Decommissioning, Dismantling and Disarming: a Unique Information Showroom Inside the G2 Reactor at Marcoule Centre (France) - 12068

The paper aims at presenting the new information showroom called 'Escom G2' (for 'Espace Communication') inaugurated by the French Atomic Energy and Alternative Energies Commission (CEA) in spring 2011. This showroom is settled directly inside the main building of the G2 nuclear reactor: a facility formerly dedicated to weapon-grade plutonium production since the late 1950's at the Marcoule nuclear centre, in south of France. After its shutdown, and reprocessing of the last spent fuels, a first dismantling step was successfully completed from 1986 to 1996. Unique in France and in Europe, Escom G2 is focused on France dismantling expertise and its action for disarmament. This showroom comprises of a 300-square meters permanent exhibition, organized around four themes: France strategy for disarmament, decommissioning and dismantling technical aspects, uranium and plutonium production cycles. Each of these topics is illustrated with posters, photos, models and technical pieces from the dismantled plants. It is now used to present France's action in disarmament to highly ranked audiences such as: state representatives, diplomats, journalists... The paper explains the background story of this original project. As a matter of fact, in 1996 France was the first nuclear state to decide to shut down and dismantle its fissile material production facilities for nuclear weapons. First, the paper presents the history of the G2 reactor in the early ages of Marcoule site, its operating highlights as well as its main dismantling operations, are presented. In Marcoule, where the three industrial-scale reactors G1, G2 and G3 used to be operated for plutonium production (to be then reprocessed in the nearby UP1 plant), the initial dismantling phase has now been completed (in 1980's for G1 and in 1996 for G2 and G3). The second phase, aimed at completely dismantling these three reactors, will restart in 2020, and is directly linked to the opening of a future national storage facility for irradiated graphite waste. Then, the paper recalls communication events and official visits hosted in Pierrelatte and Marcoule, following a formal invitation from the French President Mr. Nicolas Sarkozy. These visits, which were organized in order to illustrate the irreversibility of these dismantling operations, allowed visitors to discovers places that used to be former highly classified areas. Three official visits were organized in 2008 and 2009 for representatives of the Conference on Disarmament Member States, non-governmental experts and journalists. All participants visited the dismantled uranium enrichment plant in Pierrelatte, the G2 reactor and the UP1 plant in Marcoule. The visits were successful and visitors were especially impressed by the G2 reactor and its massive industrial architecture, symbolic of the early ages of nuclear history. In late 2010, this feedback convinced CEA Military Application Directorate (CEA DAM) that a permanent showroom could be installed inside the reactor, making it possible to preserve the cultural value of this historical landmark, and to continue its ongoing effort of communication and outreach. The paper explains the design of this concept: the museography project with a professional designer, the communication material conception and the features of such an original place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Plant Decontamination as a Precondition of the Remote Dismantling Concept of the Karlsruhe Vitrification Plant VEK - 12206

Vitrification of the high-active liquid waste concentrates (HAWC) was a major milestone in the WAK decommissioning project (StiWAK). From September 2009 to June 2010, about 56 m{sup 3} of HAWC were vitrified at the Karlsruhe vitrification facility (VEK) and filled into 123 canisters. HAWC vitrification was followed by an extensive rinsing and shutdown program, in the course of which both the VEK process installations and the facilities for the storage and evaporation of high-active fission product solutions (LAVA) are prepared specifically for dismantling. Finally the rinsing programme leads to an overall reduction of the remaining contamination in the installations by a factor of approx. 5 - 10. The amount of liquids arisen from this program has been vitrified and another 17 canisters have been filled. In total, 140 canisters were packed into 5 CASTOR casks that were already transported to the Zwischenlager Nord (interim store North) of EWN GmbH (ZLN) in the mid of February 2011. The melter of the VEK was already shut down in the late November 2010. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of accident tolerant control rod for light water reactors

