Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CULTURAL RESOURCES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Assessment of Economic Impact of Permitting Timelines on Produced Geothermal Power in Imperial County, California

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. Our study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive. In this study, we conducted economic analysis to assess the impact of permitting timelines on cost of produced electricity from geothermal resources using data from existing geothermal plants as well as prospective sites. In this paper, we present collected timelines data, approach, and results of economic impact of permitting timelines on geothermal power. We evaluated the various environmental management and permit review processes by considering a hypothetical geothermal project in the Salton Sea Known Geothermal Resource Area. Because of the variety of the biological and environmental issues and the involvement of local, state, and federal agencies with overlapping jurisdictions, this project could go through one of the many California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) review scenarios that range from the least to the most complex in its circumstances. The fastest CEQA/NEPA review timelines would have the project completed in six years. In contrast, the project would substantially need longer time to complete if it were located in an area with significant environmental resources or cultural issues that required permitting from various agencies. With increasing project completion timelines, the simplified levelized cost of electricity (sLCOE) can be 4 to 11% higher with longer CEQA/NEPA review timelines than the sLCOE value with the fastest CEQA/NEPA review timeline. Lengthier CEQA/NEPA review timelines could also result in loss of $64 million to $227 million in potential revenue. Such significant economic impacts could determine the success of a geothermal project.

15 GEOTHERMAL ENERGY↗

Economic Impact of Permitting Timelines on Produced Geothermal Power

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive.

15 GEOTHERMAL ENERGY↗

CPP-639: BLOWER BUILDING CATEGORY 3 HISTORIC PROPERTY DEMOLITION MITIGATION

As a federal agency, the Department of Energy (DOE) has been directed by the U.S. Congress and the U.S. president to provide leadership in the preservation of prehistoric, historic, and other cultural resources on lands it administers and to manage these resources in a spirit of stewardship for future generations. The management of Idaho National Laboratory (INL) cultural resources is driven and guided by various federal laws, regulations, executive orders, DOE directives, supplementary State of Idaho statutes and legislation, and INL procedures. Several laws direct the inventory of cultural resources on federal land, guide the nomination of sites to the National Register of Historic Places (NRHP), establish mechanisms to protect cultural resources during land-use activities, and levy legal penalties as a consequence for unmitigated destruction of cultural resources. Preeminent among these are the National Environmental Policy Act of 1969 (NEPA), the Archaeological Resource Protection Act of 1979 (ARPA), and the National Historic Preservation Act of 1966 (NHPA), as amended, and their implementing regulations (INL Cultural Resource Managment Office 2016, 1). When an effect on a historic architectural property will be adverse and avoidance or reuse is infeasible, mitigation to minimize the adverse effect will be necessary. Based on the relative importance of the affected property, as defined by the property category, mitigation includes varying types of documentation and potentially other activities based on its relative significance (INL Cultural Resource Managment Office 2016, 165). CPP-639 is identified as a Category 3 property; Category 3 properties include those properties that contribute to the historic landscape associated with Nuclear Reactor Testing (i.e. guardhouses, cafeterias, warehouses, powerhouses, and similar infrastructure), but which were not directly related to the key building or research process. As such, mitigation is documentation, which includes reconnaissance-level photographs and completion of an Idaho Historic Sites Inventory (IHSI) site form. This documentation will be preserved in the INL Cultural Resource Management Office (CRMO) (INL Cultural Resource Managment Office 2016, 166).

