Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Charger”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Equitable Urban Electric Vehicle Charging: Feasibility and Benefits of Streetlight Charging in Kansas City Right-of-Way

With an increasing global emphasis on sustainability, electric vehicles (EVs) play a crucial role in reducing urban pollution and carbon emissions. For EVs to be widely adopted, equitable and convenient access to charging infrastructure is essential. Equity in this paper refers to the proactive engagement with the community to ensure that the benefits of streetlight charging are distributed equitably across diverse neighborhoods in Kansas City, providing fair charging opportunities and resources to all community members. This research explores the potential of utilizing streetlights—ubiquitous elements of urban electrical infrastructure—as low-cost, equitable EV charging solutions. Compared with conventional chargers, streetlight charging offers several notable advantages, including proximity to roadways, potential boosts to the local economy, and easier usage due to city ownership. These chargers also leverage existing power setups to minimize costs and maximize efficiency by reutilizing existing structures. In this manuscript, we introduce a systematic framework to develop, analyze, and evaluate a scalable and cost-effective streetlight charging solution. Initially, we employ a two-tiered site selection framework that accounts for both charging demand and equity considerations to identify optimal locations for streetlight chargers. We then assess the feasibility of these chargers through observational data from 23 units installed in Kansas City, Missouri, comparing their performance with traditional chargers. Here, our evaluation extends to the environmental impact, comparing reduced gasoline consumption and greenhouse gas (GHG) emission reductions between streetlights and regular charging stations. Our findings reveal that streetlight charging stations offer faster charging speeds than conventional stations, validating their viability for EV charging. Additionally, the duration of stay at streetlight chargers tends to be shorter, likely due to parking constraints or associated costs. Furthermore, streetlight-powered chargers demonstrate considerable environmental advantages, achieving 11.94% greater avoided gasoline consumption and 11.24% higher GHG reductions compared with regular charging stations, highlighting their substantial environmental benefits.

42 ENGINEERING↗

Fleet Size Requirements for Each GSE Type at Each Airport

This dataset contains the required number of vehicles for each GSE type at each airport under six charging scenarios: (1) charging when the battery state of charge is insufficient for the next service using 40-kW chargers (S1); (2) charging when the battery state of charge is insufficient for the next service using 20-kW chargers (S2); (3) charging starts immediately after each GSE completes a service task using 40-kW chargers (S3); (4) charging starts immediately after each GSE completes a service task using 20-kW chargers (S4); (5) charging during off-peak hours using 40-kW chargers (S5); and (6) charging during off-peak hours using 20-kW chargers (S6). ![image](gse-vehicles-chargers.png) Number of GSE vehicles per GSE type and chargers required for different airport categories under charging scenario 1.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Solar Energy Extension Project

The town of Stratford plans to develop and own a 6 kilowatt (kW) solar array on the roof of a municipal-owned public pavilion on the town green. A SolarEdge level 2 EV charging station will be installed at the pavilion to be used by the public. The charging station will have one charging port. The town will install 3 air source heat pumps in the library located adjacent to the pavilion to reduce the use of propane to heat the library. The town will install 4 air source heat pumps in the Town Hall to reduce the use of #2 heating oil to heat the facility. The 6 kW solar array will provide electricity to the library to offset electricity usage, and when an EV plugs into the charging station the solar will provide electricity to the charging station. There is no ground disturbance or ground trenching associated with this project. The 6 kW solar array on the roof of the pavilion will include 20 (390) watt all black panels. A SolarEdge level 2 EV charger will be installed at the pavilion with the 240 V inverter. The solar array will provide electricity to the library and when a vehicle plugs into the EV charger the solar array will switch to power the charger. Any excess electricity that is generated by the array and not used by the library or the EV charger will be fed onto the grid and the town will receive a net metering credit applied towards future consumption. There is no ground disturbance associated with the EV charger or solar array, and the town will install signage to direct the public to the charger. The library will install 2 (18,000) BTU ductless air source heat pumps and 1 (24,000) BTU unit. This will significantly reduce the amount of propane required to heat the library. The Town Hall will install 2 (36,000) BTU ductless air source heat pumps and 2 (9,000) BTU units to reduce the amount of #2 heating oil required to heat the building.

