Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “optimal scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Neural Network Prediction of New Aircraft Design Coefficients

This paper discusses a neural network tool for more effective aircraft design evaluations during wind tunnel tests. Using a hybrid neural network optimization method, we have produced fast and reliable predictions of aerodynamical coefficients, found optimal flap settings, and flap schedules. For validation, the tool was tested on a 55% scale model of the USAF/NASA Subsonic High Alpha Research Concept aircraft (SHARC). Four different networks were trained to predict coefficients of lift, drag, moment of inertia, and lift drag ratio (C(sub L), C(sub D), C(sub M), and L/D) from angle of attack and flap settings. The latter network was then used to determine an overall optimal flap setting and for finding optimal flap schedules.

Norgaard, Magnus↗

Tools and Methods for Optimization of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plants (NPP) operating cycle. Refueling outages are extremely costly for a NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities in a duration of around 30 days on average. Outage staff begin working on the schedule more than a year ahead of the outage start and make every effort to build a robust schedule. Despite the robust and detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjusting. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. The Optimization of Outage Activities project under the Risk-Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program focuses on developing tools and methods to support nuclear power plants with optimization of outage schedules. The goal of the outage optimization is the completion of all planned and emergent outage activities as fast as possible while maintaining highest level of safety. This report describes the initial development of tools to support outage management that leverage computational and machine learning methods developed in other RISA and LWRS projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Lagrangian relaxation based heuristics for a chance-constrained optimization model of a hybrid solar-battery storage system

Here, we develop a stochastic optimization model for scheduling a hybrid solar-battery storage system. Solar power in excess of the promise can be used to charge the battery, while power short of the promise is met by discharging the battery. We ensure reliable operations by using a joint chance constraint. Models with a few hundred scenarios are relatively tractable; for larger models, we demonstrate how a Lagrangian relaxation scheme provides improved results. To further accelerate the Lagrangian scheme, we embed the progressive hedging algorithm within the subgradient iterations of the Lagrangian relaxation. Lastly, we investigate several enhancements of the progressive hedging algorithm, and find bundling of scenarios results in the best bounds.

14 SOLAR ENERGY↗

Synchronization-Avoiding Graph Algorithms

Because they were developed for optimal sequential complexity, classical graph algorithms as found in textbooks have strictly-defined orders of operations. Enforcing a prescribed order of operations, or even an approximate order, in a distributed memory setting requires significant amounts of synchronization, which in turn can severely limit scalability. As a result, new algorithms are typically required to achieve scalable performance, even for solving well-known graph problems. Yet, even in these cases, parallel graph algorithms are written according to parallel programming models that evolved for, e.g., scientific computing, and that still have inherent, and scalability-limiting, amounts of synchronization. In this paper we present a new approach to parallel graph algorithms: synchronization-avoiding algorithms. To eliminate synchronization and its associated overhead, synchronization-avoiding algorithms perform work in an unordered and fully asynchronous fashion in such a way that the result is constantly refined toward its final state. “Wasted” work is minimized by locally prioritizing tasks using problem-dependent task utility metrics. We classify algorithms for graph applications into two broad categories: algorithms with monotonic updates (which evince global synchronization) and algorithms with nonmonotonic updates (which evince vertex-centric synchronization). We apply our approach to both classes and develop novel, synchronization-avoiding algorithms for solving exemplar problems: SSSP and connected components for the former, graph coloring for the latter. We demonstrate that eliminating synchronization in conjunction with effective scheduling policies and optimizations in the runtime results in improved scalability for both classes of algorithms.

Firoz, Jesun S.↗

Efficient prediction of concentrating solar power plant productivity using data clustering

Concentrating solar power (CSP) plants convert solar energy to electricity and can be deployed with a thermal storage capability to shift electricity generation from time periods with available solar resource to those with high electricity demand or electricity price. Rigorous optimization of plant design and operational strategies can improve the market-competitiveness and commercial viability; however, such optimization may require hundreds of annual performance simulations, each of which can be computationally expensive when including considerations such as optimization of dispatch scheduling, sub-hourly time resolution, and stochastic effects due to uncertain weather or electricity price forecasts. This paper proposes a methodology to reduce the computational burden associated with simulation of electricity yield and revenue for CSP plants over a single- or multi-year period. Data-clustering techniques are employed to select a small number of limited-duration time blocks for simulation that, when appropriately weighted, can reproduce generation and revenue over a single year or within each year of a multi-year period. After selection of appropriate data features and weighting factors defining similarity between time-series profiles, the methodology captured annual revenue within 2.3%, 1.7%, or 1.2% using simulation of 10, 30, or 50 three-day exemplar time blocks, respectively, for each of three single-year location/weather/market scenarios and five plant configurations ranging from low to high solar multiple and storage capacity. When applied to multi-year datasets, the proposed methodology can capture inter-year variability that is unavailable from typical meteorological year (TMY) datasets while simultaneously requiring simulation of less than a single year of data.