99 GENERAL AND MISCELLANEOUS↗

CFA-671: BOILER HOUSE HEATING PLANT CATEGORY 3 HISTORIC PROPERTY DEMOLITION MITIGATION

As a federal agency, the Department of Energy (DOE) has been directed by the U.S. Congress and the U.S. president to provide leadership in the preservation of prehistoric, historic, and other cultural resources on lands it administers and to manage these resources in a spirit of stewardship for future generations. The management of Idaho National Laboratory (INL) cultural resources is driven and guided by various federal laws, regulations, executive orders, DOE directives, supplementary State of Idaho statutes and legislation, and INL procedures. Several laws direct the inventory of cultural resources on federal land, guide the nomination of sites to the National Register of Historic Places (NRHP), establish mechanisms to protect cultural resources during land-use activities, and levy legal penalties as a consequence for unmitigated destruction of cultural resources. Preeminent among these are the National Environmental Policy Act of 1969 (NEPA), the Archaeological Resource Protection Act of 1979 (ARPA), and the National Historic Preservation Act of 1966 (NHPA), as amended, and their implementing regulations (INL Cultural Resource Managment Office, 2016, p. 1). When an effect on a historic architectural property will be adverse and avoidance or reuse is infeasible, mitigation to minimize the adverse effect will be necessary. Based on the relative importance of the affected property, as defined by the property category, mitigation includes varying types of documentation and potentially other activities based on its relative significance (INL Cultural Resource Managment Office, 2016, p. 165). CFA-671 is identified as a Category 3 property; Category 3 properties include those properties that contribute to the historic landscape associated with Nuclear Reactor Testing (i.e. guardhouses, cafeterias, warehouses, powerhouses, and similar infrastructure), but which were not directly related to the key building or research process. As such, mitigation is documentation, which includes reconnaissance-level photographs and completion of an Idaho Historic Sites Inventory (IHSI) site from. This documentation will be preserved in the INL Cultural Resource Management Office (CRMO) (INL Cultural Resource Managment Office, 2016, p. 166).

99 GENERAL AND MISCELLANEOUS↗

A Standard Operating Procedure for the Inadvertent Discovery of Native American Human Remains and Associated Funerary Objects, Sacred Objects, or Objects of Cultural Patrimony at Los Alamos National Laboratory

Los Alamos National Laboratory (LANL or Laboratory) is one of several national laboratories that support the mission of the United States Department of Energy (DOE), National Nuclear Security Administration (NNSA), Los Alamos Field Office (Field Office). It is located in Los Alamos and Santa Fe Counties, New Mexico. LANL occupies approximately 40 square miles of land owned by the U.S. Government and under the administrative control of DOE/NNSA. Cultural resources management at LANL is the responsibility of the Field Office’s Cultural Resources Program Manager, with the assistance and facilitation of the LANL Environmental Stewardship Group (ES) Cultural Resources Programs (archaeology and historic buildings), which are part of the LANL Environmental Protection and Compliance (EPC) Division. LANL, which is primarily located on the Pajarito Plateau, is extremely rich in cultural resources. Nearly 2,000 archaeological sites have been recorded at LANL, based on the systematic archaeological survey of ~90% of LANL lands. Most of the known sites (~ 85%) date from the Ancestral Pueblo Late Coalition and Classic Periods of around AD 1150 to 1600. The remaining sites date to the Archaic Period (ca. 5500 BC to 600 AD), the Late Developmental and Early Coalition Periods (ca. 900 to 1200), and the Homestead Period (ca. 1890 to 1942).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Historic Architectural Resource Survey of the Dosimetry Applications Research (DOSAR) Facility in the 7700 Area of the Oak Ridge National Laboratory

In May 2022, Cultural Resource Analysts, Inc., completed a historic architectural resource survey of buildings associated with the Dosimetry Applications Research Facility at the Oak Ridge National Laboratory. The laboratory is one of three Department of Energy facilities located on the Oak Ridge Reservation in Roane and Anderson Counties, Tennessee. The Dosimetry Applications Research Facility is located approximately 2 mi southeast of the main Oak Ridge National Laboratory campus. The survey included Buildings 7709, 7710, and 7712, which date to the 1960s. An additional DOSAR building (Building 7735) dates to the late 1980s and was not surveyed since it is outside the period of significance. The survey was conducted at the request of UT-Battelle, LLC, on behalf of the Department of Energy. As stipulated by the National Historic Preservation Act of 1966, as amended, the Department of Energy is required to identify any properties under its jurisdiction that are included in or eligible for inclusion in the National Register of Historic Places. In order to identify historic properties at the Oak Ridge National Laboratory, in 2017–2018 Cultural Resource Analysts, Inc., conducted a survey of the main campus as well as outlying facilities, publishing the findings in a 2018 report entitled Oak Ridge National Laboratory Historic Architectural Resource Survey. At the time of the 2017–2018 survey, buildings associated with the Dosimetry Applications Research Facility were not accessible for security reasons and the current report serves as an addendum to the 2018 report. In addition, the current survey incorporates information included in a documentation report on Building 7709 completed in 2019. The properties included in the current survey were also evaluated for their collective potential as a historic district. The identification of archaeological properties that are eligible for inclusion in the National Register of Historic Places is beyond the scope of this report. Cultural Resource Analysts, Inc., recommends that none of the buildings surveyed for the current report are individually eligible for listing in the National Register of Historic Places. However, the collective of buildings represents a facility that made notable contributions to the Oak Ridge National Laboratory’s scientific research endeavors from the 1960s to the 1980s, specifically in the field of Health Physics. The buildings and their associated features have also maintained their integrity of setting, materials, design, location, and association. Therefore, Cultural Resource Analysts, Inc., proposes the Dosimetry Applications Research Facility Historic District, which is recommended eligible for listing under Criterion A. The three buildings addressed in the current survey (Buildings 7709, 7710, and 7712) are recommended eligible as contributing resources of the historic district. The district boundary is scribed to incorporate the environs of these three facilities, as well as additional relevant features.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Environmental Share: Damage to a Cultural Site from Off-Road Driving [Slides]

