Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “36 - MATERIALS SCIENCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Research Summary No. 36-7

The Research Summary is a bimonthly report of supporting research and development conducted at the Jet Propulsion Laboratory. This periodical is issued in three volumes. Volume I contains summaries of the work accomplished by the Space Sciences, Systems, Guidance and Control, and Telecommunications Divisions of the Laboratory. Volume II contains summaries of the work accomplished by the Physical Sciences, Engineering Mechanics, Engineering Facilities, and Propulsion Divisions. All work of a classified nature is contained in Volume Ill.

Source record↗

Assessment of Version 4 of the SMAP Passive Soil Moisture Standard Product

NASAs Soil Moisture Active Passive (SMAP) mission launched on January 31, 2015 into a sun-synchronous 6 am6 pm orbit with an objective to produce global mapping of high-resolution soil moisture and freeze-thaw state every 2-3 days. The SMAP radiometer began acquiring routine science data on March 31, 2015 and continues to operate nominally. SMAPs radiometer-derived standard soil moisture product (L2SMP) provides soil moisture estimates posted on a 36-km fixed Earth grid using brightness temperature observations and ancillary data. A beta quality version of L2SMP was released to the public in October, 2015, Version 3 validated L2SMP soil moisture data were released in May, 2016, and Version 4 L2SMP data were released in December, 2016. Version 4 data are processed using the same soil moisture retrieval algorithms as previous versions, but now include retrieved soil moisture from both the 6 am descending orbits and the 6 pm ascending orbits. Validation of 19 months of the standard L2SMP product was done for both AM and PM retrievals using in situ measurements from global core calval sites. Accuracy of the soil moisture retrievals averaged over the core sites showed that SMAP accuracy requirements are being met.

SMAP↗

Research Summary No. 36-6, Volume II

The Research Summary is a bimonthly report of supporting research and development conducted at the Jet Propulsion Laboratory. This periodical is issued in three volumes. Volume I contains summaries of the work accomplished by the Space Sciences, Systems, Guidance and Control, and Telecommunications Divisions of the Laboratory. Volume II contains summaries of the work accomplished by the Physical Sciences, Engineering Mechanics, Engineering Facilities, and Propulsion Divisions. All work of a classified nature is contained in Volume Ill.

Source record↗

Research Summary No. 36-5, Volume II

The Research Summary is a bimonthly report of supporting research and development conducted at the Jet Propulsion Laboratory. This periodical is issued in three volumes. Volume I contains summaries of the work accomplished by the Space Sciences, Systems, Guidance and Control, and Telecommunications Divisions of the Laboratory. Volume II contains summaries of the work accomplished by the Physical Sciences, Engineering Mechanics, Engineering Facilities, and Propulsion Divisions. All work of a classified nature is contained in Volume Ill.

Source record↗

Research Summary No. 36-3, Volume I, Part I

The Research Summary is a bimonthly report of supporting research and development conducted at the Jet Propulsion Laboratory. This periodical is issued in three volumes. Volume I contains summaries of the work accomplished by the Space Sciences, Systems, Guidance and Control, and Telecommunications Divisions of the Laboratory. Volume II contains summaries of the work accomplished by the Physical Sciences, Engineering Mechanics, Engineering Facilities, and Propulsion Divisions. All work of a classified nature is contained in Volume Ill.

Source record↗

Evaluation of the Validated Soil Moisture Product from the SMAP Radiometer

NASA's Soil Moisture Active Passive (SMAP) mission launched on January 31, 2015 into a sun-synchronous 6 am/6 pm orbit with an objective to produce global mapping of high-resolution soil moisture and freeze-thaw state every 2-3 days using an L-band (active) radar and an L-band (passive) radiometer. The SMAP radiometer began acquiring routine science data on March 31, 2015 and continues to operate nominally. SMAP's radiometer-derived soil moisture product (L2_SM_P) provides soil moisture estimates posted on a 36 km fixed Earth grid using brightness temperature observations from descending (6 am) passes and ancillary data. A beta quality version of L2_SM_P was released to the public in September, 2015, with the fully validated L2_SM_P soil moisture data expected to be released in May, 2016. Additional improvements (including optimization of retrieval algorithm parameters and upscaling approaches) and methodology expansions (including increasing the number of core sites, model-based intercomparisons, and results from several intensive field campaigns) are anticipated in moving from accuracy assessment of the beta quality data to an evaluation of the fully validated L2_SM_P data product.

