Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONSTRUCTION INDUSTRY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Enhancing Worker Safety During Off-Site Construction of Energy-Efficient, Low-Carbon Exterior Envelope

The construction industry is not doing enough to embrace off-site modular construction. It is a missed opportunity for optimized energy efficiency because prefabricated exterior wall envelopes are lower in cost and faster and easier to install. Factory off-site construction offers improved safety for construction workers because work is done in a controlled environment, but lack of intent, understanding, and data is also a missed opportunity for enhancing worker safety. This research looks specifically at the prefabricated wall exterior envelope in the context of safety. The research question is "off-site factories build with ease of energy efficiency and lowered carbon emissions, but is the process safer?" This research was funded by NREL Student Training in Applied Research (STAR) program, University Partnerships Program, and Wells Fargo Bank. Key finding is that modular and prefabricated construction are perceived to be safer, but the accident rates are much higher than in the general construction and manufacturing industries. Proposed solutions to decrease accidents in off-site prefabricated construction includes safety training for workers, provide movable kiosks with PPE at workstations, ensure tools are well-maintained and place safety posters in visible locations. Future work includes improving worker safety to increase worker productivity, perform pilot demonstration, work with factory designers for new modular layout for worker safety, i.e., easy access to PPE kiosks, and work closely with OSHA so that they take notice of this safety niche.

drywall↗

Life cycle assessment based environmental impact estimation model for pre-stressed concrete beam bridge in the early design phase

The late rise in global concern for environmental issues such as global warming and air pollution is accentuating the need for environmental assessments in the construction industry. Promptly evaluating the environmental loads of the various design alternatives during the early stages of a construction project and adopting the most environmentally sustainable candidate is therefore of large importance. Yet, research on the early evaluation of a construction project's environmental load in order to aid the decision making process is hitherto lacking. In light of this dilemma, this study proposes a model for estimating the environmental load by employing only the most basic information accessible during the early design phases of a project for the pre-stressed concrete (PSC) beam bridge, the most common bridge structure. Firstly, a life cycle assessment (LCA) was conducted on the data from 99 bridges by integrating the bills of quantities (BOQ) with a life cycle inventory (LCI) database. The processed data was then utilized to construct a case based reasoning (CBR) model for estimating the environmental load. The accuracy of the estimation model was then validated using five test cases; the model's mean absolute error rates (MAER) for the total environmental load was calculated as 7.09%. Such test results were shown to be superior compared to those obtained from a multiple-regression based model and a slab area base-unit analysis model. Henceforth application of this model during the early stages of a project is expected to highly complement environmentally friendly designs and construction by facilitating the swift evaluation of the environmental load from multiple standpoints. - Highlights: • This study is to develop the model of assessing the environmental impacts on LCA. • Bills of quantity from completed designs of PSC Beam were linked with the LCI DB. • Previous cases were used to estimate the environmental load of new case by CBR model. • CBR model produces more accurate estimations (7.09%) than other conventional models. • This study supports decision making process in the early stage of a new construction case.

54 ENVIRONMENTAL SCIENCES↗

Decarbonization During Predevelopment of Modular Building Solutions

Off-site construction methods offer the opportunity to compress costs of net-zero energy (NZE) housing using the advantages of mass production. There has been limited investigation on trade-offs between site-built and industrialized construction from the perspective of reducing the incremental cost of NZE strategies and reducing greenhouse gas emissions during embodied and operational stages. Blokable, LLC, a vertically integrated modular builder, wanted to know how the learning curves of mass production would help them decarbonize their existing modular housing prototype at a relative cost advantage. The method developed for this question looked at the life cycle assessment of an individual apartment and used learning-curve efficiencies to approximate the relative advantage of construction-at-scale. Greenhouse gas emissions were quantified by a learning-affected, whole-life carbon emissions model and demonstrated a path to a 60% reduction of whole-life CO2-equivalent in the 2030 production year. The resultant roadmap considers a best-first approach to decarbonizing a modular building product line, and the method can be replicated for other modular builders.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Plastic welder

Low-cost, self-contained, portable welder joins plastic parts by induction heating. Welder is useable in any atmosphere or in vacuum and with most types of thermoplastic; plastic components can be joined in situ. Device is applicable to aerospace industry and in automobile, furniture, and construction industries. Power requirements are easily met by battery or solar energy. In welder, toroidal inductor transfers magnetic flux through thermoplastic to screen. Heated screen causes plastic surface on either side to melt and flow into it to form joint.