Cultural resources, including archaeological sites and historic buildings, at Los Alamos National Laboratory are protected under the National Historic Preservation Act. Disclosure of archaeological site locations is prohibited by law, which can make it difficult to communicate issues or identify where these sites occur. The Laboratory Cultural Resources Management Plan describes how we work to manage and protect these resources: https://permalink.lanl.gov/object/tr?what=info:lanlrepo/lareport/LA-UR-19-21590. Recently, our cultural resources staff identified vehicle damage to a site . There were no active projects occurring in this area, but evidence that vehicles had been driving over the site was visible. It is not possible to mark the locations of all cultural resources as there are about 2000 on Laboratory property.

54 ENVIRONMENTAL SCIENCES↗

Amendment to Programmatic Agreement among the U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office, the New Mexico State Historic Preservation Office and the Advisory Council on History Preservation Concerning Management of the Historic Properties of Los Alamos National Laboratory, Los Alamos, New Mexico (AGREEMENT)

The Field Office has a cultural resources program manager. The LANL Management and Operating Contractor has a staff of cultural resource specialists who meet the qualifications set forth in the Secretary of the Interior's Standards and Guidelines for Professional Qualifications (36 CFR Part 61), or work under the supervision of individuals who meet these qualifications. Any future Management and Operating Contractor will have a staff of Secretary of the Interior-qualified cultural resource specialists.

99 GENERAL AND MISCELLANEOUS↗

An approach to evaluating and monitoring ecological resources for sustainability on DOE remediation sites: Hanford as a case study - 15524

Protecting ecological and environmental resources is a worthy aspect of the Department of Energy's site missions, for each of its sites, during and after remediation. Ecological resources are important to a range of stakeholders, including regulatory agencies, resource agencies, natural resource trustees, Tribal governments, and the public, and may be an essential component of Native American cultural resources. Because the nature and value of ecological resources can change over time as a result of remediation, succession, and global climate change, it is imperative for DOE to have instituted an acceptable method of evaluating resources before initiation of active remediation, over the ensuing century when institutional and engineering controls are considered to be in effect. Having such a methodology in place also would be key to resource sustainability. Department of Energy sites generally have environmental programs, so instituting specific unified practices for evaluating resources should not be difficult to implement. Instituting these practices would assure the public that ecological resources, as well as human and cultural resources, are being protected now, and can be protected into the future. Key ecological species and/or unique habitats have been preserved at Department of Energy sites since the mid-20. century because of federal government stewardship. Such preservation is particularly true for the sites with larger land areas, including the Hanford Reservation, the Idaho National Laboratory and the Savannah River Site. Individual sites typically have extensive studies of site biodiversity, but site resources are not routinely examined within a regional or national context (Eco-region). The evaluation of the on-site resources with those resources in the appropriate Eco-region provides a context for 'valuing' on- site resources. On-site resources should also be evaluated in terms of federal and state legislation where species may have legal protection and require legal consideration during remediation if present or adjacent to the remediation site. A method is needed in this study for evaluating ecological resources prior to remediation and during remediation, and a paradigm is proposed that will ensure sustainability. Finally, in a period of climate change and instability, developing methods of evaluating ecological resources is essential to successful protection, enhancement, and sustainability. The ecological methodology is part of a Hanford site-wide Risk Review Project, conducted by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP). Our method adapts an existing methodology that includes using established levels for evaluating ecological resources by expanding the existing methodology to include field work for validating previous resource level designations, to assess the occurrence of invasive/exotic species, and to identify landscape scale features (patch size, connectivity). Evaluations should be conducted in the remediation unit itself, and in a buffer zone surrounding the remediation site. The methodology described has been applied to several remediation areas at Hanford, and issues that emerged during its application are discussed. The methodology can be applied at the major sites. Application of the Eco-region analysis will provide regulators and the public with an understanding of the value of the ecological resources in relation to the region, as well as an appreciation for the stewardship role the Department of Energy has played in protecting these resources since the beginning of the Cold War Era and can continue to do so sustainably. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-Term Environmental Stewardship (LTES) life-cycle material management at Sandia National Laboratories.