Ocean Salinity↗

Research Summary No. 36-3, Volume I, Part II

The Research Summary is a bimonthly report of supporting research and development conducted at the Jet Propulsion Laboratory. This periodical is issued in three volumes. Volume I contains summaries of the work accomplished by the Space Sciences, Systems, Guidance and Control, and Telecommunications Divisions of the Laboratory. Volume II contains summaries of the work accomplished by the Physical Sciences, Engineering Mechanics, Engineering Facilities, and Propulsion Divisions. All work of a classified nature is contained in Volume Ill.

Source record↗

An Architectural Survey of the Area 25 Nuclear Rocket Development Station, Nevada National Security Site, Nye County, Nevada (Volume 1 of 3)

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO), and the U.S. Department of Energy Environmental Management Nevada Program (EM NV) plan to implement corrective action activities (under the Federal Facility Agreement and Consent Order, agreed to by the State of Nevada) and demolition of the Engine Maintenance, Assembly, and Disassembly (E-MAD) facility and the Test Cell C Historic District. These are major components of the unrecorded Nuclear Rocket Development Station (NRDS) Historic District, which is eligible for inclusion in the National Register of Historic Places (NRHP, National Register). The NRDS is in Area 25 of the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, in Nye County, Nevada. Demolition and removal of the buildings and accessories constitutes an undertaking subject to review under Section 106 of the National Historic Preservation Act (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800.

54 ENVIRONMENTAL SCIENCES↗

Status of Aqua MODIS On-orbit Calibration and Characterization

The MODIS Flight Model 1 (FM1) has been in operation for more than two years since its launch onboard the NASA's Earth Observing System (EOS) Aqua spacecraft on May 4, 2002. The MODIS has 36 spectral bands: 20 reflective solar bands (RSB) with center wavelengths from 0.41 to 2.2 micron and 16 thermal emissive bands (TEB) from 3.7 to 14.5 micron. It provides the science community observations (data products) of the Earth's land, oceans, and atmosphere for a board range of applications. Its primary on-orbit calibration and characterization activities are performed using a solar diffuser (SD) and a solar diffuser stability monitor (SDSM) system for the RSB and a blackbody for the TEB. Another on-board calibrator (OBC) known as the spectro-radiometric calibration assembly (SRCA) is used for the instrument's spatial (TEB and RSB) and spectral (RSB only) characterization. We present in this paper the status of Aqua MODIS calibration and characterization during its first two years of on-orbit operation. Discussions will be focused on the calibration activities executed on-orbit in order to maintain and enhance the instrument's performance and the quality of its Level 1B (L1B) data products. We also provide comparisons between Aqua MODIS and Terra MODIS (launched in December, 1999), including their similarity and difference in response trending and optics degradation. Existing data and results show that Aqua MODIS bands 8 (0.412 micron) and 9 (0.443 micron) have much smaller degradation than Terra MODIS bands 8 and 9. The most noticeable feature shown in the RSB trending is that the mirror side differences in Aqua MODIS are extremely small and stable (<0.1%) while the Terra MODIS RSB trending has shown significant mirror side difference and wavelength dependent degradation. The overall stability of the Aqua MODIS TEB is also better than that of the Terra MODIS during their first two years of on-orbit operation.

Aqua↗

Terra MODIS: 20 years of on-orbit calibration and performance

Since its launch in December 1999, Terra Moderate Resolution Imaging Spectroradiometer (MODIS) has successfully operated for more than 20 years, with its observations generating a broad range of science data products that have greatly enabled the remote sensing community and users worldwide in their studies of many key geophysical parameters of the Earth’s systems. MODIS collects data in 36 spectral bands, covering wavelengths from 0.41 to 14.4 μm, which are calibrated by a set of onboard calibrators (OBCs). Also contributing to the sensor’s mission-long on-orbit calibration and characterization are near-monthly scheduled lunar observations and multiple time series of the sensor’s responses over select ground targets at a variety of scan angles. To a large extent, the quality of MODIS data products relies strongly on the dedicated efforts to operate and calibrate the instrument, to derive and update calibration parameters, and to develop and implement new calibration strategies and algorithms in response to on-orbit changes of the sensor’s characteristics and its OBC functions. We provide an overview of the Terra MODIS on-orbit operation and calibration activities over the last 20 years, including changes made to extend and preserve the instrument and OBC functions and their operation strategies. It also illustrates the sensor’s on-orbit performance with results derived from its OBC, lunar observations, and select ground targets and discusses major changes in sensor characteristics and corrections applied to the L1B algorithms as well as calibration lookup table updates. To date, the Terra MODIS instrument and its OBCs continue to operate and function normally. Except for those identified prelaunch, most spectral bands and detectors continue to meet their specified calibration requirements. Also discussed in our paper are lessons learned from Terra MODIS operation and calibration, as well as future efforts to further extend and maintain the quality of its long-term data records.

