Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Artemis power system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Orion's Powered Flight Guidance Performance During Artemis I

Artemis is NASA’s campaign to explore the Moon and beyond. Artemis I, the un-crewed exo-LEO test flight, was completed in 2022. The Artemis I mission provided the means to prove-out both vehicle and systems as a pre-cursor to more advanced missions. The Orion capsule and service module had to be capable of accurately executing all major orbital burns and numerous correction burns to successfully execute the mission profile. In support of this needed translation maneuver capability, a powered flight guidance algorithm has been designed that provides a number of guided burn options depending on the burn objective. Some of these guidance options are based on classic orbit transfer problems, such as Lambert's time-of-flight problem. Some are based on proven NASA heritage manned space programs like Apollo and Shuttle. Some are new concepts that fill unique niche requirements. All of these options are integrated into an architecture based on a proven Shuttle heritage design, with a simple closed-loop guidance strategy, that provides both modularity, simplicity and adaptability to future, as yet to be defined, mission profiles. This paper will summarize the performance of Orion’s orbital powered flight guidance during the mission.

space guidance↗

Quantifying Risk to Improve Medical System Design for Long Duration Artemis Missions: A Demonstration of NASA's IMPACT Tradespace Analysis Tool

BACKGROUND NASA’s human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in-mission medical care. A greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and constraints on the evacuation of ill or injured crew. Mass, volume, and power will be limited while higher demands will be placed on the crews to manage medical events. NASA’s Moon to Mars exploration strategy outlines increasingly complex Artemis missions both in terms of duration and operations. In these more challenging deep space missions, it is important to quantitatively estimate the human system risk attributable to medical conditions and use these estimates to advance medical system design. METHODS IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a probabilistic risk assessment (PRA) and tradespace analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 includes a novel evidence library baselined to exploration environments; an expanded list of 119 medical conditions; a large increase in the number of medical resources and the flexibility of their use; and the ability for rapid and iterative analysis. Medical system risk estimates include loss of crew life, consideration of the need for return to definitive care (medical evacuation), and an estimate of crew time affected due to medical conditions. A notional long duration lunar orbit and lunar surface design reference mission (DRM) was chosen with a 4-astronaut crew to mimic a foundational exploration Artemis mission. The DRM profile includes outbound transit on Orion, Gateway space station rendezvous in lunar orbit, 6 months on the Lunar surface with extravehicular activity (EVA), return rendezvous with Gateway, and transit back to Earth. RESULTS/DISCUSSION: Overall, IMPACT successfully quantified medical risk and derived an optimal medical system to support crew on a long duration lunar mission. In this DRM, the calculated loss of crew life from a medical event was 0.008 events per mission, risk of potential need for evacuation was 0.30 events per mission, and cumulative crew time affected by medical conditions was 103 days. The medical conditions that most contributed to medical risk were decompression sickness, trauma, and respiratory failure. The conditions that had the largest effects on crew performance included musculoskeletal injuries and lunar dust exposure. The IMPACT-generated medical system included resources that target the most common and highest risk conditions and performed as expected. This demonstrates the value of the IMPACT tool in medical system design for human exploration spaceflight missions.

Arian Anderson↗

Application of Solar Electric Propulsion to the Low Thrust Lunar Transit of the Gateway Power and Propulsion Element

NASA has committed to returning to the moon, landing the first woman and the next man on its surface. To support a sustained lunar presence, NASA will assemble an orbital platform in a quasi-stable orbit near the moon known as a Near Rectilinear Halo Orbit (NRHO). This platform, known as Gateway, will support long duration exploration missions targeting the lunar south pole. An architecture simplification implemented in 2020 combined the first two elements of the Gateway together onto a single commercial launch vehicle (CLV). When launched, the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO) will form the initial capability of NASA’s Gateway. The PPE, with its high-power Solar Electric Propulsion (SEP) system, will propel the combined vehicle from an elliptical Earth parking orbit to the target NRHO. A transit of such a large mass, delivered to the moon from a single launch vehicle, is only made possible using the highly efficient SEP system. Delivering the same mass via more traditional chemical propulsion systems would require major modifications to the mission architecture, significantly more propellant mass, and could necessitate the use of a more powerful launch vehicle. This paper describes the design of the nominal low-thrust transit by which Gateway will be delivered to the NRHO utilizing the PPE SEP system. Additionally, this paper captures how the unique capabilities of the PPE electric propulsion system have guided the design of the trajectory and how mission requirements have, in turn, impacted the maturation of the SEP system.

