Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “permit”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

SolarAPP+ Enhancements and Commercialization (Final Technical Report)

With millions of distributed photovoltaic (PV) systems expected to be installed over the next five years, the permitting and inspection processes of authorities having jurisdiction (AHJs) may become overburdened, causing delays and increased costs for installed systems (Cruce et al. 2022). The central goal of this project was to automate and streamline permitting processes for distributed PV systems and complementary technologies, such as battery storage. Deploying automated permitting has been hypothesized to reduce permit review times, resulting in reduced costs and improved customer experience. This has the potential to expand the PV and PV-plus-storage market nationwide. The National Renewable Energy Laboratory (NREL) and its project partners, including UL Solutions, the Interstate Renewable Energy Council (IREC), the International Code Council (ICC), and more, developed the Solar Automated Permit Processing (SolarAPP+™) software platform to reduce permit review times. NREL and its partners also collaborated with the solar industry, the building safety community, and local governments to develop SolarAPP+.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipeline and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Management Unit Report of Post-Closure Care Activities Calendar Year 2017.

The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent regulatory closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department (NMED) issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised and updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for Calendar Year (CY) 2017 as required by the Permit. The CAMU containment cell consists of engineered barriers including a cover system, a bottom liner with a leachate collection and removal system (LCRS), and a vadose zone monitoring system (VZMS). The VZMS provides information on soil conditions under the cell for early leak detection. The VZMS consists of three monitoring subsystems, which include the primary subliner (PSL), a vertical sensor array (VSA), and the Chemical Waste Landfill (CWL) sanitary sewer (CSS) line. The PSL, VSA, and CSS monitoring subsystems are monitored quarterly for soil moisture concentration, the VSA is monitored quarterly for soil temperature, and the VSA and CSS monitoring subsystems are monitored annually for volatile organic compound (VOC) concentrations in the soil vapor at various depths. Baseline data for the soil moisture, soil temperature, and soil vapor were established between October 2003 and September 2004.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stormwater Pollution Prevention Plan for the TA-60-02 Salvage Warehouse, Los Alamos National Laboratory, Revision 3, January 2018

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015). Contents of the June 4, 2015 Multi-sector General Permit can be viewed at: https://www.epa.gov/sites/production/files/2015- 10/documents/msgp2015_finalpermit.pdf This SWPPP applies to discharges of stormwater from the operational areas of the TA-60-02 Salvage and Warehouse facility at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60-02 Salvage/ Warehouse and associated areas. The current permit expires at midnight on June 4, 2020. A copy of the facility NOI and LANS Delegation of Authority Letter are located in Appendix C of this SWPPP.

54 ENVIRONMENTAL SCIENCES↗

Stormwater Pollution Prevention Plan, TA-03-38 Carpenter's Shop, Revision 4: LANS Archived 2019

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector A–Timber Products, Subsector A4 (Wood Products Facilities not elsewhere classified) as a guide. The applicable stormwater discharge permit is EPA General Permit Registration # NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015). This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-38 Carpenter’s Shop at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-03-38 Carpenter’s Shop and associated areas. The current permit expires at midnight on June 4, 2020. As the LANS contract ended for LANL MSGP facilities on October 31, 2018, a Notice of Termination (NOT) for permit coverage was filed and is effective as of 11/02/18. A copy of the NOT acknowledgment is located in Appendix C of this SWPPP. This is the archived and final revision of the SWPPP for LANS.

54 ENVIRONMENTAL SCIENCES↗

Stormwater Pollution Prevention Plan, TA-60-02 Salvage/Warehouse, Revision 4: LANS Archived 2019

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015). This SWPPP applies to discharges of stormwater from the operational areas of the TA-60-02 Salvage and Warehouse facility at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60-02 Salvage/ Warehouse and associated areas. The current permit expires at midnight on June 4, 2020. As the LANS contract ended for LANL MSGP facilities on October 31, 2018, a Notice of Termination (NOT) for permit coverage was filed and is effective as of 11/02/18. A copy of the NOT acknowledgment is located in Appendix C of this SWPPP. This is the archived and final revision of the SWPPP for LANS.