The Long-Term Environmental Stewardship (LTES) mission is to ensure long-term protection of human health and the environment, and proactive management toward sustainable use and protection of natural and cultural resources affected by any Sandia National Laboratories (SNL) operations and operational legacies. The primary objectives of the LTES program are to: (1) Protect the environment from present and future operations; (2) Preserve and protect natural and cultural resources, and; (3) Apply environmental life-cycle management to SNL operations.

54 ENVIRONMENTAL SCIENCES↗

A Section 106 Evaluation of the Mercury Bowling Alley, Area 23, Nevada National Security Site, Nye County, Nevada, with Photographic Documentation Addendums

The National Nuclear Security Administration Nevada Field Office (NNSA/NFO) anticipates demolition of the Mercury Bowling Alley (Building 23-517) on the Nevada National Security Site (NNSS) in Nye County, Nevada (Figure 1). This survey was prompted by plans to construct new facilities at the Bowling Alley location to support NNSS’s changing role in national security. The Bowling Alley has been largely vacant since the mid-1990s following the end of nuclear testing at what was then the Nevada Test Site (NTS). The building is suffering rapid decay. An Area of Potential Effects (APE) of 4.5 acres was surveyed, resulting in recording and evaluation of the Bowling Alley (SHPO Resource Number B14451) and one associated resource (AR1). The APE is located in Section 11 T15S R53E MDBM (projected) at the principal NNSS base of Mercury in Area 23. In 2010, the NTS name was changed to the NNSS, and will be referred to as such throughout this report. Fieldwork and report preparation were done by Desert Research Institute (DRI) cultural resources staff. Architectural descriptions and portions of this report specific to the architecture of the Bowling Alley were completed by Ron Reno, Ph.D., RPA who meets Secretary of the Interior’s Professional Qualifications Standards for Architectural Historian. Administration of the project was by Colleen M. Beck, Ph.D. Historical background regarding Mercury and the NNSS was developed by Maureen King. Beck photographed the building and its environs. Copies of the building form and report are on file in the Nevada Cultural Resources Inventory System at the Nevada State Office of Historic Preservation (SHPO); DRI, Las Vegas; and in the NNSA/NFO curation facility, Las Vegas.

54 ENVIRONMENTAL SCIENCES↗

Environmental Management System Plan

Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environment will be evaluated. Objectives and targets will be developed (or updated) for each aspect that is determined to have a significant impact. Environmental Management Programs (EMPs) will be prepared (or updated) to document actions necessary for reducing certain environmental impacts. Each EMP will identify responsible parties and associated target deadlines for each action. Quarterly, environmental programs will be reviewed for compliance issues and effectiveness. Annually, an internal assessment will be performed to evaluate the progress of the EMS, and LBNL senior management will review the results. In addition, at least once every 3 years a third-party audit will be performed to validate that the EMS is being implemented according to plan.

99 GENERAL AND MISCELLANEOUS↗

Sensitive Resources Assessment and Forest Analysis for The SSP-2A Parcel and Proposed Oak Ridge Enhanced Technology and Training Center (ORETTC), Oak Ridge, Tennessee

