Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BESS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Solid-State Transformer and Hybrid Transformer With Integrated Energy Storage in Active Distribution Grids: Technical and Economic Comparison, Dispatch, and Control

Solid-state transformer (SST) and hybrid transformer (HT) are promising alternatives to the line-frequency transformer (LFT) in smart grids. The SST features medium-frequency isolation, full controllability for voltage regulation, reactive power compensation, and the capability of battery energy storage system (BESS) integration with multiport configuration. The HT has a partially-rated converter for fractional controllability and can integrate a small BESS. Fast grid-edge voltage fluctuations from increased solar photovoltaic (PV) and electric vehicle (EV) penetration are difficult to manage for mechanical load tap changers. Hence, along with the trend towards more BESS in the grid, the controllability and the storage integration capability of the SST and HT are of strong interest. However, a review of literature shows existing SST and HT research is mostly at converter level, while system-level assessments are scarce. Assessing technical and economic impacts is critical to understanding the benefits and role of the SST and HT to guide future research, which is presented for the first time in this article. Experimental results from medium-voltage (MV) SST and MV HT prototypes are shown to confirm equipment-level feasibility, where the voltage controllability waveforms of a MV HT prototype are reported for the first time. Comparative simulations are performed on a modified IEEE 34-bus system. Here, a grid-model-less decentralized grid-edge voltage control method and a day-ahead BESS dispatch method are proposed for the SST and HT. The simulations show that the SST and HT with integrated storage can host more PV, achieve peak shaving, mitigate voltage fluctuation and reverse power flow, and support energy arbitrage for operational cost reduction, as compared to the LFT. Moreover, comprehensive analyses of net present value (NPV) and internal rate of return (IRR) are performed under different installed PV capacities, HT’s partial converter ratings, and BESS capacities. Sensitivities to future cost reductions of the PV and BESS are studied. Although the NPV and IRR are currently negative, 60% capital cost reduction or 150% revenue increase will make the SST and HT economically viable in the use case studied.

14 SOLAR ENERGY↗

Energy Northwest - Horn Rapids Solar and Storage: An Assessment of Battery Technical Performance

Chartered in 1957 as a joint action agency of the state, Energy Northwest (ENW) is a consortium of 27 public utility districts and municipalities across Washington state. ENW takes advantage of economies of scale and shared services to help utilities run their operations more efficiently and at lower cost, to the benefit of more than 1.5 million customers. ENW develops, owns, and operates a diverse mix of electricity generating resources, including hydro, solar, and wind projects – and the Northwest’s only active nuclear energy facility. These projects provide enough reliable, affordable, and environmentally responsible energy to power more than a million homes each year, and that carbon-free electricity is provided at the cost of generation. The agency continually explores new generation projects to meet its members’ needs. In 2017, as part of the second round of funding from the Washington state Clean Energy Fund, the Washington State Department of Commerce granted up to $3 million in matching funds to develop an estimated $6.5 million project that deployed a 4-MW, 20-acre solar generating array of photovoltaic (PV) panels coupled with a 1 MW/5.5 MWh lithium-iron-phosphate battery energy storage system (BESS) in Richland, Washington. The combination of PV and BESS will provide a predictable, renewable generating source and will also serve as a training ground for solar and battery technicians throughout the nation. The City of Richland will purchase the power from the project and utilize the benefits of the energy storage. The project provides Washington state with its first opportunity to integrate a large-scale solar and storage facility into its clean mix of hydro, nuclear, and wind resources. This first-of-its-kind facility combines solar generation with battery storage and technician training. In 2019, Pacific Northwest National Laboratory (PNNL) worked with ENW to assess the integrated PV and BESS in representative use cases that could benefit the City of Richland. Between March and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (A) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline), and they are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (B) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with ENW. Five use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) transmission charge reduction, 4) Volt-VAR service, and 5) outage mitigation. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help ENW understand the performance of the Horn Rapids BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗

OPALCO - Decatur Island Solar and Energy Storage Project: An Assessment of Battery Technical Performance