electric propulsion↗

SERENE: Saturn Enceladus Return Explorer with Nuclear Electric Propulsion

A ‘quick’ Enceladus sample return mission concept was developed based on the scientist recommendations at the recent ‘Accelerating Space Science with Nuclear Technology Workshop’. The Nuclear Electric Propulsion spacecraft assumed a follow-on 40 kWe nuclear reactor using the demonstrated 40 kWe Fission Surface Power system, expected in the early 2030s. The NEP vehicle also utilized a set of NEXT-C ion thrusters as well as planned Artemis commercial launchers. By launching the 40 kW NEP vehicle on a Starship and adding the propellants of 15 tankers, the 27t probe could be sent on a direct trajectory to Saturn (no Earth or Jupiter flybys) where NEP was used for Saturn capture, spiral down, spiral up and return to the Earth. A small lander obtained the surface Enceladus sample. Using the 40 kW NEP provided a round-trip time of only 16.5 years. A second option was more attractive from a science perspective whereby the NEP vehicle would deliver a large, 6t chemical lander to low Enceladus orbit where it would grab and return a sample to Earth (similar to the recent Orbilander design but in reverse). After deploying the lander, the NEP vehicle would stay in Saturn space performing a moon tour by orbiting four more moons and mapping the large moon of Titan. This option took slightly longer (18.5 yrs) due to the chemical return leg limitations. Both options demonstrated the agility, payload capability, and sample return goals the workshop recommended. An all-chemical option with two stages was roughly analyzed but took 21.5 yrs and required a Jupiter gravity assist.

Nuclear Electric Propulsion↗

ISRU Evaluation of Artemis Campaign Sites: Considerations and Methodology

The Artemis campaign has stated goals of ‘sustainable exploration’ [1] which includes In-Situ Resource Utilization (ISRU). The selection of the lunar polar region for Artemis was in part due to the identification of water in permanently shadowed regions (PSRs) which is of both scientific and exploration interest. The potential use of this water (as is, or as oxygen/hydrogen) for NASA and commercial applications, such as refueling vehicles, for power systems, or supplying life support consumables, is reflected in NASA’s Moon to Mars objectives (LI-7) [2]. These objectives also specify the need to locate and characterize the lunar water such that a water ‘reserve’ can be identified (AS-3). While infusion of ISRU capabilities is not planned for Artemis III, it is an opportunity to collect information to identify water reserves for later Artemis and commercial use. Selection of an Artemis III site with ISRU consideration will help advance the infusion of ISRU into later missions.

In situ resource utilization↗

NASA’s Human Landing System: The Strategy for the 2024 Mission and Future Sustainability

In response to the 2018 White House Space Policy Directive- sustainable lunar exploration, and to the Vice President’s March 2019 direction to do so by 2024, NASA is working to establish humanity's presence on and around the Moon by: 1) sending payloads to its surface, 2) assembling the Gateway outpost in orbit and 3) demonstrating the first human lunar landings since 1972. NASA’s Artemis program is implementing a multi-faceted and coordinated agency-wide approach with a focus on the lunar South Pole. The Artemis missions will demonstrate new technologies, capabilities and business approaches needed for future exploration, including Mars. Assessing options to accelerate development of required systems, NASA is utilizing public-private engagements through the Human Exploration and Operations (HEO) Mission Directorate’s NextSTEP Broad Agency Announcements. The design, development and demonstration of the Human Landing System (HLS) is expected to be led by commercial partners. Utilizing efforts across mission directorates, the Artemis effort will benefit from programs from the Science Mission Directorate (SMD) and Space Technology Mission Directorate (STMD). SMD’s Commercial Lunar Payload Services (CLPS) initiative will procure commercial robotic lunar delivery services and the development of science instruments and technology demonstration payloads. The Space Technology Mission Directorate (STMD) portfolio of technology advancements relative to HLS include lunar lander components and technologies for pointing, navigation and tracking, fuel storage and transfer, autonomy and mobility, communications, propulsion and power. In addition to describing the objectives and requirements of the 2024 Artemis mission, this paper will present NASA’s approach to accessing the lunar surface with an affordable human-rated landing system, current status and the role o a sustainable lunar presence.

