Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “radioactive material”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Pressure Build-Up During the Fire Test in Type B(U) Packages Containing Water - 13280

The safety assessment of packages for the transport of radioactive materials with content containing liquids requires special consideration. The main focus is on water as supplementary liquid content in Type B(U) packages. A typical content of a Type B(U) package is ion exchange resin, waste of a nuclear power plant, which is not dried, normally only drained. Besides the saturated ion exchange resin, a small amount of free water can be included in these contents. Compared to the safety assessment of packages with dry content, attention must be paid to some more specific issues. An overview of these issues is provided. The physical and chemical compatibility of the content itself and the content compatibility with the packages materials must be demonstrated for the assessment. Regarding the mechanical resistance the package has to withstand the forces resulting from the freezing liquid. The most interesting point, however, is the pressure build-up inside the package due to vaporization. This could for example be caused by radiolysis of the liquid and must be taken into account for the storage period. If the package is stressed by the total inner pressure, this pressure leads to mechanical loads to the package body, the lid and the lid bolts. Thus, the pressure is the driving force on the gasket system regarding the activity release and a possible loss of tightness. The total pressure in any calculation is the sum of partial pressures of different gases which can be caused by different effects. The pressure build-up inside the package caused by the regulatory thermal test (30 min at 800 deg. C), as part of the cumulative test scenario under accident conditions of transport is discussed primarily. To determine the pressure, the temperature distribution in the content must be calculated for the whole period from beginning of the thermal test until cooling-down. In this case, while calculating the temperature distribution, conduction and radiation as well as evaporation and condensation during the associated process of transport have to be considered. This paper discusses limiting amounts of water inside the cask which could lead to unacceptable pressure and takes into account saturated steam as well as overheated steam. However, the difficulties of assessing casks containing wet content will be discussed. From the authority assessment point of view, drying of the content could be an effective way to avoid the above described pressure build-up and the associated difficulties for the safety assessment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

First Road / River Barge Security Transport of SNF under the New German Transport Security Guidelines - 19102

A transfer of 342 spent fuel assemblies from NPP Obrigheim to NPP Neckarwestheim, both located alongside the river Neckar in the south of Germany, is required to promote the decommissioning process of NPP Obrigheim, which started in 2008 after the NPP had been shut down three years before. The spent fuel storage facility in Neckarwestheim offers sufficient storage space to accept the 342 SNF assemblies, stored in fifteen dry casks type CASTOR{sup R} 440/84 mvK. After several transport feasibility studies had been conducted, Daher Nuclear Technologies GmbH was awarded the commission to plan, prepare and conduct the SNF transport. Since the combined road / river barge transport promised to be the most suitable mode of transportation Daher Nuclear Technologies started to prepare its security concept, a prerequisite to apply for and attain the transport license mandatory for transporting spent nuclear fuel in Germany. In March 2014 the company applied for the transport license, which, after more than three years and numerous amendments to the security concept, was finally granted to Daher Nuclear Technologies on May 16, 2017 by the German Federal Office for the Safety of Nuclear Waste Management (successor organization of the BfS). Simultaneously to the license application phase the transport equipment - amongst others the heavy-duty trucks and trailers, the pusher tugs, the river barge and transport frames - had to be provided and modified to meet the intensified requirements of the New German Transport Security Guidelines Road / Rail as well as several other legal regulations referring to the transport of dangerous goods by road and inland waterways (e.g. ADR - European Agreement concerning the International Carriage of Dangerous Goods by Road and ADN - European Agreement concerning the International Carriage of Dangerous Goods by Inland Waterways). The planning process involved various meetings with representatives of different authorities and administrative bodies incl. accredited experts as well as subcontractors. Tremendous training efforts had to be undertaken to train more than 100 transport participants regarding security measures, health, safety and environmental measures, as well as the proper handling of radioactive material. This also included the training of the security staff, that had to be qualified in compliance with the new Transport Security Guidelines Road and Rail. Finally, in June 2017, when all preparations where complete, all requirements met, and all permits obtained, the first ever security SNF transport on a German river was performed. Three laden CASTOR{sup R} 440/84 mvK transport and storage casks were transported in one batch via heavy-duty truck-trailer from the NPP Obrigheim to the NPP's own harbor, to be rolled on to the river barge, that would carry the three casks upstream the river Neckar to the approx. fifty kilometer distant NPP Neckarwestheim. The journey on the river took about eleven hours, in which several bridges and locks had to be passed. The entire transport was escorted by qualified security staff and auxiliary police forces on waterways and alongside on roads. It attracted nationwide public attention, due to its pioneer status and the fact, that there hadn't been any SNF or HLW shipments in Germany since 2011. After the convoy safely arrived at NPP Neckarwestheim's pier the three laden CASTOR{sup R} 440/84 mvK casks were rolled off the river barge via heavy-duty truck-trailers to be stored in the on-site interim storage facility. This first transport was a success and was followed by four additionally successful security transports in September, October, November and December 2017. The public attention receded significantly during the transport campaign, which ended on December 19, 2017 with the transfer of the last three of fifteen casks to the on-site interim storage facility in Neckarwestheim. With the last cask safely transferred to the interim storage facility Daher Nuclear Technologies successfully completed the transport campaign on schedule, meeting one of EnBW's fundamental objectives to finish the transfer of the 342 SNF assemblies by the end of 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Analysis: Disposal Plan for Pit 38 at Technical Area 54, Area G