14 SOLAR ENERGY↗

GSE Yearly Load Profiles for Each Airport Under Six Charging Scenarios

This dataset contains GSE yearly load profiles for each airport under six charging scenarios: (1) charging when the battery state of charge is insufficient for the next service using 40-kW chargers (S1); (2) charging when the battery state of charge is insufficient for the next service using 20-kW chargers (S2); (3) charging starts immediately after each GSE completes a service task using 40-kW chargers (S3); (4) charging starts immediately after each GSE completes a service task using 20-kW chargers (S4); (5) charging during off-peak hours using 40-kW chargers (S5); and (6) charging during off-peak hours using 20-kW chargers (S6). ![image](gse_load_profile_sample_day.png) GSE load profile of a sample day across different airport categories under charging scenario 1.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Use and Siting of Electric Vehicle Charging Stations in Juneau, Alaska

This report details a study of electric vehicle (EV) Level 2 charging stations in Juneau, Alaska. Utilization analyses of six public over five years and 250 residential chargers over two years are included, and a composite score is introduced to identify optimal locations for future charging stations that target residents of manufactured and multifamily housing (MMFH) in Juneau. We find that public charging station usage is very location-dependent, with three chargers in use more than 60% of days during the peak hour of the day (which ranges from 10 a.m. to 7 p.m.), including a charger near residential housing, illuminating potential needs for additional public chargers in those areas. Residential charging utilization typically occurs overnight - opposite to most public charging stations analyzed - and spikes after 10 p.m. This suggests that Alaska Electric Light & Power Company's time-of-use charging program, which lowers electricity rates at 10 p.m. to incentivize overnight charging, is very effective. Residential charging data also show that households tend to charge 15 hours per week, or 9% of the time, meaning that multiple households could likely share one charger if one were provided near MMFH locations. This is supported by residential charging session analysis, which shows that the median household has around two night charging sessions per week. The EV siting analysis identifies areas of high housing density, low access to public chargers, and unconstrained feeders. A cluster of MMFH parcels in Douglas demonstrated the highest composite scores considering all factors, being the only area to have a perfect score of 2.25.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Charging Hub Scenario Sheet Screenshot

The Excel-based CHECT tool estimates the LCOC ($/kWh) by charger type (Level 1, Level 2, and DC fast charging) for a given charging hub scenario. CHECT requires users to input certain charging hub scenario parameters, including the number of chargers, daily utilization, and charger replacement frequency by charger type. Additional inputs such as the charging schedule, local utility rates, capital/operational costs, and financial inputs can be customized by the user, or the tool can generate results using appropriate default values from literature for the charging hub scenario and service location(s). Using the above inputs, CHECT performs a robust techno-economic analysis to generate the LCOC by charger type, broken down by cost category (e.g., capital, operational, utility, taxes) for various combinations of charging hub types (multiunit dwelling or public) and ownership models (residential, utility, or private company). It also outputs the annual discounted cash flows and determines the most sensitive input variables. In addition, the tool allows users to easily compare the LCOC across various ownership models or across different states.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Soft costs and EVSE – Knowledge gaps as a barrier to successful projects

There has been a recent push to increase access to electric vehicle (EV) charging infrastructure. The National Electric Vehicle Infrastructure (NEVI) program, part of the Bipartisan Infrastructure Law (BIL) has made significant funding available for major charging infrastructure projects along state thruways, and many state and local incentives exist for EV owners to install chargers in their homes. However, deployment of these chargers has not kept up with demand, primarily due to issues in project planning, permitting processes, and unforeseen delays. This paper serves as a review of the current understanding of these and other non-hardware costs in EV charging infrastructure projects (collectively known as “soft costs”). We found that soft costs in EV charging infrastructure projects are not well understood. Specifically, there is little agreement on how soft costs should be categorized and tracked, and less agreement still on best practices for controlling these costs and lowering barriers to infrastructure deployment. A broader review of EV charging infrastructure cost analyses shows that these costs can have significant impacts on project outcomes. EV charging infrastructure projects may be able to examine the success of the solar industry in lowering soft costs, and a similar effort may lower project costs significantly. Further work on standardizing and collecting data on EV charging infrastructure costs is required to begin addressing and controlling these costs.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Electric vehicle supply equipment location and capacity allocation for fixed-route networks

