Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Charging Station”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

EVI-RoadTrip™: Electric Vehicle Infrastructure for Road Trips [SWR-22-17]

The EVI-RoadTrip™ tool offers high-resolution refueling network design and analysis to inform electric vehicle (EV) charging infrastructure development for road trips or long-distance travels. EVI-RoadTrip helps infrastructure planners, analysts, and decision makers evaluate EV energy consumption and corresponding charging demands along the routes-between origin and destination. It considers the projected location and characteristics of charging stations, potential electric grid impacts, and required infrastructure improvements. Strategically located charging stations for long-distance travel are critical to enabling the widespread adoption of EVs by allowing them to travel further beyond city or town boundaries. Sophisticated analysis and planning can identify the points (e.g., corridors) that may require increased availability of EV charging stations to support electrified road trips.

Wood, Eric↗

Rural EVSE Planning and Analysis

The dataset includes detailed anonymized public charging station usage from several rural stations on the ChargePoint and Shell Recharge Solutions (formerly Greenlots) networks situated in and around Athens, Ohio, a rural Appalachian community. Both Level 2 and DC fast charging stations are represented. Historical data in the set date back to 2019; additional data will be uploaded semiannually until the project's completion in 2023. Each charging session recorded includes information on date and time, location, charging station level, session duration, energy delivered, and fuel savings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Vehicle-to-Grid planning framework incorporating electric vehicle user equilibrium and distribution network flexibility enhancement

The rapid surge in electric vehicle (EV) adoption, coupled with advancements in charging technologies, emphasizes the critical necessity for expanding EV recharging infrastructure. Simultaneously, the Distribution Network (DN) encounters escalating challenges in meeting charging demand during peak traffic periods. Consequently, there is a mounting demand for the deployment of innovative Vehicle-to-Grid (V2G) technologies to augment the DN’s flexibility in power dispatch and alleviate travel costs for EV users. Hence, this paper proposes an EV-user-equilibrium-(UE)-constrained V2G planning framework that enhances flexibility in the DN. The framework aims to ascertain the optimal placement and capacity of EV charging stations (EVCSs) and V2G charging piles within the Transportation Network (TN). It takes into account the equilibrium condition stemming from competitive EV charging and routing behaviors alongside the optimal expansion of DN energy resources to accommodate the electricity supplied by the V2G piles. This study commences by analyzing EV drivers’ travel decisions, considering the influence of charging and V2G pile locations and sizes. Subsequently, we tackle the Traffic Assignment Problem with User Equilibrium (TAP-UE) model to characterize the steady-state traffic flow distribution of EVs. Following this, we formulate the optimization model for the Coordinated Power and Transportation Network (CPTN), which encompasses the optimal expansion of DN facilities and traffic flow regulation under UE conditions. To mitigate the computational complexity associated with the V2G planning model, we introduce a series of linearization methods to obtain a manageable Mixed-Integer Linear Programming (MILP) solution. Finally, to validate the efficacy of our proposed planning framework, we apply it to two test systems, including a real-world case study. Through these case studies, we explore the necessity and potential benefits of V2G technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cost of convenience in long-dwell public electric vehicle charging

This paper presents a comprehensive methodology for quantifying trade offs between the cost of charging at public Level-2 charging stations and the inconvenience of using those stations. The paper also includes a methodology for generating synthetic travel itineraries of tens of thousands of drivers and for sizing and placing charging infrastructure to support those itineraries. Inconvenience is quantified by a weighted sum of the time a driver spends traveling between their intended destination and the charging station; weights are derived from the activity interrupted by the driver’s need to move their car. We demonstrate a trade off between cost of charging and inconvenience by varying how far away from their destination drivers are willing to charge. Our results demonstrate the importance of access to stations and suggest that other methods for increasing access, such as increasing the spatial density of stations, could significantly impact charging cost and inconvenience. Moreover, average energy cost may be reduced by introducing managed charging, which also affects inconvenience. The framework presented here can be used to evaluate the overlapping effects of both access and charge management. Furthermore, the framework can be easily extended to include additional factors such as capital costs, enabling thorough evaluation and planning of regional Level-2 charging networks.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Physical Safety and Security at Electric Vehicle Charging Sites

This help sheet provides an overview of physical safety and security design elements for public EV charging stations and general best practices that can be considered for the safety and comfort of charging station customers.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Key Performance Indicators for Vehicle Grid Integration

Electric vehicle (EV) sales account for a rapidly growing portion of the light-duty vehicle market and a portion of medium and heavy-duty fleet vehicles. However, in many locations, charging stations will require costly utility grid upgrades with long lead times. Today, there are a few methods of smart charge management (SCM) which can reduce the costs and wait times for electric vehicle supply equipment (EVSE) interconnection approvals, as well as reduce impacts of the charging stations on the grid and on EV driver transportation costs. It is crucial for the EV charging industry to understand the vehicle grid integration (VGI) requirements for EVSE to prevent adverse impacts from EVSE interconnections and assure that charging loads and interconnections are affordable.

