Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ARRA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Analysis Results for ARRA Projects: Enabling Fuel Cell Market Transformation (Presentation)

This presentation discusses analysis results for American Recovery and Reinvestment Act early market fuel cell deployments and describes the objective of the project and its relevance to the Department of Energy Hydrogen and Fuel Cells Program; NREL's analysis approach; technical accomplishments including publication of a fourth set of composite data products; and collaborations and future work.

08 HYDROGEN↗

Medium Duty ARRA Data Reporting and Analysis; NREL (National Renewable Energy Laboratory)

Medium-duty (MD) electric vehicle (EV) data collection and analysis will help drive design, purchase, and research investments. Over 4 million miles and 160,000 driving days of EV driving data were collected under this project. Publicly available data help drive technology research, development, and deployment. Feeding the vocational database for future analysis will lead to a better understanding of usage and will result in better design optimization and technology implementation. The performance of a vehicle varies with drive cycle and cargo load - MD vehicles are 'multi-functional.' Environment and accessory loads affect vehicle range and in turn add cost by adding battery capacity. MD EV vehicles can function in vocations traditionally serviced by gasoline or diesel vehicles. Facility implications (i.e., demand charges) need to be understood as part of site-based analysis for EV implementation.

33 ADVANCED PROPULSION SYSTEMS↗

Data Collection & Analysis for ARRA Fuel Cell Projects (Presentation)

The data analysis objectives are: (1) Independent assessment of technology, focused on fuel cell system and hydrogen infrastructure:performance, operation, and safety; (2) Leverage data processing and analysis capabilities from the fuel cell vehicle Learning Demonstration project and DoD Forklift Demo; (3) Establish a baseline of real-world fuel cell operation and maintenance data and identify technical/market barriers; (4) Support market growth of fuel cell technologies by reporting on technology features relevant to the business case; and (5) Report on technology to fuel cell and hydrogen communities and stakeholders.

08 HYDROGEN↗

American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 281 Solar Hot Water Application Assessment for U.S. Army IMCOM-Southeast Region

The Energy Independence and Security Act of 2007 requires installations (EISA) to install solar systems of sufficient capacity to provide 30% of service hot water in new construction and renovations where cost-effective. However, installations are struggling with how to implement solar hot water, and while several installations are installing solar hot water on a limited basis, paybacks remain long. Pacific Northwest National Laboratory (PNNL) was tasked to address this issue to help determine how best to implement solar hot water projects. This documents discusses the results of that project.

Russo, Bryan J.↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. Army – Project 214 Analysis of Regulations Associated with Implementation of a Rocky Mountain Secure Smart-Grid

This document describes technical assistance provided by PNNL to further develop a smart grid technologies concept to provide a basis for policies and plans for the US Army. The effort was to analyze the potential to utilize emerging smart grid technologies along with indigenous renewable and other resources to meet the emergency and other power needs of Department of Defense facilities in Colorado and Wyoming.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. Army – Project 276 Renewable Resource Development on Department of Defense Bases in Alaska: Challenges and Opportunities

The potential to increase utilization of renewable energy sources among military facilities in Alaska through coordinated development and operation is the premise of this task. The US Army Pacific Command requested assistance from PNNL to help develop a more complete understanding of the context for wheeling power within Alaska, including legal and regulatory barriers that may prohibit the DOD facilities from wheeling power among various locations to optimize the development and use of renewable resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance for Geothermal Resource Evaluation Projects

The purpose of this document is to report on the evaluation of geothermal resource potential on and around three different United States (U. S.) Air Force Bases (AFBs): Nellis AFB and Air Force Range (AFR) in the State of Nevada (see maps 1 and 5), Holloman AFB in the State of New Mexico (see map 2), and Mountain Home AFB in the State of Idaho (see map 3). All three sites are located in semi-arid parts of the western U. S. The U. S. Air Force, through its Air Combat Command (ACC) located at Langley AFB in the State of Virginia, asked the Federal Energy Management Program (FEMP) for technical assistance to conduct technical and feasibility evaluations for the potential to identify viable geothermal resources on or around three different AFBs. Idaho National Laboratory (INL) is supporting FEMP in providing technical assistance to a number of different Federal Agencies. For this report, the three different AFBs are considered one project because they all deal with potential geothermal resource evaluations. The three AFBs will be evaluated primarily for their opportunity to develop a geothermal resource of high enough quality grade (i.e., temperature, productivity, depth, etc.) to consider the possibility for generation of electricity through a power plant. Secondarily, if the resource for the three AFBs is found to be not sufficient enough for electricity generation, then they will be described in enough detail to allow the base energy managers to evaluate if the resource is suitable for direct heating or cooling. Site visits and meetings by INL personnel with the staff at each AFB were held in late FY-2009 and FY-2010. This report provides a technical evaluation of the opportunities and challenges for developing geothermal resources on and around the AFBs. An extensive amount of literature and geographic information was evaluated as a part of this assessment. Resource potential maps were developed for each of the AFBs.

