Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “vinyl”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 Solid Waste Management Unit #041 Year 4 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 4 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 4 PMR extends from November 2022 through September 2023. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 4 reporting period was approximately 94%, with the majority of downtime attributed to associated groundwater sampling events, maintenance, and Hurricane Nicole. Almost five million gallons of groundwater were treated during Year 4 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 99%. This PMR describes the activities that were performed during Year 4 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 4 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 4 plume conditions. A supplemental DPT study conducted in 2022 and 2023. This study indicated that low-concentration plume conditions, where concentrations exceed State of Florida Groundwater Cleanup Target Levels, expanded westward to Kennedy Parkway North and northward to the vicinity of the railroad tracks. Based on these results, recommendations were made to install 14 wells to monitor the downgradient and boundary conditions of the expanded LCP. The contents of this Year 4 PMR were presented during the November 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Wilson Corners, Solid Waste Management Unit 001(SWMU 01) 2023 Annual Long-Term Monitoring Report

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2023 at Wilson Corners, Solid Waste Management Unit 001, at Kennedy Space Center (KSC), Florida. Annual LTM of groundwater is being conducted at the site. Based on results from groundwater sampling activities performed during the 2019 through 2020 LTM reporting period and the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified and the installation of an air sparge (AS) system to treat the area of the High Concentration Plume was recommended. The AS System was installed in late 2022 and early 2023. System start-up activities were initiated in April 2023. Following system startup, several site wells required retrofitting to equip wellheads for withstanding the air pressure released from air sparge wells during system operation. Some site wells also required repair or abandonment, and replacement. Survey of location and top-of-casing of newly installed monitoring wells was combined with scheduled AS system survey activities and was completed in January 2024. The activities presented in this report include the February and April 2023 LTM monitoring well installations; March and April 2023 LTM and performance monitoring well water level gauging and sampling; November 2023 LTM well retrofits and repairs; a summary of December 2023 LTM well abandonments and installations (complete site well abandonment activities will be presented under a separate cover); and January 2024 LTM well survey. During the March and April 2023 sampling events, the low-flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds. In March 2023, groundwater flow for the site was generally to the west was generally consistent with historical observations at the site. The Low Concentration Plume (LCP) continues to extend both horizontally and vertically beyond the terminal depth of the current monitoring well network. Data, inclusive of the 2023 LTM and baseline performance monitoring sampling events, indicate that the LCP encompasses an estimated 19.5 acres, compared to the 2021 LCP footprint, inclusive of the 2020 and 2021 DPT sampling events of 20.7 acres. The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet below land surface (bls). The results from the three vertical extent monitoring wells screened below 48 feet bls that were sampled during the 2023 LTM indicate that groundwater vinyl chloride concentrations in these three wells are greater than the GCTL. As presented in the 2021 Long-Term Monitoring Report (NASA 2022), the KSCRT agreed to delay deeper investigations in this area to prevent the creation of additional pathways for vertical migration. Based on groundwater sampling activities performed in 2023, recommendations are to perform the next annual LTM sampling event, scheduled for April 2024 and to conduct quarterly performance monitoring of the AS System. The current selection of monitoring wells in the recommended 2024 LTM plan will provide an adequate data set for monitoring groundwater plume behavior; however, the LTM monitoring well network will be evaluated and refined based on 2024 LTM and year one performance monitoring data.

King Linnea↗

Launch Complex 39A, SWMU 008 2023 Long-Term Monitoring Report Kennedy Space Center, Florida

