Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Accelerator Applications”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Accelerating Scientific Applications With SambaNova Reconfigurable Dataflow Architecture

Here, our exploratory work finds that the SambaNova Reconfigurable Dataflow Architecture (RDA) along with the SambaFlow software stack provides for an attractive system and solution to accelerate AI for science workloads. We have observed the efficacy of using the system with a diverse set of science applications and reasoned their suitability for performance gains over traditional hardware. As the Data-Scale system provides for a very large memory capacity, the system can be used to train models that typically do not fit in a GPU. The architecture also provides for deeper integration with upcoming supercomputers at the Argonne Leadership Computing Facility (ALCF), a US Department of Energy Office of Science user facility, to help advance science insights.

97 MATHEMATICS AND COMPUTING↗

Enabling Execution of a Legacy CFD Mini Application on Accelerators Using OpenMP

We describe the process and outcome of our efforts to port a legacy Fortran benchmark code to heterogeneous GPU-accelerated computing architectures using OpenMP. The benchmark code is one of the multi-zone NAS Parallel Benchmarks (NPB-MZ) called SP-MZ. This “mini-app” mimics the computation and data movement that is found in popular legacy and modern implicit computational fluid dynamics (CFD)solvers. Our objective was to examine how efficiently legacy Fortran codes can be ported to accelerators by leveraging OpenMP directives. We describe the development and optimization process and demonstrate the performance impact of various code modifications. We show select profiling results from the Nvidia nvvp profiler to help others diagnose and overcome performance issues in their own applications. We present results for two compute systems endowed with Nvidia V100 accelerators.

Ioannis Nompelis↗

First results from a high-frame-rate, multi-GHz ionizing particle detection system geared toward accelerator diagnostic applications

An integrated detection system, consists of a thin diamond sensor incorporated into a compact signal loop, coupled in turn to an application-specific integrated circuit readout chip, has been tested for the first time, using ps-duration electron pulses from the Next Linear Collider Test Accelerator at the SLAC National Accelerator Laboratory. For readout frame rates as high as 120 kHz, the detection system is shown to achieve a linear dynamic range of 10 3 and a bandwidth of 4–5 GHz, with no ringing seen on the tail of the output pulse. These results represent the best-performing multi-GHz ionizing particle detection system achieved to date.

Ferezghi, Mohammadreza Mohseni [University of Cali↗

FAIR principles for AI models with a practical application for accelerated high energy diffraction microscopy

Abstract A concise and measurable set of FAIR (Findable, Accessible, Interoperable and Reusable) principles for scientific data is transforming the state-of-practice for data management and stewardship, supporting and enabling discovery and innovation. Learning from this initiative, and acknowledging the impact of artificial intelligence (AI) in the practice of science and engineering, we introduce a set of practical, concise, and measurable FAIR principles for AI models. We showcase how to create and share FAIR data and AI models within a unified computational framework combining the following elements: the Advanced Photon Source at Argonne National Laboratory, the Materials Data Facility, the Data and Learning Hub for Science, and funcX, and the Argonne Leadership Computing Facility (ALCF), in particular the ThetaGPU supercomputer and the SambaNova DataScale ® system at the ALCF AI Testbed. We describe how this domain-agnostic computational framework may be harnessed to enable autonomous AI-driven discovery.

47 OTHER INSTRUMENTATION↗

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

Accelerating Parallel Applications in Cloud Platforms via Adaptive Time-Slice Control