Chavers, Greg↗

Impact-Identified Medical Capabilities with Largest Effect on Medical Risk for an Extended Duration Artemis Mission

Historically, identifying resources to include in a medical system has been based on heuristically guided clinical subject matter expert assessment. Probabilistic risk assessment (PRA) and tradespace analysis have the power to simplify and increase the fidelity of this traditional approach by providing initial risk estimates and system design solutions that fit within the specified constraints. This will be especially important as the increased mission complexity, distance from Earth, and duration of LDEMs is likely to drive an increase in mission medical risk. NASA’s Informing Mission Planning via Analysis of Complex Tradespaces tool (IMPACT) is designed to do just that. IMPACT uses an evidence based medical database of conditions likely to affect LDEM outcomes and a PRA computational engine to estimate how medical conditions and included medical capabilities affect mission outcomes. We identified the 10 medical conditions with the largest effect on medical risks and determined what medical system capabilities affected risk reduction the greatest.

Anderson A↗

NASA Lunar Exploration – Gateway’s Power and Propulsion Element Communications Links

As a key part of NASA’s Artemis program to return to the moon, the Lunar Gateway will provide a platform for staging lunar missions, for gaining experience in operations beyond earth orbit, and for creating sustainable infrastructure. Of specific interest, the Lunar Gateway will provide communications support to landers, orbiters, and surface systems, including in the South Polar Region where direct line of sight (LOS) to Earth is limited or non-existent. A foundational segment of the Gateway is the Power and Propulsion Element (PPE), which will carry: solar arrays to provide power to the Gateway; electric propulsion to maintain the Gateway in its operational orbit; and communication links between the Earth and Gateway, the Moon and Gateway, and relays from the Moon to the Earth. PPE Communication Links include an X-band link to Earth for Command, Ranging, and Telemetry (CR&T), which also carries low to medium rate data; a Ka-band Direct to Earth(DTE) link for high rate data transmissions; and a Ka-band Lunar link for high data rate connections to lunar systems. This paper describes the PPE communication links from a technical perspective. Other Gateway links supported by other modules are outside the scope of this paper.

ARTEMIS↗

BioSentinel SmallSat 2022 Presentation

BioSentinel, an Artemis-1 secondary spacecraft, will carry a biology experiment into deep space for the first time in 50 years. A 6U CubeSat form factor was utilized for the spacecraft and included technologies newly developed or adapted for operations beyond Earth orbit. This is the maiden deep-space voyage for the radio, propulsion system, electrical power system, and BioSensor payload. The spacecraft carries onboard budding yeast, Saccharomyces cerevisiae, as an analog to human cells to test the biological response to deep space radiation.

BioSentinel↗

Microwave ECR Ion Thruster Development Activities at NASA Glenn Research Center

Outer solar system missions will have propulsion system lifetime requirements well in excess of that which can be satisfied by ion thrusters utilizing conventional hollow cathode technology. To satisfy such mission requirements, other technologies must be investigated. One possible approach is to utilize electrodeless plasma production schemes. Such an approach has seen low power application less than 1 kW on earth-space spacecraft such as ARTEMIS which uses the rf thruster the RIT 10 and deep space missions such as MUSES-C which will use a microwave ion thruster. Microwave and rf thruster technologies are compared. A microwave-based ion thruster is investigated for potential high power ion thruster systems requiring very long lifetimes.