The 2023 Long-Term Monitoring (LTM) Report (LTMR) presents the annual and semi-annual groundwater monitoring results for Launch Complex 39A (LC39A), Solid Waste Management Unit (SWMU) 008, at Kennedy Space Center (KSC), Florida. The reporting period covered under this LTMR is from January to December 2023, and represents the first year of site-wide monitoring following Air Sparge (AS) system shutdown at the end of 2022. AS system operation at LC39A began operation in 2015. The AS system consisted of a total of 173 AS wells ranging in depth from 11 to 37 feet below land surface. The overall remedial objective for the AS Interim Measure was to actively decrease concentrations of COCs to less than their respective Florida Department of Environmental Protection Natural Attenuation Default Concentrations, so that LC39A can transition into an LTM program. This objective was achieved in 2022, with 2023 marking Year 1 of the LTM program to monitor the residual groundwater plume. VOC results indicate that COC concentrations have continued to decrease or stabilize, with no rebound observed since AS system shutdown. Vinyl chloride was the only COC detected above its GCTL, with the highest concentration detected at 8.0 μg/L. PFAS results detected 15 different PFAS compounds (out of 32 analyzed) between the six monitoring wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). PFOS was detected in one of the six samples above the FDEP Provisional GCTL at a concentration of 200 ng/L. PFOA was not detected above the FDEP Provisional GCTL in any of the six samples. PFOS and PFOA also currently have United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 ng/L. PFOS was detected in all six samples above the USEPA MCL. PFOA was detected in three of the six samples above the USEPA MCL. Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the six wells. Additional PFAS sampling will occur as part of a PFAS Site Assessment to be conducted in the future. Based on Year 1 LC39A LTM results, recommendations for 2024 are to continue with the second year of LTM in 2024 with the same monitoring well network as Year 1 (18 wells). The three wells that were on a semi-annual schedule will transition to an annual schedule to align with the remaining wells. The next annual event is scheduled for May 2024. The three wells that were found to be inadvertently destroyed will be properly abandoned and a replacement well in the vicinity of former monitoring well 21ST-MW0030I will be installed. This new well will be added to the LTM sampling plan upon installation.

Deborah M. Wilson↗

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Converter Compressor Building, SWMU 089 Monitoring Well 21 Area Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) Contract 80KSC019D0011/80KSC019F0070, for the implementation of a bioremediation Interim Measure (IM) at the Converter Compressor Building (CCB) site located at Kennedy Space Center (KSC), Florida. The location of CCB within KSC is shown on Figure A-1. CCB has been designated as Solid Waste Management Unit (SWMU) 089 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. The overall Corrective Action Objective (CAO) for CCB is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), and vinyl chloride (VC) to less than State of Florida Groundwater Cleanup Target Levels (GCTLs). The objective for the IM associated with this IM is to reduce groundwater concentrations for the contaminants of concern (COCs) to less than their Natural Default Attenuation Concentrations (NADCs) within the Monitoring Well 21 Area (herein referred to as MW21 Area) via bioremediation injections to support transition to long term monitoring (LTM). This IWP describes the activities that will be performed for the treatment of the MW21 Area. The Revision 1 CCB MW21 Area Interim Measure Work Plan (IMWP; NASA, 2024), which was approved by the Florida Department of Environmental Protection (FDEP) on December 26, 2024, was used as the design basis for this IWP.

Mark Jonnet↗

Facilitated Transport Membranes with Tunable Amine-CO 2 Chemistry for CO 2 /H 2 Separation

CO 2 -selective, amine-containing facilitated transport membranes are of great interest for syngas purification since high-pressure H 2 can be retained upon CO 2 removal. A variety of amine-containing polymers have shown decent chemical and thermal stability at aggressive conditions, but their CO 2 /H 2 separation properties are largely limited by the hydrostatic compaction and severe carrier saturation associated with the high syngas pressure. Herein, we report a new approach to enhance the CO 2 permeability by manipulating the steric hindrance of the amine carriers. A series of α-aminoacids with different alkyl or hydroxyethyl substituents are deprotonated by 2-(1-piperazinyl)ethylamine, leading to nonvolatile amine carriers with different degrees of steric hindrance. For hosting the low MW amine carriers, a highly crosslinked poly(vinyl acetal) is synthesized as a water-swellable polymer network. In order to avoid membrane compaction, perforated graphene oxide mono-sheets are dispersed as reinforcement fillers. In the presence of moisture, a bulkier alkyl substituent to the amino site (increasing steric hindrance) destabilizes the carbamate adduct and thus drastically increases the chemisorption of CO 2 , while the incorporation of ethylene oxide groups provides additional physisorption of CO 2 . The enhanced CO 2 solubility significantly mitigates the carrier saturation behavior, and an unprecedented CO 2 /H 2 selectivity greater than 100 is demonstrated at 107 °C and 12.5 atm of CO 2 partial pressure. As the CO 2 partial pressure reduces to 0.4 atm, a less hindered amine yields a higher reactive diffusivity of CO 2 , resulting in a CO 2 permeance of 435 GPU with a selectivity greater than 500. These reaction-mediated polymeric membranes are well above the theoretical upper bound, and they are of great interest for designing a highly-selective membrane process for syngas purification.