This report summarizes current knowledge of natural and cultural resources associated with potential land use changes within an 81-acre (32.8-hectare) parcel, termed SSP-2A, on the US Department of Energy’s (DOE’s) Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee (Figure 1). A primary goal for the work presented here was to evaluate potential impacts to sensitive resources within the SSP-2A parcel that might result from land disturbance and construction of the Oak Ridge Enhanced Technology and Training Center (ORETTC). In addition to on-the-ground surveys of the ORETTC footprint and SSP-2A parcel during summer 2020 (Figure 1), this report leverages historical (pre-1995) and contemporary (1995–present) data from additional sources such as the Tennessee Department of Environment and Conservation (TDEC). The individuals who obtained and compiled the data that are presented here are familiar with and routinely assess, manage, and research sensitive resources on the ORR. This report should facilitate more environmentally sound decisions during planning and development of the ORETTC, provide a foundation for further assessment of sensitive and cultural resources associated with the broader SSP-2A parcel (should additional actions take place), and help project managers address regulatory guidance and DOE policy on sustainable development. Those who reference this report must consider that the timing of surveys does not permit complete delineation of resources. Data deficiencies are indicated where possible. Additional surveys may be required to account for seasonal patterns of various threatened and endangered species (e.g., bats), and additional assessment will be required if activities extend beyond the ORETTC site (Figure 2).

54 ENVIRONMENTAL SCIENCES↗

MARSAME Radiological Release Report for Archaeological Artifacts Excavated from Area L

In 1991 Los Alamos National Laboratory’s (LANL’s) cultural resources team excavated archaeological site LA 4618 located at Technical Area 54, within Material Disposal Area L (MDA L). MDA L received non-radioactive chemical waste from the early 1960s until 1985. Further development of the MDA required excavation of several cultural sites under National Historic Preservation Act requirements; artifacts from these sites have been subsequently stored at LANL. The LANL cultural resources group would now like to release these artifacts to the Museum of Indian Arts and Culture in Santa Fe for curation. The history of disposal at Area L suggests that the artifact pool is unlikely to be chemically contaminated and LANL staff washed each artifact at least once following excavation. Thus, it is unlikely that the artifacts present a chemical hazard. LANL’s Environmental Stewardship group (EPC-ES) has evaluated the radiological survey results for the Area L artifact pool and found that the items described in this report meet the criteria for unrestricted radiological release under Department of Energy (DOE) Order 458.1 Radiation Protection of the Public and the Environment and are candidates for release without restriction from LANL control. This conclusion is based on the known history of MDA L and on radiation survey data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sensitive Resources Assessment and Forest Analysis for the Proposed Versatile Test Reactor, Oak Ridge, Tennessee

The US Department of Energy’s (DOE’s) Oak Ridge National Laboratory (ORNL) is a leading institution in advanced materials, supercomputing, neutrons, and nuclear science. As a research laboratory managed by UT-Battelle, LLC for DOE, ORNL has national priorities in energy, security, and scientific discovery that necessitate facility improvements and expansions. DOE is also committed to environmental stewardship. The laboratory is located on the ~32,000-acre (~13,000-ha) Oak Ridge Reservation (ORR), much of which is categorized as a National Environmental Research Park (NERP) and a state Wildlife Management Area. DOE works with the Tennessee Wildlife Resources Agency (TWRA), Tennessee Department of Environment and Conservation (TDEC), US Fish and Wildlife Service (USFWS), US Department of Agriculture, and other agencies to serve as an effective steward of the ORR. Accordingly, project managers must conform to environmental regulations, agreements, and policies at the federal, state, and institutional levels. Per 40 CFR (Code of Federal Regulations) 1508.14, potential effects on research and science education also represent potential effects of federal actions on the NERP, and impacts on, e.g., deer harvest, must be considered on the Oak Ridge Wildlife Management Area when other aspects of the human environment are affected. The United States currently has no fast neutron testing capability to support advanced nuclear research and development. The proposed Versatile Test Reactor (VTR) will take advantage of current investments by the US government and private industry in nuclear reactors to expedite the design and construction process, using proven technology to create a world-class scientific infrastructure. The VTR will take advantage of fast neutrons provided by this proven technology, along with a capability to rapidly insert, conduct, and remove state-of-the-art experiments. An advantage of the VTR is that it can support future innovations in experimental capabilities without modifying the facility. The VTR will support progress in a variety of science and technology areas, including testing and qualification of advanced reactor fuels; testing and qualification of innovative structural materials; testing of innovative components and instruments; validation of advanced modeling and simulation tools; and versatility for future technical missions. Through proven technology, the VTR can take advantage of existing reactor designs and operating experience to reduce the risk, cost, and time for design and construction. The top available resources of DOE laboratories, industry, and universities will be used to expedite reactor design and construction toward developing the scientific infrastructure that affords a strong testing capability that can be sustained over many years. This report summarizes current knowledge of natural and cultural resources primarily within the VTR construction area. At the time of this report, the proposed VTR site design includes a construction area of ~150.4 acres (~69.9 ha), which contains an ~51.3-acre (~20.8-ha) operations area, located within forested natural areas of the ORR. The primary goal of the work presented here was to evaluate potential effects on sensitive resources that might result from development and construction activities associated with VTR. In addition to on-the-ground surveys during spring and summer 2020 by the ORNL Natural Resources Management Program and Aquatic Ecology Group staff, this report makes use of historical (pre-1995) and contemporary (1995 to present) data from additional confirmed sources (e.g., TDEC). Likewise, forest conditions were compiled from a 2011 forest inventory and supplemented with limited ground observations in 2020. The individuals who obtained and compiled the data presented here are familiar with and routinely assess sensitive resources on the ORR. Anyone who references this report must consider that the timing of surveys did not permit a complete delineation of the resources that will be affected. If the VTR project proceeds, additional surveys will be required to account for the seasonal patterns of various threatened and endangered species. Data deficiencies and potential resources that likely went undetected are indicated where possible. Accordingly, this report should facilitate more environmentally sound decisions during planning and 2 development of the VTR site, provide a foundation for further assessment of sensitive and cultural resources, and help project managers better address regulatory guidance and DOE policies on sustainable development in compliance with, for example, the US Endangered Species Act (ESA), Migratory Bird Treaty Act (MBTA), Tennessee Rare Plant Protection and Conservation Act of 1985, Tennessee Nongame and Endangered or Threatened Wildlife Species Conservation Act of 1974, several federal and state regulations regarding aquatic resource protection, and site-specific policies as outlined in various ORR management plans developed by ORNL and TWRA for DOE.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Comparing Ecological Risk between D and D Facilities and Operating Facilities at the Hanford Site - 19531