54 ENVIRONMENTAL SCIENCES↗

Stormwater Pollution Prevention Plan, TA-03-38 Metals Fabrication Shop, Revision 4: LANS Archived 2019

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector AA-Fabricated Metal Products as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015).This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-38 Metals Fabrication Shop at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-03-38 Metals Fabrication Shop and associated areas. The current permit expires at midnight on June 4, 2020. As the LANS contract ended for LANL MSGP facilities on October 31, 2018, a Notice of Termination (NOT) for permit coverage was filed and is effective as of 11/02/18. A copy of the NOT acknowledgment is located in Appendix C of this SWPPP. This is the archived and final revision of the SWPPP for LANS.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Management Unit Report of Post-Closure Care Activities Calendar Year 2019

The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department (NMED) issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015) to the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) and its Management and Operating (M&O) contractor. The current M&O contractor is National Technology & Engineering Solutions of Sandia, LLC (NTESS). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised and updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for calendar year (CY) 2019, as required by the Permit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Management Unit Report of Post-Closure Care Activities (CY 2018)

The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent regulatory closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 26, 2015, the New Mexico Environment Department (NMED) issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised and updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for calendar year (CY) 2018 as required by the Permit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Management Unit Report of Post-Closure Care Activities. Calendar Year 2020

he Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015) to the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) and its Management and Operating (M&O) contractor. The current M&O contractor is National Technology & Engineering Solutions of Sandia, LLC (NTESS). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised and updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for calendar year (CY) 2020, as required by the Permit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada (CY2021)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment, CAU 91, Area 3 U-3fi Injection Well, CAU 92, Area 6 Decon Pond Facility, CAU 110, Area 3 WMD U-3ax/bl Crater, CAU 111, Area 5 WMD Retired Mixed Waste Pits, and CAU 112, Area 23 Hazardous Waste Trenches. This report covers calendar year 2021. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. This report will address all monitoring requirements noted in the RCRA Permit NEV HW0101, except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of RCRA Permit NEV HW0101 was issued effective December 10, 2015, and remained in effect until December 10, 2020. At the time of this report submittal, the new RCRA permit application was in review.

54 ENVIRONMENTAL SCIENCES↗

Innovative Advanced Hydrogen Mobile Fueler (Final Technical Report)

The US Department of Energy (DOE) funded a project to design, develop, deploy and analyze the economic viability of an innovative Advanced Hydrogen Mobile Fueler (AHMF). As part of the design activity the project team defined specifications based upon vehicle requirements and compliance with specific fueling performance criteria. The AHMF was originally designed to fuel 10-20 fuel cell vehicles (FCV) per day, consistent with the requirements of the H70 fueling category. The AHMF is able to operate without remote power connections, is modular for easy transport and deployment, and can provide expanded daily capacity and multi-day operations using delivered gaseous hydrogen. Toward the end of the project, due to request from the hydrogen industry and some necessary modifications of the AHMF, the system is now modified to fuel heavy duty vehicles. The project was conducted over two primary phases, each including several key tasks, subtasks, and project milestones. Phase 1 involved the design, development, and construction of the AHMF, moving from a conceptual design through to completion of assembly and testing. In addition to reviewing several different approaches, the team chose to take a conventional station design and modify it for mobile fueling. There were several innovative components included in the design. The high pressure storage was the first to achieve a US Department of Energy (DOE) Special Permit (SP 20391) to transport high pressure hydrogen (95 MPa) in a composite cylinder. The second novel system was a liquid nitrogen (LIN) cooling system with a compact heat exchanger. Without this change, the cooling system would not be able to fit into the AHMF. Phase 2 demonstrated the AHMF by fueling fuel cell buses at a fleet in Pomona, CA. The site was chosen because a temporary fueling solution was required while a fixed station was being installed. The existing permits for the fixed station and non-public access also was a determining factor. Over two months, the buses were fueled 320 times with over 5000 kg of hydrogen from tube trailers. Existing shore power was used, and the average electrical efficiency was 0.13 kWh/kg. The average liquid nitrogen (LIN) consumption was 90.68 scf/kg. The fueling and consumption data was provided to the National Renewable Energy Laboratory (NREL) for analysis. An economic analysis was performed and will be provided in a separate report. The project was successful, but not without challenges and lessons learned. The DOT special permit led the way for the use of high pressure, composite cylinders and is being by multiple other systems and applications. The pandemic along with time for the DOT special permit approval delayed the project for years. The team also believes that hydrogen mobile fueling has a use for the industry, especially during this upcoming phase of expansion. However, it does have its limitations due to high cost to build and operate, and the same permitting challenges as a fixed station. A fully capable system at the speeds and pressures of the AHMF may not be necessary for most applications and would help reduce the cost and increase storage capacity. The on-board generator can be easily replaced with shore power or the wide range of power generation solutions in the marketplace. One of the major results of the project was the development of new code language in National Fire Protection Agency (NFPA) 2 and the International Fire Code (IFC) for on-demand mobile fueling. This will provide guidance for Authorities Having Jurisdiction (AHJ) and user on how to permit temporary fueling sites across the nation.

