Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

FY24 progress report on A709 mechanical properties data development and A709 thermal aging status

The report provides the status of the creep, fatigue, and creep-fatigue testing to date conducted at Idaho National Laboratory to generate the data package. This data package evaluates the material performance from three commercial heats to support the Alloy 709 qualification in American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section III, Division 5. First procured heat was manufactured by G.O. Carlson with heat number 58776. Second and third heats were fabricated by ATI Specialty Rolled Products with heat numbers 529900 and 530843, respectively. A series of creep and cyclic specimens were fabricated from these three heats and tests were performed. A list of finished, ongoing, and planned test are presented for creep, fatigue, and creep-fatigue tests. Cyclic properties of three commercial heats are compared.

36 - MATERIALS SCIENCE↗

Gamma Spectrometry Code Rodeo for Uranium Enrichment—FY 2022 Report

In the first two quarters of FY22, data acquisition continued at ORNL and LLNL using uranium sources of known enrichments. This was an FY21 task which could not be completed in FY21 because of problems encountered with the ORNL M400 CZT in Q4 of FY21, and the subsequent repairs. The detector was received back from H3D in the first of September 2021 , and the measurements resumed . Measurements using the repaired detector were completed in Q1 of FY22. The spectra were distributed by ORNL to the analyzing labs. Analysis results were received in Q2 of FY2022. The results from the various codes were intercompared and an ANOVA analysis was performed. Random and systematic uncertainties were established for each code. The ANOVA results and discussions were included in a revised version of FY21Annual Report issued in March 2022. A paper was presented at the INMM 2022Annual Conference, with the analysis results from the various isotopic codes, and the ANOVA table with random and systematic uncertainties. The Project Work Plan (PWP) for FY22 included a task to perform field testing of the M400 CZT and the analysis codes using UF 6 cylinder measurements at the Framatome Fuel Fabrication Facility in Richland, WA. PNNL was the lead for the field testing task. PNNL drafted a Field Test Plan, and refined it based on comments received from the team. PNNL coordinated with Framatome facility, the logistics of carrying out the field testing . A collimator and shield made out of TFlex (tungsten impregnated polymer) was designed and professionally manufactured. The collimators were used in the field test measurements. The measurements at Framatome were completed on April 21, 2022. A total of 34 Type 30B cylinders were measured using three M400 detectors (PNNL, LLNL, and ORNL detectors). Measurements using M400 were taken at two locations on the side of each cylinder and from the end-on bottom location. Additionally, HPGe measurements were taken at the end-on location to establish ground truth. Cylinder wall thickness measurements were also made at all three locations. To gain a better understanding of the effect of background from surrounding cylinders, the same five cylinders measured individually in low background locations were measured again in the cylinder storage yards. Due to inclement weather, manufacturer delays, shipping delays, and equipment failure, the measurement campaign spanned twice as long compared to the original timeline. Gamma-ray spectra from M400 and HPGe detectors, along with the cylinder data and photographs were organized and shared with the collaborators for further analysis. Spectra were analyzed by the participating laboratories. FY22 PWP also consists of tasks related to plutonium source measurements, adapting the codes to analyze plutonium spectra, and inter-comparison of the results from various codes. Plutonium spectra are being acquired at LANL, ORNL, and LLNL. LANL, SNL and LLNL are in the process of modifying FRAM, GADRAS, and CZTU, respectively. The plutonium related tasks will be completed in Q2 of FY23.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Helicopter precision approach capability using the Global Positioning System

The period between 1 July and 31 December, 1992, was spent developing a research plan as well as a navigation system document and flight test plan to investigate helicopter precision approach capability using the Global Positioning System (GPS). In addition, all hardware and software required for the research was acquired, developed, installed, and verified on both the test aircraft and the ground-based reference station.

