Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Bayesian Inference in Probabilistic Risk Assessment -- The Current State of the Art

Markov chain Monte Carlo approaches to sampling directly from the joint posterior distribution of aleatory model parameters have led to tremendous advances in Bayesian inference capability in a wide variety of fields, including probabilistic risk analysis. The advent of freely available software coupled with inexpensive computing power has catalyzed this advance. This paper examines where the risk assessment community is with respect to implementing modern computational-based Bayesian approaches to inference. Through a series of examples in different topical areas, it introduces salient concepts and illustrates the practical application of Bayesian inference via Markov chain Monte Carlo sampling to a variety of important problems.

99 GENERAL AND MISCELLANEOUS↗

Analysis of Differential Financial Impacts of LWR Load-Following Operations. Revision 1

This document reports the application of HERON (Holistic Energy Resource Optimization Network), a newly-developed RAVEN (Risk Analysis Virtual ENvironment) plugin for grid and capacity optimization, to a case study conducted in collaboration with Arizona Public Service (APS). The study is a work in progress; this report presents a description of current models and corresponding results for a particular consideration. APS is anticipating several operational challenges. The first is rapid growth of Variable Renewable Energy (VRE) sources such as wind and solar power providing energy to the grid in the APS service region. This creates challenges for baseload operation of the Palo Verde Generating Station (PVGS), a nuclear power plant co-owned and operated by APS. The second challenge for APS is a change in the cooling water acquisition contract with the Sub Regional Operating Group (SROG). The existing contract is expiring soon, and a renewal is only available for a significantly higher price of water. These two challenges represent a difficulty in maintaining profitability for PVGS as local area demand is highly fluctuant and water prices may increase. Furthermore, excess production at PVGS is currently traded on the Palo Verde energy Hub (PVH), which occasionally offers very low or negative locational marginal prices (LMP) for electricity. This analysis considers the potential benefits of occasional curtailment of PVGS as a method to mitigate unprofitable production hours. Similar to load following, optional daily curtailment would allow APS to elect curtailment of PVGS as low as 70% of its nominal operating level between the hours of 08:00 and 16:00 provided local area demand is met and it is profitable to do so. This document reports a stochastic differential analysis of the Net Present Value (NPV) of PVGS as operated by NPS as a result of optional curtailment operation. To model this differential case, HERON has been designed from previous efforts in this study as a generic tool to accelerate the design and execution of RAVEN workflows for technoeconomic analysis of grid energy systems. HERON leverages both RAVEN and the CashFlow plugin for RAVEN to stochastically explore or optimize a response surface with energy grid system production capacities as inputs and mean NPV as a goal function. HERON performs these evaluations by stochastically sampling market, weather, and demand events using RAVEN’s ARMA reduced-order model capability to generate boundary conditions for dispatch optimization. The algorithm performs the dispatch optimization for each of the synthetic scenarios. For this case, HERON designs workflows to simulate behavior of the PVH, wind, solar, and APS local area demand, and use these synthetic scenarios to stochastically evaluate the differential benefit of optional curtailment for each scenario. While this study finds optional curtailment to be a potential source of revenue, the magnitude of the differential NPV is sufficiently small that it is unlikely a priority for increasing the profitability of PVGS. Further, the differential NPV shrinks throughout the simulated years, suggesting the long-term benefit of such operation given current assumptions is negligible.

14 SOLAR ENERGY↗

Improving Project Management with Simulation and Completion Distribution Functions

Despite the critical importance of project completion timeliness, management practices in place today remain inadequate for addressing the persistent problem of project completion tardiness. A major culprit in late projects is uncertainty, which most, if not all, projects are inherently subject to. This uncertainty resides in the estimates for activity durations, the occurrence of unplanned and unforeseen events, and the availability of critical resources. In response to this problem, this research developed a comprehensive simulation based methodology for conducting quantitative project completion time risk analysis. It is called the Project Assessment by Simulation Technique (PAST). This new tool enables project stakeholders to visualize uncertainty or risk, i.e. the likelihood of their project completing late and the magnitude of the lateness, by providing them with a completion time distribution function of their projects. Discrete event simulation is used within PAST to determine the completion distribution function for the project of interest. The simulation is populated with both deterministic and stochastic elements. The deterministic inputs include planned project activities, precedence requirements, and resource requirements. The stochastic inputs include activity duration growth distributions, probabilities for events that can impact the project, and other dynamic constraints that may be placed upon project activities and milestones. These stochastic inputs are based upon past data from similar projects. The time for an entity to complete the simulation network, subject to both the deterministic and stochastic factors, represents the time to complete the project. Repeating the simulation hundreds or thousands of times allows one to create the project completion distribution function. The Project Assessment by Simulation Technique was demonstrated to be effective for the on-going NASA project to assemble the International Space Station. Approximately $500 million per month is being spent on this project, which is scheduled to complete by 2010. NASA project stakeholders participated in determining and managing completion distribution functions produced from PAST. The first result was that project stakeholders improved project completion risk awareness. Secondly, using PAST, mitigation options were analyzed to improve project completion performance and reduce total project cost.