Cloud platforms can provide flexible and cost-effective environments for parallel applications. However, the resource over-commitment issues, i.e., cloud providers often provide much more executable virtual CPUs than available physical CPUs, still impede the synchronization operations of parallel applications, causing severe performance degradation. Existing methods optimize parallel applications by promoting the priorities of involved VMs. They cannot fully explore the performance of parallel applications, because they ignore the time-slice requirements of different phases of parallel applications. Furthermore, non-parallel applications experience unsatisfied performance because of low scheduling priorities. Given empirical analysis on time-slices of virtual machines (VMs), we find that shortening time-slices can mitigate synchronization overhead which incurs during communication phases, while over-short time-slices cause frequent cache misses in computation phases. Accordingly, we propose an Adaptive Time-slice Control (ATC) mechanism. ATC first detects the phases of parallel applications based on lock latency or cache misses. Then, ATC shortens time-slices during communication phases and prolongs time-slices during computation phases for parallel applications, and sets a uniform time-slice for non-parallel applications. Finally, we evaluate ATC using seven well-known benchmarks with 25+ applications. Experiments show that ATC obtains 1.5-75x performance gain for running parallel applications than state-of-the-art solutions, with nearly unaffected impact on non-parallel applications.

97 MATHEMATICS AND COMPUTING↗

Object Proxy Patterns for Accelerating Distributed Applications

Workflow and serverless frameworks have empowered new approaches to distributed application design by abstracting compute resources. However, their typically limited or one-size-fits-all support for advanced data flow patterns leaves optimization to the application programmer—optimization that becomes more difficult as data become larger. The transparent object proxy, which provides wide-area references that can resolve to data regardless of location, has been demonstrated as an effective low-level building block in such situations. Here we propose three high-level proxy-based programming patterns—distributed futures, streaming, and ownership—that make the power of the proxy pattern usable for more complex and dynamic distributed program structures. We motivate these patterns via careful review of application requirements and describe implementations of each pattern. As a result, we evaluate our implementations through a suite of benchmarks and by applying them in three meaningful scientific applications, in which we demonstrate substantial improvements in runtime, throughput, and memory usage.

Distributed Computing↗

Probabilistic data fusion and physics-informed machine learning: A new paradigm for modeling under uncertainty, and its application to accelerating the discovery of new materials

In this report we summarize the work conducted by PI Perdikaris and his group under this Early Career project DE–SC0019116 during the period of 09/01/2018 – 08/31/2023. The central aim of the work was to introduce a new paradigm for scientific data analysis that can seamlessly synthesize rigorous mathematical modeling with data of variable fidelity (e.g., measurements at multiple scales/resolutions or predictions of variable fidelity models) and multiple modalities (e.g., images, time–series, or scattered measurements). The setting we are interested in involves complex systems that are partially observed and whose dynamical behavior could be hard to model or totally unknown. The inherent uncertainty associated with this setting necessitates a departure from the classical deterministic realm of modeling and scientific computation, and, consequently, our main building blocks can no longer be crisp deterministic numbers and governing laws, but instead we must operate with probabilistic models.

97 MATHEMATICS AND COMPUTING↗

Dynamic System Scaling Application to Accelerated Nuclear Fuel Testing

The development of nuclear fuel and materials requires a continuous effort to investigate the acute and prolonged effects of irradiation, thermal-material stress, chemical change, or other conceivable damage mechanics acquired during normal operation or accident scenarios throughout its lifetime. As in-core fuel property measurement techniques advance to support in the real-time, non-invasive, and enhanced accuracy realm, it is the future of fuel development to pursue to higher degrees of control, predictability of integral test behavior via separate effects test (SET), and shorter test time intervals. The fuel development life cycle from initial concept to commercial licensing is approximated to be 20 years and current literature suggests by optimizing fuel performance codes with SETs, the process could possibly be compressed to 5 to 10 years. Recently, a research group in the Idaho National Laboratory (INL) is testing reduced scale fuel rods and increased power density to accelerate evolution of fuel phenomena in metallic fuels. In support of nuclear fuel rod development, compressing fuel test process, and accelerating fuel phenomena, it was the purpose of this study to investigate nuclear fuel performance phenomena via literature review and effectively scale the initial conditions, boundary conditions, and geometric properties to describe the time-dependent response including to fuel burnup, thermal and mechanical stress, transmutations and inter-diffusion, and other relevant observed phenomena. The study was based on BISON simulations of historic EBR-II metallic fuel experiments and Dynamical System Scaling (DSS) method are utilized to assess effects of scaling activity including fuel phenomena acceleration and calculations of time-dependent distortions. The research successfully scaled metallic fuel phenomena, accelerated fuel testing, and assessed the distortions for each scaled case derived.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Degradation of Poly- and Perfluoroalkyl Substances (PFAS) in Water via High Power, Energy-Efficient Electron Beam Accelerator