14 SOLAR ENERGY↗

Secure mmWave Spectrum Sharing with Autonomous Beam Scheduling for 5G and Beyond

Spectrum Sharing (SS) has seen a renewed set of initiatives in 5G with the availability of shared and unlicensed spectrum bands that can be used by multiple cellular service providers and private cellular networks. Beam based transmission, instead of the traditional sector based transmission in conjunction with the spectrum agility of the 5G New Radio (NR) has brought new opportunities to optimized sharing of spectrum. Currently in the U.S., a centralized Spectrum Access Server (SAS) is used to co-ordinate spectrum sharing among networks sharing the same spectrum band. However, SAS becomes a focal point for security attacks and a performance bottleneck. In addition, SAS relies on an Environmental Sensor Network (ESN), separate from the 5G network. Without trusted spectral occupancy information, false reporting of spectrum sensing data can create sub-optimal and unfair spectrum usage. This paper summarizes our recent research findings in using a decentralized scheme for multiple networks to securely share spectrum with autonomous beam scheduling : 1) A new stochastic network framework based on Lyapunov Optimization approach is developed to optimize scheduling at the base stations; 2) Game theoretic (GT) approach is used to formulate the distributed scheduler; 3) Another distributed scheduler with Q-learning is presented that utilizes the Reinforcement Learning (RL) approach; 4) The performance and convergence rate of these distributed solutions to use shared and unlicensed spectrum are compared with existing solutions. Conditions under which the performance of these schedulers approach the theoretical upper bound, which is the performance possible with no interference among the operators sharing the spectrum, are presented; 5) The ability of a base station to use its own user equipment as sensors, for optimal spectrum sharing with base stations in other operator networks, is demonstrated to be an effective approach.

5G↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

Machine Learning Based Parallel I/O Predictive Modeling: A Case Study on Lustre File Systems

Parallel I/O hardware and software infrastructure is a key contributor to performance variability for applications running on large-scale HPC systems. This variability confounds efforts to predict application performance for characterization, modeling, optimization, and job scheduling. We propose a modeling approach that improves predictive ability by explicitly treating the variability and by leveraging the sensitivity of application parameters on performance to group applications with similar characteristics. We develop a Gaussian process-based machine learning algorithm to model I/O performance and its variability as a function of application and file system characteristics. We demonstrate the effectiveness of the proposed approach using data collected from the Edison system at the National Energy Research Scientific Computing Center. The results show that the proposed sensitivity-based models are better at prediction when compared with application-partitioned or unpartitioned models. We highlight modeling techniques that are robust to the outliers that can occur in production parallel file systems. Using the developed metrics and modeling approach, we provide insights into the file system metrics that have a significant impact on I/O performance.

I/O performance variability↗

Aspirin and Statin Nonuse Associated With Early Biochemical Failure After Prostate Radiation Therapy

Purpose: To present the largest retrospective series investigating the effect of aspirin and statins, which are hypothesized to have antineoplastic properties, on biochemical failure (nadir plus 2 ng/mL) after prostate radiation therapy (RT). Methods and Materials: Between 1989 and 2006, 2051 men with clinically localized prostate cancer received definitive RT alone (median dose, 76 Gy). The rates of aspirin use and statin use (defined as any use at the time of RT or during follow-up) were 36% and 34%, respectively. The primary endpoint of the study was an interval to biochemical failure (IBF) of less than 18 months, which has been shown to be the single strongest predictor of distant metastasis, prostate cancer survival, and overall survival after RT. Patient demographic characteristics and tumor staging factors were assessed with regard to associations with the endpoint. Univariate analysis was performed with the {chi}{sup 2} test for categorical variables and the Wilcoxon test for continuous variables. Multivariable analysis was performed with a multiple logistic regression. Results: The median follow-up was 75 months. Univariate analysis showed that an IBF of less than 18 months was associated with aspirin nonuse (P<.0001), statin nonuse (P<.0001), anticoagulant nonuse (P=.0006), cardiovascular disease (P=.0008), and prostate-specific antigen (continuous) (P=.008) but not with Gleason score, age, RT dose, or T stage. On multivariate analysis, only aspirin nonuse (P=.0012; odds ratio, 2.052 [95% confidence interval, 1.328-3.172]) and statin nonuse (P=.0002; odds ratio, 2.465 [95% confidence interval, 1.529-3.974]) were associated with an IBF of less than 18 months. Conclusions: In patients who received RT for prostate cancer, aspirin or statin nonuse was associated with early biochemical failure, a harbinger of distant metastasis and death. Further study is needed to confirm these findings and to determine the optimal dosing and schedule, as well as the relative benefits and risks, of both therapies in combination with RT.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Adaptive job and resource management for the growing quantum cloud