Orcas Power & Light Cooperative (OPALCO) is a member-owned, nonprofit cooperative utility that provides energy services to approximately 11,200 customers across 20 islands in San Juan County, Washington. OPALCO’s mostly hydroelectric power is generated by Bonneville Power Administration and delivered to the islands by submarine cables. In 2016, as part of the second round of funding from the Washington state Clean Energy Fund, OPALCO received a $1 million matching grant to support a project that deployed a 504-kW LG community photovoltaic (PV) system in combination with a 1 MW/2 MWh lithium-iron-phosphate battery energy storage system (BESS) on Decatur Island, Washington. The Decatur Island Substation is essential to ensuring reliable energy for the residents of the San Juan Islands as it is the point of interconnection with the mainland transmission system. The BESS, in combination with the community solar array, will deliver an innovative method to both defer the costly upgrade of the transmission system and allow for other high-value applications intended to benefit the utility and its customers. In 2018, Pacific Northwest National Laboratory (PNNL) completed a preliminary economic assessment for several identified use cases in collaboration with OPALCO. Between August 2021 and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (a) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline) and are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (b) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with OPALCO. Four use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) outage mitigation, and 4) transmission deferral. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help OPALCO understand the performance of the Decatur Island BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗

Principles and Options for Designing Battery Energy Storage Zoning Ordinances

Deployment of battery energy storage (BESS) systems, both standalone and as part of hybrid systems paired with generation, has rapidly increased in the United States in recent years as utilities and communities have deployed storage to improve electric grid reliability and act as a cost-effective alternative to larger grid infrastructure. The modular nature of BESS technologies means systems may be built near other existing land uses, creating the potential for conflicts with neighboring landowners that can be managed and mitigated through zoning and permitting requirements established by local jurisdictions. While many cities and counties have adopted ordinances specific to BESS into their local zoning codes, these ordinances vary significantly in their requirements and level of detail. Meanwhile, many other jurisdictions, including those home to proposed or existing BESS projects, lack any specific language related to BESS in their zoning codes. Local planning and zoning officials have limited capacity and may lack the familiarity with BESS technologies needed to develop ordinances or otherwise make reasonable zoning decisions that balance safety, community impacts, and other goals. The resulting uncertainty at the local zoning level has led developers to withdraw projects in some areas and has spurred moratoria or bans on energy storage projects in others. This report intends to provide practical resources for practitioners interested in reasonable and effective local regulation of battery energy storage. It does not present a model zoning ordinance, but rather is intended to complement model ordinances developed by others by providing additional context and analysis regarding the structure of energy storage zoning ordinances and the decision points for local officials. Zoning ordinances at the city, town, and county level across the U.S. were surveyed alongside two template model ordinances to identify common elements and options for regulating the zoning and siting of BESS. Common elements identified and analyzed include definitions and general requirements, including cutoffs or tiers used to apply regulations to different system sizes and the permitted zones where jurisdictions allow BESS to be sited; visual, noise, and aesthetic requirements, including property line setbacks, fencing and visual screening, noise, and lighting requirements; and safety and planning requirements, such as site plans, decommissioning plans or funds, and requirements for access by emergency services. The report also summarizes some of the more unique regulations, including those that place additional restrictions on BESS at the local level.

25 ENERGY STORAGE↗

Demonstration of Power System Black Start with Hydropower Generator and Battery Energy Storage: Preprint

Battery energy storage systems (BESS) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various services to the grid. This paper presents the hardware demonstration and characterization of using a utility-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to perform a bottom-up power system black start that enhances power systems' resiliency. ROR hydropower plants are generally not used for power system restoration due to their frequency instability during islanded operation; however, BESS with droop control can provide critical damping to convert a ROR hydropower generator into a blackstart- capable unit. To demonstrate this, we carry out hardware experiments at the megawatt-scale integrating a synchronous generator driven by a dynamometer, an actual GFL/GFM BESS, a medium-voltage impedance network, and a load bank. The demonstration shows the different roles of BESS with GFL and GFM control in power system restoration. GFL BESS can suffer from high-frequency oscillations, even instability, depending on the droop control gain and loading condition. The results provide further insights for system operators on how GFL- or GFMcontrolled BESS can enhance grid stability and how hydro-BESS hybrids can operate as a black-start-capable unit. The presented experimental results are also a valuable resource to understand the different stability characteristics of real-world BESS with different control modes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Provision of Grid Services by PV Plants with Integrated Battery Energy Storage System: Preprint

Battery energy storage systems (BESS), due to their tremendous range of uses and configurations, may assist PV integration in any number of ways by increasing power system flexibility. In this paper we describe results of a research project conducted by NREL and First Solar for developing controls and demonstrating many use cases for PV-BESS systems including (1) matching generation to loads through time shifting, reducing PV curtailment,; (2) promoting higher levels of PV penetrations by balancing the grid through ancillary services; (3) use of PV-BESS systems to provide wide-area stability services in the form of oscillations damping controls; and (r) use of gird forming BESS for enabling black start and islanded applications for PV-BESS systems. In the paper we will also describe the unique multi-MW test and validation platform developed at NREL for conducting research on fielded utility-scale PV-BESS systems. The platform consists of First Solar 0.43 MW PV power plant, NREL’s 1MW/1MW BESS, 2MW PV power supplies and 7MVA power electronic grid simulator interfaced with industrial plant controllers and power-hardware-in-the-loop (PHIL) capability.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Multi-service battery energy storage system optimization and control