For an accident tolerant control rod (ATCR) designed to improve LWR (light water cooled reactor)core safety, the following inherent characteristics are required: sufficient neutron absorption, high-temperature stability and high miscibility with fuel materials to avoid uncontrollable recriticality. In the present work an ATCR is being developed to improve the safety of light water reactors under all conditions including severe accidents. Promising neutron-absorbing materials for the ATCR include rare-earth sesquioxides (RE{sub 2}O{sub 3}), hafnium dioxide (HfO{sub 2}) and mixtures of these materials. A reactivity worth analysis of these materials in representative light water reactors revealed that a conventional control rod can be replaced by an ATCR without significant impact on the reactor operation conditions. A high-temperature compatibility of the candidate ATCR materials and iron, which is a main component of control rod cladding, was examined experimentally, and no significant reaction occurred upon heating to 1600 Celsius degrees for 1 hour. That is, the ATCR is expected to have no significant damage prior to extensive fuel pin failure in severe accidents, thus avoiding uncontrollable recriticality after reactor shutdown even in case of injection of non-borated or insufficiently borated water for emergency cooling of the reactor.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

French Atomic and alternative energies commission decommissioning policy and strategies: What is at stake lessons learned and feedback experience - 15013

Since its creation in 1945, the French Atomic Energy and Alternative Energies Commission has carried out research programmes on civil use of nuclear, and its application. CEA has set up and run various types of installations from research (accelerators, pond reactors, fast reactors, laboratories) to industry (power reactor, processing facilities). There are currently more than several tens of facilities which are presently closed down pending dismantling or in the process of being dismantled by CEA, the governmental body for research and development in nuclear and renewable energies. When operating, all these installations have generated radioactive waste. When they are shutdown, either as a result of the programmes for which they were set up, or due to equipment wearing out or being obsolete, these installations must be cleaned up, dismantled and decommissioned, taking into account their nuclear nature and requirements related to safety and environment. During the decommissioning process, the implementer has to deal with safety and site remediation issues. Dealing with these installations is a long-term programme which must be carefully planned and financed in order to optimise its management. The paper will describe the CEA's decommissioning policy, strategies adopted, and draw up lessons learned and feedback experience, showing that: - Safety is guaranteed, - Dismantling is a technically controllable operation, but R and D actions are to be developed for specific problems as characterization or operation in hostile environment. Moreover all the methods and techniques improve as a result of feedback experience, - The amount of material and waste produced by the dismantling are manageable. The very low, low and intermediate level waste can be stored on existing shallow land burial centres, some new repositories have to be created for specific waste (graphite, radium,...) and for high and intermediate level long live waste, which are stored in interim storage , - The dismantling must be optimized, especially by appliance of a good strategy based on rational industrial choices. - Communication and transparency with stakeholders is essential for global process acceptance, - The lessons learned and how feedback experience could benefit for future decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The february 2014 accidents at WIPP - 15024 (What Happened and What We Know About Why)

With almost 15 years of successful and safe operations, the WIPP facility was suddenly shutdown in February 2014 due to two unrelated accidents underground. A fire burned the front tires and engine of a salt haul truck, creating significant soot and forced evacuation of the mine. A second unrelated incident occurred 9 days later when at least one drum of non-compliant waste from Los Alamos National Laboratory burst, introducing airborne radioactivity into the underground ventilation air. Some radioactivity was released to the atmosphere at the surface. Bioassay showed that 22 workers received low internal doses, with no long-term adverse health effects expected for these employees. Independent environmental monitoring indicated very low levels off-site and dose reconstruction modeling indicated no members of the public were exposed. Comprehensive accident investigations resulted in significant planned changes to enhance safety management programs at WIPP, and a recovery plan was developed. In addition to safety management program augmentation, recovery involves new and enhanced underground ventilation systems and decontamination of affected areas underground. Resumption of initial waste disposal operations is scheduled for early in FY16, with a return to normal operations (17 shipments per week) within about three years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Considerations for recovery of large areas of a nuclear facility for re-use - 15147