Electric vehicle (EV) supply equipment location and allocation (EVSELCA) problems for freight vehicles are becoming more important because of the trending electrification shift. Some previous works address EV charger location and vehicle routing problems simultaneously by generating vehicle routes from scratch. Although such routes can be efficient, introducing new routes may violate practical constraints, such as drive schedules, and satisfying electrification requirements can require dramatically altering existing routes. To address the challenges in the prevailing adoption scheme, we approach the problem from a fixed -route perspective. We develop a mixed -integer linear program, a clustering approach, and a metaheuristic solution method using a genetic algorithm (GA) to solve the EVSELCA problem. The clustering approach simplifies the problem by grouping customers into clusters, while the GA generates solutions that are shown to be nearly optimal for small problem cases. A case study examines how charger costs, energy costs, the value of time (VOT), and battery capacity impact the cost of the EVSELCA. Charger equipment costs were found to be the most significant component in the objective function, leading to a substantial reduction in cost when decreased. VOT costs exhibited a significant decrease with rising energy costs. Further, an increase in VOT resulted in a notable rise in the number of fast chargers. Longer EV ranges decrease total costs up to a certain point, beyond which the decrease in total costs is negligible.

33 ADVANCED PROPULSION SYSTEMS↗

Time Matters: A Survival Analysis of Public Electric Vehicle Charging Infrastructure Utilization

The rapid adoption of plug-in electric vehicles (PEVs) places significant demands on public charging infrastructure, making it critical to understand and optimize charger utilization. This study provides one of the most comprehensive analyses of charging behavior to date by applying a survival analysis to a dataset of nearly 16 million level 2 (L2) and direct current (DC) fast charger sessions across the United States from 2017 to 2022. Using Kaplan-Meier curves and log rank tests, our analysis reveals statistically significant and distinct duration patterns influenced by charger type, time of day, and day of the week. We find that L2 charging sessions exhibit high variability tied to venue type, whereas DC sessions are more uniform, typically lasting 30-45 min. This study introduces the operational efficiency score (OES), a metric for standardizing the performance evaluation of charging stations. Our findings offer actionable insights for optimizing charger deployment, developing dynamic pricing strategies to reduce vehicle dwell time, and improving load management for grid operators, ultimately enhancing the efficiency and availability of public charging infrastructure.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Macro Analysis to Estimate Electric Vehicles Fast-Charging Infrastructure Requirements in Small Urban Areas

Electric vehicles (EVs) are known to reduce emissions and fossil fuel dependency. However, the limited range, long charging time, and inadequate charging infrastructure have hampered the adoption of EVs. The current EV charging infrastructure planning studies and tools require detailed information, extensive resources, and skills that can be a significant barrier to urban areas for finding the required charging infrastructure to support a targeted EV market share. This study generates regression models to estimate the number of direct current fast charging stations and the chargers to support the EV charging demand for urban areas. These models provide macro-level estimates of the required infrastructure investment in urban areas, which can be easily implemented by policy-makers and city planners. This study incorporates data obtained from applying a disaggregate optimization-based charger placement model, developed recently by the same authors, for multiple case studies to generate the required data to calibrate the macro-level models, in the state of Michigan. This simulated data set includes the number of charging stations and chargers for each market share, technology advancement scenario, and the transportation network topology. The results show that the number of charging stations reduces with battery size and charging power and increases with EV market share and the road network lane length. The number of chargers reduces with charging power, whereas it increases with battery size, EV market share, and vehicle miles traveled in the system. The model developed here can be applied to any state having urban characteristics and weather conditions similar to Michigan.