Foster, John E.↗

Moon to Mars (M2M) Habitation Considerations: A Snap Shot As of January 2022

The following NASA Technical Memorandum (TM) is intended to provide a snapshot in time of NASA’s current considerations (ground rules and assumptions, functional allocations, logistics) for habitation systems for the lunar surface (non-roving) and Mars transits. As NASA continues to refine the reference designs to meet the needs of an evolving architecture, it is expected that this information will also be updated as a result. Where appropriate, relevant publicly released documents will be referenced to provide further detail. NASA’s human lunar exploration plan under the Artemis program calls for achieving the goal of sending the first woman and first person of color to the surface of the Moon in the mid- 2020s and working toward sustainable exploration by the end of the decade. Working with both commercial and international partners, NASA will establish a permanent human presence on the Moon to uncover new scientific discoveries and lay the foundation for private companies to build a lunar economy. Longer duration missions on the lunar surface and in lunar orbit will also serve as a test bed for technologies to support future Mars exploration campaigns. The agency will use what we learn on the Moon to prepare for humanity's next giant leap – sending astronauts to Mars. NASA intends to establish a sustained lunar presence with the development of the Artemis Base Camp to prove technologies and capabilities that will one day enable humans to live and work on Mars, beginning with core elements including the Lunar Terrain Vehicle (LTV), the Pressurized Rover (PR), the lunar Surface Habitat (SH), power systems, and in-situ resource utilization (ISRU) systems. For in space operations and eventual transport of humans to Mars, NASA will utilize a Mars Transit Habitat (TH). Following deployment, the TH will complete a series of longer duration missions and shakedown testing while docked at Gateway, leveraging Gateway’s habitation redundancy for safety measures. Proposed Gateway-TH missions will far exceed the longest duration cislunar human missions to date. They will be the first operational readiness tests of our long-duration deep space systems, and of the split crew (two crew on the surface, two crew in space) operations that are vital to the approach for the first human Mars mission. Both the SH and TH are major architectural elements of NASA’s Moon to Mars (M2M) approach, each with very different concepts of operation. The SH is intended for use on the lunar surface as a home for astronauts, surface operations base, science facility, hub for communications, extravehicular activity (EVA) equipment repair site, waste processing facility, and supply hub. It serves as an enabler for a sustained surface presence and preparation for partial gravity operations during Mars missions. The SH will be designed to be self-sufficient for operations on the lunar surface. The SH will independently provide several functions, including its own power generation, energy storage capability, sleep quarters, hygiene areas, work areas, and dining areas. It will be capable of communicating with surface assets, orbital assets, and directly with Earth ground stations. It is planned to operate with two crew in the habitat for ~28- day stays with crew swap-outs in which the PR crew of two trades places with the habitat crew. During the swap-out, the habitat will nominally support four crew for a short period of time. For contingency scenarios, the habitat must also be capable of supporting four crew for up to 7 days. The TH will be designed to be capable of up to ~1,200-day Mars missions with the ability to carry all food and supplies needed to support a crew of four for this duration. An assumed Mars mission profile for the TH is to carry crew and supplies for ~850-day roundtrips between Earth and Mars orbit that allows 30-day stays on the Martian surface. To test the systems for this long journey, the TH will be used to extend the duration of missions at Gateway, enabling the orbiting outpost to be used as a Mars analog. These analog missions will be accomplished by attaching the TH to Gateway and conducting lunar surface operations from the TH. The TH may also need to perform free-flying shakedown missions to test out all systems prior to leaving for Mars. The habitat provides many critical functions including: a contingency airlock, crew quarters, galley, hygiene areas, safe haven capability, and science equipment. It can receive docked items from either axial end or on a radial port.