Buckley, J. D.↗

Development of Integrated Mechanical Pods

This presentation highlights early wins, updated progress, and upcoming developments on ‘national-scale shared development platform’ for rapid prototyping, testing and validation of various integrated Mechanical Pod solutions and form factors. Such pod solutions consist of a set of all-electric heat pump mechanical equipment that have integrated functionalities through built-in controls, with heating, cooling, hot water, ventilation (including energy recovery), electrical management, and battery storage within a single package. The presentation draws inspiration from the success of bathroom pods in the US modular construction industry, UK’s efforts with unitizing mechanical systems as ‘utility cupboards’, and VEIC’s early wins in design-build of all-electric Mechanical Pod solutions in Vermont. The presentation includes researchers and partners involved with NREL in Design for Manufacturing and Assembly (DfMA), Virtual Design and Construction (VDC), and digital twin based process optimization modeling of integrated Mechanical Pod solutions. The presentation aims to highlight early wins from such a platform and how various physical and virtual tools are currently being employed as part of NREL’s ongoing multi-year project funded by US DOE. Streamlined procurement, coordination, installation, and O&M of Mechanical Pods such that the majority of work is delegated to the off-site modular factory implies monetary savings. Such a seemingly basic shift in location of the construction process leads to great reduction in complexity, first cost, lead time, and waste, and greater opportunities for innovative compartmentalization and integration of mechanical systems appropriately sized for each apartment or hotel guest room. However, past studies on unitized combination systems show that high installation costs, maintenance issues, challenges with system integration, limitations in existing electrical infrastructure, and lack of architecturally appealing solutions are key barriers. NREL and partners aim to address key barriers through DfMA approach, rapid prototyping and testing, and digital twin process optimization modeling. The presentation is also a call for interested entities to partner with NREL as part of the national-scale development platform, help drive both product and process innovation, and encourage open source sharing of learnings. Learning objectives include (1) learn about the vision of national-scale shared development platform for process-product innovation on integrated mechanical pod solutions and how to get involved, (2) gain an understanding of the components of an all-electric, high performance home, design characteristics and equipment included in an all-electric mechanical pod, integration of mechanical systems within a modular factories’ assembly line, and the system’s commissioning, operation and maintenance. The pre-planning and coordination with the factory and sub-contractors are also highlighted, (3) gain an understanding of using process modeling tools to quantify resource-constrained performance of operations (such as integration of energy efficiency strategies) to manufacture modules of varying design, (4) gain insights on virtual design, rapid prototyping, and emulated testing of various form factors across different climatic conditions. The need for such preliminary testing with open source sharing of learnings will also be highlighted.

30 DIRECT ENERGY CONVERSION↗

Optimized Floating Offshore Wind Turbine Substructure Design Trends for 10–30 MW Turbines in Low-, Medium-, and High-Severity Wave Environments

Floating offshore wind is a promising renewable energy source, as 60% of the wind resources globally are found at depths requiring floating technologies, it minimizes construction at sea, and provides opportunities for industrialization given a lower site dependency. While floating offshore wind has numerous advantages, a current obstacle is its cost in comparison to more established energy sources. One cost-reduction approach for floating wind is increasing turbine capacities, which minimizes the amount of foundations, moorings, cables, and O&M equipment. This work presents trends in mass-optimized VolturnUS hull designs as turbine capacity increases for various wave environments. To do this, a novel rapid hull optimization framework is presented that employs frequency domain modeling, estimations of statistical extreme responses, industry constructability requirements, and genetic algorithm optimization to generate preliminary mass-optimal VolturnUS hull designs for a given turbine design and set of site conditions. Using this framework, mass-optimized VolturnUS hull designs were generated for 10–30 MW turbines for wave environments of varying severities. These design studies show that scaling up turbine capacities increases the mass efficiency of substructure designs, with decreasing returns, throughout the examined turbine capacity range. Additionally, increased wave environment severity is shown to increase the required mass of a given substructure design.