Cates, Grant R.↗

Adapting Traditional Hazards Analysis Methods to Address Cyber Risks

Traditional hazards analysis (HA) methods, originally developed to address physical and operational risks, often fall short when it comes to identifying and mitigating cyber threats. These cyber threats pose unique and evolving risks to critical infrastructure and industrial control systems (ICS). This report explores the integration of Cyber-Informed Engineering (CIE) principles into existing HA methods to enhance their ability to address cyber-induced risks. CIE provides organizations with a practical, cost-effective approach to closing the gap between traditional HA methods and the need for cyber risk mitigation. By leveraging existing safety processes and controls, CIE allows users to examine and mitigate cyber vulnerabilities without overhauling existing HA methods. This report identifies areas where HA and CIE naturally align and where their approaches diverge. It emphasizes how CIE principles can be used to adapt HA methods, broadening their scope to include cyber risks and enabling the mitigation of cyber- induced impacts alongside traditional hazards and failure scenarios. This report examines how CIE can be applied across various HA methods—such as Hazard and Operability Studies (HAZOP), Probabilistic Risk Assessment (PRA), Failure Modes and Effects Analysis (FMEA), Systems-Theoretic Process Analysis (STPA), Hazard and Consequence Analysis for Digital Systems (HAZCADS), and Layers of Protection Analysis (LOPA). It provides strategies for integrating CIE to strengthen the identification, assessment, and mitigation of cyber-induced risks. The findings offer a structured entry point for organizations to embed CIE concepts into hazards and safety analyses, as well as broader engineering processes, ultimately supporting the design and operation of a more resilient infrastructure.

42 ENGINEERING↗

Adapting Traditional Hazards Analysis Methods to Address Cyber Risks

Traditional hazards analysis (HA) methods, originally developed to address physical and operational risks, often fall short when it comes to identifying and mitigating cyber threats. These cyber threats pose unique and evolving risks to critical infrastructure and industrial control systems (ICS). This report explores the integration of Cyber-Informed Engineering (CIE) principles into existing HA methods to enhance their ability to address cyber-induced risks. CIE provides organizations with a practical, cost-effective approach to closing the gap between traditional HA methods and the need for cyber risk mitigation. By leveraging existing safety processes and controls, CIE allows users to examine and mitigate cyber vulnerabilities without overhauling existing HA methods. This report identifies areas where HA and CIE naturally align and where their approaches diverge. It emphasizes how CIE principles can be used to adapt HA methods, broadening their scope to include cyber risks and enabling the mitigation of cyber- induced impacts alongside traditional hazards and failure scenarios. This report examines how CIE can be applied across various HA methods—such as Hazard and Operability Studies (HAZOP), Probabilistic Risk Assessment (PRA), Failure Modes and Effects Analysis (FMEA), Systems-Theoretic Process Analysis (STPA), Hazard and Consequence Analysis for Digital Systems (HAZCADS), and Layers of Protection Analysis (LOPA). It provides strategies for integrating CIE to strengthen the identification, assessment, and mitigation of cyber-induced risks. The findings offer a structured entry point for organizations to embed CIE concepts into hazards and safety analyses, as well as broader engineering processes, ultimately supporting the design and operation of a more resilient infrastructure.

42 - ENGINEERING↗

Quantifying and Addressing the DOE Material Reactivity Requirements with Analysis and Testing of Hydrogen Storage Materials & Systems

The objective of this project is to examine safety aspects of candidate hydrogen storage materials and systems being developed in the DOE Hydrogen Program. As a result of this effort, the general DOE safety target will be given useful meaning by establishing a link between the characteristics of new storage materials and the satisfaction of safety criteria. This will be accomplished through the development and application of formal risk analysis methods, standardized materials testing, chemical reactivity characterization, novel risk mitigation approaches and subscale system demonstration. The project also will collaborate with other DOE and international activities in materials based hydrogen storage safety to provide a larger, highly coordinated effort.