08 HYDROGEN↗

Biofuel Air Emissions Analysis

U.S. has goals to produce 3 billion gallons of sustainable aviation fuel (SAF) annually by 2030, increasing to 35 billion gallons by 2050 to decarbonize the aviation sector. Meeting these production targets will require large number of biorefineries to be set up. However, ability to comply with federal air quality standards is prerequisite to being issued a construction permit. Negotiating the permitting process for a new biorefinery can be quite onerous and cost the investors significant time and money. Although there can be numerous reasons for delayed biorefinery construction, air permitting is fraught with pitfalls because the permitting process relies on precedence, which the future SAF biorefineries lack. NREL's Biofuel Air Emissions Analysis project is unique and innovative in terms of the tools, approaches, and analyses provided. NREL is the only national laboratory that is actively working at the intersection of Federal air quality regulations, emissions and air quality analysis across the supply chain, and process design. This project is focused on providing much needed data and analyses that address biorefinery air permitting. This project develops models and quantitative analyses and measures progress towards meeting air quality regulatory requirements. These models and methods are applied to analyze air permitting related to wastewater sludge to biofuel conversion pathways using hydrothermal liquefaction (HTL), impacts of HTL pathway on local and regional air quality including an assessment of health and equity impacts. In addition to filling research gaps, this project also disseminates the findings to the relevant stakeholders at BETO, other national labs, and regulatory agencies.