This paper highlights a number of factors an organization might consider for recovery of a facility, using a successful example from the UK. In 2013 a power failure led to the shutdown of the ventilation system that caused loose contamination to be deposited over large sections of man-accessible areas of plant after the evacuation of personnel. The successful initiation of emergency Command and Control arrangements during the Response phase, saw several key responders brought together to offer technical direction across many disciplines. The actions of the Command and Control unit prevented any further spread contamination to other areas of the facility and any external release. This enabled the return of the plant to an operational status which forms an important mission enabler for the site hazard reduction programme. Intervention at an early stage during the Response phase of the incident saw the cessation of traditional dilute chemical wet decontamination approach that would otherwise leave a legacy of slow leaching contamination; to that of containment and ultimate removal of loose contamination using strippable coatings. Doing so established a more rapid and reliably 'clean' access or pathway into the plant to establish the full extent of the situation. The scale and scope of the decontamination requirement was steadily revealed through a number of controlled re-entries to the plant. A number of other techniques were considered and employed to address the different areas making use of available plant resources to deliver the successful 'self-help' recovery of the plant using multi-disciplinary teams. As Response switched to Recovery, it was important to set out and agree which strategic option should be adopted to return the facility to normal operation. Equally, it was necessary to verify which equipment had been affected by the power outage and repair as required. Furthermore, equipment with designated safety functions had to be maintained alongside the Recovery activities. A careful balance of priorities demanded an unparalleled depth of plant knowledge to address this, whilst still keeping site and external stakeholders informed. The engagement by the plant workforce to take on the decontamination challenge to enable recovery of their plant supported by other teams formed a critical step in the speed of recovery. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Guidance for decommissioning plants entering safe storage - 15280

Although a number of plants worldwide have been placed into safe storage after permanent shutdown, there is no generic guidance for establishment of safe storage conditions. To address this need, EPRI is conducting a project to document the best practices to reduce risk, maintenance and monitoring requirements during safe storage, as well as practices that optimize decommissioning following the safe storage period. This project additionally evaluates potential options for establishment of safe storage conditions, such as performance of chemical decontamination, completion of environmental remediation activities, early removal of highly activated components, dismantlement of non-power block structures and partial site release in advance of completion of decommissioning of the nuclear island. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solutions for management of defective fuel assemblies - 15318

Defective fuel management is a major challenge for nuclear operators when the time comes for finding a long-term solution for their used (or spent) fuel assemblies. This question of defective fuel management can be raised in several cases: - For optimizing the remaining operating costs of shutdown reactors, the spent fuel pools must be emptied as soon as possible; a solution needs therefore to be found for evacuating all the spent fuel assemblies, defective fuel assemblies and in particular defective fuel rods included; - Some utilities are today facing a saturation of their reactor spent fuel pool; evacuating the defective fuel assemblies and extracted defective fuel rods allows optimizing the space in the pool. Whereas the solutions for managing intact used fuel assemblies are well-known, a specific technical solution must be implemented for managing the defective spent fuel assemblies as well. The purpose of this paper is to describe the existing solutions for the management of all types of defective fuel assemblies. Interim Dry Storage Solution Interim dry storage of defective spent fuel assemblies is being implemented for decades in the USA. Specific operations are performed for preparing the defective fuel assemblies for interim dry storage and they are then stored with intact used fuel assemblies in the dry storage cask. The advantage of such a solution is its short-term cost effectiveness. The paper presents the existing dry interim storage solutions for defective used fuel rods, the way they are implemented, the associated operational experience. Long-term Dry Storage Solution A long-term dry storage solution for defective fuel assemblies is being developed, compliant with direct disposal requirements. The solution is based on the encapsulation of each defective fuel rod into a fuel rod capsule and an associated specific dry storage licensing approach: this is the best available technology regarding long term storage safety requirements. The paper presents this unique capsule technology, the transport and storage casks that can be used for transportation of defective fuel rods to the storage facility, and the associated transport licensing approach currently used in Europe. Treatment Solution. The most definitive way to get rid of defective fuel assemblies is their treatment (or reprocessing) in a treatment plant. There is then no need to assess the behaviour of these specific used fuel assemblies as for an interim storage facility or a final repository. The advantage of such a solution is its sustainable approach. The paper presents the existing transport and treatment solutions, the way they are implemented, the associated operational experience. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance improvement and human resources transition management in D and D projects - 15440

