Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CLINKER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Nanostructural evolution of Al(OH)3 gel formed by the cubic and orthorhombic ye'elimite clinkers of calcium sulfoaluminate cements in an ultra-wide hydration temperature range

This paper investigated the influence of hydration temperature on the nanostructure of the AH{sub 3} phase formed in calcium sulfoaluminate cements. Orthorhombic ye'elimite (st-ye'elimite) and cubic ye'elimite (ss-ye'elimite) were hydrated in an ultra-wide temperature range (5–220 °C). Results showed that the AH{sub 3} phase formed by ss-ye'elimite was always microcrystalline in nature at various curing temperatures (5–130 °C), and transformed into the AlOOH phase at 150 °C and above. However, the AH{sub 3} phase formed by st-ye'elimite grew from a microcrystal to a favorable crystal as the temperature increased, and transformed into the AlOOH phase at 170 °C and above. The nanostructure of hydration products was further investigated using TEM/SAED analysis together with FE-SEM images, directly evidencing that the formed AFm-12 phase was single-crystal in nature, and the formed AH{sub 3} phase was microcrystalline at low temperatures and grew into single-crystal hexagonal prisms with the preferred growth direction along [001] direction at high temperatures.

36 MATERIALS SCIENCE↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Synthesis and characterisation of alites from reduced basic oxygen furnace slags

Basic oxygen furnace slags (BOFS) are by-products of the steelmaking process. Several researchers have studied the production of Portland cement clinker and metallic iron from BOFS via a reductive treatment. }In this study, we applied a carbothermal reduction of BOFS in a technical-scale electric arc furnace and characterised the clinker-like products. Those clinker-like non-metallic products (NMPs) had a chemical and mineralogical composition comparable to clinker for ordinary Portland cement (OPC) and contained large elongated alite crystals as major component. The pure NMPs reacted more slowly and achieved a lower degree of hydration compared with commercial OPC. }If the reactivity of the products can be further increased by employing specific adaptations, it can be used as a full clinker substitute for OPC. Nevertheless, it is also an option to use the material without further modifications as a cement component or concrete addition, which contributes to the strength development in both cases.

36 MATERIALS SCIENCE↗

Production of α' H -belite-CSA cement at low firing temperatures

A global increase in population creates a need for infrastructure development to stimulate economic growth and improve quality of life. Concrete plays a significant role in this development due to its availability and mechanical strength. Ordinary Portland cement (OPC) has been the most utilized binder in the construction industry since its formulation. However, OPC production has an enormous energy demand and generates large quantities of CO 2 . This research investigates the production of a clinker, containing mainly the hydraulically activated alpha'H-belite polymorph and calcium sulfoaluminate (ye'elimite or C4A3$\acute{S}$), at a lower firing temperature, using a combination of fluoride and boron oxide. This novel clinker addresses the problem of creating high strength cements at extremely low firing temperatures of 1000–1050 °C (a decrease of 450–500 °C as compared to OPC, and a decrease of 200–250 °C as compared to calcium sulfoaluminate (CSA) cement). This clinker reduces CO 2 emissions from energy consumption and by producing phases with lower limestone requirements. The combination of lower firing temperatures and clinker phases that require lower limestone requirements provide a means to reduce CO 2 emissions.

36 MATERIALS SCIENCE↗

Climate control on Quaternary coal fires and landscape evolution, Powder River basin, Wyoming and Montana

Late Cenozoic stream incision and basin excavation have strongly influenced the modern Rocky Mountain landscape, but constraints on the timing and rates of erosion are limited. The geology of the Powder River basin provides an unusually good opportunity to address spatial and temporal patterns of stream incision. Numerous coal seams in the Paleocene Fort Union and Eocene Wasatch Formations within the basin have burned during late Cenozoic incision, as coal was exposed to dry and oxygen-rich near-surface conditions. The topography of this region is dominated by hills capped with clinker, sedimentary rocks metamorphosed by burning of underlying coal beds. We use (U-Th)/He ages of clinker to determine times of relatively rapid erosion, with the assumption that coal must be near Earth's surface to burn. Ages of 55 in situ samples range from 0.007 to 1.1 Ma. Clinker preferentially formed during times in which eccentricity of the Earth's orbit was high, times that typically but not always correlate with interglacial periods. Our data therefore suggest that rates of landscape evolution in this region are affected by climate fluctuations. Because the clinker ages correlate better with eccentricity time series than with an oxygen isotope record of global ice volume, we hypothesize that variations in solar insolation modulated by eccentricity have a larger impact on rates of landscape evolution in this region than do glacial-interglacial cycles.