15 GEOTHERMAL ENERGY↗

ARRA-INPRVMNTS IN CMPTNG &CMMNC;RECOVERY ACT RESEARCH IN THEORETICAL HIGH ENERGY PHYSICS

The RAID array of 80 terabytes of hard disk data storage that was purchased on this project and interfaced with the existing Rutgers high energy physics computer farm has been used in support of a number of research projects during the last budget period. Monte carlo simulations for the Large Hadron Collider (LHC) have been continued for multi-jet signatures. The additional disk storage supported by this project allowed next to leading order matching effects of QCD radiation to be included in this study. Simulations to validate the technique of shot-gun sequencing of cascade decay trees in multi-dimensional Dalitz spaces have also been advanced. The results of this work will be applied to searches for quantum dimensions at the LHC. Simulations to investigate the possibility of extending these techniques to the search for the Higgs boson are also underway. The funds supporting this project have been entirely expended during the last period.

47 OTHER INSTRUMENTATION↗

Improved Optical Diagnostic and Microwave Power Supply, final report. An ARRA Supplement to Instabilities in Nonthermal Atmospheric Pressure Plasma

This is the final report for the supplemental program ''Improved Optical Diagnostic and Microwave Power Supply'' which has funded the purchase of laboratory instrumentation to enhance the main DOE project, ''Instabilities in Non-thermal Atmospheric Pressure Plasma.'' The main program’s goals include a scientific study of the plasma physics causing large-area plasmas to become unstable at atmospheric pressure. These fundamental scientific discoveries will then allow for the design of controllable cold plasma sources capable of materials processing, including photovoltaic devices, at one atmosphere. This leads to lower costs of energy production. This final report describes only the completion of the supplement. A high-speed spectroscopic camera capable of diagnosing plasma fluctuations and instabilities on time-scales of 2 ns was specified, purchased, installed and tested at the Tufts University Plasma Laboratory. In addition, a 30 watt microwave power system capable of producing short pulses of power in the 0.8 – 4.2 GHz bands was specified, purchased, installed and tested. Scientific experiments are continuing under the funding of the main grant, but a few preliminary examples of scientific discoveries made using these items are included in this report.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance - United States Pacific Command (PACOM) Guam, Task 3.3: Building Retuning Training

Document describes an onsite workshop and building retuning training conducted in Guam in August 2010. Document reports on issues identified during an audit of several buildings and recommendations to save energy throughout the site. During the workshop, it became apparent that as site personnel maintain the facilities at Guam, the following retuning efforts and strategies should be prioritized: (1) Controlling the mechanical systems operational hours and zone temperature set points appeared to present the best opportunities for savings; (2) Zone temperature set points in some buildings are excessively low, especially at night, when the zone temperatures are so cold that they approached the dewpoint; and (3) Manually-set outside air dampers are providing excessive outside air, especially for spaces that are unoccupied. Two of the larger schools, one on the Naval Base and one on Anderson AFB, are in need of a significant recommissioning effort. These facilities are relatively new, with direct digital controls (DDC) but are significantly out of balance. The pressure in one school is extremely negative, which is pulling humid air through the facility each time a door is opened. The draft can be felt several feet down the halls. The pressure in the other school is extremely positive relative to the outside, and you can stand 20-feet outside and still feel cool drafts of air exiting the building. It is recommended that humidity sensors be installed in all new projects and retrofitted into exist facilities. In this humid climate, control of humidity is very important. There are significant periods of time when the mechanical systems in many buildings can be unloaded and dehumidification is not required. The use of CO{sub 2} sensors should also be considered in representative areas. CO{sub 2} sensors determine whether spaces are occupied so that fresh air is only brought into the space when needed. By reducing the amount of outside air brought into the space, the humidity load is also substantially reduced. CO{sub 2} and humidity sensors, combined with outside air sensors, can be used to predict whether conditions are amenable to mold growth and to automatically adjust systems to help prevent mold without using extra energy. The goal of this training is to give the building operators the knowledge needed to make positive changes in the operation of building systems. As class participants apply this knowledge, building systems will run more efficiently, occupant comfort should improve, while saving energy and reducing greenhouse gas emissions.

54 ENVIRONMENTAL SCIENCES↗

ARRA-Multi-Level Energy Storage and Controls for Large-Scale Wind Energy Integration

The Project Objective is to design innovative energy storage architecture and associated controls for high wind penetration to increase reliability and market acceptance of wind power. The project goals are to facilitate wind energy integration at different levels by design and control of suitable energy storage systems. The three levels of wind power system are: Balancing Control Center level, Wind Power Plant level, and Wind Power Generator level.

17 WIND ENERGY↗

FY12 ARRA-NRAP Report – Studies to Support Risk Assessment of Geologic Carbon Sequestration

This report summarizes results of research conducted during FY2012 to support the assessment of environmental risks associated with geologic carbon dioxide (CO 2 ) sequestration and storage. Several research focus areas are ongoing as part of this project. This includes the quantification of the leachability of metals and organic compounds from representative CO 2 storage reservoir and caprock materials, the fate of metals and organic compounds after release, and the development of a method to measure pH in situ under supercritical CO 2 (scCO 2 ) conditions.

carbon sequestration↗

Hybrid Cooling for Geothermal Power Plants: Final ARRA Project Report

Many binary-cycle geothermal plants use air as the heat rejection medium. Usually this is accomplished by using an air-cooled condenser (ACC) system to condense the vapor of the working fluid in the cycle. Many air-cooled plants suffer a loss of production capacity of up to 50% during times of high ambient temperatures. Use of limited amounts of water to supplement the performance of ACCs is investigated. Deluge cooling is found to be one of the least-cost options. Limiting the use of water in such an application to less than one thousand operating hours per year can boost plant output during critical high-demand periods while minimizing water use in binary-cycle geothermal power plants.

15 GEOTHERMAL ENERGY↗