Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “time service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

pnnl/parking

Commercial Parking Application is a web-based application that alerts delivery drivers in real time to available parking spaces near their destinations. Parking availability can be viewed on a map in real-time, using sensor data supplied by external services. The app can be viewed with a web browser on a mobile device or PC. Currently the app supports connections to real time sensors from Lacuna, Fybr, Cleverciti, and Automotus

Bleeker, Amelia↗

Ground Segment Operations Concept for the Orion Artemis-2 Optical Communications System

The ACCESS Project (formerly Space Network) will implement an optical communications ground segment to support the Orion Artemis II Optical Communications (O2O) demonstration as part of the next manned human spaceflight mission to the moon, Artemis II. O2O implements laser communication (lasercomm) technology for operational use on the Orion series of spacecraft, as a development test objective (DTO), in order to demonstrate the feasibility and operational utility of lasercomm for human spaceflight missions. O2O consists of three segments: Space Segment, Ground Segment, and Operations Segment. The Space Segment consists of the Space Terminal Element and the Orion spacecraft. The Space Terminal Element effort is managed by the GSFC Laser-Enhanced Mission Communications Navigation and Operational Services (LEMNOS) project in collaboration with MIT Lincoln Laboratory. The Ground Segment consists of an optical ground terminal (GT) at the White Sands Complex (WSC), which is being developed in collaboration with MIT Lincoln Laboratory, the Ground Segment Operations and Analysis (GSOA) element and Ground Data Element (GDE), and a second optical GT in the Optical Communications Telescope Laboratory (OCTL) at the JPL Table Mountain Facility. The Operations Segment consists of the Artemis II Mission Control Center (MCC), the Lasercomm Space Terminal Console (LSTC), and the Lasercomm Link Planning & Analysis Center (LPAC), all located at the Johnson Space Center (JSC). O2O utilizes pulse-position modulation (PPM) direct-to-earth services resulting in an 80 Mbps downlink data rate from lunar orbit. The O2O concept of operations is to provide optical services for a minimum of 1 hour per day for each day of the Artemis II mission. O2O will utilize a 10-20 Mbps uplink data rate and 40-260 Mbps downlink data rate, depending on the Artemis II mission phase. The ACCESS project will also provide a centralized mission data interface for user data distribution and storage to the MCC and perform planning and scheduling of services in coordination with the Operations Segment for the O2O Ground Segment. The O2O Ground Segment will support the following O2O mission phases: Pre-Mission Planning; Daily Operations Planning; Event Execution; and Post-Pass Reporting. O2O will be used to exchange data files between Orion and the MCC and to distribute real-time video through the optical downlink service to the MCC; which would not be possible without the high-bandwidth link that O2O will provide to Orion. In this paper, I will discuss the O2O Ground Segment development approach and how it will support these critical O2O functions: plan and schedule the contact; acquire and track the optical link; flow information bidirectionally; distribute information; and control and accommodate the system.

optical communications↗

Quantifying and Understanding the Access Time to Dockless Micromobility: A Case Study in Washington, D.C.

Micromobility has been widely deployed in many cities. Similar as how access time/distance affects the travel demand to use public transit and informs transit system design, access time/distance to micromobility service measures its service efficiency and also serves as an equity indicator to inform city agencies from a regulation perspective. Though there is an increasing need to understand it, access to micromobility has not been sufficiently studied. This paper developed a framework to quantity the access time to dockless micromobility service (i.e., the minimum time needed to walk to reach the closest dockless micromobility vehicles). Based on the real-time vehicle location data collected from Washington, DC, this research quantified the access time to dockless micromobility, analyzed its spatial and temporal variation patterns and investigated its relationship with socio-demographic variables (i.e., population density, employment density and low-income population). The results revealed that the access time to dockless micromobility ranges between 0 to 4 minutes with the most frequently observed range of 0.5 to 1 minutes, and the city center area tends to have shorter access time than the outskirts areas. Results also indicate a quite stable access time level in DC with access time standard deviation of 0.2 to 0.5 minutes. After correlating the access time at census-block-group level with socio-demographic data, it was discovered that shorter access time usually aligns with larger population and employment density, and the proportion of low-income population was found not helpful with explaining the access time variation, which indicating a relatively equitable micromobility program.