08 HYDROGEN↗

Glass/Glass Photovoltaic Module Reliability and Degradation: A Review - Figures

Glass/glass (G/G) photovoltaic (PV) module construction is quickly rising in popularity due to increased demand for bifacial PV modules, with additional applications for thin-film and building-integrated PV technologies. G/G modules are expected to withstand harsh environmental conditions and extend the installed module lifespan to greater than 30 years compared to conventional glass/backsheet (G/B) modules. With the rapid growth of G/G deployment, understanding the outdoor performance, degradation, and reliability of this PV module construction becomes highly valuable. In this review, we present the history of G/G modules that have existed in the field for the past 20 years, their subsequent reliability issues under different climates, and methods for accelerated testing and characterization of both cells and packaging materials. We highlight some general trends of G/G modules, such as greater degradation when using poly(ethylene-co-vinyl acetate) (EVA) encapsulants, causing the industry to move toward polyolefin-based encapsulants. Transparent backsheets have also been introduced as an alternative to the rear glass for decreasing the module weight and aiding the effusion of trapped gaseous degradation products in the laminate. New amendments to IEC 61215 standard protocols for G/G bifacial modules have also been proposed so that the rear side power generation and UV exposure will be standardized. We further summarize a suite of destructive and non-destructive characterization techniques, such as current-voltage scans, module electro-optical imaging, adhesion tests, nanoscale structural/chemical investigation, and forensic analysis, to provide deeper insights into the fundamental properties of the module materials degradation and how it can be monitored in the G/G construction. This will set the groundwork for future research and product development.

transparent backsheet↗

Acid-degradable and bioerodible modified polyhydroxylated materials

Compositions and methods of making a modified polyhydroxylated polymer comprising a polyhydroxylated polymer having reversibly modified hydroxyl groups, whereby the hydroxyl groups are modified by an acid-catalyzed reaction between a polydroxylated polymer and a reagent such as acetals, aldehydes, vinyl ethers and ketones such that the modified polyhydroxylated polymers become insoluble in water but freely soluble in common organic solvents allowing for the facile preparation of acid-sensitive materials. Materials made from these polymers can be made to degrade in a pH-dependent manner. Both hydrophobic and hydrophilic cargoes were successfully loaded into particles made from the present polymers using single and double emulsion techniques, respectively. Due to its ease of preparation, processability, pH-sensitivity, and biocompatibility, of the present modified polyhydroxylated polymers should find use in numerous drug delivery applications.

Frechet, Jean M. J.↗

Degradation in Photovoltaic Encapsulant Transmittance: Results of the Second PVQAT TG5 Artificial Weathering Study

The optical degradation of encapsulants from ultraviolet (UV) radiation has historically resulted in a significant loss in performance throughout the life of a photovoltaic (PV) module. IEC test methods have recently been developed to screen for PV encapsulants prone to loss in optical performance. The present study was performed to benchmark polymeric packaging materials relative to IEC 62788-1-4 (covering the measurement of optical transmittance) and IEC 62788-1-7 (on the durability of transmittance), provide feedback toward improvement of the methods, and develop insight regarding optical degradation. Contemporary materials were examined, including: poly(ethylene-co-vinyl acetate) (EVA), thermoplastic polyolefin (TPO), polyolefin elastomer (POE), and polyvinyl butyral (PVB) encapsulants; a poly(ethene-co-tetrafluoroethene)/poly(ethylene terephthalate) (ETFE/PET) transparent backsheet; and a polystyrene (PS) working reference material. The use of silica-, specialty-, and rolled-glass was also compared in laminated coupons. Specimen size was separately examined from 2.5 cm to 12.5 cm. Weathering was performed with a xenon source, using IEC TS 62788-7-2 methods A2, A3, A4, and A5 (chamber temperature of 55 Degrees C, 65 Degrees C, 75 Degrees C, or 85 Degrees C), respectively. Characterizations were made using a UV-VIS-NIR spectrophotometer (transmittance and reflectance, with and without an integrating sphere), a UV-VIS fluorescence spectrophotometer, a camera, and an optical microscope. Performance was analyzed, including solar weighted transmittance, yellowness index, UV cut-off wavelength, and haze (scattering). Separate Arrhenius analyses were performed to assess retention of transmittance and changes in yellowness index. The activation energy for both characteristics was found to range from 15 kJ?mol-1-80 kJ/mol-1, with an average of 48 kJ/mol-1, similar to the average of 45 kJ/mol-1 identified in the previous international PV Quality Assurance Task Force (PVQAT) Task Group 5 (TG5) study of more traditional encapsulants. The separate degradation modes of discoloration and scattering were distinguished in the encapsulants using a comprehensive spectral characterization. Based on these results, the IEC 62788-1-7 pass/fail criteria of 5% change in transmittance was confirmed to identify a known bad encapsulant.