Power generation and other nuclear facilities production is mainly characterized by stable working environment, with continuous efforts for improvement based on previous achievements, constant workload, foreseeable and established organizational hierarchy; and generation of cash. In contrary to normal production - when phasing down the facility for final shutdown, decommissioning and dismantling - one has to manage a new, highly dynamic working environment, with decreasing workload, new skills required; and consumption of cash. The key to successful transition is to recognize the need for establishing an explicit performance improvement program with an effective change management process in order to address this profound evolution as early as possible in the project. AREVA owns and operates large nuclear material processing facilities. This includes the responsibility for their end of life up to final Decommissioning and Dismantling (D and D). Faced with this transitional challenge, AREVA took example from well-known management methods (Lean Management, 6 Sigma, TPM...) successfully applied by the non-nuclear production industry with the corresponding philosophy of Operational Excellence. These methods were adapted to the specifics of nuclear decommissioning projects. Furthermore, specific computerized tools were developed to assist managers in implementing measures for re-deploying, re-training and re-qualifying personnel as well as re-organizing the work structure while maintaining safety and social consensus. Significant improvements in the dismantling works as well as in the management of generated waste were achieved early after start of the implementation of the performance improvement programs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of the DOE nuclear fuels storage and transportation planning project - 15444

The US Department of Energy (DOE) Office of Nuclear Energy is conducting planning activities within the Nuclear Fuels Storage and Transportation Planning Project (NFST) to lay the groundwork for implementing interim storage, including associated transportation, per the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste, and to develop a foundation for a new nuclear waste management organization. The purpose of the NFST is to make progress on this important national issue within existing legislative and budgetary authorizations. The objective of the NFST is to develop and begin implementation of an integrated plan to (1) implement interim storage; (2) improve the overall integration of storage as a planned part of the waste management system; (3) prepare for the large-scale transportation of spent nuclear fuel and high-level radioactive waste, with an initial focus on removing SNF from the shutdown reactor sites; and (4) develop foundational information, resources, and capabilities needed to support the aforementioned objectives and future implementation decisions and actions. An over-arching goal is to develop options for decision-makers on the design of an integrated waste management system. The planning activities are divided into four major topical areas: (1) Consent-Based Siting, (2) Storage, (3) Transportation, and (4) Strategic Crosscuts. This paper provides an overview of the NFST and its activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Issue focused stakeholder collaboration: reaching consensus on spent nuclear fuel transportation operational practices - 15465

This paper examines stakeholder and issue-focused approaches used by Department of Energy (DOE) programs to collaborate with key stakeholders on transportation practices to ship radioactive material, particularly used nuclear fuel (UNF) and transuranic waste (TRU). In accordance with the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste, the current effort by DOE to plan for the development of a future transportation system to ship UNF from commercial reactors, with an initial focus on shutdown reactors, is using approaches similar to those used in other successful shipping campaigns to collaborate with stakeholders about sustainable transportation practices. As part of a coordinated approach to stakeholder outreach and collaboration, DOE is currently developing a draft Transportation Planning Framework to provide a template for future shipments of UNF from commercial reactors and is engaged with states and tribes and other stakeholders in discussions on the institutional and operational components of that Framework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MP197HB; First licensed transportation package with canistered high burnup fuel after dry storage - 15580