access time↗

RePOWERD: Restoration of Power Outage from Wide-area Severe Weather Disruptions

The purpose of the RePOWERD project is to develop a probabilistic and a simulation based power restoration forecasting model for tropical storms based on geographic utility service areas, impacts to energy infrastructures and transportation networks, time-varying customer outage number, crew information (i.e., crew size, crew staging requirements), and utility restoration plans. Energy infrastructure is a critical lifeline essential for the United States’ national and economic security. Like other critical infrastructures, this infrastructure is aging and is at a high risk of damages from extreme weather events. Based on the number of reported outages in EAGLE-I during 2020 and 2021, it is evident that the current energy infrastructure is not equipped to handle extreme event impacts and will contribute to significant outages. From a resilience perspective, it is essential to forecast restoration time in the event of a severe weather induced power outage to assist the US Department of Energy, emergency managers, and first responders with resource planning. This project contributes to this crucial need. This report details the models, that were developed in this pilot study, to determine the rate of restoration and estimated time of restoration (ETR) during tropical storm events within counties and utility service areas based on damage to energy infrastructures and total number of customers experiencing outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Engine Development Design Margins Briefing Charts

New engines experience durability problems after entering service. The most prevalent and costly is the hot section, particularly the high-pressure turbine. The origin of durability problems can be traced back to: 1) the basic aero-mechanical design systems, assumptions, and design margins used by the engine designers, 2) the available materials systems, and 3) to a large extent, aggressive marketing in a highly competitive environment that pushes engine components beyond the demonstrated capability of the basic technology available for the hardware designs. Unfortunately the user must operate the engine in the service environment in order to learn the actual thrust loading and the time at max effort take-off conditions used in service are needed to determine the hot section life. Several hundred thousand hours of operational service will be required before the demonstrated reliability of a fleet of engines or the design deficiencies of the engine hot section parts can be determined. Also, it may take three to four engine shop visits for heavy maintenance on the gas path hardware to establish cost effective build standards. Spare parts drive the oerator's engine maintenance costs but spare parts also makes lots of money for the engine manufacturer during the service life of an engine. Unless competition prevails for follow-on engine buys, there is really no motivation for an OEM to spend internal money to improve parts durability and reduce earnings derived from a lucrative spare parts business. If the hot section life is below design goals or promised values, the OEM migh argue that the engine is being operated beyond its basic design intent. On the other hand, the airframer and the operator will continue to remind the OEM that his engine was selected based on a lot of promises to deliver spec thrust with little impact on engine service life if higher thrust is used intermittently. In the end, a standoff prevails and nothing gets fixed. This briefing will propose ways to hold competing engine manufacturers more accountable for engine hot section design margins during the entire Engine Development process as well as provide tools to assess the design temperature margins in the hot section parts of Service Engines.

Bentz, Chuck↗

The Evolution of Payload Data Capabilities on the Commercial Visiting Vehicles that Service the International Space Station

The visiting vehicles designed by U.S.-based commercial companies to deliver cargo and crew to the International Space Station (ISS) can transfer science payloads to the ISS in an active, powered state. To provide payload developers with situational awareness during transit, NASA is working with current and future visiting vehicles to offer a variety of payload monitoring and control capabilities. This presentation will offer discussion of the following topics: How NASA requirements for the data services available to ISS payloads on the visiting vehicles have expanded over time; The challenges that have been faced in establishing these services.

Wiggins, Lindsay↗

Single stage to orbit/SDIO

This paper included a discussion of the United States' need for a launch system that demonstrates both high capacity and low cost. Current systems, which typically require two years' lead time to provide on-orbit service to space platforms, are too inflexible for many missions. A system is needed that is able to operate in much the same way as existing commercial aircraft. The SSTO program is focused on satisfying aircraft-like operations and logistics support requirements such as engine-out intact abort capability and seven-day, 350-man-day vehicle turnaround times.