durability↗

Three-dimensional porous siloxanes using leachable porogen particles

According to one embodiment, a silicone-based ink for additive manufacturing includes a vinyl-terminated diphenyl siloxane macromer, a treated silica hydrophobic reinforcing filler, a rheology modifying additive, and a plurality of porogen particles. According to another embodiment, a product of additive manufacturing with a silicone-based ink includes a plurality of continuous filaments comprised of a siloxane matrix, where the continuous filaments are arranged in a geometric pattern, a plurality of inter-filament pores defined by the geometric pattern of the continuous filaments, and a plurality of intra-filament pores having an average diameter in a range of greater than 1 micron to less than 50 microns.

Perez, Lemuel Perez↗

The effect of barrier films and exposure on the aging of vacuum insulation panels with fumed silica cores

Vacuum insulation panels have very low thermal conductivities compared to conventional insulation materials. The reduction of the core pressure significantly lowers gas phase conduction and overall thermal conductivity. As a consequence, increases in gas pressure can significantly increase thermal conductivity of the VIP. In addition, the thermal conductivity of the core is sensitive to moisture content. For vacuum insulation panels with fumed silica cores, work shows that the measured thermal conductivity increases by 0.5 x 10-3 W/mK per mass percent increase in water content [1]. This is significant since the thermal conductivity of vacuum insulation panels with fumed silica cores is in the range of 0.004 W/mK. This work investigates the long-term behavior of vacuum insulation panels comprised of fumed silica cores with polymer (ethylene vinyl alcohol) and metalized (aluminized) barrier films exposed to different exposure conditions: ambient conditions; exterior conditions in a mixed humid climate; and 24oC and 80 percent relative humidity. Results show that the increase in thermal conductivity is more pronounced for vacuum insulation panels made using polymer barrier films compared to the same panel protected by a metalized film. The increase is more pronounced when exposed to high relative humidity, 80 percent. After almost two years exposure, the decrease in thermal conductivity for vacuum insulation panels protected by a metalized barrier films are between 4 and 11 percent depending on exposure condition. The smallest decrease is for ambient conditions where the largest decrease is for exposure to 80 percent relative humidity. Similar behavior was observed for panels protected using polymer films, except the decrease in thermal conductivity was significantly higher, between approximately 20 and 60 percent, in the same order as for panels protected by metalized films. Measurements are ongoing with an attempt to develop a better relationship between these types of tests and vacuum insulation panel service life.

Aldykiewicz Jr, Antonio↗

Proton selective membranes based on two dimensional materials

Proton conductive membrane includes a proton selective layer of 80-100% carbon with sp2 hybridization having a thickness of 0.3-100 nm, with 0-20% of hydrogen, oxygen, nitrogen and sp3 carbon; wherein the sp2 carbon is in a form of graphene-like material; the proton selective layer having a plurality of pores formed by any of 7, 8, 9 or 10 sp2 carbon cycles or a combination thereof, with the pores having an effective diameter of up to 0.6 nm; an ionomeric polymer layer on the proton selective layer. Total thickness of the proton conductive membrane is less than 50 microns. The ionomeric polymer is PFSA (perfluorinated sulfonic acid), PVP (polyvinylpyrrolidone) or PVA (poly vinyl alcohol) with iodide or bromide counterion dissolved inside. The graphene-like material is CVD graphene or reduced graphene oxide (rGO). A D to G Raman band ratio of the membrane is more than 0.1.

Smirnov, Sergei↗

Evaluation of Bifacial Modules and PV Technologies with Combined-Accelerated Stress Testing

