis, the lessons learned, and recommendations for improvement in the operation of this district GSHP system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimizing Heat Recovery with Storage: Control Validation and Sensitivity Analysis of the Time-Independent Energy Recovery Plant Using Modelica

Heat recovery in large building central plants saves energy but traditionally requires simultaneous heating and cooling. The Time-Independent Energy Recovery (TIER) plant shifts this paradigm by integrating thermal energy storage (TES) to enable heat recovery regardless of concurrent demand, offering a highly efficient, space-saving solution to achieve California’s energy goals. However, its integration of heat recovery chillers, cooling-only chillers, cooling towers, and trim air-source heat pumps (ASHPs) creates growing control and sizing complexity. To overcome this, this study employs high-fidelity Modelica dynamic simulation to validate TIER control sequences and optimize equipment sizing. We translated the written Sequences of Operation into executable Control Description Language (CDL) to test logic against sub-hourly loads. This verification workflow successfully identified and resolved critical vulnerabilities, such as thermal storage freezing and equipment short-cycling, in a virtual environment prior to physical deployment. Then, the study analyzes TIER plant performance across three simulated building types in three locations, and a real building load profile, ensuring variety in heating and cooling loads, and simultaneity factors and explores sizing rules for the TES and ASHP capacity. The analysis shows that the TIER plant operates equipment efficiently leading to a plant SCOP of around 7.5 across all scenarios, higher than a traditional ASHP plant, and a viable pathway to de-risk complex system design and control through simulation to identify optimal designs that maximize energy efficiency, minimize operational costs, and ensure robust operation in varied environmental conditions, thereby facilitating the broader adoption of such a solution for large buildings.

Zanetti, Ettore↗

EMPIRICAL VALIDATION OF BUILDING ENERGY SIMULATION SOFTWARE: ENERGYPLUS

This paper compares the results from a study conducted at Iowa Energy Center s Energy Resource Station with EnergyPlus simulation results. The building consists of controlled test rooms, dedicated air handling units and air-cooled chillers for the purpose of obtaining quality data suitable for empirical validation studies. Weather data were also collected at the facility and used for the simulation. Empirical validation can be performed on various levels of the program such as zone level, systems level, and plant level. This study is unique in the sense that it integrates the zones, system, and plant into one analysis. For this study, the difference between empirical and EnergyPlus predicted zone cooling loads varied from 1.7% to 10.2%, but the difference for the compressor power was as much as 22.4%. The paper also describes the potential reasons why simulation results might not match field data.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

District Energy Corporation SW 40th Street Thermal Energy Plant

The overall deliverable from the project is the design, construction and commissioning of a detention facility heating and cooling system that minimizes ownership costs and maximizes efficiency (and therefore minimizes environmental impact). The primary deliverables were the proof of concept for the application of geothermal systems for an institutional facility and the ongoing, quarterly system operating data downloads to the Department of Energy . The primary advantage of geothermal based heat pump systems is the higher efficiency of the system compared to a conventional chiller, boiler, cooling tower based system. The higher efficiency results in a smaller environmental foot print and lower energy costs for the detention facility owner, Lancaster County. The higher efficiency for building cooling is primarily due to a more constant compressor condensing temperature with the geothermal well field acting as a thermal “sink” (in place of the conventional system’s cooling tower). In the heating mode, Ground Couple Heat Pump (GCHP) systems benefits from the advantage of a heat pump Coefficient of Performance (COP) of approximately 3.6, significantly better than a conventional gas boiler. The geothermal well field acting as a thermal “source” allows the heat pumps to operate efficiently in the heating mode regardless of ambient temperatures. The well field is partially located in a wetland with a high water table so, over time, the project will be able to identify the thermal loading characteristics of a well field located in a high water table location. The project demonstrated how a large geothermal well field can be installed in a wetland area in an economical and environmentally sound manner. Finally, the SW 40th Street Thermal Energy Plant project demonstrates the benefits of providing domestic hot water energy, as well as space heating, to help balance well filed thermal loading in a cooling dominated application. During the period of August 2012 thru March 2014, with the detention facility occupied for the final seven months, the well field supply water temperatures to the heat pumps dropped to a minimum of 39°F and reached a maximum temperature of 68 °F while providing 15,819 MMBtu of cooling energy and 27,467 MMBtu of heating energy. During this period the peak recorded system cooling load was 610 tons and the peak heating load was 8.4 MMBtu. The DEC is currently evaluating the most beneficial electric rate for plant operations. Total project cost of $16.9 million was approximately $3.2 million less than the estimate provided in the grant application. The reduction in project costs were primarily due to favorable construction material prices as well as strong competition in the local construction contractor market. The DEC plant reached the substantial completion milestone in December 2011 and began providing thermal service to the detention facility in January 2012 when the building’s HVAC system was ready to accept heating service. The plant reached commercial operating status on August 1, 2012. However, due to construction delays, the detention facility was not occupied until September of 2013. The detention facility construction delays also impacted the installation and commissioning of the project’s dedicated domestic hot water heat pump. Final coordination with the detention facility’s building management system vendor to establish network links for the exchange of date is currently being completed. This will allow the development of control sequences for the optimal operation of the domestic hot water system.