French, James R.↗

Building an Economical and Sustainable Lunar Infrastructure to Enable Lunar Industrialization

A new concept study was initiated to examine the architecture needed to gradually develop an economical, evolvable and sustainable lunar infrastructure using a public/private partnerships approach. This approach would establish partnership agreements between NASA and industry teams to develop a lunar infrastructure system that would be mutually beneficial. This approach would also require NASA and its industry partners to share costs in the development phase and then transfer operation of these infrastructure services back to its industry owners in the execution phase. These infrastructure services may include but are not limited to the following: lunar cargo transportation, power stations, communication towers and satellites, autonomous rover operations, landing pads and resource extraction operations. The public/private partnerships approach used in this study leveraged best practices from NASA's Commercial Orbital Transportation Services (COTS) program which introduced an innovative and economical approach for partnering with industry to develop commercial cargo services to the International Space Station. This program was planned together with the ISS Commercial Resupply Services (CRS) contracts which was responsible for initiating commercial cargo delivery services to the ISS for the first time. The public/private partnerships approach undertaken in the COTS program proved to be very successful in dramatically reducing development costs for these ISS cargo delivery services as well as substantially reducing operational costs. To continue on this successful path towards installing economical infrastructure services for LEO and beyond, this new study, named Lunar COTS (Commercial Operations and Transport Services), was conducted to examine extending the NASA COTS model to cis-lunar space and the lunar surface. The goals of the Lunar COTS concept are to: 1) develop and demonstrate affordable and commercial cis-lunar and surface capabilities, such as lunar cargo delivery and surface power generation, in partnership with industry; 2) incentivize industry to establish economical and sustainable lunar infrastructure services to support NASA missions and initiate lunar commerce; and 3) encourage creation of new space markets for economic growth and benefit. A phased-development approach was also studied to allow for incremental development and demonstration of capabilities needed to build a lunar infrastructure. This paper will describe the Lunar COTS concept goals, objectives and approach for building an economical and sustainable lunar infrastructure. It will also describe the technical challenges and advantages of developing and operating each infrastructure element. It will also describe the potential benefits and progress that can be accomplished in the initial phase of this Lunar COTS approach. Finally, the paper will also look forward to the potential of a robust lunar industrialization environment and its potential effect on the next 50 years of space exploration.

Zuniga, Allison F.↗

Rapidly Connecting You to the World: Improving NASA’s Worldview to Enhance Discovery and Access to Near Real-Time Imagery

The world around us is constantly in motion. Storms swirl, fires rage, volcanoes erupt and icebergs calve. NASA’s fleet of Earth Observing System (EOS) satellites are there to capture this. Within hours of satellite overpass, NASA’s Worldview (https://worldview.earthdata.nasa.gov) delivers this global, near-real time imagery through an interactive web map application. Provided through NASA’s Land Atmosphere Near real-time Capability for EOS (LANCE) (https://earthdata.nasa.gov/lance) via NASA’s Global Imagery Browse Services (GIBS) (https://earthdata.nasa.gov/gibs), the near real-time satellite imagery provides a launching point to discover where the latest wildfires, severe storms, volcanic eruptions, and calving ice shelves are happening. This poster will explore the newest near real-time satellite imagery and soon-to-be available imagery in Worldview, including imagery from geostationary satellites - GOES-East/West and Himawari-8. The poster will cover recent and future improvements to Worldview aimed to enhance the discovery and interaction with near real-time imagery and show how it is used by people from researchers, to meteorologists to the science-minded public around the world.

Wong, Min Minnie↗

Next-Generation RS-25 Engines for the NASA Space Launch System

The utilization of heritage RS-25 engine, also known as the Space Shuttle Main Engine (SSME), has enabled rapid progress in the development and certification of the NASA Space Launch System (SLS) toward operational flight status. The RS-25 brings design maturity and extensive experience gained through 135 missions, 3000+ ground tests, and over a million seconds total accumulated hot-fire time. In addition, there were also over a dozen functional flight assets remaining from the Space Shuttle program that could be leveraged to support the first four flights. Beyond these initial SLS flights, NASA must have a renewed supply of RS-25 engines that must reflect program affordability imperatives as well as technical requirements imposed by the SLS Block-1B vehicle (i.e., 111% RPL power level, reduced service life). Recognizing the long lead times needed for the fabrication, assembly and acceptance testing of flight engines, design activities are underway at NASA and the RS-25 engine provider, Aerojet Rocketdyne, to improve system affordability and eliminate obsolescence concerns. This paper describes how the achievement of these key objectives are enabled largely by utilizing modern materials and fabrication technologies, but also by innovations in systems engineering and integration (SE&I) practices.