33 - ADVANCED PROPULSION SYSTEMS↗

International Space Station Spacecraft Charging Hazards: Hazard Identification, Management, and Control Methodologies, with Possible Applications to Human Spaceflight Beyond LEO

In this paper, we present an overview of how the International Space Station (ISS) safety engineering methodology directed to controlling extravehicular activity (EVA) crew electrical shock hazards, caused by ISS spacecraft charging, has evolved over the past 25+ years. Long-term measurements of ISS charging severity and frequency-of-occurrence, combined with detailed probabilistic analysis of EVA electric shock- circuit completion, led to a change in hazard control methodology. The requirement for two-fault tolerant EVA shock hazard control during all EVAs was replaced with a less operationally burdensome and risky EVA shock hazard detection and warning process. The applicability of event probability-based detection-and- warning processes to human spaceflight charging hazard control beyond low-earth orbit (LEO) is also considered.

Koontz, Steve↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Dynamic Pricing Method to Manage the Impact of EV Charging on the Grid Using RL

This work addresses the challenge of managing electrical vehicle (EV) charging loads on distribution feeders with the increase in deployment of fast charging stations. To mitigate the adverse impacts on feeder health, a novel dynamic grid-informed pricing approach is proposed. This approach leverages reinforcement learning (RL) to determine hourly charging prices based on real-time grid conditions. A synthetic environment was developed to train the reinforcement learning agent. A model of an IEEE 34-bus distribution feeder with EV charging stations has been developed in OpenDSS utilizing Caldera for realistic EV charging profiles. Test cases demonstrate that the dynamic pricing strategy achieves higher energy delivery to the EV end user at a lower cost compared to constant pricing methods, while lowering voltage deviations and congestion. This approach offers more granular price adjustments, responding dynamically to feeder conditions and potentially improving grid stability and efficiency. The communication architecture to implement this dynamic pricing method is described. This research contributes to the development of smart grid-informed charging solutions that can reduce the cost of charging to the end user while also helping the grid.

EV charging, dynamic pricing, grid-informed chargi↗

A dynamic pricing method to manage the impact of EV charging on the grid using RL

This work addresses the challenge of managing electrical vehicle (EV) charging loads on distribution feeders with the increase in deployment of fast charging stations. To mitigate the adverse impacts on feeder health, a novel dynamic grid-informed pricing approach is proposed. This approach leverages reinforcement learning (RL) to determine hourly charging prices based on real-time grid conditions. A synthetic environment was developed to train the reinforcement learning agent. A model of an IEEE 34-bus distribution feeder with EV charging stations has been developed in OpenDSS utilizing Caldera for realistic EV charging profiles. Test cases demonstrate that the dynamic pricing strategy achieves higher energy delivery to the EV end user at a lower cost compared to constant pricing methods, while lowering voltage deviations and congestion. This approach offers more granular price adjustments, responding dynamically to feeder conditions and potentially improving grid stability and efficiency. The communication architecture to implement this dynamic pricing method is described. This research contributes to the development of smart grid-informed charging solutions that can reduce the cost of charging to the end user while also helping the grid.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Control and Optimization of Energy Storage System in Power Distribution System

The widespread adoption of electric vehicles (EVs) and transportation electrification is encumbered by two chief barriers: i) the limited driving range of EVs in the market today and ii) inadequate fast-charging infrastructure for long-distance trips. Extreme fast charging (XFC) technology can recharge EVs in less than 10 minutes for 200 miles range. Firstly, a novel robust optimization-based mixed integer linear programming model is proposed to size a battery energy storage system (BESS) and PV system in an XFCS. In this part, it is assumed that the sizing and location of the XFCS are known. Secondly, the aforesaid assumption is relaxed, and a strategic multi-period coordinated planning model is proposed to optimally site and size BESS-assisted charging stations in a highway transportation network and PV systems in a power distribution network by considering the coupling between both networks. Optimal operation and control of BESS-assisted EV charging stations are vital to alleviate the adverse impact of extreme fast charging of EVs on the host power network. A joint solution is proposed to mitigate the steady state and transient impact of extremefast charging of EVs and ensure grid-friendly integration of XFCSs with the host grid. Lastly, to make the operation of the XFCS cost-effective, a multi-layered energy management framework is proposed for the XFCS by considering forecast uncertainties, monthly demand charges reduction, and BESS degradation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Peer-to-peer communication control for resilient operations of networked cyberphysical systems