08 HYDROGEN↗

A Multifaceted Mathematical Approach for Complex Systems

Applied mathematics has an important role to play in developing the tools needed for the analysis, simulation, and optimization of complex problems. These efforts require the development of the mathematical foundations for scientific discovery, engineering design, and risk analysis based on a sound integrated approach for the understanding of complex systems. However, maximizing the impact of applied mathematics on these challenges requires a novel perspective on approaching the mathematical enterprise. Previous reports that have surveyed the DOE's research needs in applied mathematics have played a key role in defining research directions with the community. Although these reports have had significant impact, accurately assessing current research needs requires an evaluation of today's challenges against the backdrop of recent advances in applied mathematics and computing. To address these needs, the DOE Applied Mathematics Program sponsored a Workshop for Mathematics for the Analysis, Simulation and Optimization of Complex Systems on September 13-14, 2011. The workshop had approximately 50 participants from both the national labs and academia. The goal of the workshop was to identify new research areas in applied mathematics that will complement and enhance the existing DOE ASCR Applied Mathematics Program efforts that are needed to address problems associated with complex systems. This report describes recommendations from the workshop and subsequent analysis of the workshop findings by the organizing committee.

97 MATHEMATICS AND COMPUTING↗

Multi-resolution, Multi-scale Modeling for Scalable Macroalgae Production

Macroalgae harvested along coastlines and in the open ocean has traditionally been used as food for human consumption, animal feed, and fertilizer. The U.S. ARPA-E MARINER Program estimates that the nation has suitable conditions and geography to produce at least 500 million dry metric tons of macroalgae per year, yielding approximately 2.7 quadrillion BTUs of energy in the form of liquid fuel, which is roughly 10% of the nation’s annual transportation energy demand. Adverse environmental effects of nutrient overload and ocean acidification may also be reduced by large-scale macroalgae cultivation in many coastal ocean regions. However, the successful deployment of large-scale marine macroalgae farms for fuel production depends on ambient hydrodynamic conditions and nutrient availability, as well as their interactions with macroalgae farm structures. Pacific Northwest National Laboratory led an ARPA-E MARINER project to develop a set of numerical modeling tools capable of simulating ocean hydrodynamic and biogeochemical processes, macroalgae trajectories for free-floating systems, macroalgae growth and biomass yields, and hydrodynamic load on macroalgae canopies and farm structures using a multi-resolution and multi-scale approach. This set of modeling tools provides a suite of information essential for system design, optimal project siting, risk analysis, and management of macroalgae production systems in the ocean. Better clarity can also help macroalgae system developers reduce deployment costs, operational risk, and potential impacts on the local marine environment.

59 BASIC BIOLOGICAL SCIENCES↗

Risk-Informed Safety Analysis for Accident Tolerant Fuels

Accident Tolerant Fuels (ATF) are being tested by different nuclear vendors and research organizations and their introduction in the US light water reactors fleet is planned for the second half of the 2020`s. In the framework of the US-DOE Light-Water Reactor Sustainability program, Risk-Informed Systems Analysis pathway, researches are being conducted at the Idaho National Laboratory for developing tools and methods that can help the industry quantifying the benefits from the adoption of ATF technology. In this paper we describe the developed risk-informed methodology including the safety analysis codes improvements, and we present some results for selected accident scenarios. The developed methodology combines INL state-of-the-art deterministic Best Estimate code RELAP5-3D, and Probabilistic Risk Analysis tools RAVEN and SAPHIRE. The analyses are performed on a three-loops pressurized water reactor, simulating Station Blackout and LB-LOCA accidents and considering near-term ATFs, or FeCrAl and Chromium-coated clads. Finally, we show how, applying our methodology, the new Core Damage Frequency can be assessed. The results indicated that the main benefits in introducing near-term ATFs concern a significant reduction in the hydrogen production during accident conditions. No significant Core Damage Frequency reduction was found.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