Kaufmann, David N.↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. It examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

JWST↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in mid-2020, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20 K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is an assessment of thermal model pre-test prediction performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. The insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Testing↗

EVs@Scale NextGen Profiles: EVSE Characterization 2024

As part of the U.S. Department of Energy's EVs@Scale consortium, the Next-Generation Profiles (NextGen Profiles) project presents analysis and results from the characterization of high-power conductive and wireless charging infrastructure. High power charging equipment is capable of recharging electric vehicle traction batteries at power levels of 200KW and above. EVSE characterization was conducted over a wide range of DC output current and DC voltage charging for nominal and off-nominal test conditions. Test plans and procedures were developed and refined to define the test configurations and requirements, measurement parameters, and test procedures used throughout NextGen Profiles testing.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Full power level development of the Space Shuttle main engine

Development of the Space Shuttle main engine for nominal operation at full power level (109 percent rated power) is continuing in parallel with the successful flight testing of the Space Transportation System. Verification of changes made to the rated power level configuration currently being flown on the Orbiter Columbia is in progress and the certification testing of the full power level configuration has begun. The certification test plan includes the accumulation of 10,000 seconds on each of two engines by early 1983. Certification testing includes the simulation of nominal mission duty cycles as well as the two abort thrust profiles: abort to orbit and return to launch site. Several of the certification tests are conducted at 111 percent power to demonstrate additional safety margins. In addition to the flight test and development program results, future plans for life demonstration and engine uprating will be discussed.

Johnson, J. R.↗

STEP flight experiments Large Deployable Reflector (LDR) telescope

Flight testing plans for a large deployable infrared reflector telescope to be tested on a space platform are discussed. Subsystem parts, subassemblies, and whole assemblies are discussed. Assurance of operational deployability, rigidization, alignment, and serviceability will be sought.

Runge, F. C.↗

Ground Shake Test of the Boeing Model 360 Helicopter Airframe

Boeing Helicopters, together with other U.S. Helicopter manufacturers, is engaged in a finite element applications program designed to emplace in the U.S. a superior capability to utilize finite element analysis models in support of helicopter airframe structurel design. This program was given the acronym DAMVIBS (Design Analysis Methods for VIBrationS). The test plan is reviewed and results are presented for a shake test of the Boeing Model 360 helicopter. Results of the test will serve as the basis for validation of a finite element vibration model of the helicopter.

Reed, D. A.↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center’s Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Yang, Kan↗

New Global Ocean Color Sensor: OCI on PACE

- OCI will provide TOA radiances at ~1km spatial resolution, from 340nm (315nm?) to 2260nm, hyperspectral from 340nm to 890nm, 2 day global coverage - OCI will continue and enhance NASA’s earth system data records for ocean color (heritage sensors: SeaWiFS, MODIS, VIIRS) - OCI flight unit is close to being ready for testing (planned for March 2022 to September 2022) - OCI ETU (Engineering Test Unit) completed testing summer 2021, results look promising (see next presentation) - On-orbit calibration will combine successful trending approaches from previous sensors (2 solar diffusers, QVD, lunar gain trending, spectral trending) - New calibration approaches for OCI: large QVD, dim diffuser for linearity trending, lunar hysteresis trending - OCI will be characterized prelaunch with an ambitious goal of 0.5% relative uncertainty; absolute uncertainty will be about 2% (before vicarious calibration); expected on-orbit gain trending accuracy is 0.2% or better - More info on PACE and OCI can be found at https://pace.oceansciences.org/

radiometer↗

Chemical Challenge Tests on ISS Fire Cartridges

Following a confirmed combustion event onboard the International Space Station (ISS), crewmembers will don Emergency Masks, each fitted with 2 ISS fire cartridge filters. As the crewmember breathes through the filters, combustion products in the cabin air are either filtered or catalyzed by the fire cartridge media to minimize crew exposure to harmful levels of contaminants. Rigorous certification, acceptance, and surveillance programs for the fire cartridges ensure that each lot meets stringent performance requirements during the beginning of and throughout the service life of the cartridges. In accordance with the Quality/Acceptance Test Plan, multiple fire cartridges from each lot undergo chemical challenge tests, with each test lasting 2.5 hours and involving one or more chemicals at specified concentrations. These tests are conducted at specific temperatures, humidity levels, and gas flow rates intended to mimic the worst-case conditions for fire cartridge performance. These challenge tests are conducted by the Environmental Chemistry Laboratory at the NASA Lyndon B. Johnson Space Center. The majority of the challenge tests focus on carbon monoxide (CO), but other gases include hydrogen cyanide (HCN), hydrogen chloride (HCl), cyclohexane, acrolein, and acetaldehyde. A fire cartridge is exposed to the test gas in a test chamber at the specified conditions and the outlet is monitored for breakthrough during the 2.5-hour test. This paper will briefly introduce fire cartridges and how they work, then discuss details of the challenge gas delivery and exposure system, breakthrough monitoring methods, and discussion of issues that have arisen during the course of the test program. Although the focus of this paper will be on the conduction of the challenge tests, a general summary of the performance of the fire cartridges will be provided.