VolturnUS↗

A Kinetic Study Investigating the Carbothermic Recovery of Chromium from a Stainless-Steel Slag

In 2018, the stainless-steel industry produced > 10 million tons of slag, which for the most part was landfilled because of chromium oxide contamination. Long-term studies indicate a possible formation of soluble hexavalent chromium, which is classified as carcinogenic. Recent research focuses on the development of a treatment technology to recover chromium from the slag into a ferroalloy, producing an oxidic material that can be utilized in the construction industry. To date, there has been no literature dealing with the kinetics of a carbothermic treatment process to result in a model to predict the necessary treatment time. The present article fills this gap by investigating the reduction kinetics of chromium oxide of a process close to practical applications. Based on experimental measurements, a model has been developed to predict the necessary treatment time to reach a specific final chromium concentration as a function of the starting concentration and required process temperature in the range between 1600 °C and 1700 °C. Finally, presented findings can serve as a guideline to develop kinetic models in similar pyrometallurgical recovery processes.

36 MATERIALS SCIENCE↗

A BIM-based system for demolition and renovation waste estimation and planning

Highlights: ► We developed a waste estimation system leveraging the BIM technology. ► The system can calculate waste disposal charging fee and pick-up truck demand. ► We presented an example scenario demonstrating this system. ► Automatic, time-saving and wide applicability are the features of the system. - Abstract: Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C and D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D and R) works and the growing amount of D and R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D and R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D and R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an Assessment Method for Radiation Exposure from NORM in Construction Materials - 19032

Once radiological impact is usually considered to be related to nuclear energy accidents and atomic bombs, most of the research on radiation protection has been focused on artificial radionuclides and radioactive waste. Less attention had been given to radiation exposure due to the presence of naturally occurring radioactive materials in raw materials usually considered as not radioactive and used in manufacturing of many building materials. At national level, radiological data from building materials is not available as the control of building materials regarding the content of naturally occurring radionuclides is addressed for the first time in the EU Directive 2013/59/EURATOM. At international level the research developed is largely incomplete: data on the activity concentration measurements of Ra-226, Th-232 and K-40 in building materials used in the construction industry in the EU is non-statistically representative. The data collected are not enough to have an idea of the European situation, but they confirm high concentration of Ra-226, Th-232 and K-40, in some cases. Moreover, most of the research studies carried out in the EU are based on the assessment of the activity concentration index, which was derived for practical monitoring purposes to identify whether a dose criterion is met; to be used only as a screening tool for identifying materials which might be of concern. The dose criterion considers only effective dose due to γ-radiation, but population at home is also exposed to Rn-222 (and Rn-220) from soil, water and building material itself, sometimes to β radiation from superficial materials, and even to Cs-137 from some types of wood. The indoors exposure can be actually much higher than the value assessed with the dose criterion method. Also, in most cases toxic and radioactive components are inseparably. Therefore, all technical questions related to the toxic part of these materials should be addressed: an integrated approach is needed to assess the impacts of using these materials (new materials, recyclates and by-products). Until recently, radiation from natural sources seemed both unremarkable and unalterable - a background phenomenon. It is now known that doses from natural sources and in particular, decay products of radon can be remarkably high within houses in some areas. Therefore, concerning exposure to natural radiation sources, special provisions have been laid down in the EU Directive 1996/28 EURATOM. Still, the radiological evaluation of building materials was not mandatory in this Directive. The most recent EU Directive 2013/59/EURATOM brings some changes concerning the exposure to natural occurring radioactive materials but the previous screening method was kept. An effective dose of 1 mSv/year was set, as a basis for the exposure to radionuclides of natural origin (except for radon). This work seeks to develop an integrated radiological and chemical-mineralogical assessment methodology for realistic exposure scenarios concerning different types of raw materials, by-products and recyclates and used as building materials. The methodology includes the characterization of selected materials accounting for radiological exposure - calculation of effective dose; toxicity assessment - determination of chemical composition and leaching tests, study of changes in the microstructure and consequently in the radon emanation coefficient. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Component pose reconstruction using a single robotic total station for panelized building envelopes