Los Alamos National Laboratory (LANL) generates radioactive waste as a result of various activities. Operational waste is generated from a wide variety of research and development activities including nuclear weapons development, energy production, and medical research; environmental restoration (ER), and decontamination and decommissioning (D&D) waste is generated as contaminated sites and facilities at LANL undergo cleanup or remediation. The majority of this waste is low-level radioactive waste (LLW) and is disposed of at the Technical Area 54 (TA-54), Area G disposal facility. U.S. Department of Energy (DOE) Order 435.1 (DOE, 2001) requires that radioactive waste be managed in a manner that protects public health and safety, and the environment. To comply with this order, DOE field sites must prepare site-specific radiological performance assessments for LLW disposal facilities that accept waste after September 26, 1988. Furthermore, sites are required to conduct composite analyses that account for the cumulative impacts of all waste that has been (or will be) disposed of at the facilities and other sources of radioactive material that may interact with the facilities. Revision 4 of the Area G performance assessment and composite analysis was issued in 2008 (LANL, 2008). These analyses estimate rates of radionuclide release from the waste disposed of at the facility, simulate the movement of radionuclides through the environment, and project potential radiation doses to humans for several on- and off-site exposure scenarios. The assessments are based on existing site and disposal facility data, and on assumptions about future rates and methods of waste disposal. The Area G disposal facility consists of Material Disposal Area (MDA) G and the Zone 4 expansion area. To date, disposal operations have been confined to MDA G and are scheduled to continue in that region until MDA G undergoes final closure at the end of 2013. Given its impending closure, efforts have been made to utilize the remaining disposal capacity within MDA G to the greatest extent possible. One approach for doing this has been to dispose of low-activity waste from cleanup operations at LANL in the headspace of selected disposal pits. Waste acceptance criteria (WAC) for the material placed in the headspace of pits 15, 37, and 38 have been developed (LANL, 2010) and the impacts of placing waste in the headspace of these units has been evaluated (LANL, 2012a). The efforts to maximize disposal efficiency have taken on renewed importance because of the disposal demands placed on MDA G by the large volumes of waste that are being generated at LANL by cleanup efforts. For example, large quantities of waste were recently generated by the retrieval of waste formerly disposed of at TA-21, MDA B. A portion of this material has been disposed of in the headspace of pit 38 in compliance with the WAC developed for that disposal strategy; a large amount of waste has also been sent to off-site facilities for disposal. Nevertheless, large quantities of MDA B waste remain that require disposal. An extension of pit 38 was proposed to provide the disposal capacity that will be needed to dispose of institutional waste and MDA B waste through 2013. A special analysis was prepared to evaluate the impacts of the pit extension (LANL, 2012b). The analysis concluded that the disposal unit could be extended with modest increases in the exposures projected for the Area G performance assessment and composite analysis, as long as limits were placed on the radionuclide concentrations in the waste that is placed in the headspace of the pit. Based, in part, on the results of the special analysis, the extension of pit 38 was approved and excavation of the additional disposal capacity was started in May 2012. The special analysis presented here uses performance modeling to identify a disposal plan for the placement of waste in pit 38. The modeling uses a refined design of the disposal unit and updated radionuclide inventories to identify a disposal configuration that promotes efficient utilization of the pit and ensures continued compliance with DOE Order 435.1 performance objectives. Section 2 describes the methods used to conduct the analysis; the results of the evaluation are provided in Section 3. The disposal plan for pit 38 is provided in Section 4 and the conclusions of the investigation are provided in Section 5. Throughout the report, pit 38 is used to refer to the entire disposal unit, including the existing pit and the extension that is currently under construction. Where a distinction between the two portions of the pit is necessary, the existing unit is referred to as pit 38 proper and the new portion of the pit as the pit 38 extension or, more simply, the extension.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Phyto-screening for Volatile Organic Compounds in a Clay-based Glacial Till at the Niagara Falls Storage Site, New York - 17372

The Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs) occupy approximately 607 hectares (1,500 acres) of the original 3,035-hectare (7,500-acre) Lake Ontario Ordnance Works (LOOW). The NFSS was used to store radioactive materials, residues and waste from uranium ore processing between 1944 and 1952. The waste-handling practices produced an array of groundwater impacts throughout the site. Although the groundwater at the NFSS is naturally high in total dissolved solids that preclude untreated consumption, the groundwater contaminant levels in some areas of the site are very high and may pose risk to a Construction Worker receptor, as well as limit the options for future site re-use. Volatile organic compound (VOC) impacted soil in the northern portion of the site has produced a groundwater plume with significant concentrations of tetrachloroethene (PCE) and associated daughter compounds. Active groundwater remediation is impractical due to the clayey soils, as evident from adjacent property owners who have unsuccessfully attempted active remediation of their VOC plumes. Consequently, the Buffalo District may evaluate excavation options, with secondary phyto-remediative approaches as passive alternatives to lessen the groundwater impacts during the project's life cycle. A preliminary field-study in the VOC plume area sampled the interior of a Black Locust (Robinia pseudoacacia) tree using a Haglof tree corer. Detectable levels of tetrachloroethene (PCE), trichloroethene (TCE), and cis-1,2,-dichloroethene (cis-DCE) were found in the woody interior of the tree. Subsequent sampling and analyses were performed on proximal trees of varying species in and around the currently delineated VOC plume. The results indicate that poplar and native cottonwood variants preferentially contain the VOCs, whereas collocated hardwood trees produced non-detectable results. Additional sampling of Cottonwoods in the VOC-impacted area promoted further delineations of the impacts. The tree-sampling data can be considered a broad surrogate for soil sampling to optimally delineate the VOC plume without performing additional invasive sampling of the subsurface (e.g., drilling). The results also will be used to determine which native tree species preferentially uptake the VOCs from soil and groundwater. These species, and possibly other hybrid species known for VOC uptake and transpiration, would be propagated to promote interim phyto-extraction of the VOCs during the maintenance period between decision-document completion and likely remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measuring Radioactivity from Fukushima Daiichi in New Mexico

On March 11, 2011, the Fukushima Daiichi nuclear power plant was damaged by the tsunami that followed the 'Great East Japan Earthquake,' and the reactor subsequently leaked radioactive material. In response, LANL augmented the routine ambient (AIRNET) and stack (Rad-NESHAP) measurements with three high-volume samplers: No.167 at the Old White Rock Fire Station; No.173 at the TA-49 gate, and No.211 at the Los Alamos Medical Center. Previous accidents, such as the Three-Mile-Island accident in 1979 and the Chernobyl accident in 1986, indicated that the most likely releases were (a) the noble gases: krypton and xenon; and (b) the volatile elements: cesium, tellurium, and iodine. At the latitude of Fukushima, the predominant winds across the Pacific Ocean are from west to east, and models predicted that the plume would arrive in the western US on about March 18. By this time the shorter-lived isotopes would have decayed. Therefore, the expected radionuclides were xenon-133, cesium-134, cesium-136, cesium-137, tellurium-132, iodine-131, and iodine-132. As expected, cesium-134, cesium-136, cesium-137, tellurium-132, iodine-131, and iodine-132 were all detected by all three high-volume samplers during March 17-21. The concentrations peaked during the March 24-28 period. After this, concentrations of all nuclides declined. In general, the concentrations were consistent with those measured by the EPA RadNet system and many other monitoring systems throughout the world. At the time of writing, preliminary results from the AIRNET and Rad-NESHAP systems are being reported. More detailed results are described in LA-UR-11-10304 and will be reported in full in the annual environmental report for 2011. All previous releases from nuclear reactors have been dominated by noble gases, primarily krypton and xenon, which are not measured by the high-volume samplers or the AIRNET system. However, in sufficient concentrations these and other fission products would be detected by NEWNET. Consistent with this possibility, all NEWNET detectors recorded an increase of 0.2 {micro}R/h from March 19-1, followed by an additional increase of 0.1 {micro}R/h on March 24 (Figure 1). The consistency of the NEWNET stations is indicated by the error bars, which represent the standard error of the mean of the individual stations. Over the next 10 days, the NEWNET readings declined with approximately the 5-day half life of xenon-133, returning to near normal levels on April 2. After this, any further decrease was masked by high radon concentrations on April 3, by a weather system that moved into New Mexico on April 4, and by rainfall on April 6-9. Furthermore, it is likely that all NEWNET detectors responded to a gradually increasing trend in terrestrial radiation during the month of March as the ground dried out. It is difficult to distinguish the hypothetical effects of xenon-133 from the fluctuations of radon decay products. However, at present we do not have an alternative hypothesis for the sharp increase that was observed in all NEWNET stations from March 19-21. Perhaps some of the increase was caused by radon or terrestrial radiation, in which case the observed increase is an upper limit to that caused by releases from Fukushima. LANL data are consistent with those of the EPA RadNet monitoring system. The EPA has repeatedly stated that 'The levels detected are far below levels of concern.'