01 COAL, LIGNITE, AND PEAT↗

Crystal structure of low magnesium-content alite: Application to Rietveld quantitative phase analysis

Five members of tricalcium silicate solid solution, Ca{sub 3-x-y}Mg{sub x}Al{sub y}(Si{sub 1-y}Al{sub y})O{sub 5}, have been prepared. T{sub 1,} T{sub 3} and M{sub 3} forms have been identified by X-ray powder diffraction, but pure M{sub 1} form was not stabilized. The crystal structure of a sample nominally Ca{sub 2.96}Mg{sub 0.03}Al{sub 0.01}(Si{sub 0.99}Al{sub 0.01})O{sub 5} has been studied by a joint Rietveld refinement using strictly monochromatic laboratory X-ray and neutron powder diffraction data, with soft constraints of interatomic distances. The crystal structure of this alite is a T{sub 3} form with a triclinic cell, space group P 11-, of dimensions a = 11.6389(2) A, b = 14.1716(3) A, c = 13.6434(3) A, {alpha} = 104.982(2) deg., {beta} = 94.622(1) deg., {gamma} = 90.107(2) deg. and V/Z = 120.346(6) A{sup 3}. Laboratory and commercial clinkers were studied by synchrotron X-ray powder diffraction and the Rietveld method. The reported T{sub 3} structure for alite fits properly a variety of laboratory Portland clinkers with low magnesium contents. The alite refined volume(s) (V/Z) is useful to predict the magnesium oxide content of a clinker and the alite-type. Thus, a refined V/Z value between 121.0 and 120.3 A{sup 3} should contain up to {approx} 1.0 wt.% of MgO, being T{sub 3} type. If refined C{sub 3}S V/Z is smaller than {approx} 119.8 A{sup 3} the clinker may contain more than {approx} 2.1 wt.% of MgO with alite as M{sub 3}. For intermediate magnesium (and sulfur) contents, alites phase coexistence may be detected by using strictly monochromatic laboratory or synchrotron X-ray powder diffraction. However, the application of these results to commercial materials has to be taken cautiously due to the influence of other foreign ions in volume and alite-type.

36 MATERIALS SCIENCE↗

Alite-ye'elimite cement: Synthesis and mineralogical analysis

Alite-ye'elimite cement is an alternative cement that combines desirable characteristics of calcium sulfoaluminate cements and Portland cement in that it shows improved strength development at early age while retaining high portlandite contents. The key problem in the clinkering process is to produce the alite-ye'elimite phase assemblage so that both phases can co-exist. In this study, a new synthesis method is proposed to achieve the coexistence of alite and ye'elimite consisting of a secondary heat treatment step at 1250 °C after regular Portland clinker firing at 1450 °C. Quantitative X-ray powder diffraction and electron microscopy were used to analyze the phase composition of clinker before and after the secondary heat treatment. The results show that ye'elimite develops during secondary heat treatment of calcium sulphate enriched clinker by reaction of C{sub 3}A and sulphate phases. Additional ferrite is formed as result of rejection of Fe originally in solid solution with C{sub 3}A during ye'elimite formation.