Habitat↗

Lunar Surface Position Determination using Perceived Signal Strength

The purpose of this project is to evaluate the feasibility of transmitters and receivers on the lunar surface for Position Determination (PD) without any form of lunar Global Positioning System (GPS). The early Artemis program may lack GPS satellites orbiting the Moon, and it is critical that activities with the lander, rover, and crew EVA identify their position on the lunar surface at all times. This project creates a prototype system that trilaterates user position based upon the perceived signal from at least 3 nearby transmission towers, called “Lunar Access Points”. The application of perceived signal strength for surface PD has historically been used in terrestrial systems such as Long Range Navigation (LORAN), which was popular with the maritime industry prior to the Global Positioning System (GPS). The ease of installing such a local system for early Artemis missions provides a critical resource until satellite-based position determination systems are deployed. A surface-based PD can also be used in GPS-denied environments such as deep craters or lava tubes where satellite visibility is compromised. By demonstrating the basic capability of surface PD, this student team has learned about issues with power, distance, thermal, dust, radiation, data processing, and communication problems applicable to the lunar surface. This knowledge can feed into future NASA requirements to improve the capability of a LunaNET implementation for the Artemis program. This project follows 10 years of successful collaboration between NASA JSC/ARES, Texas Space, Technology, Applications and Research (T STAR) and Texas A&M University in a Public, Private, Academic (PPA) Partnership. NASA funds T STAR to mentor undergraduate Capstone teams in the College of Engineering Department to design, built, and test prototypes meeting NASA requirements. TAMU faculty lead the student teams in their academic class, and NASA Subject Matter Experts (SMEs) provide T STAR and students insight on requirements evolution, prior design projects, and future development goals.

Position Determination↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Mission

NASA has partnered with Advanced Space to develop and build the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission which will serve as a pathfinder for Near Rectilinear Halo Orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) will be the intended orbit for the NASA’s Artemis Gateway lunar orbital platform. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for the Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The baseline for CAPSTONE is to fly a 12U cubesat developed, integrated, and tested by Tyvak Nanosatellite Systems carrying a payload communications system capable of cross-link ranging with the Lunar Reconnaissance Orbiter (LRO), a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA Launch Services Program, will be provided by a Rocket Lab launch vehicle utilizing their new Proton upper stage to deploy the CAPSTONE spacecraft into the lunar orbit. The CAPSTONE mission is targeting a launch no earlier than September 23, 2021. Upon launch, the spacecraft will traverse a highly efficient transfer taking approximately three months to enter a primary demonstration phase in an NRHO for six months followed by a twelve month technology enhancement operations phase. The CAPSTONE Project is lead by Advanced Space, LLC of Boulder Colorado. Spacecraft development and mission operations will be conducted by Tyvak Nanosatellite Systems of Irvine, California. Noted objectives for the CAPSTONE mission will be to demonstrate the accessibility of NHROs, validate key operational concepts in the NHRO environment, lay a foundation for commercial support of future lunar operations and accelerate the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology Program (SSTP), which is one of several programs in NASA’s Space Technology Mission Directorate. SSTP is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The launch for the CAPSTONE Mission is provided by Human Exploration & Operations Missions Directorate Advanced Exploration Systems Division. Coordination and Acquisition of the Launch is managed by NASA’s Launch Services Program. The CAPSTONE Mission and project status will be presented.

CAPSTONE↗

Lunar Surface Relay - Mobile: Concept to Provide Relay Links to Surface Assets

At the request of NASA’s Space Communication and Navigation (SCaN) program, the Glenn Research Center’s (GRC) Compass concurrent engineering team developed a conceptual design of a Lunar Surface Relay- Mobile (LSR-M) system to provide a variety of surface and relay communication links in support of future Artemis sorties. The team determined that a mobile asset, with its ability to relocate to support a variety of surface sites and leverage more hospitable winter locations on the lunar south pole, would be of particular use in the architecture. Following the design of a solar array and battery powered baseline case, a quick look design further investigated adding a multi-mission radioisotope thermoelectric generator (MMRTG) to the system to reduce battery requirements to survive the lunar night and remove the need to relocate to favorable night locations during the lunar winter.

