Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ACCSYS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Electron Bypass Line (EBL) Design: Electrons to A-line bypassing LCLS

Forty one years ago, September 20, 1966, the first beam entered End Station A, passed on through, and was terminated in Beam Dump East. This beam had an energy of 18.4 GeV, a record for the time. Since then, the SLAC ESA has been a mainstay facility for many high-energy physics and test beam experiments involving countless hours of data taking. Heretofore, it was assumed that with the completion and commissioning of the LCLS facility, beams from the main injector would no longer be available to this well equipped experimental facility. Fortunately, it has become clear that a bypass beamline design calling for modest modifications and using existing, soon to be surplus, components will enable continued utilization of this important facility.

43 PARTICLE ACCELERATORS↗

3 GeV Booster Synchrotron Conceptual Design Report

Synchrotron light cna be produced from a relativistic particle beam circulating in a storage ring at extremely high intensity and brilliance over a large spectral region reaching from the far infrared regime to hard x-rays. The particles, either electrons or positrons, radiate as they are deflected in the fields of the storage ring bending magnets or of magnets specially optimized for the production of synchrotron light. The synchrotron light being very intense and well collimated in the forward direction has become a major tool in a large variety of research fields in physics, chemistry, material science, biology, and medicine.

43 PARTICLE ACCELERATORS↗

LHC RF System Time-Domain Simulation

Non-linear time-domain simulations have been developed for the Positron-Electron Project (PEP-II) and the Large Hadron Collider (LHC). These simulations capture the dynamic behavior of the RF station-beam interaction and are structured to reproduce the technical characteristics of the system (noise contributions, non-linear elements, and more). As such, they provide useful results and insight for the development and design of future LLRF feedback systems. They are also a valuable tool for the study of diverse longitudinal beam dynamics effects such as coupled-bunch impedance driven instabilities and single bunch longitudinal emittance growth. Results from these studies and related measurements from PEP-II and LHC have been presented in multiple places. This report presents an example of the time-domain simulation implementation for the LHC.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

ESTB: A New Beam Test Facility at SLAC

End Station A Test Beam (ESTB) is a beam line at SLAC using a small fraction of the bunches of the 13.6 GeV electron beam from the Linac Coherent Light Source (LCLS), restoring test beam capabilities in the large End Station A (ESA) experimental hall. ESTB will provide one of a kind test beam essential for developing accelerator instrumentation and accelerator R&D, performing particle and particle astrophysics detector research, linear collider machine and detector interface (MDI) R&D studies, development of radiation-hard detectors, and material damage studies with several distinctive features. In the past, 18 institutions participated in the ESA program at SLAC. In stage I, 4 new kicker magnets will be added to divert 5 Hz of the LCLS beam to the A-line. A new beam dump will be installed and a new Personnel Protection System (PPS) is being built in ESA. In stage II, a secondary hadron target will be installed, able to produce pions up to about 12 GeV/c at 1 particle/pulse.

43 PARTICLE ACCELERATORS↗

Compact, Low-power and Precision Timing Photodetector Readout

Photodetector readout for next generation high event rate particle identification and single-photon detection requires a digitizer capable of integrated recording of dense arrays of sensor elements with high analog bandwidth (precision timing) and large record depth, in a cost-effective, compact and low-power way. Simply stated, one cannot do better than having a high-fidelity 'oscilloscope on a chip' for every sensor channel. A firs version of the Buffered Large Analog Bandwidth (BLAB1) ASIC has been designed based upon the lessons learned from the development of the Large Analog Bandwidth Recorder and Digitizer with Ordered Readout (LABRADOR) ASIC. While this LABRADOR ASIC has been very successful and forms the readout basis of a generation of new, large-scale radio neutrino detectors, its limited sampling depth is a major drawback. To address this shortcoming, a prototype intended for photodetector readout has been designed and fabricated with 64k deep sampling at multi-GSa/s operation. An evaluation system has been constructed for instrumentation of Time-Of-Propagation (TOP) and focusing DIRC prototypes and test results will be reported.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Measurement of Thermal Dependencies of PBG Fiber Properties