Engineering↗

Multiplexing-Based Flyback Converter for Multi-Port USB Power Delivery with True Power-Sharing

Universal serial bus power delivery (USB-PD) chargers are more attractive to consumers with multiple output ports. Existing multiple port charger designs take multi-stage approach thus increase power loss and charger size. Also, ports are normally designed with different power capability thus the high-power port becomes under-used if the connected device is fully charged while the other lower power ports cannot take over the unused power. This is mainly limited by the power architecture design. This paper addresses this issue by presenting a multiplexing based multi-port quasi-resonant flyback converter. The design achieves true power-sharing with high efficiency, small size, and simple analog implementation. This paper discusses the operating principle and design considerations. A GaN-based 60 W dual port charger verifies the proposed scheme while achieving 76% size reduction and 1% efficiency improvement than state-of-the-art.

Xue, Lincoln↗

Time-Dependent Electric Bus and Charging Station Deployment Problem

Battery electric buses (BEBs) have gained popularity due to their emission-free and energy-efficient features. Many transit authorities worldwide have set goals to gradually replace their bus fleets with BEBs. Considering the potential decline in BEB battery and charger prices, this study proposes a time-dependent bus fleet transition model to determine the optimal bus fleet transition plan, which includes selecting the bus lines to be electrified, determining the timing and type of BEBs to be purchased, and deploying on-route fast chargers and depot chargers. The model is a bi-objective integer linear program that considers the trade-off between electrified transit mileages and bus electrification costs. A normalized normal constraint method is applied to solve the bi-objective optimization model. The effectiveness of the proposed model is tested using a real-world bus network. Additionally, sensitivity analyses are conducted to better understand the impact of different parameter values on the optimal solutions. Our proposed model can provide transit authorities with a powerful tool to make informed decisions about their BEB fleet replacement plans.

ADVANCED PROPULSION SYSTEMS↗

Extreme-scale EV charging infrastructure planning for last-mile delivery using high-performance parallel computing

Here, this paper addresses stochastic charger location and allocation problems under queue congestion for last-mile delivery using electric vehicles (EVs). The objective is to decide where to open charging stations and how many chargers of each type to install, subject to budgetary and waiting-time constraints. We formulate the problem as a mixed-integer non-linear program, where each station-charger pair is modeled as a multiserver queue with stochastic arrivals and service times to capture the notion of waiting in fleet operations. The model is extremely large, with billions of variables and constraints for a typical metropolitan area; even loading the model in solver memory is difficult, let alone solving it. To address this challenge, we develop a Lagrangian-based dual decomposition framework that decomposes the problem by station and leverages parallelization on high-performance computing systems, where the subproblems are solved by using a cutting plane method and their solutions are collected at the master level. We also develop a three-step rounding heuristic to transform the fractional subproblem solutions into feasible integral solutions. Computational experiments on data from the Chicago metropolitan area with hundreds of thousands of households and thousands of candidate stations show that our approach produces high-quality solutions in cases where existing exact methods cannot even load the model in memory. We also analyze various policy scenarios, demonstrating that combining existing depots with newly built stations under multiagency collaboration substantially reduces costs and congestion. These findings offer a scalable and efficient framework for developing sustainable large-scale EV charging networks.

Capacity allocation↗

Deployment priority of public charging speeds for increasing battery electric vehicle usability

To inform charger deployment decisions, this paper aims to understand the potential utilization and deployment priority for public charging infrastructure. A data-driven Cumulative Public Recharging (CPR) model is developed to explore the travel patterns by using 2017 National Household Travel Survey data. Given the daily trip sequence, trip distance, and dwell times, the study examines the daily expected driving range and BEV feasibility under different charging speeds, battery capacity, and charging behaviors. The results suggest that more advanced public chargers increase the daily expected driving range. Home charging is sufficient for most daily short-distance trips while public chargers are still needed for medium- and long-distance trips. Extreme fast charging (xFC) may not be necessary for people with home charging but could be more useful for people without home charging and for urgent charging. In conclusion, xFC becomes even less important to drivers with longer BEV ranges, a finding that contradicts conventional thinking.