The construction industry can benefit greatly from increased automation in construction processes in terms of precision, time, and labor costs. This is especially true for prefabricated construction for either new buildings or envelope retrofits. Here, prefabricated components are manufactured offsite according to design specifications and installed onsite. Accurate information on the component’s position and orientation (pose) is needed to achieve this. A tool named “Real-Time Evaluator” (RTE), designed to autonomously track prefabricated components as they are being installed and provide real-time installation instructions, is currently under development using a single robotic total station. This is challenging since at least three points are needed to determine the pose of an object in space. To achieve this goal with a single robotic total station, two key algorithms were developed: the “resection” algorithm aligns the digital twin with the physical twin regardless of the location of the total station, and the “transformation” algorithm gives instructions of translations and rotations to installers to achieve the desired installation pose. The algorithms were evaluated experimentally on a lab-scale demonstration. Results show that the resection algorithm achieved an average error of < 3.1 mm, while the transformation algorithm predicted the rotation angle along a single axis with an error of < 0.5◦.

Tang, Mengjia↗

Galvanic Liquid Applied Coating System For Protection of Embedded Steel Surfaces from Corrosion

Corrosion of reinforcing steel in concrete is an insidious problem facing Kennedy Space Center (KSC), other Government Agencies, and the general public. These problems include KSC launch support structures, highway bridge infrastructure, and building structures such as condominium balconies. Due to these problems, the development of a Galvanic Liquid Applied Coating System would be a breakthrough technology having great commercial value for the following industries: Transportation, Infrastructure, Marine Infrastructure, Civil Engineering, and the Construction Industry. This sacrificial coating system consists of a paint matrix that may include metallic components, conducting agents, and moisture attractors. Similar systems have been used in the past with varying degrees of success. These systems have no proven history of effectiveness over the long term. In addition, these types of systems have had limited success overcoming the initial resistance between the concrete/coating interface. The coating developed at KSC incorporates methods proven to overcome the barriers that previous systems could not achieve. Successful development and continued optimization of this breakthrough system would produce great interest in NASA/KSC for corrosion engineering technology and problem solutions. Commercial patents on this technology would enhance KSC's ability to attract industry partners for similar corrosion control applications.

Curran, Joseph↗

2020 Solar Decathlon Education Partner: Cooperative Research and Development (Final Report, CRADA Number CRD-19-00802)

The U.S. Department of Energy Solar Decathlon (DOE/SD) is a collegiate competition, comprising 10 contests, that challenges student teams to design and build highly efficient and innovative buildings powered by renewable energy. The winners will be those teams that best blend architectural and engineering excellence with innovation, market potential, building efficiency, and smart energy production. The DOE/SD is comprised of two Challenges--Design Challenge (annual, in April of each year at NREL in Golden, Colo.) and Build Challenge (biennial, held next in June/July 2020 in Washington D.C.). NREL provides competition management for DOE/SD. For over 35 years, EEBA has provided the most trusted resources for building science information and education in the construction industry. EEBA delivers turn-key educational resources and events designed to transform residential construction practices through high performance design, marketing, materials, and technologies. NREL and EEBA establish this CRADA to enable the success of the DOE/SD program in managing sponsorship funds and creating a professional education program. EEBA acted as an Education Partner to DOE/SD, which included: 1) accepting and dispersing sponsorship funds for DOE/SD; and 2) providing professional development content.