air quality↗

Regulatory Compliance of H Retention Basin Using Rhombo Balls - 16151

Elevated pH conditions in the Savannah River Site 281-8H Retention Basin will have to be resolved prior to the issuance of a new National Pollutant Discharge Elimination System permit. The 281-8H retention basin collects rain water runoff, cooling tower blow downs and steam condensate from H Area Tank Farm operation processes. The basin discharges to a South Carolina Department of Health and Environmental Control National Pollutant Discharge Elimination System permitted out-fall, H-12. The permit requires the out-fall to meet certain discharge requirements. The National Pollutant Discharge Elimination System permit requires the pH to be within the range 4.8 to 8.5. The 281-8H Retention Basin has a steady history of elevated pH levels, above 8.5, especially during the warmer months of the year, normally March through October. The rise in pH has been attributed to the exponential growth of algae which occurs during the warm months of the year. The increased algae colonies undergo photosynthesis which depletes the CO{sub 2} in the basin water and subsequently raises the pH level. The current permit allows simultaneous discharge of low pH well water, pH between 4.6 and 5.0, and the 281-8H Retention Basin water which provides blending to achieve regulatory compliance. The regulatory agency indicated in 2010 that adding well water to achieve compliance of pH limits will not be allowed when the new permit is issued in the future. Therefore, a solution to the high pH had to be identified and implemented in order to ensure regulatory compliance. A system engineering evaluation was conducted to determine the best solution to the large algae colonies and high pH levels. The evaluation identified options in four primary categories as well as some combination of those categories to control algae growth and to ultimately increase the amount of CO{sub 2} in the basin. Eleven evaluation criteria were developed for the various options, and a percentage (out of 100%) was assigned to related groups of criteria. Twenty-six options were evaluated during this process. The highest ranking options determined from the evaluation were the 12-sided Rhombo ball floating cover, biological digester and a combination of the digester and the floating cover. Option 3, a combination of the top two choices, was chosen as the best approach. The Rhombo cover along with the initial shock application of a biological digester has worked to eliminate algae growth and lower the pH level. The Rhombos have significantly lowered the basin pH level from greater than 9 to less than 7, which is within the regulatory compliance pH requirements of 4.8 to 8.5. The system engineering evaluation and subsequent solution chosen are useful in many venues. The application of the 12 sided Rhombo ball's unique ability to nestle together no matter which way they turn is advantageous to applications/problems that need to block 99.99% sunlight from a body of water. The 281-8H Retention Basin required nine 18 wheeler truckloads with trailers that were 16.2 m (53 Ft) long and filled with Rhombo balls. The basin required a total of approximately 700,000 Rhombo balls to be fully covered. They are easy to install and handle. The Rhombo balls have wind resistance up to 120 Km/hr (75 MPH) and have a life expectancy of 25 years. This application can be used to control plant and algae growth and is effective in evaporation reduction at 99%. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Non-Technical Barriers to Geothermal Development in California and Nevada

Geothermal project development in the United States may be subject to numerous permits, authorizations, and other regulatory requirements at the federal, state, and local level, which are necessary to address potential environmental and resource impacts at geothermal project sites. This report presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Lake Michigan Offshore Wind Feasibility Assessment

The purpose of this project was to conduct the first comprehensive offshore wind assessment over Lake Michigan and to advance the body of knowledge needed to support future commercial wind energy development on the Great Lakes. The project involved evaluation and selection of emerging wind measurement technology and the permitting, installation and operation of the first mid-lake wind assessment meteorological (MET) facilities in Michigan’s Great Lakes. In addition, the project provided the first opportunity to deploy and field test floating LIDAR and Laser Wind Sensor (LWS) technology, and important research related equipment key to the sitting and permitting of future offshore wind energy development in accordance with public participation guidelines established by the Michigan Great Lakes Wind Council (GLOW). The project created opportunities for public dialogue and community education about offshore wind resource management and continued the dialogue to foster Great Lake wind resource utilization consistent with the focus of the GLOW Council. The technology proved to be effective, affordable, mobile, and the methods of data measurement accurate. The public benefited from a substantial increase in knowledge of the wind resources over Lake Michigan and gained insights about the potential environmental impacts of offshore wind turbine placements in the future. The unique first ever hub height wind resource assessment using LWS technology over water and development of related research data along with the permitting, sitting, and deployment of the WindSentinel MET buoy has captured public attention and has helped to increase awareness of the potential of future offshore wind energy development on the Great Lakes. Specifically, this project supported the acquisition and operation of a WindSentinel (WS) MET wind assessment buoy, and associated research for 549 days over multiple years at three locations on Lake Michigan. Four research objectives were defined for the project including to: 1) test and validate floating LIDAR technology; 2) collect and access offshore wind data; 3) detect and measure bird and bat activity over Lake Michigan; 4) conduct an over water sound propagation study; 5) prepare and offer a college course on offshore energy, and; 6) collect other environmental, bathometric, and atmospheric data. Desk-top research was performed to select anchorage sites and to secure permits to deploy the buoy. The project also collected and analyzed data essential to wind industry investment decision-making including: deploying highly mobile floating equipment to gather offshore wind data; correlating offshore wind data with conventional on-shore MET tower data; and performing studies that can contribute to the advancement and deployment of offshore wind technologies. Related activities included: • Siting, permitting, and deploying an offshore floating MET facility; • Validating the accuracy of floating LWS using near shoreline cup anemometer MET instruments; • Assessment of laser pulse technology (LIDAR) capability to establish hub height measurement of wind conditions at multiple locations on Lake Michigan; • Utilizing an extended-season (9-10 month) strategy to collect hub height wind data and weather conditions on Lake Michigan; • Investigation of technology best suited for wireless data transmission from distant offshore structures; • Conducting field-validated sound propagation study for a hypothetical offshore wind farm from shoreline locations; • Identifying the presence or absence of bird and bat species near wind assessment facilities; • Identifying the presence or absence of benthic and pelagic species near wind assessment facilities; All proposed project activities were completed with the following major findings: • Floating Laser Wind Sensors are capable of high quality measurement and recordings of wind resources. The WindSentinel presented no significant operational or statistical limitations in recording wind data technology at a at a high confidence level as compared to traditional anemometer cup technology. • During storms, mean Turbulent Kinetic Energy (TKE) increases with height above water; • Sufficient wind resources exist over Lake Michigan to generate 7,684 kWh of power using a 850 kW rated turbine at elevations between 90 - 125 meters, a height lower than originally anticipated for optimum power generation; • Based on initial assessments, wind characteristics are not significantly different at distant (thirty-two mile) offshore locations as compared to near-shore (six mile) locations; • Significant cost savings can be achieved in generation wind energy at lower turbine heights and locating closer to shore. • Siting must be sufficiently distant from shore to minimize visual impact and to address public sentiment about offshore wind development; • Project results show that birds and bats do frequent the middle of Lake Michigan, bats more so than birds; • Based on the wind resource assessment and depths of Lake Michigan encountered during the project, future turbine placement will most likely need to incorporate floating or anchored technology; • The most appropriate siting of offshore wind energy locations will enable direct routing of transmission cables to existing generating and transmission facilities located along the Michigan shoreline; • Wind turbine noise propagation from a wind energy generating facility at a five mile offshore location will not be audible at the shoreline over normal background sound levels.