Many countries are faced with a large remediation task resulting from World War II, the Cold War, and subsequent industrial development. In the U.S. the Department of Energy (DOE) faces the largest hazardous waste remediation tasks, with a commitment to protect human health and the environment during and following remediation. DoE's biggest challenge is remediation of the many remaining cleanup areas at the Hanford Site, Washington. Some Hanford sites have extensive ecological resources and ecosystems that require protection or restoration. We briefly 1) describe a rapid evaluation method for ecological resources on units slated for cleanup that allows comparison among the different areas at the Hanford Site, 2) examine some D4 (deactivation, decommissioning, decontamination and demolition) facilities and Operating facilities that require remediation, 3) describe potential ecological harm to resources on these sites, and 4) compare how risks from potential harm vary at the Hanford Site. The ecological evaluation includes three phases: 1) general steps (identify resource categories, identify cleanup areas), 2) ecological descriptions (describe resources on the site to be cleaned up), and 3) ecological ratings (rate the value of the resources on a scale that can be applied across remediation sites). After completion of these steps for the sites requiring cleanup, a comparison of potential risks can be made among types of facilities (e.g. D4 facilities, legacy waste sites, operating facilities). D4 facilities are those slated for deactivation, decommissioning, decontamination and demolition, while operating facilities at Hanford include waste treatment plants, sludge basins, waste trenches, Central Waste Complex, storage facilities, and disposal facilities, among others required to support the D4 and other remediation activities, before they too are remediated. Currently the potential harm to ecological (and eco-cultural) resources on the Hanford Site for remediation at D4 facilities is very low, but increases to very high (for reactors) during remediation when there is physical disruption, increased traffic and personnel, and possible increased contamination. Following remediation, the potential harm to ecological resources is low, and the value may increase due to restoration of native vegetation on sites that were largely industrial prior to remediation. In contrast, the potential harm to ecological resources at Operating Facilities was higher currently than for D4 facilities, but was low to medium following cleanup. The higher harm (risk) at D4 facilities partly derives from the location of the reactors near the Columbia River, a resource extremely important to Tribal Nations and to other peoples in the Northwestern United States, as well as for the iconic and threatened salmon populations. Methods described in this paper provide Congress, DOE managers, regulators, Tribes, and the general public with assurance that ecological and eco-cultural resources and the environment are being protected during and following remediation. The analysis of specific sites provides managers, regulators and the public with information to make cost-effective decisions about remediation that continues to enhance ecological value while protecting human health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