Photonic crystal fibers (PCFs) represent a class of optical fibers which have a wide spectrum of applications in the telecom and sensing industries. Currently, the Advanced Accelerator Research Department at SLAC is developing photonic bandgap particle accelerators, which are photonic crystal structures with a central defect used to accelerate electrons and achieve high longitudinal electric fields. Extremely compact and less costly than the traditional accelerators, these structures can support higher accelerating gradients and will open a new era in high energy physics as well as other fields of science. Based on direct laser acceleration in dielectric materials, the so called photonic band gap accelerators will benefit from mature laser and semiconductor industries. One of the key elements to direct laser acceleration in hollow core PCFs, is maintaining thermal and structural stability. Previous simulations demonstrate that accelerating modes are sensitive to the geometry of the defect region and the variations in the effective index. Unlike the telecom modes (for which over 95% of the energy propagates in the hollow core) most of the power of these modes is located in the glass at the periphery of the central hole which has a higher thermal constant than air ({gamma}{sub SiO{sub 2}} = 1.19 x 10{sup -6} 1/K, {gamma}{sub air} = -9 x 10{sup -7} 1/K with {gamma} = dn/dT). To fully control laser driven acceleration, we need to evaluate the thermal and structural consequences of such modes on the PCFs. We are conducting series of interferometric tests to quantify the dependencies of the HC-633-02 (NKT Photonics) propagation constant (k{sub z}) on temperature, vibration amplitude, stress and electric field strength. In this paper we will present the theoretical principles characterizing the thermal behavior of a PCF, the measurements realized for the fundamental telecom mode (TE{sub 00}), and the experimental demonstration of TM-like mode propagation in the HC-633-02 fiber.

36 MATERIALS SCIENCE↗

A Solid-State Nanosecond Beam Kicker Modulator Based on the DSRD Switch

A fast solid-state beam kicker modulator is under development at the SLAC National Accelerator Laboratory. The program goal is to develop a modulator that will deliver 4 ns, {+-}5 kV pulses to the ATF2 damping ring beam extraction kicker. The kicker is a 50 {Omega}, bipolar strip line, 60 cm long, fed at the downstream end and terminated at the upstream end. The bunch spacing in the ring is 5.6 ns, bunches are removed from the back end of the train, and there is a gap of 103.6 ns before the next train. The modulator design is based on an opening switch topology that uses Drift Step Recovery Diodes as the opening switches. The design and results of the modulator development are discussed. There are many applications that benefit from very fast high power switching. However, at MW power levels and nanosecond time scales, solid state options are limited. One option, the Drift Step Recovery Diode (DSRD) has been demonstrated as capable of blocking thousands of volts and switching in nanosecond to sub-nanosecond ranges. When used as an opening switch, the DSRD exhibits a very fast turn off transient. The process is described in detail by its pioneers in [5,6]. In essence, charge is pumped into and then extracted from the DSRD under pulsed conditions. The turn off transient occurs precisely when the pumped charge is equal to the extracted charge and the DSRD is switched off. At the SLAC National Accelerator Laboratory, a DSRD is being used as an opening switch in the development of a fast kicker modulator. The modulator is designed to create {+-}5kV pulses with <1ns rise and fall time on a 50{Omega} strip line kicker. As is common in beam optics, the absence of power in the kicker before and after the pulse is very important. The entire {+-}5kV kicker modulator is composed of two identical 5kV pulsing circuits, each with its own DSRD component. This paper describes the modulator topology and the status of tests on one of the two 5kV pulse circuits.

43 PARTICLE ACCELERATORS↗

Studies of RF Noise Induced Bunch Lengthening at the LHC

Radio Frequency (RF) noise induced bunch lengthening can strongly affect the Large Hadron Collider (LHC) performance through luminosity reduction, particle loss, and other effects. This work presents measurements from the LHC that better quantify the relationship between the RF noise and longitudinal emittance blowup and identify the performance limiting RF components. The experiments presented in this paper confirmed the predicted effects on the LHC bunch length growth. Dedicated measurements were conducted in the LHC to gain insight in the effect of RF noise to the longitudinal beam diffusion. It was evident that the growth rate of the bunch length is strongly related to the accelerating voltage phase noise power spectral density around f{sub s} + kf{sub rev}, as predicted in [4]. The noise threshold for 2.5 ps/hr growth was estimated to -101 dBc/Hz (SSB flat noise spectral density from f{sub s} to the edge of the closed loop bandwidth). A 9 dB margin is achieved with the current RF configuration and the BPL on. With this formalism it is now possible to estimate the effect of different operational and technical RF configurations on the LHC beam diffusion. This formalism could also be useful for the design of future RF systems and the budgeting of the allowed noise.