17 WIND ENERGY↗

2014 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant

This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2013, through October 31, 2014. The report contains, as applicable, the following information; Site description; Facility and system description; Permit required monitoring data and loading rates; Status of compliance conditions and activities; and Discussion of the facility’s environmental impacts. The current permit expires on March 16, 2015. A permit renewal application was submitted to Idaho Department of Environmental Quality on September 15, 2014. During the 2014 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant and therefore, no effluent flow volumes or samples were collected from wastewater sampling point WW-014102. Seepage testing of the three lagoons was performed between August 26, 2014 and September 22, 2014. Seepage rates from Lagoons 1 and 2 were below the 0.25 inches/day requirement; however, Lagoon 3 was above the 0.25 inches/day. Lagoon 3 has been isolated and is being evaluated for future use or permanent removal from service.

2014 Annual Wastewater Reuse Report Central Facili↗

2014 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste Pond

This report describes conditions, as required by the state of Idaho Industrial Wastewater Reuse Permit (LA 000161 01, Modification B), for the wastewater land application site at the Idaho National Laboratory Site’s Advanced Test Reactor Complex Cold Waste Pond from November 1, 2013–October 31, 2014. The report contains the following information; Facility and system description; Permit required effluent monitoring data and loading rates; Permit required groundwater monitoring data; Status of compliance activities; Noncompliance issues; and Discussion of the facility’s environmental impacts. During the 2014 permit year, approximately 238 million gallons of wastewater were discharged to the Cold Waste Pond. This is well below the maximum annual permit limit of 375 million gallons. As shown by the groundwater sampling data, sulfate and total dissolved solids concentrations are highest near the Cold Waste Pond and decrease rapidly as the distance from the Cold Waste Pond increases. Although concentrations of sulfate and total dissolved solids are elevated near the Cold Waste Pond, both parameters are below the Ground Water Quality Rule Secondary Constituent Standards in the downgradient monitoring wells.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