AREVA TN has recently received the NRC 10 CFR Part 71 transportation license CoC 9302 Revision 7 for the MP197HB transportation package that allows transportation of canistered high burnup fuel assemblies. The Nuclear Horizontal Modular Storage (NUHOMS{sup R}) system canisters containing high burnup PWR and BWR fuel assemblies are now licensed for transportation as a payload in MP197HB after these canisters were in dry storage at the utility ISFSIs. Enhancements have been made to the MP197HB transportation package to improve thermal performance and also provide superior shielding capabilities. Design features of existing AREVA TN transportation packages such as radial fins, thermal shield, neutron resin and optimized gamma and neutron shielding were used to accommodate transportation of high burnup fuel assemblies with heat loads up to 32 kW. The transportation package is designed for exclusive use by rail, truck or marine transport. State-of-the-art analyses methodologies were used to demonstrate compliance with regulatory requirements of 10 CFR 71.55 for the high burnup fuel after dry storage at any ISFSI. Some of the issues addressed in the license application related to the transportation of high burnup fuel included potential degradation of fuel cladding, uncertainty associated with high burnup fuel cladding material properties, and larger radiation and thermal sources due to higher burnups. Bounding conservative assumptions were made where limited test data was available. AREVA TN's licensing approach did not rely on the cladding integrity of high burnup fuel cladding. Instead, the criticality, thermal and shielding analyses were carried out assuming high burnup fuel reconfiguration. With the approval of this transportation package for PWR and BWR canistered high burnup fuel from dry storage at ISFSIs, the utilities can now transport these canisters which are in dry storage at their sites. This is also a major step forward for the canistered fuel that is currently in dry storage at the shutdown plants because they can use this AREVA TN MP197HB transportation package to ship that fuel to any interim storage facility (ISF) or to a repository when they become available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological characterization and Decommissioning of Research and Power Reactors - 15602

The production of the detailed activity and dose rate atlases (ADAs) is one of the indispensable measures in the decommissioning process of nuclear reactors which allows to determine the radiation field for optimal radiation protection as well as to quantify and characterize nuclear waste for disposal. High-detailed simulation models capable of performing neutron and radiation transport calculations at different levels of precision and details are applied for this purpose. Within the framework of the research project 'Decommissioning of Research and Power Reactors', funded by the German Federal Ministry of Education and Research (BMBF), and implemented by the Institute of Nuclear Engineering and Technology Transfer (NET) -RWTH Aachen, sophisticated simulation tools are developed. The enhances capability of these tools for the generation of the activity and dose rate distribution are tested and demonstrated on the shutdown German research reactor FRJ-2. To achieve the project goal different computational steps were required: 1. Development of a calculational CAD-based model for Monte Carlo neutron and gamma transport simulation using converter tool McCad 2. Design of the neutron source which reproduce the neutron distribution leaving the core 3. Enhancement of the simulation performance by using the hybrid deterministic Monte Carlo variance reduction methods 4. Calculation of N-flux distribution in the entire geometry 5. Development of couple codes between MCNP5 and the activation code ORIGEN2.2 This paper describes the main significant project milestones. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Examining Supply Chain Resilience for the Inter-modal Shipment of Spent Nuclear Fuel and High Level Radioactive Materials - 16309

The U.S. Department of Energy (DOE) has a significant programmatic interest in the safe and secure routing and transportation of Spent Nuclear Fuel (SNF) and High Level Waste (HLW) in the United States, including shipments entering the country from locations outside U.S borders. In any shipment of SNF/HLW, there are multiple 'chains'; a jurisdictional chain as the material moves between jurisdictions (state, federal, tribal, administrative), a physical supply chain (which mode), as well as a custody chain (which stakeholder is in charge/possession) of the materials being transported. Given these interconnected networks, there lies vulnerabilities, whether in lack of communication between interested stakeholders or physical vulnerabilities such as interdiction. By identifying key links and nodes as well as administrative weaknesses, decisions can be made to 'harden' the physical network and improve communication between stakeholders. This paper examines the parallel chains of oversight and custody as well as the chain of stakeholder interests for the shipments of SNF/HLW and the potential impacts on systemic resiliency. Using the Crystal River shutdown location as well as a hypothetical international shipment brought into the United States, this paper illustrates the parallel chains and maps them out visually. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Database dedicated to nuclear criticality events that occurred in fuel cycle facilities