43 PARTICLE ACCELERATORS↗

Multipacting Simulation on Half Wave Resonantor for Beta 0.53

In the driver linac of the Facility for Rare Isotope Beams (FRIB), multipacting is an issue of concern for the superconducting resonators, which must accelerate the ion beams from 0.3 MeV per nucleon to 200 MeV per nucleon. While most of the multipacting bands can be conditioned and eliminated with RF, hard multipacting barriers may prevent the resonators from reaching the design voltage. Using the ACE3P code suite, multipacting bands can be computed and analysed with the Track3P module to identify potential problems in the resonator design. This paper will present simulation results for multipacting in half-wave resonators for the FRIB driver linac. The driver linac for the Facility for Rare Isotope Beams (FRIB) will use superconducting cavities to accelerate the heavy-ion beam to a minimum energy of 200 MeV/u. The first part of the driver linac utilizes two types of Quarter Wave Resonator (QWR) accelerating cavities operating at a frequency of 80.5 MHz to increase the beam energy to 17.5 MeV/u. The second part of the driver linac uses two types of Half Wave Resonators (HWR) cavities operating at a frequency of 322 MHz, with {beta} = 0.285 and 0.53 respectively to accelerate the beam to the final energy of 200 MeV/u. Multipacting (MP) is an issue of concern for superconducting resonators which may cause prolonged processing time or limit the achievable design gradient. While most of the MP bands may be conditioned and eliminated with RF, hard multipacting barriers may prevent the resonators from reaching the design voltage. Elimination of potential MP conditions in the cavity design could significantly reduce time and cost of conditioning and commissioning the driver linac. We have utilized the Track3P code, a module of ACE3P code suite, to analyze and identify the potential MP bands in the QWR and HWR cavities for the FRIB linacs. Due to space limitations, we will present the simulation results for the beta53 HWR cavity in this paper. The MP study for the QWR cavity will be presented in a different report. High power testing of these cavities is being carried out and will be compared with simulation when data are available.

43 PARTICLE ACCELERATORS↗

SuperB Bunch-By-Bunch Feedback R&D

The SuperB project has the goal to build in Italy, in the Frascati or Tor Vergata area, an asymmetric e{sup +}/e{sup -} Super Flavor Factory to achieve a peak luminosity > 10**36 cm{sup -2} s{sup -1}. The SuperB design is based on collisions with extremely low vertical emittance beams and high beam currents. A source of emittance growth comes from the bunch by bunch feedback systems producing high power correction signals to damp the beams. To limit any undesirable effect, a large R&D program is in progress, partially funded by the INFN Fifth National Scientific Committee through the SFEED (SuperB Feedback) project approved within the 2010 budget. The SuperB project [1] has the goal to build in Italy, in the Frascati or Tor Vergata area, an asymmetric e{sup +}/e{sup -} Super Flavor Factory to achieve a peak luminosity > 10**36 cm{sup -2} s{sup -1}. In the last and current years, the machine layout has been deeply modified, in particular the main rings are now shorter and an option with high currents has been foreseen. In the fig.1 the new SuperB layout is shown. From bunch-by-bunch feedback point of view, the simultaneous presence in the machine parameters, of very low emittance, of the order of 5-10 pm in the vertical plane, and very high currents, at level of 4 Ampere for the Low Energy Ring, asks for designing very carefully the bunch-by-bunch feedback systems. The parameter list is presented in Fig. 2. The bunch-by-bunch feedback design must take care of the risky and exciting challenges proposed in the SuperB specifications, but it should consider also some other important aspects: flexibility in terms of being able to cope to unexpected beam behaviours [2], [3] legacy of previous version experience [4], [5] and internal powerful diagnostics [6] as in the systems previously used in PEP-II and DAFNE [7].