Battery energy storage systems (BESS) have become fundamental part of modern power systems due to their capability to provide multiple grid services. As the renewable penetration increases, BESS procurement is also expected to increase where it is envisioned to play a systematic and strategical role in power systems planning and operation. Hence, in this paper we present a multiple grid service procurement and operation for BESS - ranging from energy arbitrage, reserve/regulation services, power factor correction, and demand management. The proposed framework considers an optimal multi-temporal dimension, designed to be operable for both planning and real-time operation. Moreover, non-linearity inherent to BESS services and uncertainty associated to market forecasts variables are addressed using techniques such as polyhedral norms and robust optimization approaches. Here, the developed model is tested using a utility-scaled BESS and the obtained results show the effectiveness of the systematic BESS multi-service planning and operation approach.

25 ENERGY STORAGE↗

Applying Utility's Advanced Grid Technologies to Improve Resiliency of a Critical Load

The US DOE Office of Electricity's Energy Storage Program's joint R&D work with the Cordova Electric Cooperative (CEC) has deployed several advanced grid technologies that are providing benefits today to Cordova Alaska's electricity users. Advanced grid technologies deployed through DoE co-funded R&D include a 1MW Battery Energy Storage System (BESS), and enhanced monitoring including Phasor Measurement Units (PMU's) to help better understand the operational impacts of the added BESS. This paper will highlight key accomplishments to-date in deploying and using advanced grid technologies, and then outline the next phase of work that will use these technologies to implement an operating scheme to reconfigure the utility's distribution system and utility resources including BESS to provide emergency back-up power to a critical load: the Cordova Community Medical Center (CCMC). This paper will include additional insights on the use of utility resources to support critical loads via case study examples by the National Rural Electric Cooperative Assoc. (NRECA).

BESS↗

Key Considerations for Adoption of Technical Codes and Standards for Battery Energy Storage Systems in Thailand

Battery storage is “technology that enables power system operators and utilities to store energy for later use. A battery energy storage system (BESS) is an electrochemical device that charges (or collects energy) from the grid or a power plant and then discharges that energy at a later time to provide electricity or other grid services when needed”. As countries in Asia consider the inclusion of BESS in their power systems to meet policy objectives, renewable energy goals, increase resilience, and expand energy access, there is an opportunity to learn from the experiences of other regions and jurisdictions that have developed more advanced storage markets and deployment methodologies. This report presents global best practices of codes, standards, and interconnection procedures developed to support the safe and reliable deployment of BESS. Several relevant case studies highlight current efforts to ensure safe operation of BESS and showcase potential pathways for adoption of relevant codes and standards. Specifically, this report is intended to support the Thailand Office of Energy Regulatory Commission (OERC) and other stakeholders in their efforts to develop technical codes and standards to govern the installation and operation of BESS; it may also be utilized as a guide for other countries as interest in the deployment of BESS technologies continues to grow.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluating the Risk of Enabling Energy Storage Systems to Provide Multiple Services

Battery energy storage systems (BESS) are emerging as a promising, versatile technology for modern power grids due to their inherent distributed nature, their ability to inject bidirectional power flows and to provide multiple grid services. With the proliferation of intermittent renewable energy resources, the BESS procurement is also expected to increase, thereby creating systematic and strategic opportunities for BESS to various revenue streams for providing multiple grid services. Utilizing a co-simulation architecture, this work presents evaluation framework for enabling Utility-scale BESS with simultaneous provision of multiple services. The proposed framework is implemented on a real-life feeder modeled in GridLAB-D, leveraging multi-service grid support. A Risk-Aware control strategy is also implemented in this work that that takes into account the uncertain nature of some of the stochastic services and ensures the BESS to deliver their service commitments. This promotes overall grid reliability and encourages BESS implementation through the revenue streams from providing multiple grid services.