CESIUM 134↗

Corrosion Testing of Carbon Steel Exposed to Sludge Heel Chemical Cleaning Solutions - 16109

As efforts continue to treat and dispose of millions of gallons of legacy radioactive materials from the production of nuclear weapons, non-compliant waste storage tanks will gradually be emptied of the bulk waste volume leaving heel materials requiring removal prior to tank closure. The waste heel slurries are distributed on the floor of large, million gallon tanks, which frequently contain numerous obstructions that limit the effectiveness of mechanical removal methods. As a result, chemical cleaning methods are needed for the effective removal of the heels as well as chemical scales that are present on the tank walls and other interior surfaces. Two tank cleaning technologies have already been implemented at the Savannah River Site (SRS): Low Temperature Aluminum Dissolution (LTAD) and Bulk Oxalic Acid Cleaning (BOAC). Recent chemical cleaning efforts on SRS Tank 12 were very successful with regard to bulk sludge heel (especially for Al, Fe, and U phases) and beta/gamma radionuclide removal. Although chemical cleaning using these technologies has been shown to be effective, no disposition path has been identified for oxalate added during BOAC, and insoluble oxalate salts are accumulating within the SRS tank farm and waste processing facilities (evaporators, etc.). Extensive sludge washing is also required to remove moderately soluble sodium oxalate salts prior to sludge vitrification in the SRS Defense Waste Processing Facility (DWPF). As a result, oxalate additions to the tank farm need to be minimized by the use of supplementary acids to assist sludge removal in OA or the use of other cleaning reagents or processing strategies. Previous SRNL testing revealed the importance of pH control for BOAC and recommended the use of a supplementary acid (dilute HNO{sub 3}) with OA to minimize oxalate additions. Primary drivers in SRS Tank Closure Performance Assessments, which evaluate the fate and impact of tank sludge residuals on a geological timescale, are the removal of alpha emitting radionuclides present at low concentrations such as Pu, Am, and Np, which are not highly soluble in currently utilized chemical cleaning reagents. Scoping studies conducted at SRNL revealed promising methods to dissolve the actinides within the HLW tank heels. Oxidation of the actinides with permanganate in either strong caustic (10 M NaOH) or dilute acidic (0.2 M HNO{sub 3}) solutions was shown to result in dissolution of oxy/hydroxide phases of these metals in the absence of major sludge phases. The waste tanks at SRS and Hanford are constructed of carbon steel. Carbon steel corrodes rapidly in most acidic and/or oxidizing environments. Previous electrochemical corrosion testing indicated that the corrosion rates in dilute HNO{sub 3} with OA may result in manageable corrosion rates, over short exposure periods. Additional corrosion testing was performed to provide data for the nitric acid/OA blend as well as the acid/permanganate and caustic permanganate based chemical cleaning solutions. Corrosion rates from the passive coupon tests for the nitric acid/oxalic acid blend were significantly greater than those observed previously with the electrochemical testing. This result may be due to simultaneous electrochemical and chemical dissolution of the steel. The corrosion rate data from the coupon tests in the nitric acid/oxalic acid blend were evaluated to determine the degree of potential structural damage. The corrosion rates, although relatively high, would not be expected to cause damage that would reduce the capacity of the tank primary wall if the process is completed within a month. The corrosivity of sodium permanganate in four proposed cleaning solutions, 1 nitric acid solution and 3 sodium hydroxide solutions, was studied by electrochemical methods at room temperature. The corrosion rates were significantly less aggressive than in the nitric acid/oxalic acid blend corrosion tests. Passive coupon tests needs to be performed in these solutions to ensure that chemical dissolution of the metal is not occurring simultaneously. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Derivation of heterogeneous material distributions and their sensitivity to HM-coupled two-phase flow models exemplified with the LASGIT experiment