TEAL Output Visualization

Tool for Economic Analysis (TEAL) is an open-source economics calculation package written and maintained by Idaho National Laboratory (INL). As a plugin of the Risk Analysis Virtual ENvironment (RAVEN), TEAL provides economics analysis models to RAVEN workflow users. In addition, TEAL is used in other RAVEN plugins such as LOGOS and the Holistic Energy Resource Optimization Network (HERON) to complement other analyses with economic calculations. This report documents the efforts in developing the capability of TEAL output visualization for users to better understand and investigate TEAL simulation results. In the past, outputs (e.g., various cash flows) were generated and printed to screen. According to the need and purpose for visualization, users can select various bar charts and donut charts to visualize the cash flows including inflows, outflows, and net cash flows in each year or in a selected time range, in addition to observing data stored in comma-separated value files (CSVs). The visualization capability is flexible and user-friendly by introducing several user-defined parameters, for instance, the start and the end project year of interest and the type of colors to be assigned to the cash flows.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CHRNA5 rs16969968 polymorphism is associated with lung cancer risk: A meta‐analysis

Abstract Objective To evaluate the genetic association between rs16969968 and lung cancer risk by meta‐analysis. Data source We searched eligible studies from MEDLINE, Web of Science and EMBASE up to Dec, 2017. Study selection Association studies concerning rs16969968 and lung cancer risk were included. We assessed the association strength between this polymorphism and risk of lung cancer by calculating odds ratios (OR) and 95% confidence interval (95%CI). Results A total of 26 data sets comprising 30 772 lung cancers and 90 954 controls were included. rs16969968 was found to be associated with lung cancer risk in population of European ancestry in all models (A vs. G: OR = 1.30, 95%CI 1.27‐1.33, P < 0.001; AA + GA vs. GG: OR = 1.38, 95%CI 1.33‐1.43, P < 0.001; AA vs. GG + GA: OR = 1.45, 95%CI 1.38‐1.53, P < 0.001), consistent with previous genome‐wide association study (GWAS). However, no association was observed in Asians (A vs. G: OR = 1.19. 95%CI 0.95‐1.49, P = 0.131). The minor allele A may increase the risk of lung cancer in both smokers (OR = 1.33, 95%CI 1.29‐1.39, P < 0.001) and nonsmokers (OR = 1.25, 95%CI 1.12‐1.39, P < 0.001). There was no obvious publication bias in all analyses. Conclusions Our analysis provided more evidence that rs16969968 is a susceptibility locus of lung cancer in the Caucasians and that it may be not associated with the risk in the Asians.

Zhou, Wei↗

Numerical analysis of the influence of scale effects and microstructure on hydrogen diffusion in polycrystalline aggregates

Predicting resistance to environmental degradation, especially hydrogen embrittlement (HE) has become a major concern for life assessment and risk analysis of structural materials. The microstructure of the materials plays a significant role in HE. Despite the large documentation about the subject, the contribution of hydrogen diffusion on this process stays unclear. In this work, we analyze the effects of the microstructure on hydrogen diffusion, especially the influence of grain boundaries considered as high diffusivity paths and possible sites of damage occurrence. Electrochemical permeation was simulated using finite elements method (FEM). Scale effects between the RVE (Representative Volume Element) and the size of the membrane are discussed. Domains of applicability for standard homogenization methods, especially Hashin Shtrikman model are studied using results from microstructural based FEM. Domains of invariance of diffusion behavior and concentration profiles for grain shapes and the size of the membrane are also analyzed. Thus, the difficulty to extract diffusion properties by permeation test for heterogeneous microstructures is highlighted and discussed.

hydrogen, permeation, diffusion, microstructure, g↗

Geomechanical risk assessment for subsurface fluid disposal operations

Numerical models are commonly used to estimate the state of stress in the subsurface for various engineering applications. These estimates are subject to considerable uncertainty, and yet, the estimates are almost always deterministic, yielding no information about the certainty of the prediction. For some applications, unquantified uncertainties in stress are often acceptable, because the risks related to geomechanics may be of low relative importance compared to other risks (e.g. recoverable resource volume), for which uncertainties are often quantified. Furthermore, many geomechanics-related risks in the petroleum industry are relatively short lived (e.g. well bore stability), and decrease in importance with time. In contrast, for waste water injection or geologic carbon sequestration (GCS), geomechanics-related risks (e.g. seal integrity, induced seismicity) are on par with resource-related risks and are of long-term concern, with the risk generally increasing in importance for a significant period of time. For these reasons, the deterministic stress estimation and risk analysis approaches generally applied in the petroleum industry are insufficient for GCS applications. This paper describes a Bayesian approach to geomechanical uncertainty quantification and risk assessment. The method is demonstrated using data from an active enhanced oil recover/geologic carbon sequestration field as a case study

Burghardt, Jeffrey A.↗

Satellite solar power - Will it pay off

A cost analysis is presented for front-end investments required for the development of a satellite solar power system. The methodology used makes use of risk analysis techniques to quantify the present state of knowledge relevant to the construction and operation of a satellite solar power station 20 years in the future. Results are used to evaluate the 'expected value' of a three-year research program providing additional information which will be used as a basis for a decision to either continue development of the concept at an increasing funding level or to terminate or drastically alter the program. The program is costed phase by phase, and a decision tree is constructed. The estimated probability of success for the research and studies phase is .540. The expected value of a program leading to the construction of 120 systems at a rate of four per year is 12.433 billion dollars.