43 PARTICLE ACCELERATORS↗

The Computer Program LIAR for Beam Dynamics Calculations in Linear Accelerators

Linear accelerators are the central components of the proposed next generation of linear colliders. They need to provide acceleration of up to 750 GeV per beam while maintaining very small normalized emittances. Standard simulation programs, mainly developed for storage rings, do not meet the specific requirements for high energy linear accelerators. We present a new program LIAR ('LInear Accelerator Research code') that includes wakefield effects, a 6D coupled beam description, specific optimization algorithms and other advanced features. Its modular structure allows to use and to extend it easily for different purposes. The program is available for UNIX workstations and Windows PC's. It can be applied to a broad range of accelerators. We present examples of simulations for SLC and NLC.

43 PARTICLE ACCELERATORS↗

Lattice Commissioning Stretgy Simulation for the B Factory

To prepare for the PEP-II turn on, we have studied one commissioning strategy with simulated lattice errors. Features such as difference and absolute orbit analysis and correction are discussed. To prepare for the commissioning of the PEP-II injection line and high energy ring (HER), we have developed a system for on-line orbit analysis by merging two existing codes: LEGO and RESOLVE. With the LEGO-RESOLVE system, we can study the problem of finding quadrupole alignment and beam position (BPM) offset errors with simulated data. We have increased the speed and versatility of the orbit analysis process by using a command file written in a script language designed specifically for RESOLVE. In addition, we have interfaced the LEGO-RESOLVE system to the control system of the B-Factory. In this paper, we describe online analysis features of the LEGO-RESOLVE system and present examples of practical applications.

43 PARTICLE ACCELERATORS↗

Individual Beam Size And Length Measurements at the SLC Interaction Point Derived From the Beam Energy Loss During a Beam Beam Deflection Scan

At the Interaction Point (IP) of the SLC Final Focus, beam-beam deflection scans routinely provide a measurement of the sum in quadrature of the electron and positron transverse beam sizes, but no information on the individual beam sizes. During the 1996 SLC run, an upgrade to the Final Focus beam position monitor system allowed a first measurement of the absolute beam energy loss of both beams on each step of the deflection scan. A fit to the energy loss distributions of the two beams provides a measurement not only of the individual transverse beam sizes at the IP but also of the individual bunch lengths.

43 PARTICLE ACCELERATORS↗

Optimizing Integrated Luminosity in a B Factory Storage Ring Using Emittance Control During a Beam Fill

During a fill in a colliding beam storage ring, the beam currents decay which decreases the luminosity and reduces the beam-beam tune shift parameters. In this note we investigate the active control of the vertical and horizontal emittances during a fill in order to keep the beam-beam tune shifts at their maxima thereby maximizing the integrated luminosity over the fill. The beam conditions are complicated by the inter-beam requirements of a asymmetric collider, e.g. PEP-II. Estimates of the increase in integrated luminosity are given and discussions of the required emittance adjustments and control possibilities are included.

43 PARTICLE ACCELERATORS↗

The Closed Orbit Measurement System at the DELTA Synchrotron Radiation Facility And First Investigations Concerning the Installation of a Beam Based BPM Calibration System

For a synchrotron radiation source it is necessary to operate a monitoring system to determine the beam position with high resolution and accuracy with respect to the axis of the quadrupole magnets. In this paper the present closed orbit measurement system of the DELTA SR-Facility, concerning the hardware setup, data processing and the calibration methods, will be presented. The results of the calibration measurements and the recent operating experience will be discussed. These results show, that the system is close to the design resolution. But the BPM offsets with respect to the magnetic center of the quadrupole magnets turn out to be not acceptable. For some BPMs they are in the order of several 100 micro m. Therefore it was decided to install a beam based BPM calibration system in the near future . This system should allow to determine the BPM offsets relative to the center of the quadrupole magnets for all 40 BPMs. It is planned to install a system in order to change the focussing strength of each quadrupole individually either in a static or dynamic way.

43 PARTICLE ACCELERATORS↗

RESOLVE Upgrades for on Line Lattice Error Analysis

We have increased the speed and versatility of the orbit analysis process by adding a command file, or 'script' language, to RESOLVE. This command file feature enables us to automate data analysis procedures to detect lattice errors. We describe the RESOLVE command file and present examples of practical applications.

43 PARTICLE ACCELERATORS↗