Fire Cartridge↗

Chemical Challenge Tests on ISS Fire Cartridges

Following a confirmed combustion event onboard the International Space Station (ISS), crew members will don Emergency Masks, each fitted with 2 ISS fire cartridge filters. As the crew member breathes through the filters, combustion products in the cabin air are either filtered or catalyzed by the fire cartridge media to minimize crew exposure to harmful levels of contaminants. Rigorous certification, acceptance, and surveillance programs for the fire cartridges ensure that each lot meets stringent performance requirements throughout the service life of the cartridges. In accordance with the Quality/Acceptance Test Plan, multiple fire cartridges from each lot undergo chemical challenge tests involving one or more chemicals at specified concentrations. These tests are conducted at specific temperatures, humidity levels, and gas flow rates intended to mimic the worst-case conditions for fire cartridge performance. These challenge tests are conducted by the Environmental Chemistry- Laboratory at the NASA Lyndon B. Johnson Space Center. Many of the challenge tests focus on carbon monoxide (CO), but other gases include hydrogen cyanide (HCN), hydrogen chloride (HCl), cyclohexane, acrolein, ammonia (NH3), and acetaldehyde. A fire cartridge is exposed to the test gas in a chamber at the specified conditions, and the outlet is monitored for breakthrough during the 2.5-hour test. This paper will briefly introduce fire cartridges and how they work and will then discuss details of the challenge gas delivery and exposure system, breakthrough monitoring methods, and discussion of issues that have arisen during the course of the test program. Although the focus of this paper will be on the challenge tests, a general summary of the performance of the fire cartridges will also be provided.

Cristina M. Muko↗

Aging of Concrete for the Evaluation of Repair Materials to Protect the Walls of the HCAEX Tunnel at Savannah River - 20301

H-Canyon, located in the Savannah River site, is a unique facility for chemical reprocessing of plutonium, highly-enriched uranium, and other radioactive materials. The exhaust gases of the H-Canyon are sent through the H-Canyon Exhaust (HCAEX) tunnel for contamination removal. Robotic inspections of the tunnel revealed significant degradation of the reinforced concrete structure that was associated with acid attack, and could compromise the structural stability of the tunnel. Thus, the identification and evaluation of potential repair materials that could be applied on the degraded walls to mitigate and prevent further degradation is of significant interest to the Department of Energy and the Savannah River representatives. This research effort has been divided into two phases: 1) Development and evaluation of aged concrete under accelerated aging conditions (which is the focus of this paper) and 2) Evaluation of potential repair materials applied on aged and non-aged concrete under simulated aggressive conditions. In order to develop and evaluate concrete samples exposed to accelerated aging conditions in simulated aggressive environments, a literature review of the HCAEX tunnel was conducted that included 1) characterization and extent of the concrete damage, 2) environmental conditions inside the tunnel and 3) primary deterioration mechanisms. In addition, potential coatings and/or repair materials for degraded concrete surfaces exposed to aggressive environments (primarily acidic) were selected from the literature review and the most common testing and measurements for evaluating acid attack phenomena, erosion, etc. were reviewed. From the literature review findings, a preliminary bench-scale test plan for the concrete aging was developed, including accelerated aging tests with aggressive conditions (acid fumes, humidity, etc.). Concrete samples were exposed to the aging accelerated conditions (e.g. immersion in acid solutions) and visual inspection, mass loss and pH change (acid solution) were recorded over time. Correlations between the visual inspection, mass loss and pH changes results and the aging time or the aging conditions were developed. Specimens submitted to the highest acid concentration showed the fastest and most intense degradation. The type of coarse aggregate (limestone) used for the concrete seemed to be the cause of the fastest aging observed, compared to the cement paste. The research findings created the foundation for the ongoing investigation, in which new concrete samples with a mix design similar to the HCAEX tunnel will be tested and will serve as the substrate for testing the selected coatings and /or repair materials. In this paper, the literature review and preliminary results from the aging tests are provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