33 ADVANCED PROPULSION SYSTEMS↗

Finding gaps in the national electric vehicle charging station coverage of the United States

Abstract The United States federal government has invested $7.5 billion into charging infrastructure, including the National Electric Vehicle Infrastructure Program, to build fast charging stations along designated highways for long-distance car travel. We develop a consecutive coverage metric to compute the percent of United States roads (traffic-weighted) that are consecutively accessible within 500 miles of each county. We answer (1) what the state of consecutive coverage is in each county and (2) what the increase in coverage is when designated highways receive fast chargers. In 2023, 10% of counties had at least 75% minimum viable coverage. We find that if all designated highways receive fast-charging stations, 94% of United States counties will reach at least 75% fast charger coverage. However, the remaining counties are rural. This demonstrates that federal funding for fast chargers will help connect most—but not all—counties to the national network of continuously accessible charging stations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of a DC Distribution Testbed for High-Power EV Charging

This paper explores the design and implementation of a power hardware-in-the-loop (P-HIL) setup for DC distribution infrastructure integrated with high-power charging (HPC) of electric vehicles (EVs), DC loads, and sources. The utilization of DC distribution holds significant potential for enhancing the operation of a HPC station architecture. However, there are challenges establishing a DC charging hub including interoperability, commoditization, distributed energy resource integration, stability, DC protection, and lack of common system level controllers. To address these challenges, a testing setup is required that accommodates commercial off-the-shelf (COTS) products to evaluate different use cases at rated power and voltage levels. The developed P-HIL setup features a dedicated DC charging hub, DC-coupled chargers, DC loads/sources, DC protection, and a communication architecture. The integrated P-HIL system provides a versatile testing environment to address technology and interoperability gaps and implements a smart energy management system (SEMS). This platform enables comprehensive and robust testing of COTS devices, charger prototypes, SEMS controllers and protection schemes, which together will accelerate transition to EVs at scale. The setup is tested for various use-cases at full-scale, integrating 950 V DC bus voltage, 660 kW grid-tied inverter, 150 kW COTS charger, and 100 kW energy storage system within an open-source SEMS platform.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Balancing Charging Station Utilization and Throughput in Electric Vehicle Charging Stations with Queuing Theory

The rapid increase in electric vehicle (EV) adoption demands enhancements in the efficiency and adaptability of EV supply equipment (EVSE). Traditional EVSE systems often fail to optimize power delivery to meet the variable acceptance rates of EV batteries, resulting in significant energy wastage and reduced operational efficiency. This research addresses these challenges by integrating queuing theory with modular EVSE architectures, offering a dual strategy to optimize the operation of EV charging stations. A simulation model was developed to assess various configurations of charger capacities and outlet numbers. This model aimed to identify the optimal setup that maximizes station utilization while minimizing charging times and maximizing throughput. The model focused on charger capacities ranging from 50 to 250 kW and analyzed the different capacities’ effects on charging times and the number of vehicles served. The results indicate that a charger capacity of 125 kW is optimal, striking a balance between the charging time and the number of EVs served per hour, thus achieving the highest station utilization rate. This capacity allows for servicing a significant number of EVs with moderate increases in charging times. Lower capacities, although capable of serving more vehicles, lead to longer charging times and decreased throughput efficiency. The study underscores the effectiveness of combining queuing theory with flexible, modular charging systems that can dynamically adjust to EV charging demands.

Kumar, Praveen↗

Integrated Magnetics for Multiport Inductive and Conductive Power Transfer Architecture for Electric Vehicles

This paper proposes a shared magnetic arrangement for an electric-vehicle charger that supports both conductive and inductive charging while preserving independent power control at the two ports. In the proposed implementation, the high-frequency transformer used for the conductive path and the resonant inductor required by the inductive path are realized in an integrated form. By combining the magnetic structure and primary-side converter hardware, the charger can deliver improved hardware utilization and higher power density without a corresponding increase in cost or implementation complexity. The paper describes the magnetic realization and presents finite-element and circuit-level simulation results to confirm minimal interaction between the two charging paths. The study demonstrates that the proposed charger is a viable option for flexible, high-power EV charging systems.

Mukherjee, Subho [ORNL] (ORCID:0009000672297925)↗