Nuclear fuel cycle facilities can encounter events, resulting from human errors, failure of safety organization or technical failures. However, the application of the concept of defense in depth, especially the first two levels (prevention of abnormal situations and detection) requires to ensure safety in such undesirable situations. Furthermore, the periodic safety reviews of each nuclear fuel cycle facility involve the evaluation of the safety of these facilities with regard to the regulation evolution, the best safety practices, the facility evolution (modifications, aging...) and the global feedback. Part of this work is based on the analysis of the feedback and lessons learned from the events that occurred during the past period. This specific work indeed provides lessons about the operating conditions of the facility and highlights malfunctions that have occurred during operations, maintenance or restart after a shutdown. Taking into account this feedback, IRSN developed a database gathering the events which have affected the safety of French fuel cycle facilities (from conversion to waste storage, laboratories and experimental facilities, facilities under dismantling and decommissioning). Among all the recorded events, it is possible to extract in particular those impacting the criticality safety. In order to extend the analysis of these events, the IRSN criticality safety department developed a specific database dedicated to criticality risks. The 'criticality events' database is continuously updated on the basis of the declared events and their analysis by engineers from the criticality safety department. At this time, about 600 events are described and analyzed in this database. (author)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Preliminary Planning of Radwaste Management for the Decommissioning of Chinshan NPP in Taiwan - 18201

The Chinshan NPP was the first commercially operated nuclear power plant in Taiwan since 1978. There are two BWR units in Chinshan NPP, which each unit has electrical output of 636 MWe. After 40 year's period of license, the final shutdown date of Unit No. 1 and Unit No. 2 will be in December, 2018 and in July, 2019, respectively. According to 'Nuclear Reactor Facilities Regulation Act' in Taiwan, decommissioning of nuclear reactor facilities should be implemented by the strategy of DECON (Decontamination followed by dismantling) within 25 years when the permission is approved by Atomic Energy Council (AEC). The decommissioning plan of Chinshan NPP has been permitted by AEC in the end of June, 2017. The implementation of Chinshan NPP decommissioning will be started while the Environmental Impact Assessment is approved by EPA. In this study, the Turbine Building in Chinshan NPP is selected as a case study for the preliminary planning of decommissioning. First, we thoroughly examine the inventory of all macro-components in the Turbine Building to estimate the waste amounts. Accordingly, the work breakdown structure (WBS) for dismantling of facilities is scheduled. Then, considering to minimize waste amounts, several suitable decontamination techniques, such as chemical and mechanical methods, which are developed by INER are considered to be adopted. As for the estimation of man hours of dismantling facilities, all events during the decommissioning tasks are classified into 16 work procedures and appropriative factors of corresponding team hours are gotten. In addition, the detailed methodology of the preliminary plan of decommissioning is also discussed. Finally, we hope the results of this planning can provide practical benefits to upcoming decommissioning work in Taiwan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Peculiarities of Transition from Operation to Decommissioning for the Chernobyl NPP - 18486