Theisen, John↗

Integration of Storage in the DC Link of a Full Converter-Based Distributed Wind Turbine

Energy storage is known to support the dispatchability of variable renewable resources. In this paper, we model a battery energy storage system (BESS) integrated with the DC link of a Type IV full converter-based wind turbine and the necessary controls to achieve efficient dispatch. To support the validation of control methodologies, we build a detailed model of a Type IV research wind turbine at the National Renewable Energy Laboratory (NREL), the Controls Advanced Research Turbine (CART 3), and we integrated a lithium-ion BESS model in grid-following mode into the model. The simulation results illustrate the sizing and control of the DC link-integrated BESS for a given variable wind resource and varying dispatch strategies (i.e., under constant, uncertain, and ramping wind scenarios). The integrated storage can smooth variabilities in distributed wind output, hedge against uncertainties, provide the ramping capability, as well as support stability under voltage and frequency transients. All of these have been illustrated in MATLAB/Simulink.

DC-link voltage↗

Impacts of Control Set-Points on Battery Energy Storage Performance for Peak Shaving Application

This article presents the impact of battery energy storage system’s (BESS) control triggers on its performance during peak shaving application. With the increasing deployment of BESS for load leveling and grid capacity relief, the sensitivity of BESS performance to its set-points is yet to be investigated. Most utilities have defined thresholds for activating BESS control during peak demand leveling and baseload BESS charging. However, this study shows that without using optimal setpoints for control applications, the BESS can be under-utilized. Simulations results of the peak shaving algorithm implementation in 30-minute time step over a period of 10 years show the impact of different set-points on distribution transformer loading, line and system losses.

battery energy storage system↗

Regional Power System Black Start with Run-of-river Hydropower Plant and Battery Energy Storage

Battery energy storage systems (BESSs) are an important asset for power systems with high integration levels of renewable energy, and they can be controlled to provide various critical services to the power grid. This paper presents the real-world experience of using a megawatt-scale BESS with grid-following (GFL) and grid-forming (GFM) controls and a run-of-river (ROR) hydropower plant to restore a regional power system. To demonstrate this, we carry out power-hardware-in-the-loop experiments integrating an actual GFL- or GFM-controlled BESS and a load bank. Both the simulation and experimental results presented in this paper show the different roles of GFL- or GFM-controlled BESS in power system black starts. The results provide further insight for system operators on how GFL- or GFM-controlled BESS can enhance grid stability and how an ROR hydropower plant can be converted into a black-start-capable unit with the support of a small-capacity BESS. The results show that an ROR hydropower plant combined with a BESS has the potential of becoming one of enabling elements to perform bottom-up black-start schemes as opposed to conventional bottom-down method, thus enhancing the system resiliency and robustness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Sizing battery energy storage and PV system in an extreme fast charging station considering uncertainties and battery degradation

In this paper, we present mixed integer linear programming (MILP) formulations to obtain optimal sizing for a battery energy storage system (BESS) and solar generation system in an extreme fast charging station (XFCS) to reduce the annualized total cost. The proposed model characterizes a typical year with eight representative scenarios and obtains the optimal energy management for the station and BESS operation to exploit the energy arbitrage for each scenario. Contrasting extant literature, this paper proposes a constant power constant voltage (CPCV) based improved probabilistic approach to model the XFCS charging demand for weekdays and weekends. This paper also accounts for the monthly and annual demand charges based on realistic utility tariffs. Furthermore, BESS life degradation is considered in the model to ensure no replacement is needed during the considered planning horizon. Different from the literature, this paper offers pragmatic MILP formulations to tally BESS charge/discharge cycles using the cumulative charge/discharge energy concept. McCormick relaxations and the Big-M method are utilized to relax the bi-linear terms in the BESS operational constraints. Finally, a robust optimization-based MILP model is proposed and leveraged to account for uncertainties in electricity price, solar generation, and XFCS demand. Case studies were performed to signify the efficacy of the proposed formulations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhanced Inertial Support: Modeling Fast Frequency Response Controls for Energy Storage System Inverters

Reduction of power system inertia is a growing concern for grid operators given the transition under way from conventional fossil generators to inverter-based resources. One key concern is the rapid and severe dip in power system frequency following a large disturbance which could trigger remedial actions including operation of under frequency load shedding (UFLS) relays. A potential solution is to utilize battery energy storage systems (BESS) to provide fast frequency response(FFR) to mitigate the system frequency impact of low system inertia. In this work, we investigate different control parameters to achieve modeled FFR response from BESS in the simulated US Western Interconnection. First, a very low inertia model is developed from an existing positive sequence model of the Western Interconnection. Afterwards, we tune the BESS dynamic response parameters to eliminate any risks of reaching UFLS relay thresholds following the loss of large generators. Finally, we investigate the relative impact of having large BESS units in comparison of multiple smaller units in the same area. The results of the analyses indicate that 1 GW of transmission-connected BESS can help mitigate the frequency drop caused by large generators outages in the Western Interconnection, and significantly reduce the risk of under frequency load shedding.