The goal of the 2-year workplan was to see if electron beam (EB) could be used to break down a sub-set of the larger chemical family of per and polyfluoroalkylated substances (PFAS) in an energy efficient and economical manner when compared to conventional water treatment technologies. Year one (Y1) work focused on sample EB treatment work in the Fermi National Accelerator Laboratory’s (FNALs) Accelerator Applications Demonstration and Development (A2D2) EB accelerator. While there are reportedly thousands of types of PFAS, for the point of most of the work herein, a small subset was examined, typically perfluorooctane sulfonate (PFOS) and perfluorooctanoate (PFOA). PFOA and PFOS are two of the most well studied PFAS and are studied for baseline evaluations and are considered most useful. The work from Y1 provided information about the optimal operating parameters and additives to use when treating PFOS and PFOA via EB. The data were then used to see where in a water treatment system an EB accelerator would be best suited to treat PFAS. A conventional water treatment technology, GAC, was then compared to e-beam treatment technology with respect to energy and costs for treatment. In year two (Y2), several conventional e-beam accelerator designs, and FNAL’s developmental compact SRF accelerator design, were evaluated for their suitability in PFAS treatment, from an energy efficiency and cost standpoint. Several EB parameters were evaluated and optimized for the removal of PFOA and PFOS from water at normal pressure and temperature, measured as total PFAS removal. Under the optimized test conditions both PFOA showed complete destruction to inorganic fluoride, and PFOS to inorganic fluoride and sulfate, with mass balance. The effect on PFAS removal relative to solution pH, total EB dose, EB dose rate, dissolved oxygen concentration (DO), temperature, and initial PFAS concentration were evaluated. In general, PFOA was easier to destroy than PFOS. Degradation products, typically observed under less-than-optimal EB conditions, provided insight to degradation mechanisms. Products were identified to rule out possible deleterious biproduct formation. The water radiolysis radical reaction kinetics with PFOS and PFOA were not dependent on the initial concentration over 5-orders of magnitude from 2 μg/L to 20 mg/L. This is thought to be because there was an overabundance of the reactive water radiolysis radicals relative to PFAS molecules and largely attributed to aqueous electrons. The reaction rates appeared to be diffusion limited. Testing at higher concentrations (100-200 mg/L) showed a decrease in removal efficiency, suggesting alternative kinetics, possibly second order rates, at higher concentrations. In all, we successfully defined a set of optimal EB parameters to treat PFOA and PFOS at concentrations of 20 mg/L in water with destruction efficiencies near 100%. We further tested the optimized EB parameters with other types of PFAS, including shorter and longer fluorocarbon chain homologs of PFOA and PFOS, and PFAS with alternative functional groups such as sulfonamides. Based on our results EB can be optimized as an effective destructive technology for removing PFAS from water. The conditions optimized for PFOA and PFOS were less effective with ultra-short fluorocarbon compounds like TFMS, PFES, PFPS and PFBS, and likely require re-optimization of parameters to them. In all, it was determined that from a cost and energy efficiency standpoint, EB would be best applied to waste streams with relatively high concentrations of PFOS and PFOA and is not as cost effective as GAC treatment for removing low concentrations of PFAS from water. Higher concentrations of PFAS can be found in the wastewater of conventional treatment processes such as RO and IE and therefore EB may be used to supplement such treatment technologies. Some real-world IE regeneration wash water and RO reject water containing higher concentrations of PFAS and obtained from pilot scale industrial wastewater treatment system at a fluorochemical manufacturing facility, showed that EB could remove PFAS from such types of wastewaters. The IE regenerant wash water appeared to be the most efficient of the two types of wastewaters tested. However, some further optimization of the EB parameters for the specific PFAS types present in those wastewaters may be required. Also, the effects of co-present TOC and mineral salts should be considered during such optimization efforts. From the experimental Y1 results it was seen that the aqueous electron drives degradation of