Ballard, Richard O.↗

Next-Generation RS-25 Engines for the NASA Space Launch System

The utilization of heritage RS-25 engines, also known as the Space Shuttle Main Engine (SSME), has enabled rapid progress in the development and certification of the NASA Space Launch System (SLS) toward operational flight status. The RS-25 brings design maturity and extensive experience gained through 135 missions, 3000+ ground tests, and over 1 million seconds total accumulated hot-fire time. In addition, there were also 16 flight engines and 2 development engines remaining from the Space Shuttle program that could be leveraged to support the first four flights. Beyond these initial SLS flights, NASA must have a renewed supply of RS-25 engines that must reflect program affordability imperatives as well as technical requirements imposed by the SLS Block-1B vehicle (i.e., 111% RPL power level, reduced service life). Recognizing the long lead times needed for the fabrication, assembly and acceptance testing of flight engines, design activities are underway to improve system affordability and eliminate obsolescence concerns. These key objectives are enabled largely by utilizing modern materials and fabrication technologies, but also by innovations in systems engineering and integration (SE&I) practices.

Ballard, Richard O.↗

Sensitivity of Infrastructure Sectors to the Disruption of Commercial Electric Power

Electric power is crucial to the function of other infrastructures, as well as to the stability of the economy and the social order. Disruption of commercial electric power service, even for brief periods of time, can create significant consequences to the function of other sectors, and make living in some environments untenable. This analysis, conducted in 2017 for the United States Department of Energy (DOE) as part of the Grid Modernization Laboratory Consortium (GMLC) Initiative, focuses on describing the function of each of the other infrastructure sectors and subsectors, with an eye towards those elements of these sectors that depend on primary electric power service through the commercial electric power grid. It leverages the experience of Sandia analysts in analyzing historical disruptive events, and from the development of capabilities designed to identify the physical, logical, and geographic connectivity between infrastructures. The analysis goes on to identify alternatives for the provision of primary electric power service, and the redundancy of said alternatives, to provide a picture of the sector’s ability to withstand an extended disruption.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A wideband channel model for land mobile satellite systems

A wideband channel model for Land Mobile Satellite (LMS) services is presented which characterizes the time-varying transmission channel between a satellite and a mobile user terminal. The channel model statistic parameters are the results of fitting procedures to measured data. The data used for fitting have a time resolution of 33 ns corresponding to a bandwidth of 30 MHz. Thus, the model is capable to characterize the channel behaviour for a wide range of services e.g., voice transmission, digital audio broadcasting (DAB), and spread spectrum modulation schemes. The model is presented for different environments and scenarios. The model is derived for a quasi-mobile user with hand-held terminal being in two different environments: rural and urban. The parameters needed for the description are (a) the number of echoes, (b) the distribution of the echo power, and (c) the distribution of the echo delay. It is shown that the direct path follows a Rician distribution whereas the reflected paths are Rayleigh/lognormal distributed. The parameters are given for an elevation angle of 25 deg.

Jahn, Axel↗

Dissolved Oxygen and Temperature Data from the Hyporheic Zone of the East River Watershed July 2017 to October 2018

Dissolved oxygen (DO) is critical for aquatic ecosystems. Our focus is on the long-term DO dynamics in hyporheic zone of rivers, which are a function of both transport (hydrologic exchange between river and hyporheic zone) and uptake by biogeochemical reactions or respiration. The study site is the alpine East River watershed in Colorado, USA, meander A downstream from the pump house. Opti O2 probes were deployed in the water column and directly within the river-bed at 10, 20, and 35 cm depth (38°55'23.38"N, 106°57'4.21"W, 9046.88m) to monitor DO and temperature. A continuous data stream from July 24, 2017 to Oct 24, 2018 was autonomously telemetered to the cloud. This 14-month DO and temperature time series were obtained without any servicing for maintenance or data downloads; additionally the ability to remotely verify probe performance during field deployment was essential to confirm data validity during winter freeze-in and hydrological/weather events, such as spring melt and summer monsoons. We investigate the variations in dissolved oxygen dynamics of this snow-pack dominated watershed during a comparatively low flow water year (2018) and a relatively normal water year (2017), enabled by distinctive, in-situ, high frequency (∆t = 5min) sensors that provided a continuous time-series from the undisturbed study site over multiple seasons.