14 SOLAR ENERGY↗

GROUT TEMPERATURE MEASUREMENTS IN 105-R DISASSEMBLY BASIN D AND E CANAL

The 105-R Reactor Disassembly Basin Grout Placement Strategy Report (SRNL-TR-2009-00157) identifies various portions of the facility that will undergo an in-situ decommissioning process. The estimated residual radioactive contamination in the 105-R facility is shown in Figure 1. Cementitious grout formulations developed by SRNL are being used to immobilize and isolate the radioactive contamination in existing below grade portions of the 105-R building as shown by the gray-hatched area in Figure 2. A Zero Bleed flowable fill was formulated for both dry placement and for underwater placement. The first major area in the 105-R Disassembly Basin to undergo the grouting process was the D&E Canal and an underlying void space known as the Chase. Grout temperature data was needed to ensure that the grout mix design was on the correct grout curing trajectory to meet the material compressive strength requirement of 50 pounds per square inch. Initial grout temperature measurements were needed to confirm and optimize grout mix design fresh property characteristics; i.e. material strength, and set time. Grout curing temperature is an integrating fresh property characteristic that is used to estimate cementitious material strength in accordance with the Standard Practice for Estimating Concrete Strength by the Maturity Method, ASTM C 1074. The Maturity Method is used in the construction industry to estimate in-place strength of concrete to allow the start of critical construction activities; e.g. formwork removal, removal of cold weather protection, opening of roadways to traffic, etc. Applying this methodology provides an expeditious means to estimate in-place grout strength based on compressive strength laboratory results. The Maturity Method results define the relationship between strength-time and age-time that may be utilized in the field for estimating strength after a given time of placement. Maturation curves were developed under the 105-R Reactor Disassembly Basin Cementitious Materials Laboratory Test Plan (SRNL-TR-2009-00175) to establish grout mix maturation indices for this relationship. Temperature data collected from the D&E grout placement will be evaluated against these maturation indices in a subsequent analysis. Grout temperature data outside the maturation indices highlight the opportunity to adjust the grout mix design for future placements. The pre-existing grout placement will not be removed since this material will comply with strength requirements under the normal curing duration. SRNL designed a standalone measurement system to collect grout mass placement temperature data in the D&E Canal. Four vertical poles instrumented with thermocouples were positioned in the canal prior to grout placement. The thermocouples were connected to stand-alone, battery-powered data recorders mounted nearby that were configured to take temperature recordings every 10 minutes for up to 100 days. Unfortunately, after just 2 weeks, data collection was terminated because the thermocouple wires connecting the data loggers to the thermocouple poles were severed during construction activities. This report will highlight the unique challenges in designing a data collection system for the D&E canal, describe the temperature measurement system and its installation, and present calculated as well as measured temperature values.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Experimental validation of multiphysics model simulations of the thermal response of a cement clinker rotary kiln at laboratory scale

Abstract An increasing demand for buildings, transportation systems and civil infrastructure development has driven expansion of cement consumption world‐wide, producing a significant increase in related global energy demand. With approximately 7% of the world‐wide industrial energy consumption (10.7 exajoules [EJ]), the cement industry is the third most energy intensive industrial processes and a key component for concrete, the most consumed composite material in the global construction industry. In cement manufacturing, the cement kiln accounts for most of the energy consumption in the production process. As the heart of a cement plant, the cement kiln is where the kiln feed primarily containing calcium oxide (CaO), silica (SiO 2 ), alumina (Al 2 O 3 ), and iron (Fe 2 O 3 ) are thermally and chemically transformed into clinker minerals. The presented work developed a multiphysics model, designed and built a laboratory‐scale rotary cement clinker kiln, and produced cement clinker at laboratory‐scale. The model was developed to study the interaction between the various thermal, fluid dynamic and chemical interactions involved in the sintering process used to form Portland cement clinker in an effort to reduce energy use. The analytical model was validated through experimental testing using a unique laboratory‐scale rotary cement kiln developed during the investigation. Also demonstrated was the feasibility of producing clinker at laboratory scale. This modeling and lab scale tests were designed to better understand the clinker sintering process so that operational and quality decisions can be made to optimize energy consumption without compromising cement clinker quality. The computational fluid dynamics modeling was developed in COMSOL Multiphysics 6.0. The characteristics of the combustion fluid flow, concentration of species, temperature and heat transfer were studied for a turbulent flow of methane (CH 4 ) gas and oxygen (O 2 ). Theory suggests that heat transfer impacts the cement production process but the multiphysics model more accurately describes the convection, conduction, and radiant heat transfer in the kilning process and thus allows for a better understanding of the energy exchange driving the chemical reactions that produce Portland cement. Clinker minerals were formed because of appropriate burning conditions implemented during experimental model validation.