Terra↗

Assessment of the SMAP Passive Soil Moisture Product

The National Aeronautics and Space Administration (NASA) Soil Moisture Active Passive (SMAP) satellite mission was launched on January 31, 2015. The observatory was developed to provide global mapping of high-resolution soil moisture and freeze-thaw state every two to three days using an L-band (active) radar and an L-band (passive) radiometer. After an irrecoverable hardware failure of the radar on July 7, 2015, the radiometer-only soil moisture product became the only operational Level 2 soil moisture product for SMAP. The product provides soil moisture estimates posted on a 36 kilometer Earth-fixed grid produced using brightness temperature observations from descending passes. Within months after the commissioning of the SMAP radiometer, the product was assessed to have attained preliminary (beta) science quality, and data were released to the public for evaluation in September 2015. The product is available from the NASA Distributed Active Archive Center at the National Snow and Ice Data Center. This paper provides a summary of the Level 2 Passive Soil Moisture Product (L2_SM_P) and its validation against in situ ground measurements collected from different data sources. Initial in situ comparisons conducted between March 31, 2015 and October 26, 2015, at a limited number of core validation sites (CVSs) and several hundred sparse network points, indicate that the V-pol Single Channel Algorithm (SCA-V) currently delivers the best performance among algorithms considered for L2_SM_P, based on several metrics. The accuracy of the soil moisture retrievals averaged over the CVSs was 0.038 cubic meter per cubic meter unbiased root-mean-square difference (ubRMSD), which approaches the SMAP mission requirement of 0.040 cubic meter per cubic meter.

passive↗

DSN Aperture Enhancement Project Office

All contracts are underway for antennas, associated facilities modifications and new transmitters. High risk CPI 100kW klystron and JPL high power uplink microwave components have been designed, prototyped and successfully tested at GDSCC to support the 80kW transmitter implementation and testing at vendor facility. Open issues, which might affect project delivery date, have plans in place or are being created, to maintain DSS-35 Operational Date. There are no known open issues that affect performance. Overall good progress has been made in all areas (procurements, contracts, design and development) and the project is confident that DSS-35 & 36 antennas and the three 80kW Uplink systems will be delivered according to plan.