power system dynamic performance, Low Inertia, Fas↗

Preparing Distribution Utilities for Utility-Scale Storage and Electric Vehicles: A Novel Analytical Framework

Emerging distributed energy resources (DERs)—such as solar photovoltaics (PV), battery energy storage systems (BESS), and electric vehicles (EVs)—are expected to increase substantially in India in the coming years following policy-driven targets of the Government of India to modernize its electricity system, reduce greenhouse gas emissions (GHGs), and improve air quality. These emerging technologies can pose challenges to distribution utilities, forcing overhauls in planning and operational practices. They can also create challenges in power system infrastructure planning and cause more frequent system operational violations (e.g., network voltage bounds and loading thresholds) if not properly integrated. The impacts on the localized power distribution grid from these emerging technologies manifest in increased infrastructure investments and erratic shifts in demand patterns. These impacts are not yet well understood, and analytic solutions are not readily available. To address these challenges, the National Renewable Energy Laboratory (NREL), in collaboration with BSES Rajdhani Power Ltd. (BRPL), developed an advanced power distribution system impact analysis framework of BRPL’s distribution system. This framework helps analyze the readiness of the power distribution network to accommodate emerging technologies and the potential opportunities they might introduce. The framework has been predominantly set up to evaluate distributed PV, BESS, and EVs. In this collaboration between NREL and BRPL, we developed and evaluated the framework on two distribution feeders in the BRPL territory for various scenarios of BESS and EVs. BESS are evaluated for their effectiveness on the grid to mitigate present and future feeder overloading scenarios, and they are subsequently analyzed for their costs compared to the costs of traditional upgradation measures. Scenarios include assessing the effects of EV density on grid infrastructure upgrades and interlinking EV management with BESS integration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Storage in Local Zoning Ordinances

Increasing policy support and declining prices for battery energy storage systems (BESS) are driving rapid growth in the installation of these systems in the United States and around the world. Because a BESS is modular in nature and has limited infrastructure requirements, it can be built in close proximity to existing uses, which creates the potential for conflict. As the use of BESS grows, local planning and zoning staff are increasingly being asked to determine where the systems can be built and how their impacts on surrounding uses can be mitigated. While a large-scale BESS offers significant electric grid and societal benefits, it can also pose safety, visual, auditory, and environmental impacts on the community in which it is located. While these are material impacts, current safety codes for energy storage systems and land use frameworks provide planners with the necessary tools and processes to mitigate those impacts and ensure that their communities safely receive the benefits of energy storage systems. This report provides an overview of BESS from a land use perspective and describes their implications for zoning and project permitting. It concludes with an analysis of current energy storage zoning standards adopted by local jurisdictions in the U.S. Its intent is to objectively inform land use decisions for energy storage projects by equipping planning officials with relevant information about these technologies and knowledge of what questions to ask during review processes, so that energy storage projects can move forward in ways that will benefit electric systems while not unduly affecting host communities.

25 ENERGY STORAGE↗

Assessing Cost-Optimal Battery Energy and Solar-Plus-Storage Systems for Federal Customers: A Nationwide Assessment: Preprint

Prior research has identified that the financial viability of behind-the-meter battery energy storage systems is heavily dependent on technology cost, utility rate structure, energy consumption patterns, and co-deployment with synergistic technologies like solar photovoltaics (PV), among other factors. This study builds on existing research by comprehensively evaluating the economics of battery energy storage systems (BESS) and solar-plus-storage systems for a reference office building at 755 reference sites under 834 utility rates, and four storage capital cost scenarios. Results indicate that even with dramatic cost reductions, BESS is likely to be cost-effective only under utility rates that include demand charges, and possibly include time-of-use (TOU) pricing as well. Even under these utility rates, BESS systems provide marginal savings, and office building operators are unlikely to deploy the technology for cost savings alone. Solar-plus-storage systems provide more savings than BESS and allow for larger economic storage capacities. Solar-plus-storage provides compelling savings opportunities at baseline prices, and even at capital costs 25% higher than baseline. Solar-plus-storage is most effective where there are demand charges and energy pricing schemes include TOU pricing, or where electricity is expensive (at least $0.30/kWh). Our case studies illustrate that the presence of demand charges, even at similar energy costs, can be the deciding factor in BESS and solar-plus-storage viability. The findings and maps from this assessment may be of use to planners, building owners, and developers looking for potentially economic storage opportunities.

battery energy storage systems↗