This report includes two main accomplishments of the peer-to-peer communication control for resilient operation of networked microgrids project in FY24, which include a scheme for cyberattack-aware coordination of networked microgrids for supporting voltages of bulk power systems and a scheme for price signal-based operations of EV-rich networked microgrids with mixed ownership. First, the cyberattack-aware scheme enables networked microgrids to distributedly determine the amount of reactive power injection to support the voltage of bulk power system (BPS) in a fair manner. In this scheme, a risk-informed algorithm is presented to generate the peer-to- peer (P2P) communication graph with minimal risk of attack on communication links. To deal with cyberattacks on MG controllers, the resilient consensus algorithm (CA) is utilized for MG controllers to robustly estimate the total reactive power headroom, from which the MGs can accurately provide the needed amount of reactive power injection for supporting the voltage of BPS. The CA implementation and performance within the P2P communication framework are demonstrated on the IEEE 39-bus system with 6 microgrids contained in the distribution feeder under different cyberattack scenarios. Second, the price-based scheme enables the usage of the real-time price signal for the operations of electric vehicle (EV)-rich networked-microgrids with mixed ownership, in which not all the microgrids can communicate with the distribution system operator (DSO). In this scheme, a max consensus is introduced to enable the real-time price signal to be propagated from the DSO to all the microgrids, from which each microgrid controller will manage the DERs to balance the load demand and the power injection from the EV charging stations within its microgrid. Numerical results over one day with 288 slots of 5-minute intervals on the modified 123-node test feeder including 3 microgrids with high penetration of EV are presented to evaluate how the price signal affects the operations of networked microgrids under different charging strategies of the EV charging stations. The result indicates that our proposed EVCS (dis)charging strategy, which leverages the flexibility of EVs to support the grid through discharging during peak demand, proves to be a cost-effective solution that reduces operational costs while improving the social welfare of EV charging.

24 POWER TRANSMISSION AND DISTRIBUTION↗

International Space Station Spacecraft Charging Environments: Modeling, Measurement and Implications for Future Human Space Flight Programs

Spacecraft charging analysis and migration is an interdisciplinary subject combining aspects of electrostatics, plasma physics, ionizing radiation, and materials science, as well as electronic system electromagnetic interference and compatibility (EMI/EMC) effects. Spacecraft charging hazards are caused by the accumulation of electrical charge on spacecraft and spacecraft components produced by interactions with space plasmas, energetic charged particles, and solar UV photons as well as spacecraft electrical power and propulsion systems operations. Spacecraft charging hazard effects include both hard and soft avionics and electrical power system anomalies and have led to the partial or complete loss of numerous spacecraft. The International Space Station (ISS) orbital altitude and inclination (~400 km and 51.6o) determined the dominant natural environment factors affecting ISS spacecraft charging; high speed flight through the geomagnetic field and electrical power system interaction with the cold, high-density ionospheric plasma. In addition ISS is exposed to energetic auroral electrons at high latitude. In this paper we present the results of ISS spacecraft charging modeling and measurements and compare the measurements with numerical modeling of ISS charging processes. ISS is a large metallic structure and flight through the geomagnetic field at orbital speed dominates ISS charging. Collection of ionospheric electrons by the large 160V PV arrays is the next largest contributor. Charging by auroral electrons is detectable but makes a relatively minor contribution. Finally we report the observation of short duration (~ 1 sec) rapid charging peaks associated with shunt/un-shunt operations of the 160V PV arrays, a phenomena not predicted before flight. ISS spacecraft charging environments are radically different from those encountered at higher altitudes in Earth?s magnetosphere and in cis-Lunar space. We present a brief review of those charging environments and an assessment of the applicability of ISS spacecraft charging management and experience to future human spaceflight programs beyond LEO.

Koontz, Steven L.↗

Improving EV Charger Resiliency for MW Charging Systems

In this paper, the resiliency of a megawatt-scale EV charging station is investigated. Fault detection and tolerance methodologies are presented, based on monitoring the voltage offsets in DABs and switch-level currents in three-phase inverters, with the goal of maintaining operation at rated power during single faults and at reduced power under multiple fault conditions. To validate the effectiveness of the proposed strategy, simulation results at the rated 1 MW power of the charging station are carried out, followed by controller hardware-in-the-loop (CHIL) experiments on a 250 kW section of the station. The results highlight the feasibility of the integrated fault-tolerant methods for resilient, high-power EV charging infrastructure.