the PFAS. In a hypothetical water treatment skid using EB for PFAS destruction the parameters of the system should be optimized to promote aqueous electron production. Before EB treatment, the PFAS should be preconcentrated when possible, the pH should be raised to pH 10 or higher to enhance aqueous electron production, and the water should be nitrogen purged to remove dissolved oxygen to minimize aqueous electron scavenging. An excel spreadsheet was created that calculates optimal conditions based on inlet PFAS concentration and desired outlet concentration, by optimizing the accelerator power, dose rate, water treatment rate, pH and dissolved oxygen levels to reach the desired endpoint. Given this information on accelerator operating conditions five different EB accelerator systems were compared. One EB system was a continuous-wave, linear superconducting accelerator being designed at Fermilab. Three other EB systems (IMPELA at 5% and 25% duty factor and the ILU-14) were normal conducting pulsed linear accelerators. The fifth system was an IBA Rhodotron which is a normal conducting, circular, continuous-wave accelerator. The accelerator efficiency (% of the incoming power that is used in water treatment) was the dominating factor in accelerator choice. The radio frequency (RF) power supply and the accelerator design (superconducting versus warm technology) drive the accelerator efficiency. The IBA Rhodotron was seen to be the most energy efficient commercially available technology with a wall-plug (total) power efficiency of 43% at 400 kW. The Fermilab design, with a prototype for a different application currently being fabricated, was the most energy efficient at 55% when driven by a Klystron RF power supply and as high as 77% when powered by a magnetron. As the Fermilab design was the most energy efficient by approximately 10-30%, further design work was done on the accelerator and beam delivery system specific to the destruction of PFAS in water. The Fermilab design is unique from industrial accelerators in that is superconducting. Superconducting technology allows for the acceleration of electrons without losses. The accelerator must be cooled to below the point where it is superconducting and is operated around 4 degrees Kelvin. The bulk of the design work for the accelerator is on making the accelerator as energy efficient as possible so that it does not require liquid helium and can be cooled with conduction cooling via cryocoolers. Final design work resulted in an EB accelerator that would operate at minimally 200 kW and 10 MeV. Prototype construction would cost $\$ $7.8 million dollars when driven by a Klystron power supply. A second version of the same accelerator would cost $\$ $5.5 million dollars when driven by a magnetron that is still under development. The commercially available 300 kW IBA Rhodotron cost was estimated at approximately $\$ $9 million. While it is hard to directly compare, an operational GAC system used by 3M for groundwater treatment capital cost (2022 dollars) was estimated to cost $\$ $3.3 million. While the capital expense of the EB accelerator systems was higher than GAC, the accelerator EB treatment would result in destruction of the PFAS and not just sequestration of PFAS to form a new waste stream that requires further treatment or disposal. The operating cost to destroy the PFAS via 400 kw EB system was less than $\$ $1000/kg of PFAS destroyed when treating at a 20 mg/L PFAS concentration, compared to GAC with operating costs that calculated at $\$ $27,530 per kg of PFAS sequestered when treating 100 μg/L PFOA and PFOS combined concentration.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Tunable Permanent Magnet Quadrupole Operating at Cryogenic Temperatures for Accelerators

The project objective is to develop a compact and tunable quadrupole using Electron Energy Corporation (EEC)’s PM materials for cryogenic accelerator applications. To achieve this objective, EEC and SLAC National Accelerator Laboratory (SLAC) will collaborate to develop a cost-effective quadrupole and optimize the conventional manufacturing process. Based on previous experience, EEC designed an innovative field adjustment capability using tuning magnets which is able to achieve all the requirements for SLAC’s cold copper collider (C3 ) application. These novel ideas enable us to develop a compact and tunable quadrupole magnet superior to the current designs. Our approach is to leverage EEC's over 50 years of experience in magnet manufacturing and SLAC’s beamline test capabilities.

42 ENGINEERING↗