Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Accelerator Design, Technology and Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Flow Measurements in Pressurized Helium Gas Cooling Channels: Rev. 1

Compressed helium gas is used to cool the NorthStar Medical Radioisotope (NMR) target system, also called the trident, chosen due to its superior heat transfer capabilities and its inability to react with Molybdenum-100 (Mo-100) during irradiation. To test the housing and NMR target stack at Los Alamos National Laboratory (LANL), two sets of helium gas flow loop facilities have been set-up and tested. One system is used for bench-top experiments to systematically investigate individual components of the NMR target, and the other, larger system is more representative of the system at NMR and is used for testing the full NMR target stack.

43 PARTICLE ACCELERATORS↗

Risk-based System Upgrade Planning for AOT-IC Presentation [Slides]

The number of deployed systems and different HW/SW form factors makes it difficult to maintain a complete understanding of their health which leads to a reduced level of certainty when assessing risk and trying to prioritize system upgrade efforts. AOT-IC must constantly plan and execute system upgrade and replacement projects to ensure the longevity of the control system. There are many more projects needed than the group can realistically accomplish given schedule and resource constraints. The group must prioritize their upgrade projects to choose only the highest priority projects to execute each year. Currently plans upgrade and replacement projects based on alignment with mission needs, group vision, resource availability, and qualitative risk assessments based on SME estimates. The group maintains a risk register. This is useful as a tool for shaping strategic planning but currently lacks the quantitative data and process needed to generate accurate risk assessments.

43 PARTICLE ACCELERATORS↗

RF Sources for Electron Accelerators With a focus on high-duty-factor, low-to-moderate energy architectures

A charged particle, such as an electron or a proton, is accelerated through its interaction with either a static (DC) or time-varying (RF) electric field. The magnitude of the accelerating field, or gradient, is typically given in units of volts per meter; in charged-particle accelerators, fields are usually expressed as kV/m or MV/m. The energy of the accelerated particle is usually expressed in terms of electron volts, or eV. An electron starting at rest at ground potential, and accelerated to an electrode with a potential of 1 kV, will have an energy of 1 keV.

43 PARTICLE ACCELERATORS↗

Beam dynamics in independent phased cavities

Linear accelerators containing the sequence of independently phased cavities with constant geometrical velocity along each structure are widely used in practice. The chain of cavities with identical cell lengths is utilized within a certain beam velocity range, with subsequent transformation to the next chain with higher cavity velocity. Design and analysis of beam dynamics in this type of accelerator are usually performed using numerical simulations. A full theoretical description of particle acceleration in an array of independent phased cavities has not been developed. In the present paper, we provide an analytical treatment of beam dynamics in such linacs employing Hamiltonian formalism. We begin our analysis with an examination of beam dynamics in an equivalent traveling wave of a single cavity, propagating within accelerating section with constant phase velocity. We then consider beam dynamics in arrays of cavities, utilizing an effective traveling wave propagating along with the whole accelerator with the velocity of synchronous (reference) particle. The analysis concluded with the determination of the matched beam conditions. Finally, we present a beam dynamics study in 805 MHz Coupled Cavity Linac of the LANSCE accelerator facility.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Diagnostics for PSR Upgrade

This report discusses the diagnostics upgrade plan for the PSR. The PSR diagnostics under discussion include beam position and phase monitor (BPPM), wirescanners, wall current monitors, bunch shape monitors, laser notchers, and diamond array detectors. Existing diagnostics at the PSR include beam position monitors (BPM), a wirescanner, and a wall current monitor. All existing diagnostics need modernization, as part of the PSR upgrade plan. Meanwhile, we will introduce minor changes to improve the existing setups, which will enhance the performance and the longevity of the diagnostics equipment and components in the upgraded PSR operation. On the other hand, new, advanced, and available diagnostic technologies at a high technology readiness level (TRL) can also be considered for implementation for the PSR upgrade. In this note, we go through all types of diagnostics, introducing their basic principle, operating status, and plans for the PSR upgrade.