36 MATERIALS SCIENCE↗

Calcined clay limestone cements (LC3)

The use of supplementary cementitious materials (SCMs) to replace part of the clinker in cement is the most successful strategy to reduce CO{sub 2} emissions in the global cement industry. However, limited supplies of conventional SCMs make it difficult to take this strategy further unless new types of SCMs become available. The only type of material available in the quantities needed to meet demand is clay containing kaolinite, which can be calcined to produce an effective SCM. Such clays are widely available in countries where most growth in demand for cement is forecast. Calcined clays have previously been used as pozzolans, but calcination makes the economics of substitution marginal in a conventional pozzolanic blend. The major innovation presented here is the possibility to make a coupled substitution of cement with calcined clay and limestone. This allows much higher levels of substitution. Blends where calcined clay is used as a pozzolan, typically have clinker contents around 65–70%. Combination of calcined clay with limestone allows higher levels of substitution down to clinker contents of around 50% with similar mechanical properties and improvement in some aspects of durability. The replacement of clinker with limestone in these blends lowers both the cost and the environmental impact.

36 MATERIALS SCIENCE↗

Influence of citric acid on the hydration of Portland cement

Citric acid can be used to retard the hydration of cement. Experiments were carried out to investigate the influence of citric acid on the composition of solid and liquid phases during cement hydration. Analyses of the solid phases showed that dissolution of alite and aluminate slowed down while analyses of the pore solution showed that citric acid was removed almost completely from the pore solution within the first hours of hydration. The complexation of the ions by citrate was weak, which could also be confirmed by thermodynamic calculations. Only 2% of the dissolved Ca and 0.001% of the dissolved K formed complexes with citrate during the first hours. Thus, citric acid retards cement hydration not by complex formation, but by slowing down the dissolution of the clinker grains. Thermodynamic calculations did not indicate precipitation of a crystalline citrate species. Thus, it is suggested that citrate sorbed onto the clinker surface and formed a protective layer around the clinker grains retarding their dissolution.

36 MATERIALS SCIENCE↗

Influence of limestone on the hydration of ternary slag cements

The hydration kinetics, microstructure and pore solution composition of ternary slag-limestone cement have been investigated. Commercial CEM I 52.5 R was blended with slag and limestone; maintaining a clinker to SCM ratio of 50:50 with up to 20% slag replaced by limestone. The sulphate content was maintained at 3% in all composite systems. Hydration was followed by a combination of isothermal calorimetry, chemical shrinkage, scanning electron microscopy, and thermogravimetric analysis. The hydration of slag was also followed by SEM image analysis and the QXRD/PONKCS method. The accuracy of the calibrated PONKCS phase was assessed on slag and corundum mixes of varying ratios, at different water/solid ratios. Thus, the method was used to analyse hydrated cement without dehydrating the specimens. The results show that the presence of limestone enhanced both clinker and slag hydration. The pore volume and pore solution chemistry were further examined to clarify the synergistic effects. The nucleation effects account for enhanced clinker hydration while the space available for hydrate growth plus the lowering of the aluminium concentration in the pore solution led to the improved slag hydration.

36 MATERIALS SCIENCE↗

Achieving Unprecedented CO 2 Utilization InCO 2 Concrete™: System Design, Product Development and Process Demonstration