Lunar Surface Relay↗

SPACE: Three Decades of Spacecraft Power Systems Analysis with Fortran

The SPACE (System Power Analysis for Capability Evaluation) Fortran program developed at NASA Glenn Research Center has enabled power generation predictions and energy balance analyses for spacecraft electrical power systems (EPS) since 1988. SPACE was originally designed to analyze the EPS of the Space Station Freedom and continues to support certifications for visiting vehicles and extravehicular activities on the International Space Station today. Another version of SPACE currently supports design and mission planning operations for the Orion and Gateway vehicles as part of NASA’s Artemis program. In total, over 50 engineers have contributed to the development and use of SPACE on various platforms throughout its history. Ongoing code modernization efforts aim to generalize the program for use with different vehicles and configurations. While SPACE team analysts currently interact with the program via the command line, future development work also includes the creation of a graphical user interface for use by flight operations personnel. The SPACE code thus has a long legacy in spacecraft EPS analysis and will continue to play a critical role in future human spaceflight missions by leveraging the computational power of Fortran.

Fortran↗

Wide Bandgap Semiconductor Devices & Systems for Communications in Extreme Environment

The feasibility of Ka-band gallium nitride (GaN) based high power amplifier (HPA) for signal amplification in extreme planetary environment is investigated and its measured performance is presented. The data includes Pout, PAE, EVM for several waveforms and data rates, output spectrum, IMD, Noise Figure, and Gain. The data indicates excellent overall performance. Potential application of this HPA includes communication systems required to operate in the extreme hot environment of Mercury and Venus, extreme cold and high radiation environment of Jupiter’s icy moons, and Artemis missions that involve human/robotic exploration and long-term presence on the Moon.

Gallium Nitride↗

Long -Term Architecture Development For The Moon And M

Developing an enterprise-level architecture encompassing future human-robotic science and exploration at the Moon and Mars requires a visionary approach that ensures NASA is responsive to national priorities and global science and technology advancement objectives. While the initial capabilities needed to return humans to the Moon may be well understood, NASA is still formulating a long-term infrastructure at the Moon and working to narrow the trade space for the first human missions to Mars. This paper will focus on the formulation and current status of engineering and design applications for a long-term and robust lunar architecture that will implement the Artemis Base Camp concept, including pre-formulation activities and elements currently in formulation. Authors will demonstrate how the Moon-to-Mars campaign approach fosters commonality of requirements and standards across individual mission elements, as well as multi-destination systems and operations, to reduce risk and encourage healthy competition in the growing space market. Among the Artemis Base Camp elements discussed will be multiple surface mobility elements, a fixed, anchoring surface habitat, fission surface power, and an in-situ resource development pilot plant. The narrative will clearly illustrate the direct evolution of the base camp elements to a minimal Mars architecture concept, and also outline unique development efforts that will be required in the next decade to make it possible to send humans to the Red Planet as early as the 2030s.

Greg Chavers↗

Development Testing and Analysis of the Integrated Gateway-ESPRIT Bipropellant Refuelling System

The Gateway will be humanity’s first space station orbiting the Moon completed by NASA in partnership with ESA and other US and international partners. The Gateway will provide critical support to sustainable human exploration on the moon through the Artemis program. To enable the Lunar Gateway to complete its mission, on orbit refuelling is essential. The ESPRIT Refuelling Module (ERM) will provide the capability to transfer propellants, MMH and MON-3, through the Habitation and Logistics Outpost (HALO) to the Power and Propulsion Element (PPE). The transfer of these propellants carries known risks and hazards. These hazards include overpressure of the propellant lines during priming sequences between modules and during refuelling pause operations. To support the early system development and to mitigate these risks, a collaborative test program between NASA, ESA and Thales Alenia Space was completed at the Thales Alenia Space test facility in Harwell, UK. This test program integrated fluidic breadboards of the ERM, HALO and PPE modules. The objectives of the test program were to demonstrate and characterise critical performance and transient operations, inform refuelling concept of operations and to calibrate and validate numerical models of the refuelling subsystem in EcosimPro. To support the completion of this final objective a detailed model of the integrated breadboard was developed in EcosimPro and key steady-state and transient test cases were simulated. As an industry first, a National Institute of Standards and Technology (NIST) database correlation for Hydrofluoroether (HFE-7000) was used as a mixed oxides of nitrogen (MON-3) simulant with EcosimPro and European Space Propulsion System Simulation (ESPSS) libraries to result in a more accurate analysis for transient phenomenon such as priming. The test and simulation data showed good agreement validating the model for further system analysis as the ERM design progresses.

Refuelling↗