43 PARTICLE ACCELERATORS↗

LAMP Technical Readiness Evaluation Report (Rev. 1)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed. Corresponding Technical Readiness Levels (TRLs) were also determined for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Only two subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

805 Stepped Plan Project Description

The 805 MHz system utilizes 1.25 MW class klystron amplifiers. The Solid-State Amplifier (SSA) technology has been utilized in the SC accelerator technology, but more powerful sources are needed for use in the NC accelerator facilities such as LASNCE. The SSA topologies that are widely used need to be scaled and tested for reliability and operation in a high impact accelerator facility, such as the 805 MHz SCCL in Los Alamos. Operational experience with high power SSA needs to be assessed prior to installation of an SSA unit at LANSCE. The RFE group at LANSCE is looking for collaboration in the development of the Solid-State Amplifier.

43 PARTICLE ACCELERATORS↗

Mitigation of Beam Losses in LANSCE Linear Accelerator

Suppression of beam losses is essential for successful operation of high-intensity accelerator facility. The LANSCE accelerator started routine operation in 1972 as a 0.8 MW average proton beam power facility for meson physics research, and delivered highpower beam for a quarter century. The accelerator currently delivers 100 MeV proton beam to Isotope Production Facility (IPF) and 800 MeV H- beams to various experimental areas. The accelerator is equipped with two independent injectors for H + and H - beams, merging at the entrance of a 201.25 MHz Drift Tube Linac (DTL). The DTL performs acceleration up to the energy of 100 MeV. After the DTL, the Transition Region beamline directs a 100 MeV proton beam to the Isotope Production Facility, while the H - beam is accelerated up to the final energy of 800 MeV in an 805- MHz Coupled Cavity Linac. The H - beams, created with different time structure by a lowenergy chopper, are distributed in the Switch Yard (SY) to four experimental areas: the Lujan Neutron Scattering Center equipped with a Proton Storage Ring (PSR), the Weapons Neutron Research facility (WNR), the Proton Radiography facility (pRad), and the Ultra-Cold Neutron facility (UCN). Multi-beam operation requires careful control of accelerator tune to minimize beam losses. In this paper we review main effects affecting beam losses in LANSCE linear accelerator and discuss methods to reduce them.

43 PARTICLE ACCELERATORS↗

Delivery of H - / H + Beams to Area A

We explore the relative merits of transporting the beam from the H + ion source and from the H - ion source to Area-A for low current applications. Transporting the H - beam to Area-A using the laser neutralization approach has some risk associated with it and will require some development. Alternative method of delivering H - beam to Area-A includes replacing LDBM00 bending magnet with kicker for sharing beam between Line D and modified Line A. Transporting the H + beam to Area-A will have significant impact on the operation the IPF facility and maintaining high pulse rate to IPF will require major modifications to the transition region of the accelerator and Drift Tube Linac.

43 PARTICLE ACCELERATORS↗

LANSCE Accelerator Modernization Project (LAMP) Overview [Slides]

LANSCE is based on a high-current 800 MeV proton accelerator capable of delivering 1 MW of beam power to the central target area. The LANSCE accelerator provides beam simultaneously to 5 separate experimental areas. LANSCE operates with 650 µs RF macro pulses at 120 Hz. Within this macro pulse several different beam timing patterns are utilized. LANSCE also accelerates H + and H – simultaneously. LANSCE celebrated 50 years of beam delivery in 2022.

43 PARTICLE ACCELERATORS↗

Initial Conditioning of the Rod-style RFQ

The RFQ test stand will allow new sources to be tested and will provide information on the performance of our RFQ designs. The RFQ must sustain the high peak power that will be necessary for bunching and accelerating beam, and that peak power must be sustained at a duty factor that is higher than other facilities that use similar rod-style RFQs. The conditioning of the RFQ allows both requirements to be tested, and in addition the intricacies of its operation are discovered and can be corrected for future work. In addition, the conditioning procedure was able to be done concurrently with the source development.

43 PARTICLE ACCELERATORS↗