DSN Aperture Enhancement Project (DAEP)↗

NASA Tech Briefs, July 2011

Topics covered include: 1) Collaborative Clustering for Sensor Networks; 2) Teleoperated Marsupial Mobile Sensor Platform Pair for Telepresence Insertion Into Challenging Structures; 3) Automated Verification of Spatial Resolution in Remotely Sensed Imagery; 4) Electrical Connector Mechanical Seating Sensor; 5) In Situ Aerosol Detector; 6) Multi-Parameter Aerosol Scattering Sensor; 7) MOSFET Switching Circuit Protects Shape Memory Alloy Actuators; 8) Optimized FPGA Implementation of Multi-Rate FIR Filters Through Thread Decomposition; 9) Circuit for Communication Over Power Lines; 10) High-Efficiency Ka-Band Waveguide Two-Way Asymmetric Power Combiner; 11) 10-100 Gbps Offload NIC for WAN, NLR, and Grid Computing; 12) Pulsed Laser System to Simulate Effects of Cosmic Rays in Semiconductor Devices; 13) Flight Planning in the Cloud; 14) MPS Editor; 15) Object-Oriented Multi Disciplinary Design, Analysis, and Optimization Tool; 16) Cryogenic-Compatible Winchester Connector Mount and Retaining System for Composite Tubes; 17) Development of Position-Sensitive Magnetic Calorimeters for X-Ray Astronomy; 18) Planar Rotary Piezoelectric Motor Using Ultrasonic Horns; 19) Self-Rupturing Hermetic Valve; 20) Explosive Bolt Dual-Initiated from One Side; 21) Dampers for Stationary Labyrinth Seals; 22) Two-Arm Flexible Thermal Strap; 23) Carbon Dioxide Removal via Passive Thermal Approaches; 24) Polymer Electrolyte-Based Ambient Temperature Oxygen Microsensors for Environmental Monitoring; 25) Pressure Shell Approach to Integrated Environmental Protection; 26) Image Quality Indicator for Infrared Inspections; 27) Micro-Slit Collimators for X-Ray/Gamma-Ray Imaging; 28) Scatterometer-Calibrated Stability Verification Method; 29) Test Port for Fiber-Optic-Coupled Laser Altimeter; 30) Phase Retrieval System for Assessing Diamond Turning and Optical Surface Defects; 31) Laser Oscillator Incorporating a Wedged Polarization Rotator and a Porro Prism as Cavity Mirror; 32) Generic, Extensible, Configurable Push-Pull Framework for Large-Scale Science Missions; 33) Dynamic Loads Generation for Multi-Point Vibration Excitation Problems; 34) Optimal Control via Self-Generated Stochasticity; 35) Space-Time Localization of Plasma Turbulence Using Multiple Spacecraft Radio Links; 36) Surface Contact Model for Comets and Asteroids; 37) Dust Mitigation Vehicle; 38) Optical Coating Performance for Heat Reflectors of the JWST-ISIM Electronic Component; 39) SpaceCube Demonstration Platform; 40) Aperture Mask for Unambiguous Parity Determination in Long Wavelength Imagers; 41) Spaceflight Ka-Band High-Rate Radiation-Hard Modulator; 42) Enabling Disabled Persons to Gain Access to Digital Media; 43) Cytometer on a Chip; 44) Principles, Techniques, and Applications of Tissue Microfluidics; and 45) Two-Stage Winch for Kites and Tethered Balloons or Blimps.

Source record↗

DOE ARM Future of LASSO Workshop Report

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility held a two-day workshop at the National Science Foundation National Center for Atmospheric Research in Boulder, Colorado in November 2023 to discuss the history and future of the Large-Eddy Simulation (LES) ARM Symbiotic Simulation and Observation (LASSO) activity. LASSO is a suite of data products focused on supplementing ARM observations with high-resolution modeling. The workshop used a hybrid format with 15 invited, in-person attendees and 36 virtual attendees logging in for portions of the workshop. Many topics were covered at the workshop, with this report reflecting the ensuing discussion. Some topics discussed had clear conclusions while others require further thought, given the breadth of topics included in a short workshop.

54 ENVIRONMENTAL SCIENCES↗

Explicit quantification of residence and flushing times in the Salish Sea using a sub-basin scale shoreline resolving model

The Salish Sea, located in the Pacific Northwest region of North America has complex currents and circulation features distributed over numerous interconnected deep basins with islands. Increased risk of exposure to oil spills and untreated wastewater from maritime emergencies and treatment plant failures have led to a need for quantifying residence and flushing characteristics at a sub-basin scale using a shoreline resolving hydrodynamic model. An unstructured grid model of the Salish Sea was developed using FVCOM with a ≈75-100m shoreline resolution. In addition to 7 tides and 23 salinity and temperature monitoring stations, an extensive currents data set from 135 stations collected over a span of three years was used for skill assessment and validation. Explicit forward computations were then conducted to define and quantify residence and flushing times in various sub-basins of interest using (a) Lagrangian particles and (b) Numerical/virtual dye experiments. The results in most basins show expected seasonal variability with longer flushing time associated with summer lower tides and lower freshwater inflows. However, contrary to expectation, flushing time is significantly longer in wintertime in large fjord-like basins such as Hood Canal (≈138 days), likely due to increased stratification and reduced mixing. The flushing time for the Puget Sound region of the Salish Sea is ≈115 days, while Georgia Basin is 240 days when analyzed as stand-alone basins with zero background concentrations. When examined as part of the flushing of the entire Puget Sound filled with virtual dye, the compounded flushing times for embedded sub-basins can be significantly longer in order of magnitudes and largely dictated by the flushing time of Puget Sound. The computed residence and flushing time scales tabulated over 36 sub-basins provide an improved understanding of water renewal in the system, informing pollution management actions.