Usually the transition period is supposed to last around 5 years and to cover the eventual defueling of the reactor and the reactor cooling pool, completion of the characterization survey and preparation of all necessary documents to start the decommissioning activities in accordance with the decommissioning strategy chosen and the decommissioning plan approved. It was not the case for the Chernobyl NPP due to a number of reasons and obstacles, including delayed defueling due to unavailability of the storage capacities, lack of preparatory work due to prescheduled decommissioning, luck of experience of RBMK-type reactors decommissioning, influence of the destroyed Chernobyl-4 Unit and related works on site. All these factors not only delayed the completion of the characterization survey, but added complications to development of the decommissioning strategy and the decommissioning plan. De facto the issue of end state is still open as the end state for the destroyed Chernobyl-4 as well as the prospects of the exclusion zone transformation need further clarifications and justifications. As a result, the need to reconsider the standard concept of transition period was recognized already by the end of 2000, when Chernobyl-1 and Chernobyl-2 were out of operation for a few years. It was clear that the personnel had generally a bad perception of the prescheduled permanent shutdown decision and a low motivation to change and to learn. The first signs of organizational degradation were visible and the framework of the operational license did not fit well to prevent it. So it was decided to start the legal and organizational transformation into the decommissioning mode without waiting for polishing of the decommissioning strategy and decommissioning plan as in this case both documents seemed to need further adjustments anyway. The transition period (or the termination of operation as it called in the national nuclear safety regulations) was considered as the first phase of decommissioning to be covered by the decommissioning license. The detailed plan of activities for the transition period with proper safety justification documents was the main part of the relevant license application. Human resource management plan and adoption of the management system were important constituents as well. It was also considered reasonable to start some dismantling works already at this phase to avoid further delays and degradation, the works being carefully justified. Eventually such approach added to streamlining the decommissioning process and to avoid further organizational and technical degradation. Flexibility in transition from operation to decommissioning seems necessary in cases of prescheduled or post-accidental decommissioning but may be also beneficial for a scheduled decommissioning case. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Replacement of Melter 2 at the Defense Waste Processing Facility (DWPF) - 18608

The original DWPF melter was replaced in 2002 with an identical unit, and radioactive operation of Melter 2 commenced in 2003. After nearly 14 years of service, a lower electrode failure of Melter 2 occurred in February 2017 which required its removal and replacement with Melter 3. The scope of the replacement outage involves several significant evolutions: - Shutdown of Melter 2 and placement into a safe state; - Remote external and internal inspection of Melter 2 to chronicle its condition prior to removal; - Disassembly and removal of Melter 2 from the process cell; - Placement of Melter 2 into a storage box and transport to a storage vault; - Preparation and initial testing of Melter 3 prior to transport to the DWPF; - Transport to the DWPF and installation of Melter 3 in the process cell; - Final startup testing and initiation of radioactive operation. Upon determination that repair of Melter 2 was not feasible, DWPF created an outage team to integrate schedules and resources needed to execute melter replacement as well as including maintenance scope for facility work that can only be performed when the melter is de-energized. The execution of this scope required integration with other mission critical outage activities already in progress, and planned to start, including initial facility tie-in scope for the new Salt Waste Processing Facility (SWPF). This unplanned addition of the melter replacement scope to the existing outage scope resulted in the longest facility outage period since the initiation of radioactive operations at the DWPF in 1996. Successful completion of this scope across all Liquid Waste facilities would require balance - for schedules, resources, priority, funding, etc. To overcome the significant challenges created by this additional scope, a WAR Room was established to ensure adequate integration and coordination of critical resources, and daily progress. The execution of this scope has required the integration of nearly two dozen work groups across multiple facilities at Savannah River Site (SRS), in addition to support from nearly a dozen vendors. The melter replacement outage was executed with a high degree of disciplined operation to ensure the facility was ready to resume glass pouring operation in time to support restart of the Liquid Waste program at the Savannah River Site (SRS). This paper will provide a brief overview of Melter 2 operational history. The execution of the removal and replacement operations will be described with a specific focus on lessons learned and opportunities where the outage execution diverged from the original Melter 1 replacement outage. It is expected to be of interest to vitrification facilities, as well as facilities, which require remote maintenance and replacement of large process equipment. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