Hazelrigg, G. A., Jr.↗

Systems Engineering and Integration (SE and I)

The issue of technology advancement and future space transportation vehicles is addressed. The challenge is to develop systems which can be evolved and improved in small incremental steps where each increment reduces present cost, improves, reliability, or does neither but sets the stage for a second incremental upgrade that does. Future requirements are interface standards for commercial off the shelf products to aid in the development of integrated facilities; enhanced automated code generation system slightly coupled to specification and design documentation; modeling tools that support data flow analysis; and shared project data bases consisting of technical characteristics cast information, measurement parameters, and reusable software programs. Topics addressed include: advanced avionics development strategy; risk analysis and management; tool quality management; low cost avionics; cost estimation and benefits; computer aided software engineering; computer systems and software safety; system testability; and advanced avionics laboratories - and rapid prototyping. This presentation is represented by viewgraphs only.

Chevers, ED↗

Situational Awareness of Grid Anomalies (SAGA)

The modern power industry becomes more vulnerable to cyber events due to the growing interconnectivity, interdependence, and complexity of the electric power grid. High-fidelity modeling and simulation tools that support the preventative risk analysis on potential cyber-relevant events is essential for ensuring the situational awareness of the system operator as it provides an inexpensive and risk-free environment to test the system responses under various cyber-relevant events and hereby can support research on cyber anomaly detection, optimal protective resource allocation, and mitigation measures. In this webinar, we will share NREL's cybersecurity research capabilities by highlighting the development of a scalable cyber-physical event test bed and demonstration with real hardware in the loop. The developed cyber-physical event test bed is backboned by an integrated transmission, distribution, and communication dynamic co-simulation framework and a plug-and-play cyber event generation module. It is designed to be modular and compatible with parallel computing, and thereby supports large-scale system simulations at an affordable computation cost. The test bed can capture millisecond-to-minutes dynamic frequency and voltage responses under cyber events from the bulk transmission system to the active distribution systems and distributed energy resources at the grid edge.

co-simulation↗

Land use and air quality in urban environments: Human health risk assessment due to inhalation of airborne particles

Highlights: • Biomonitors showed intraurban differences in particles bound metals. • The PM{sub 10} limit (150 µg/m{sup 3}) was exceeded in almost all land uses categories. • Industrial sites had an unacceptable carcinogenic risk (> 1 × 10{sup −4}). • Adults and elder are the most susceptible age groups. • Land use influence health risk due to particle inhalation. Particle matter (PM) and its associated compounds are a serious problem for urban air quality and a threat to human health. In the present study, we assessed the intraurban variation of PM, and characterized the human health risk associated to the inhalation of particles measured on PM filters, considering different land use areas in the urban area of Cordoba city (Argentina) and different age groups. To assess the intraurban variation of PM, a biomonitoring network of T. capillaris was established in 15 sampling sites with different land use and the bioaccumulation of Co, Cu, Fe, Mn, Ni, Pb and Zn was quantified. After that, particles were collected by instrumental monitors placed at the most representative sampling sites of each land use category and an inhalation risk was calculated. A remarkable intraurban difference in the heavy metals content measured in the biomonitors was observed, in relation with the sampling site land use. The higher content was detected at industrial areas as well as in sites with intense vehicular traffic. Mean PM{sub 10} levels exceeded the standard suggested by the U.S. EPA in all land use areas, except for the downtown. Hazard Index values were below EPA's safe limit in all land use areas and in the different age groups. In contrast, the carcinogenic risk analysis showed that all urban areas exceeded the acceptable limit (1 × 10{sup −6}), while the industrial sampling sites and the elder group presented a carcinogenic risk higher that the unacceptable limit. These findings validate the use of T. capillaris to assess intraurban air quality and also show there is an important intraurban variation in human health risk associated to different land use.

54 ENVIRONMENTAL SCIENCES↗