54 ENVIRONMENTAL SCIENCES↗

Real-Time Very High-Resolution Regional 4D Assimilation in Supporting CRYSTAL-FACE Experiment

To better understand tropical cirrus cloud physical properties and formation processes with a view toward the successful modeling of the Earth's climate, the CRYSTAL-FACE (Cirrus Regional Study of Tropical Anvils and Cirrus Layers - Florida Area Cirrus Experiment) field experiment took place over southern Florida from 1 July to 29 July 2002. During the entire field campaign, a very high-resolution numerical weather prediction (NWP) and assimilation system was performed in support of the mission with supercomputing resources provided by NASA Center for Computational Sciences (NCCS). By using NOAA NCEP Eta forecast for boundary conditions and as a first guess for initial conditions assimilated with all available observations, two nested 15/3 km grids are employed over the CRYSTAL-FACE experiment area. The 15-km grid covers the southeast US domain, and is run two times daily for a 36-hour forecast starting at 0000 UTC and 1200 UTC. The nested 3-km grid covering only southern Florida is used for 9-hour and 18-hour forecasts starting at 1500 and 0600 UTC, respectively. The forecasting system provided more accurate and higher spatial and temporal resolution forecasts of 4-D atmospheric fields over the experiment area than available from standard weather forecast models. These forecasts were essential for flight planning during both the afternoon prior to a flight day and the morning of a flight day. The forecasts were used to help decide takeoff times and the most optimal flight areas for accomplishing the mission objectives. See more detailed products on the web site http://asd-www.larc.nasa.gov/mode/crystal. The model/assimilation output gridded data are archived on the NASA Center for Computational Sciences (NCCS) UniTree system in the HDF format at 30-min intervals for real-time forecasts or 5-min intervals for the post-mission case studies. Particularly, the data set includes the 3-D cloud fields (cloud liquid water, rain water, cloud ice, snow and graupe/hail).

Wang, Donghai↗

New Millennium EO3

The New Millennium Program (NMP) is a NASA technology program that focuses on the validation of advanced spacecraft and instrumentation technologies in space. This program specifically seeks technologies that could significantly benefit future space and Earth science missions by enabling new science capabilities and reducing life cycle costs. These technologies must also require a validation in space to mitigate risks to the first science users, and provide cross-cutting benefits to both NASA's Earth and Space Science enterprises. The NASA Office of Earth Science (OES) directed the NMP to focus the third Earth Observing mission, E03, on innovative measurement concepts that would facilitate remote sensing observations from orbits beyond conventional low-Earth orbit (LEO). These orbits include geosynchronous orbits, highly elliptical orbits, mid-Earth and high-Earth orbits, and other unique vantage points such as L1 and L2. To maximize the input from the Earth science community, a NASA Research Announcement (NRA) was released to solicit innovative measurement concepts for this NMP flight. Because the NMP is a technology validation program, rather than a conventional science program, the NRA required that these measurement concepts employ revolutionary technologies and/or measurement strategies that will enable future science missions from orbits beyond LEO. Another requirement was that a validation in space was needed to reduce real or perceived risks of this concept to future science users. The proposals submitted in response to this NRA were peer reviewed by the NASA OES. The measurement concepts selected through this process will be summarized in this presentation. The E03 measurement concept NRA did not solicit complete mission concepts or flight hardware. Instead, the selected investigators will join integrated project formulation teams to define the mission for the demonstration of the measurement technique and participate in mission design trades and implementation planning. The teams will define and document the measurement approach, the required technologies, the validation plan, the scalability of the design to future science missions, and the infusion path for the completely validated instrument. During this project formulation phase, the specific technologies required to implement each measurement concept will be solicited through an open technology solicitation, and the technology providers will be added to the integrated teams. Once a complete candidate mission concept has been formulated for each measurement concept, these concepts will be subjected to a comprehensive review. The Associate Administrator of the OES will use the results of this review to select a single concept for the E03 flight opportunity. That mission concept will enter its implementation phase, which is expected to last for less than 36 months before launch. During this phase, and after launch, the implementation team will work with the NMP to document and disseminate the information gathered during the flight qualification testing and operations of the measurement concept and its component technologies. This information will be archived and published, where appropriate, to encourage the rapid infusion of these validated technologies into future space and Earth science missions. I

Li, Fuk K.↗