In view of the increasing interest and market share of bifacial cells and modules, suitable substrates such as glass and transparent backsheets along with ethylene vinyl acetate (EVA) and polyolefin elastomer (POE) encapsulants were examined in combined-accelerated stress testing (C-AST) to evaluate and compare degradation modes. Testing with both monofacial and bifacial cells, we found glass-glass modules with monofacial cells led to greater grid finger breakage than those with polymeric backsheets. This is attributed to previous x-ray topography work showing higher stress in cells in glass-glass modules than glass backsheet modules. Consistent with the objectives of C-AST, which stresses modules at levels corresponding to the limits seen in the natural environment, we observed the UV-fluorescence signatures of modules tested in C-AST (considering the degradation associated with developing chromophores, moisture penetration and photobleaching effects) to be like those in fielded modules, more so than other chamber stress testing implemented for comparison. Finally, among multiple cell degradation modes that we observed such as light-induced degradation (LID), we differentiated susceptibility to potential-induced degradation (PID) on the back of the bifacial Passivated Emitter Back Cells (PERC) in C-AST. Confirming with ex-situ tests, we found polarization-type PID most prevalent in glass/glass modules with EVA as would be anticipated considering the greater leakage current through such module encapsulation. Unlike PID tests performed in the dark, which can lead to false positive PID test results, field-representative illumination is experienced by the modules on the front and back side while -1200 V system voltage is applied in C-AST, supporting the conclusion that this module type would be susceptible to PID in the field.

bifacial modules↗

Case Studies of Residential Façade Upgrades in Four Climate Zones

This paper reports on a project that explored the viability of insulation and window upgrades during siding retrofits in four case studies across the United States. Thousands of homes are re-sided every year, but only a fraction of consumers add insulation and upgrade the windows at the same time, even though a siding replacement is the ideal time to update the thermal performance of building enclosures. To better understand why more siding retrofits do not include insulation and window upgrades, research staff from several organizations collaborated with the U.S. Department of Energy on a multi-faceted research project that included a cost analysis, workforce analysis, market assessment, and contractor assessment. This paper will review four in-field case studies conducted with contractors actively engaged in home re-siding projects that agreed to add rigid insulation and window upgrades as part of their projects. Findings from the case studies will be presented including contractor perspectives, cost, and technical approaches on projects, located in multiple climate zones including Bellingham WA, Jackson MS, Kalamazoo MI, and Phoenix AZ. All projects involved adding continuous rigid insulation on the exterior walls and installation of new cladding. Cladding types varied from wood and metal to fiber cement, vinyl, and traditional stucco. All homes also received a window upgrade, although upgrades varied depending on the original condition of the windows and climate; upgrades included triple-pane windows, low-e storm windows, and exterior shading. Key findings including technical approaches, opportunities, barriers, and project cost will be presented.

re-siding, insulation, rigid insulation, exterior ↗

Evaluation of Surface Crack Formation in Photovoltaic Backsheets Using Fragmentation and Finite Element Simulations: Preprint

Backsheet cracking is among the most commonly observed degradation modes of photovoltaic (PV) modules in the field. Cracks can reduce the ability of backsheets to fulfil their functions, for example, protection of the modules from the environment or electrical insulation. This work presents an evaluation of the degradation and cracking propensity of two backsheets during accelerated IEC TS 62788-7-2 A3 (International Electrotechnical Commission) aging with the fragmentation test: a co-extruded polyamide backsheet (AAA), and a laminated multilayer backsheet with a polyethylene terephthalate core and outer layer and ethylene vinyl acetate inner layer (PPE). Results show the surface embrittlement of the AAA outer layer during exposure. A longer time of exposure causes cracks to form at lower strains during stretching and creates deeper cracks. Accordingly, Young's modulus of the outer layer increases, as measured by cross-sectional nanoindentation. PPE exhibits cracking after exposure as well. While no similar increase of modulus or crack depth can be observed, the outer layer of PPE exhibits more obvious signs of erosion during exposure, including progressive morphological changes and thickness losses. A finite element model to simulate surface crack formation is devised, based on initially zero-thickness decohesion elements. Decohesion criteria define a critical stress, at which these elements grow, and cracks can begin to form. These criteria are obtained via parameter optimization by comparison between simulation and experiment. The model is used to interpret crack formation in both backsheets.

backsheet↗

Polynorbornene-based polycations

A statistical, cationic-functionalized norbornene copolymer is formed by a process including performing a vinyl addition polymerization in the presence of a metal catalyst of a first norbornene monomer substituted with a first alkyl group and at least a second norbornene monomer substituted with a second alkyl group, to form an intermediate norbornene copolymer. The second alkyl group includes a substituent which undergoes a substitution reaction with a precursor of a cationic group. The process further includes adding the precursor for the cationic group to the intermediate norbornene copolymer to form the cationic functionalized norbornene copolymer. The cationic group has a volume of 0.25 cm 3 /mol or greater (for example, a phosphonium group or an imidazolium group).

Noonan, Kevin↗