Anthropogenic sources of carbon dioxide are generated from a number of sources, but the key among these are ordinary Portland cement (OPC) production and combustion of fossil fuels. Cement production is the largest global CO 2 source from the mineral decomposition of carbonates. This is due to the clinkering process whereby limestone (mainly consisting of CaCO 3 ) is decomposed into CaO and CO 2 , and combined with silica rich clays at high temperatures to form clinkers (i.e. the four key minerals that comprise cement). The high temperature range of 1400 – 1550°C required for this process accounts for up to 60% of the generated CO 2 from cement production. Combination of the limestone decomposition and thermal requirements of the clinkering process causes cement production to contribute 8-9% of annual global CO 2 emissions. Combustion of fossil fuels (coal, oil and gas) was shown to contribute a much larger portion of global CO 2 emissions. As of 2018, combustion of fossil fuels accounted for 65% of global CO 2 , where 41% was derived from stationary sources for electricity and heat generation and the other 24% was related to transport. To reduce these contributions, key steps forward in CO 2 utilization technologies are required. Therefore, a CO 2 mineralization technology (CO 2 mineralization concrete) to reduce the OPC content in concrete, while utilizing flue gas emissions from fossil fuel combustion has been developed to address both areas simultaneously. This Reversa™ technology utilizes low-carbon cementation agents produced by in situ CO 2 mineralization (“mineral carbonation reactions”) to offer a promising alternative to OPC. CO 2 mineralization relies upon the reaction of dissolved CO 2 with inorganic alkaline reactants to precipitate mineral carbonates (e.g., CaCO 3 ), which bind proximate particles and achieve cementation. Herein, a concrete green body, which is composed of a mixture of binder, water, and mineral aggregates, is exposed to CO 2 borne in industrial flue gas streams. This manner of CO 2 mineralization allows the production of construction components that feature equivalent engineering attributes as their OPC-based counterparts while featuring a much smaller embodied carbon intensity (eCI). The purpose of this project is to demonstrate the feasibility of the Reversa process evolving from a TRL-3 technology at the bench-scale up to TRL-6 technology at the pilot-scale. The reliability of the Reversa technology was tested to prove the effective production of three standard industrial concrete products selected during the course of the project. The results detailed herein will demonstrate the evolution of this technology to the industrial scale. The culmination of this work resulted in 9 production runs completed at the National Carbon Capture Center (NCCC), Wilsonville, AL, using natural gas (NG) flue gas as the CO 2 source. Over the course of the production runs at NCCC, the CO 2 utilization as a function of time, 24-h CO 2 uptake, electricity usage, and 28-d net area compressive strength recorded for each run. Collection of this data will be used to determine the success of the demonstration goals: (1) achieving in excess of 0.2gCO 2 /g reactant , (2) achieving greater than 50% reduction in global warming potential compared to standard produced units, and (3) ensuring compliance of carbonated concrete with industry standard specifications.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Environmentally Safe, Large Volume Utilization Applications for Gasification Byproducts

Samples of gasification by-products produced at Polk Station and Eastman Chemical were obtained and characterized. Bulk samples were prepared for utilization studies by screening at the appropriate size fractions where char and vitreous frit distinctly partitioned. Vitreous frit was concentrated in the +20 mesh fraction while char predominated in the -20+100 mesh fraction. The vitreous frit component derived from each gasifier slag source was evaluated for use as a pozzolan and as aggregate. Pozzolan testing required grinding the frit to very fine sizes which required a minimum of 60 kwhr/ton. Grinding studies showed that the energy requirement for grinding the Polk slag were slightly higher than for the Eastman slag. Fine-ground slag from both gasifiers showed pozzoalnic activity in mortar cube testing and met the ASTM C618 strength requirements after only 3 days. Pozzolanic activity was further examined using British Standard 196-5, and results suggest that the Polk slag was more reactive than the Eastman slag. Neither aggregate showed significant potential for undergoing alkali-silica reactions when used as concrete aggregate with ASTM test method 1260. Testing was conducted to evaluate the use of the frit product as a component of cement kiln feed. The clinker produced was comprised primarily of the desirable components Ca{sub 3}SiO{sub 5} and Ca{sub 2}SiO{sub 4} after raw ingredient proportions were adjusted to reduce the amount of free lime present in the clinker. A mobile processing plant was designed to produce 100 tons of carbon from the Eastman slag to conduct evaluations for use as recycle fuel. The processing plant was mounted on a trailer and hauled to the site for use. Two product stockpiles were generated; the frit stockpile contained 5% LOI while the carbon stockpile contained 62% LOI. The products were used to conduct recycle fuel tests. A processing plant was designed to separate the slag produced at Eastman into 3 usable products. The coarse frit has been shown to be suitable for use as clinker feed for producing Portland cement. The intermediate-size product is enriched in carbon (58-62% C) and may be used as recycle fuel either in the gasifier or in a PC boiler. The fines product contains 30-40% C and may also be used as a recycle gasifier fuel, as is presently done at TECO's Polk Station, however, due to gasifier operating requirements for the production of syngas, this is not feasible at Eastman.