Adib, Aswad [ORNL] (ORCID:000000020997056X)↗

A Data Processing Pipeline To Extract A Knowledge Graph From Heterogeneous Data For Socio-technical Analysis Of Critical Infrastructure Influence

The code is written in Python and consists of the following pipeline that is implemented in Apache Airflow. This pipeline intends to understand the companies that are directly or indirectly involved with a type of critical infrastructure system at some point in that system's lifecycle. The pipeline takes a configuration file that specifies a list of initial companies to consider, a geographic region of interest, and a set of SEC form types as well as other data sources (e.g. CrunchBase) from which to extract entities and relations. There are four main components to this pipeline as currently implemented: Entity Extraction, Network Construction, Analysis, and Visualization. First, Entity Extraction, is implemented as the `topear-extract_organizations` Apache Airflow workflow. Given an initial query that specifies a geographic region of interest and a time interval, the software will extract CI facilities of interest and organizations that have a direct influence relationship to those facilities (e.g. ownership). During the course of the LDRD, we focused on Electric Vehicle charging stations and this information is available via the Department of Energy (DOE) database on fueling stations maintained by NREL. Within the context of the DOE CESER project, we have focused on Battery Energy Storage Systems (BESS). Second, the Network Extraction component will iteratively construct a social network graph given the set of organizations and people extracted in the previous step. Organizations (and eventually People if desired) are then fed as a query to the `topgear-construct_social_network` Apache Airflow workflow which given a set of initial companies and data sets (e.g. SEC EDGAR form types, OpenCorporates, Crunchbase). This Airflow workflow will iteratively query such data sources to discover relationships with new organizations and people. For example, this module can iteratively query SEC EDGAR for metadata that documents the number of each type of form for the given set of companies and their location. This forms metadata represents a catalog of data sources from SEC EDGAR for the extracted social network knowledge graph. The pipeline then downloads these forms from the website and saves them in a build directory for further processing. These documents are then parsed for entities and relations. Again, we note that in additional to SEC data sources, this step can also pull in information on organizations via API services such as CrunchBase and OpenCorporates or bulk data sources. At the end of this step, the resultant social network, the Critical Infrastructure network, and the edges that encode relationships between organizations and CI facilities, form the Adversarial Socio-Technical Network (ASTN) that informs the analysis. Third, the Analysis component processes these generated ASTN. Previously, that has included the ability to compare prevalence of different vendors for a given infrastructure component type across different regions as well as identify common public and private investors across those vendors. This was demonstrated for EV Charging Stations across several different metropolitan areas within an IEEE PES GridEdge publication. More recently, we have looked at ways to identify infrastructure owners and operators of BESS with the most nameplate capacity across different states as well as other indictors of risk resulting from changes in ownership over time. Finally, the Visualization component consists of an HTML/CSS/JS framework by which users can interact geospatial, operational, and organizational relationships across a given portfolio of Critical Infrastructure facilities. The objective is to provide a library of UI/UX modules that can be repurposed for stakeholder-specific dashboards. All of the modules are related via a common event model that enables UI actions in one view to percolate across the other views.

Weaver, Gabriel [Idaho National Laboratory (INL), ↗

Time Matters: A Survival Analysis of Public Electric Vehicle Charging Infrastructure Utilization

The rapid adoption of plug-in electric vehicles (PEVs) places significant demands on public charging infrastructure, making it critical to understand and optimize charger utilization. This study provides one of the most comprehensive analyses of charging behavior to date by applying a survival analysis to a dataset of nearly 16 million level 2 (L2) and direct current (DC) fast charger sessions across the United States from 2017 to 2022. Using Kaplan-Meier curves and log rank tests, our analysis reveals statistically significant and distinct duration patterns influenced by charger type, time of day, and day of the week. We find that L2 charging sessions exhibit high variability tied to venue type, whereas DC sessions are more uniform, typically lasting 30-45 min. This study introduces the operational efficiency score (OES), a metric for standardizing the performance evaluation of charging stations. Our findings offer actionable insights for optimizing charger deployment, developing dynamic pricing strategies to reduce vehicle dwell time, and improving load management for grid operators, ultimately enhancing the efficiency and availability of public charging infrastructure.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