James Webb Space Telescope Optical Telescope Element / Integrated Science Instrument Module (OTIS) Cryogenic Vacuum Test Part I: Thermal Architecture

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the mutiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.

OTIS↗

MARVEL Utilization Plan

This report provides a high-level overview of the operational plan for the MARVEL microreactor. The main focus is on discussing testing and application demonstration opportunities that leverage the reactor. With the reactor rapidly progressing towards demonstration, along with the short operational window (2 years), it was deemed critical to start establishing a basis for how stakeholders can engage with the program and leverage the reactor as a testbed. The report discusses potential opportunities for using MARVEL leveraging from data/design access, novel controls testing, novel nuclear-electric applications, to novel nuclear-heat applications. It also provides guidance for interested stakeholders on potential funding opportunities that can be pursued to support tests during the operational lifetime of the reactor. The report also discusses the recommended strategy for outreach and the organization structure to review and down select project. It is important to emphasize that this is intended to be a living document with revisions issued as the MARVEL demonstration timeline evolves. Similarly, the framework for engagement is subject to change as the project nears construction. As such, this first revision to the original test plan highlights the new Microreactor Program-sponsored pathway for engaging with stakeholders via an Expression of Interest and Notice of Opportunity.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Space Construction Experiment Definition Study (SCEDS), part 2. Volume 2: Study results

The Space Construction Experiment (SCE) was defined for integration into the Space Shuttle. This included development of flight assignment data, revision and update of preliminary mission timelines and test plans, analysis of flight safety issues, and definition of ground operations scenarios. New requirements for the flight experiment and changes for a large space antenna feed mask test article were incorporated. The program plan and cost estimates were updated. Revised SCE structural dynamics characteristics were provided for simulation and analysis of experimental tests to define and verify control limits and interactions effects between the SCE and the Orbiter digital automatic pilot.

Source record↗

Iodine Capture Studies of Silver Mordenite and Novel Alternative Metal Sorbents

Radioiodine is one of the radionuclides of concern when considering reprocessing of used nuclear fuel (UNF). It is expected to be released primarily in the dissolver off-gas (DOG) stream. Sorbents that target I 2 removal from a UNF processing off gas must perform efficiently under elevated temperatures in the presence of water vapor and nitrogen oxide gasses (NOx). Many studies have been conducted that examine the adsorption of iodine species in the presence of NOx gases through reduced silver-exchanged mordenite (Ag 0 Z), a zeolite mineral. This study characterizes the effects of iodine, water vapor, and nitrogen dioxide on the adsorption of I 2 by Ag 0 Z at lower temperatures suitable for comparison with novel Cu- and Bi- bearing sorbents which offer a non-RCRA alternative. When exposed to ‘harsh’ conditions such as I 2 , H 2 O, and NO 2 vapors carried by air, Cu 2 S-polyacrylonitrile (PAN) is more efficient than Ag 0 Z and all other novel sorbents, providing with 11% I capture efficiency. However, under ‘ideal’ conditions in which I 2 is carried by dry air), Ag 0 Z is more efficient than Cu 2 S-PAN and other novel sorbents, providing 74% I capture efficiency. To investigate this result and the overall performance of all sorbents tested, several characterization techniques were employed, including thermal gravimetric analysis, scanning electron microscopy – electron dispersion X-Ray spectroscopy, powder X-ray diffraction, and X-ray photoelectron spectroscopy. These techniques are discussed within this report. This document also includes a design and test plan update from Idaho National Laboratory as the next step in testing the high performing sorbents from thin-bed tests carried out by Oak Ridge National Laboratory.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