Tabares, Juan David↗

Social cost in construction projects

Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

54 ENVIRONMENTAL SCIENCES↗

Integration of a real-time orientation measurement system for a real-time evaluator (RTE) to measure the position and orientation of crane-lifted components

Prefabrication of building components holds the potential to revolutionize the construction industry. Prefabrication consists of manufacturing building components, modules, and other elements in a factory to be shipped and installed on a construction site. Prefabricated components have been produced for various applications including precast concrete panels for new construction and exterior wall retrofits. The manufacturing process has seen much innovation in recent years; however, the installation process has seen minimal advancements. A real-time evaluator (RTE) was developed to reduce the installation cost of prefabricated components by reducing installation time, decreasing rework, and improving accuracy. The RTE uses off-the-shelf hardware and novel algorithms to assist erectors with component installation by measuring the real-time positions of connections and prefabricated components, providing installation guidance through a graphical user interface, and monitoring the accumulated installation errors. An overview of the RTE and the proposed workflow is presented. Previous on-site demonstrations provided valuable feedback from users on the potential areas for improvement of the system. One common request was real-time measurement of component orientation during lifting, a process that previously required that the component remain stationary while the laser tracker cycled through target prisms. This paper will present the incorporation and testing of a real-time orientation measurement system as it was implemented into the RTE, allowing for measurement of component orientation during movement.

Selvakumar, Balaji [ORNL]↗

Demand Response in Residential Energy Code: Technical Brief

As buildings account for over 75% of U.S. electricity use, effectively managing their loads can greatly facilitate the transition towards a clean, reliable grid. Grid-interactive efficient buildings (GEBs) combine efficiency and demand flexibility with smart technologies and communication to provide occupant comfort and productivity while serving the grid as a distributed energy resource (DER). In turn, GEBs can play a key role in ensuring access to an affordable, reliable, sustainable, and modern U.S. electric power system. Their national adoption could provide $\$$100-200 billion in U.S. electric power system cost savings over the next two decades. The associated reduction in CO 2 emissions is estimated at 6% per year by 2030 (DOE 2021). Building codes represent standard design practice in the construction industry and continually evolve to include advanced technologies and innovative practices. Historically, national model energy codes establish minimum efficiency requirements for new construction (ICC 2020). Expanding codes to support GEB capabilities is a pivotal step towards realizing demand flexibility in support of a clean grid by addressing capabilities to improve interoperability between smart building systems, the grid, and renewable energy resources. Realizing GEBs requires buildings with automated demand response (DR) capabilities that enable standardized communication with or control of, subject to explicit consumer consent, energy smart appliances or home energy management systems. This is achieved through direct or indirect (i.e., via an aggregator) communication between appliances and the electric grid. Energy codes can also support DR communication standardization and advance the deployment of building-integrated DERs such as energy storage, generation, and electric vehicles (EVs). Incorporating automated DR capabilities in energy codes provides many benefits to the consumers. Specifically, it aligns building electric load demand with intermittent renewable energy source availability, decreases peak load on the electric grid, allows buildings to respond to utility price signals, supports electrical network reliability and market growth of products and processes aligned with clean economic growth. The incorporation of DR into the model residential energy codes was considered for both the 2021 and 2024 International Energy Conservation Code (IECC) code development cycles. The approved DR measures in the 2021 cycle were removed in response to appeals (ICC 2020). Updated language was presented for consideration again for the 2024 IECC, where it was negotiated and again approved, and again removed in response to appeals (ICC 2024). This resulted in many sections, including sections on demand responsive controls, being moved to the credits options or an appendix as a voluntary application. This technical brief updates the proposed DR components such that they can be considered by states and local governments for direct incorporation into their codes, as well as for future IECC energy code development. The proposal refinements are intended to support consistency in approach and provide a degree of certainty for building owners, designers, contractors, manufacturers, and building and fire safety professionals. The scope of this technical brief includes three strategies for DR in residential buildings: 1) smart thermostats with demand-responsive control, 2) electric water heating incorporating demand-responsive controls and communication and 3) grid Integrated solar and energy storage systems.

2021 IECC↗