54 ENVIRONMENTAL SCIENCES↗

A global distributed storage architecture

NSA architects and planners have come to realize that to gain the maximum benefit from, and keep pace with, emerging technologies, we must move to a radically different computing architecture. The compute complex of the future will be a distributed heterogeneous environment, where, to a much greater extent than today, network-based services are invoked to obtain resources. Among the rewards of implementing the services-based view are that it insulates the user from much of the complexity of our multi-platform, networked, computer and storage environment and hides its diverse underlying implementation details. In this paper, we will describe one of the fundamental services being built in our envisioned infrastructure; a global, distributed archive with near-real-time access characteristics. Our approach for adapting mass storage services to this infrastructure will become clear as the service is discussed.

Lionikis, Nemo M.↗

Rapidly Viable Sustained Grid

Rapid recovery of power flow, possibly after a blackout, is a crucial need arising in scenarios that are increasingly becoming more frequent; here, solutions for rapid viability of power while the grid is being restored are urgently needed to keep critical infrastructure (CI) online. Increasingly, after the initial recovery phase, sustenance of reliable power requires assistive services to the grid for long periods of time. Even though the need is urgent, there is only sparse effort present toward a comprehensive framework/strategy for making power rapidly viable with an emphasis on sustained grid ancillary services; which is the focus of this proposal. The proposed concept envisions four phases. In the first phase, when a large portion of power is disrupted (see Figure 1(a)), emphasis is on bringing CI online with the objective of maximizing the time horizon of power viability using resources available at the CI. In the second phase (Figure 1(b)), neighborhood resources are tightly coordinated that forms the CI’s central-core (CC) to provide guaranteed viability of CI over a longer horizon. In the third phase, self-organizing power networks are expanded in a distributed layer supporting the central-core (Figure 1(c)). In the fourth phase, separate CI-networks coalesce and are controlled in a coordinated fashion to provide grid ancillary services (AS), such as primary frequency control and enhancing grid resiliency. With time, system efficiencies and penetration of renewables increase, while the time-horizon of guaranteed sustenance of CI is maximized. Under proposed work, the concept will be instantiated with a focus on medical centers as CI. Comprehensive power hardware in the loop strategies and emulated field tests will guide and validate devised solutions. A strong T2M effort to commercialize resulting technology is outlined. The proposed technology will be transformative for the grid. It will fundamentally change the way large contingencies are managed where power systems and critical infrastructure transition from being fragile to being robust using intelligent, self-organizing control for coordinating resources, enhanced resiliency and use of sustainable energy sources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstration of a High-Fidelity Predictive/Preview Display Technique for Telerobotic Servicing in Space

A highly effective predictive/preview display technique for telerobotic servicing in space under several seconds communication time delay has been demonstrated on a large laboratory scale in May 1993, involving the Jet Propulsion Laboratory as the simulated ground control station and, 2500 miles away, the Goddard Space Flight Center as the simulated satellite servicing set-up. The technique is based on a high-fidelity calibration procedure that enables a high-fidelity overlay of 3-D graphics robot arm and object models over given 2-D TV camera images of robot arm and objects. To generate robot arm motions, the operator can confidently interact in real time with the graphics models of the robot arm and objects overlaid on an actual camera view of the remote work site. The technique also enables the operator to generate high-fidelity synthetic TV camera views showing motion events that are hidden in a given TV camera view or for which no TV camera views are available. The positioning accuracy achieved by this technique for a zoomed-in camera setting was about +/-5 mm, well within the allowable +/-12 mm error margin at the insertion of a 45 cm long tool in the servicing task.

Kim, Won S.↗