15 GEOTHERMAL ENERGY↗

Final Report: Assessment of Combined Heat and Power Premium Power Applications in California

This report analyzes the current economic and environmental performance of combined heat and power (CHP) systems in power interruption intolerant commercial facilities. Through a series of three case studies, key trade-offs are analyzed with regard to the provision of black-out ridethrough capability with the CHP systems and the resutling ability to avoid the need for at least some diesel backup generator capacity located at the case study sites. Each of the selected sites currently have a CHP or combined heating, cooling, and power (CCHP) system in addition to diesel backup generators. In all cases the CHP/CCHP system have a small fraction of the electrical capacity of the diesel generators. Although none of the selected sites currently have the ability to run the CHP systems as emergency backup power, all could be retrofitted to provide this blackout ride-through capability, and new CHP systems can be installed with this capability. The following three sites/systems were used for this analysis: (1) Sierra Nevada Brewery - Using 1MW of installed Molten Carbonate Fuel Cells operating on a combination of digestor gas (from the beer brewing process) and natural gas, this facility can produce electricty and heat for the brewery and attached bottling plant. The major thermal load on-site is to keep the brewing tanks at appropriate temperatures. (2) NetApp Data Center - Using 1.125 MW of Hess Microgen natural gas fired reciprocating engine-generators, with exhaust gas and jacket water heat recovery attached to over 300 tons of of adsorption chillers, this combined cooling and power system provides electricity and cooling to a data center with a 1,200 kW peak electrical load. (3) Kaiser Permanente Hayward Hospital - With 180kW of Tecogen natural gas fired reciprocating engine-generators this CHP system generates steam for space heating, and hot water for a city hospital. For all sites, similar assumptions are made about the economic and technological constraints of the power generation system. Using the Distributed Energy Resource Customer Adoption Model (DER-CAM) developed at the Lawrence Berkeley National Laboratory, we model three representative scenarios and find the optimal operation scheduling, yearly energy cost, and energy technology investments for each scenario below: Scenario 1 - Diesel generators and CHP/CCHP equipment as installed in the current facility. Scenario 1 represents a baseline forced investment in currently installed energy equipment. Scenario 2 - Existing CHP equipment installed with blackout ride-through capability to replace approximately the same capacity of diesel generators. In Scenario 2 the cost of the replaced diesel units is saved, however additional capital cost for the controls and switchgear for blackout ride-through capability is necessary. Scenario 3 - Fully optimized site analysis, allowing DER-CAM to specify the number of diesel and CHP/CCHP units (with blackout ride-through capability) that should be installed ignoring any constraints on backup generation. Scenario 3 allows DER-CAM to optimize scheduling and number of generation units from the currently available technologies at a particular site. The results of this analysis, using real data to model the optimal schedulding of hypothetical and actual CHP systems for a brewery, data center, and hospital, lead to some interesting conclusions. First, facilities with high heating loads will typically prove to be the most appropriate for CHP installation from a purely economic standpoint. Second, absorption/adsorption cooling systems may only be economically feasible if the technology for these chillers can increase above current best system efficiency. At a coefficient of performance (COP) of 0.8, for instance, an adsorption chiller paired with a natural gas generator with waste heat recovery at a facility with large cooling loads, like a data center, will cost no less on a yearly basis than purchasing electricity and natural gas directly from a utility. Third, at marginal additional cost, if the reliability of CHP systems proves to be at least as high as diesel generators (which we expect to be the case), the CHP system could replace the diesel generator at little or no additional cost. This is true if the thermal to electric (relative) load of those facilities was already high enough to economically justify a CHP system. Last, in terms of greenhouse gas emissions, the modeled CHP and CCHP systems provide some degree of decreased emissions relative to systems with less CHP installed. The emission reduction can be up to 10% in the optimized case (Scenario 3) in the application with the highest relative thermal load, in this case the hospital. Although these results should be qualified because they are only based on the three case studies, the general results and lessons learned are expected to be applicable across a broad range of potential and existing CCHP systems.

25 ENERGY STORAGE↗

Model Predictive Control for the Operation of Building Cooling Systems

A model-based predictive control (MPC) is designed for optimal thermal energy storage in building cooling systems. We focus on buildings equipped with a water tank used for actively storing cold water produced by a series of chillers. Typically the chillers are operated at night to recharge the storage tank in order to meet the building demands on the following day. In this paper, we build on our previous work, improve the building load model, and present experimental results. The experiments show that MPC can achieve reduction in the central plant electricity cost and improvement of its efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