Abstract Advective gas transport in bentonite, a possible buffer material in repositories for radioactive materials, is difficult to simulate in numerical continuum models, partly due to the complicated microstructure of bentonite. To generate reliable models of repositories nevertheless, spatially distributed heterogeneous material properties can be used to allow localization of gas flow. In this study, a pore-size-dependent stochastic approach of the gas entry pressure is derived from Mercury Intrusion Porosimetry, which is used to replicate measurements from the LASGIT experiment. In addition, three benchmark tests are simulated to investigate the dependence of heterogeneous distributions of material properties on the mesh discretization, the temporal dependence, and the coupling between the processes influenced by the heterogeneous parameters. The numerical modeling results of the LASGIT experiment show that the onset of gas flow into the system and the subsequent increase in pressure and stress can be well reproduced using heterogeneous distributions. Compared to a model with homogeneous material properties, heterogeneous distributions may allow the generation of dilatancy-controlled microfractures—an important feature with regard to the advective gas flow in bentonites. However, it can be observed that the heterogeneous distributions in LASGIT are less significant, as technical gaps or differences in material types could have a greater impact.

Environmental Sciences & Ecology↗

Safety Basis Compliant Flexible Operations [Capstone Project]

Compliant nuclear operations must be weighed against the radiological risk to the worker, public, and the environment. This project set out to look at one facility at Los Alamos National Laboratory (LANL or the Laboratory) and compare the risk with the operational restrictions associated with the Technical Safety Requirements (TSRs). The hope was to identify controls that could be reduced or simplified while maintaining compliance with 10 CFR 830, Nuclear Safety Management. This would result in increasing facility operational flexibility and efficiency. Controls were identified to be simplified or eliminated based on risk. This identification was initially envisioned from the perspective of reanalysis of the accident and hazard analysis consequences. Additionally, it was envisioned that fire testing could show that the consequences of a fire are not as dramatic as analyzed. Specific facility controls were identified that cause operational inefficiencies. Based on data collection, two controls were identified for further evaluation. The first control was combustible loading within the waste storage buildings, and the second control is related to the seismic power cutoff switch. In evaluating the combustible loading control, the thought is that the fire suppression system (FSS) provides adequate protection and the combustible loading controls do not need elevation to a TSR control. The FSS, along with the Fire Protection Program, would provide protection to prevent a fire from impacting large amounts of stored waste material. The seismic switch was more of a challenge. When reviewing the facility operation, it was determined that the facility does not operate anywhere near the established material-at-risk (MAR – radioactive material) limits. By adjusting these limits, a reduced consequence could be achieved and hence, a significant risk reduction achieved. A new operating mode would be used to achieve this reduction. A reduced MAR limit was successfully used as a test case for snow removal during this project. This project expands on that trial case as related to combustible loading and the seismic power cutoff switch TSRs. This will increase the efficiency of operations with reduced TSR controls while reducing overall facility risk. This is a win-win situation for Triad National Security, LLC (Triad) and the U.S. Department of Energy (DOE). Due to schedule and budgetary constraints, not all envisioned work scope was accomplished. However, it is maintained in this report for future efforts.

61 RADIATION PROTECTION AND DOSIMETRY↗

RadSTraM: Radiological Source Tracking and Monitoring, Phase II Final Report

This report focuses on the technical information gained from the Radiological Source Tracking and Monitoring (RadSTraM) Phase II investigation and its implications. The intent of the RadSTraM project was to determine the feasibility of tracking radioactive materials in commerce, particularly International Atomic Energy Agency (IAEA) Category 3 and 4 materials. Specifically, Phase II of the project addressed tracking radiological medical isotopes in commerce. These categories of materials are susceptible to loss or theft but the problem is not being addressed by other agencies.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Radiological Control Manual

Objectives of the manual are to (1) ensure compliance with requirements of AEC and governmental health agencies, (2) ensure against excessive and unnecessary exposure of personnel to harmful radiation, and (3) prevent contamination of equipment, materials, and environment with radioactive materials.