01 COAL, LIGNITE, AND PEAT↗

Guidebook for Using the Tool BEST Cement: Benchmarking and Energy Savings Tool for the Cement Industry

The Benchmarking and Energy Savings Tool (BEST) Cement is a process-based tool based on commercially available efficiency technologies used anywhere in the world applicable to the cement industry. This version has been designed for use in China. No actual cement facility with every single efficiency measure included in the benchmark will likely exist; however, the benchmark sets a reasonable standard by which to compare for plants striving to be the best. The energy consumption of the benchmark facility differs due to differences in processing at a given cement facility. The tool accounts for most of these variables and allows the user to adapt the model to operational variables specific for his/her cement facility. Figure 1 shows the boundaries included in a plant modeled by BEST Cement. In order to model the benchmark, i.e., the most energy efficient cement facility, so that it represents a facility similar to the user's cement facility, the user is first required to input production variables in the input sheet (see Section 6 for more information on how to input variables). These variables allow the tool to estimate a benchmark facility that is similar to the user's cement plant, giving a better picture of the potential for that particular facility, rather than benchmarking against a generic one. The input variables required include the following: (1) the amount of raw materials used in tonnes per year (limestone, gypsum, clay minerals, iron ore, blast furnace slag, fly ash, slag from other industries, natural pozzolans, limestone powder (used post-clinker stage), municipal wastes and others); the amount of raw materials that are preblended (prehomogenized and proportioned) and crushed (in tonnes per year); (2) the amount of additives that are dried and ground (in tonnes per year); (3) the production of clinker (in tonnes per year) from each kiln by kiln type; (4) the amount of raw materials, coal and clinker that is ground by mill type (in tonnes per year); (5) the amount of production of cement by type and grade (in tonnes per year); (6) the electricity generated onsite; and, (7) the energy used by fuel type; and, the amount (in RMB per year) spent on energy. The tool offers the user the opportunity to do a quick assessment or a more detailed assessment--this choice will determine the level of detail of the energy input. The detailed assessment will require energy data for each stage of production while the quick assessment will require only total energy used at the entire facility (see Section 6 for more details on quick versus detailed assessments). The benchmarking tool provides two benchmarks--one for Chinese best practices and one for international best practices. Section 2 describes the differences between these two and how each benchmark was calculated. The tool also asks for a target input by the user for the user to set goals for the facility.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Techno-Economic Analysis of Cement Decarbonization Techniques: Oxygen Enrichment vs. Hydrogen Fuel

The Paris Agreement aims to limit global warming, and one of the most polluting sectors is heavy industry, where cement production is a significant contributor. This work briefly explores some alternatives, recycling, reducing clinker content, waste heat recovery, and carbon capture, discussing their advantages and drawbacks. Then, it examines the economic viability and benefits of increasing oxygen concentration in the primary burning air from 21 to 27 vol.%, which could improve clinker production by 7%, and the production of hydrogen through PEM electrolysis to make up 5% of the fuel thermal fraction, considering both in a cement plant producing 3000 tons of clinker per day. This analysis used reference values from Secil, an international company for cement and building materials, to determine the required scale of the oxygen and hydrogen production, respectively, and calculate the CAPEX of each approach. It is concluded that oxygen enrichment can provide substantial fuel savings for a relatively low cost despite a possible significant increase in NOx emissions. However, hydrogen production at this scale is not currently economically viable.

Domingues, Bruno C.↗

Methods of use of calcium hexa aluminate refractory linings and/or chemical barriers in high alkali or alkaline environments

A method for improving the insulating character/and or penetration resistance of a liner in contact with at least one of an alkali and/or alkaline environments is provided. The method comprises lining a surface that is subject to wear by an alkali environment and/or an alkaline environment with a refractory composition comprising a refractory aggregate consisting essentially of a calcium hexa aluminate clinker having the formula CA.sub.6, wherein C is equal to calcium oxide, wherein A is equal to aluminum oxide, and wherein the hexa aluminate clinker has from zero to less than about fifty weight percent C.sub.12A.sub.7, and wherein greater than 98 weight percent of the calcium hexa aluminate clinker having a particle size ranging from -20 microns to +3 millimeters, for forming a liner of the surface. This method improves the insulating character/and or penetration resistance of the liner.

36 MATERIALS SCIENCE↗