Noblin, J. W.↗

Radioactive 7Be materials flown on LDEF

Following the discovery of the atmospheric cosmogenic radionuclide Be-7 on the Long Duration Exposure Facility (LDEF), we began a search for other known nuclides produced by similar mechanisms. None of the others have the narrow gamma-ray line emission of Be-7 decay which enable its rapid detection and quantification. A search for Be-10 atoms on LDEF clamp plates using accelerator mass spectrometry is described. An unexpected result was obtained.

Gregory, John C.↗

Romania: Brand-New Engineering Solutions

The HEU spent nuclear fuel transport from Romania was a pilot project in the framework of the Russian Research Reactor Fuel Return Program (RRRFR), being the first fully certified spent nuclear fuel shipment by air. The successful implementation of the Romanian shipment also brought various new technology in the program, further used by other participating countries. Until 2009, the RRRFR program repatriated to the Russian Federation HEU spent nuclear fuel of Russian origin from many countries, like Uzbekistan, Czech Republic, Latvia, Hungary, Kazakhstan and Bulgaria. The means of transport used were various; from specialized TK-5 train for the carriage of Russian TUK-19 transport casks, to platform trains for 20 ft freight ISO containers carrying Czech Skoda VPVR/M casks; from river barge on the Danube, to vessel on the Mediterranean Sea and Atlantic Ocean. Initially, in 2005, the transport plan of the HEU spent nuclear fuel from the National Institute for R&D in Nuclear Physics and Nuclear Engineering 'Horia Hulubei' in Magurele, Romania considered a similar scheme, using the specialized TK-5 train transiting Ukraine to the destination point in the Russian Federation, or, as an alternative, using the means and route of the spent nuclear fuel periodically shipped from the Bulgarian nuclear power plant Kosloduy (by barge on the Danube, and by train through Ukraine to the Russian Federation). Due to impossibility to reach an agreement in due time with the transit country, in February 2007 the US, Russian and Romanian project partners decided to adopt the air shipment of the spent nuclear fuel as prime option, eliminating the need for agreements with any transit countries. By this time the spent nuclear fuel inspections were completed, proving the compliance of the burn-up parameters with the international requirements for air shipments of radioactive materials. The short air route avoiding overflying of any other countries except the country of origin and the country of destination also contributed to the decision making in this issue. The efficient project management and cooperation between the three countries (Russia, Romania and USA) made possible, after two and a half years of preparation work, for the first fully certified spent nuclear fuel air shipment to take place on 29th of June 2009, from Romanian airport 'Henri Coanda' to the Russian airport 'Koltsovo' near Yekaterinburg. One day before that, after a record period of 3 weeks of preparation, another HEU cargo was shipped by air from Romanian Institute for Nuclear Research in Pitesti to Russia, containing fresh pellets and therefore making Romania the third HEU-free country in the RRRFR program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

25 Years Of Environmental Remediation In The General Separations Area Of The Savannah River Site: Lessons Learned About What Worked And What Did Not Work In Soil And Groundwater Cleanup

The Savannah River Site (SRS) is owned and administered by the US Department of Energy (DOE). SRS covers an area of approximately 900 square kilometers. The General Separation Area (GSA) is located roughly in the center of the SRS and includes: radioactive material chemical separations facilities, radioactive waste tank farms, a variety of radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the GSA from the mid-1950s through the mid-1990s. Radioactive operations at the F Canyon began in 1954; radioactive operations at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground (ORWBG) began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility (MWMF) and Low Level Radioactive Waste Disposal Facility (LLRWDF) received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970s, 1980s, and 1990s led to changes in waste management and environmental cleanup practices at SRS. The US Congress passed the Clean Air Act in 1970, and the Clean Water Act in 1972; the Resource Conservation and Recovery Act (RCRA) was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980; the Federal Facilities Compliance Act (FFCA) was signed into law in 1992. Environmental remediation at the SRS essentially began with a 1987 Settlement Agreement between the SRS and the State of South Carolina (under the South Carolina Department of Health and Environmental Control - SCDHEC), which recognized linkage between many SRS waste management facilities and RCRA. The SRS manages several of the larger groundwater remedial activities under RCRA for facilities recognized early on as environmental problems. All subsequent environmental remediation projects tend to be managed under tri-party agreement (DOE, Environmental Protection Agency, and SCDHEC) through the Federal Facilities Agreement. During 25 years of environmental remediation SRS has stabilized and capped seepage basins, and consolidated and capped waste units and burial grounds in the GSA. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Over the last 25 years concentrations of contaminants in the aquifers beneath the GSA and in surface water streams in the GSA have dropped significantly. Closure of 65 waste sites and 4 RCRA facilities has been successfully accomplished. Wastes have been successfully isolated in place beneath a variety of caps and cover systems. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. SRS operated two very large pump and treat systems at the F and H Seepage Basins to attempt to limit the release of tritium to Fourmile Branch, a tributary of the Savannah River. The systems were designed to extract contaminated acidic groundwater, remove all contamination except tritium (not possible to remove the tritium from the water), and inject the tritiated groundwater up-gradient of the source area and the plume. The concept was to increase the travel time of the injected water for radioactive decay of the tritium. The two systems were found to be non-effective and potentially mobilizing more contamination. SRS invested approximately $50 million in construction and approximately $100 million in 6 years of operation. The H Seepage Basin pump and treat system was replaced by a series of subsurface barriers that alters the groundwater velocity; the F Seepage Basin pump and treat system was replaced by subsurface barriers forming a funnel and gate augmented by chemical treatment within the gates. These replacement systems are mostly passive and cost approximately $13 million to construct, and have reduced the tritium flux to Fourmile Branch, in these plumes, by over 70%. SRS manages non-acidic tritiated groundwater releases to Fourmile Branch from the southwest plume of the MWMF with a forest irrigation system. Tritiated water is captured with a sheetpile dam below the springs that caused releases to Fourmile Branch. Water from the irrigation pond is pumped to a filter plant prior to irrigation of approximately 26 hectares of mixed forest and developing pine plantation. SRS has almost achieved a 70% reduction in tritium flux to the Branch from this plume. The system cost approximately $5 million to construct with operation cost of approximately $500K per year. In conclusion, many lessons have been learned in 25 years of relatively aggressive remedial activities in the GSA. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. In water management situations with non-accumulative contaminants (tritium, VOCs, etc.) irrigation in a forest setting can be very effective.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent Developments in the Management of Cameco Corporation's Fuel Services Division Waste - 13144

Cameco Corporation is a world leader in uranium production. Headquartered in Saskatoon, Saskatchewan our operations provide 16% of the world uranium mine production and we have approximately 435 million pounds of proven and probable uranium reserves. Cameco mining operations are located in Saskatchewan, Wyoming, Nebraska and Kazakhstan. Cameco is also a major supplier of uranium processing services required to produce fuel for the generation of clean energy. These operations are based in Blind River, Cobourg and Port Hope, Ontario and are collectively referred to as the Fuel Services Division. The Fuel Services Division produces uranium trioxide from uranium ore concentrate at the Blind River Refinery. Cameco produces uranium hexafluoride and uranium dioxide at the Port Hope Conversion Facility. Cameco operates a fuel manufacturing facility in Port Hope, Ontario and a metal fabrication facility located in Cobourg, Ontario. The company manufactures fuel bundles utilized in the Candu reactors. Cameco's Fuel Services Division produces several types of low-level radioactively contaminated wastes. Internal processing capabilities at both the Blind River Refinery and Port Hope Conversion Facility are extensive and allow for the recycling of several types of waste. Notwithstanding these capabilities there are certain wastes that are not amenable to the internal processing capabilities and must be disposed of appropriately. Disposal options for low-level radioactively contaminated wastes in Canada are limited primarily due to cost considerations. In recent years, Cameco has started to ship marginally contaminated wastes (<500 ppm uranium) to the United States for disposal in an appropriate landfill. The landfill is owned by US Ecology Incorporated and is located near Grand View, Idaho 70 miles southeast of Boise in the Owyhee Desert. The facility treats and disposes hazardous waste, non-hazardous industrial waste and low-activity radioactive material. The site's arid climate, deep groundwater and favourable geology help ensure permanent waste isolation. Combined with a state of the art multi-layer landfill liner system, the Grand View facility represents an ideal choice to minimize environmental liability. Marginally contaminated wastes from operations within the Fuel Services Division are typically loaded into PacTec IP-2 rated Intermediary Bulk Containers and then transported by road to a nearby rail siding. The Intermediary Bulk Containers are then loaded in US Ecology owned gondola rail-cars. The gondolas are then transported via Canadian Pacific and Union Pacific railroads to the US Ecology Rail Transfer facility located in Mayfield, Idaho. The Intermediary Bulk Containers are unloaded into trucks for transport to the disposal facility located approximately 32 miles away. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

25 years of environmental remediation in the general separations area of the Savannah river site: lessons learned about what worked and what did not work in soil and groundwater cleanup - 15270

The Savannah River Site, which is owned and administered by the US Department of Energy, covers approximately 900 square kilometers. The General Separation Area is located in the center of the site and includes: radioactive material chemical separations facilities, radioactive waste tank farms, radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the General Separation Area from the mid-1950's through the mid-1990's. Operations at the F Canyon began in 1954 and at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility and Low Level Radioactive Waste Disposal Facility received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970's through 1990's led to changes in waste management and environmental cleanup practices. The US Congress passed the Clean Air Act in 1970 and the Clean Water Act in 1972; the Resource Conservation and Recovery Act was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act was enacted by Congress in 1980; and the Federal Facilities Compliance Act was signed into law in 1992. Environmental remediation at the Savannah River Site essentially began with a 1987 Settlement Agreement between the Savannah River Site and the State of South Carolina. The site manages several of the larger groundwater remedial activities under the Resource Conservation and Recovery Act for facilities recognized early on as environmental problems. All subsequent remediation projects are managed under a tri-party agreement (Department of Energy, Environmental Protection Agency, and South Carolina Department of Health and Environmental Control) through the Federal Facilities Agreement. Environmental remediation activities during the past 25 years have stabilized and capped seepage basins as well as consolidated and capped waste units and burial grounds in the General Separation Area. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Concentrations of contaminants in the aquifers beneath the General Separation Area and in surface water streams in the General Separation Area have decreased over the past 25 years. Closure of 65 waste sites and 4 Resource Conservation and Recovery Act facilities has been successfully accomplished. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process of remediating the General Separations Area. Geo-textile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive and enhanced natural processes to address contamination are much more cost effective than pump and treat systems. Forest irrigation can be very effective in water management situations with non-accumulative contaminants such as tritium and volatile organic contaminants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Understanding Radionuclide Interactions with Cementitious Materials for Radioactive Waste Management - 18298

In the UK, ILW is currently managed using cementitious encapsulation in Portland cement (PC)-based grouts. The long-term behaviour of radionuclides in ILW cementitious waste-forms under varying local conditions of extended interim storage and geological disposal is not well understood and the behaviour of cement minerals in the retention of various radionuclides is poorly constrained. This work focuses on the Ca-Si-[Al,Mg,S] mineral system and how this may evolve with the introduction of radionuclides into the system. Here, we discuss the experimental program aimed at underpinning the uptake and retention mechanisms of a range of key radionuclides (U, Tc, Ce/Pu), with selected cement phases: calcium-silicate-hydrate (C-S-H), hydrotalcite (Mg{sub 6}Al{sub 2}CO{sub 3}(OH)16.4H{sub 2}O) and ettringite (Ca{sub 6}(Al{sub 2}O{sub 6})(SO{sub 4}){sub 3}.32H{sub 2}O). Described here is the syntheses of C-S-H and radionuclide incorporation experiments performed on this phase. Further to this, thermodynamic geochemical modelling has been adopted to explore the Ca-Si-U mineral system, aimed at identifying the mineral phases likely to form on contact of C-S-H phases with aqueous uranium, as a function of pH. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DEVELOPMENT OF BURN TEST SPECIFICATIONS FOR FIRE PROTECTION MATERIALS IN RAM PACKAGES

The regulations in 10 CFR 71 require that the radioactive material (RAM) packages must be able to withstand specific fire conditions given in 10 CFR 71.73 during Hypothetical Accident Conditions (HAC). This requirement is normally satisfied by extensive testing of full scale test specimens under required test conditions. Since fire test planning and execution is expensive and only provides a single snapshot into a package performance, every effort is made to minimize testing and supplement tests with results from computational thermal models. However, the accuracy of such thermal models depends heavily on the thermal properties of the fire insulating materials that are rarely available at the regulatory fire temperatures. To the best of authors knowledge no test standards exist that could be used to test the insulating materials and derive their thermal properties for the RAM package design. This paper presents a review of the existing industry fire testing standards and proposes testing methods that could serve as a standardized specification for testing fire insulating materials for use in RAM packages.

42 ENGINEERING↗