As the popularity of quantum computing continues to grow, efficient quantum machine access over the cloud is critical to both academic and industry researchers across the globe. And as cloud quantum computing demands increase exponentially, the analysis of resource consumption and execution characteristics are key to efficient management of jobs and resources at both the vendor-end as well as the client-end. While the analysis and optimization of job / resource consumption and management are popular in the classical HPC domain, it is severely lacking for more nascent technology like quantum computing.This paper proposes optimized adaptive job scheduling to the quantum cloud taking note of primary characteristics such as queuing times and fidelity trends across machines, as well as other characteristics such as quality of service guarantees and machine calibration constraints. Key components of the proposal include a) a prediction model which predicts fidelity trends across machine based on compiled circuit features such as circuit depth and different forms of errors, as well as b) queuing time prediction for each machine based on execution time estimations. Altogether, this proposal is evaluated on simulated IBM machines across a diverse set of quantum applications and system loading scenarios, and is able to reduce wait times by over 3x and improve fidelity by over 40% on specific usecases, when compared to traditional job schedulers.

97 MATHEMATICS AND COMPUTING↗

Scalable Circuit Cutting and Scheduling in a Resource-constrained and Distributed Quantum System

Despite quantum computing's rapid development, current systems remain limited in practical applications due to their limited qubit count and quality. Various technologies, such as superconducting, trapped ions, and neutral atom quantum computing technologies are progressing towards a fault tolerant era, however they all face a diverse set of challenges in scalability and control. Recent efforts have focused on multi-node quantum systems that connect multiple smaller quantum devices to execute larger circuits. Future demonstrations hope to use quantum channels to couple systems, however current demonstrations can leverage classical communication with circuit cutting techniques. This involves cutting large circuits into smaller subcircuits and reconstructing them post-execution. However, existing cutting methods are hindered by lengthy search times as the number of qubits and gates increases. Additionally, they often fail to effectively utilize the resources of various worker configurations in a multi-node system. To address these challenges, we introduce FitCut, a novel approach that transforms quantum circuits into weighted graphs and utilizes a community-based, bottom-up approach to cut circuits according to resource constraints, e.g., qubit counts, on each worker. FitCut also includes a scheduling algorithm that optimizes resource utilization across workers. Implemented with Qiskit and evaluated extensively, FitCut significantly outperforms the Qiskit Circuit Knitting Toolbox, reducing time costs by factors ranging from 3 to 2000 and improving resource utilization rates by up to 3.88 times on the worker side, achieving a system-wide improvement of 2.86 times.

Kan, Shuwen [Fordham University]↗

On Evaluating Cycling and Movement of Conventional Generators for Balancing Services with Large Solar Penetration

Abstract— The increasing uncertainty caused by a higher penetration level of renewable energy points to the need for sufficient balancing services to ensure secure operation. It is thus of necessity to accurately quantify these services and evaluate the cycling and movement of conventional generators providing load following and regulation services for optimally planning and scheduling multiple resources. This paper first introduces a systematic approach to calculating load following and regulation requirements with a large amount of solar integration. Then, two methods to quantitatively determine the cycling of conventional generators are proposed, including (1) mileage and number of direction changes in balancing service and (2) ramp statistics (or half-cycle) analysis. The proposed methods are tested on the NV Energy power system model. Simulation results demonstrate a significant impact of increased solar capacity on balancing service and cycling of conventional generators. Busy hours are identified for different study scenarios with various solar penetration levels. This study provides a basis for evaluating the wear and tear of the conventional generators in the solar integration process in the Nevada power system. Index Terms—balancing requirement, conventional generator, cycling and movement, load following, regulation, renewable energy, solar integration

ok↗

Quantitative analysis of treatment process time and throughput capacity for spot scanning proton therapy

Purpose: To determine the patient throughput and the overall efficiency of the spot scanning system by analyzing treatment time, equipment availability, and maximum daily capacity for the current spot scanning port at Proton Therapy Center Houston and to assess the daily throughput capacity for a hypothetical spot scanning proton therapy center. Methods: At their proton therapy center, the authors have been recording in an electronic medical record system all treatment data, including disease site, number of fields, number of fractions, delivered dose, energy, range, number of spots, and number of layers for every treatment field. The authors analyzed delivery system downtimes that had been recorded for every equipment failure and associated incidents. These data were used to evaluate the patient census, patient distribution as a function of the number of fields and total target volume, and equipment clinical availability. The duration of each treatment session from patient walk-in to patient walk-out of the spot scanning treatment room was measured for 64 patients with head and neck, central nervous system, thoracic, and genitourinary cancers. The authors retrieved data for total target volume and the numbers of layers and spots for all fields from treatment plans for a total of 271 patients (including the above 64 patients). A sensitivity analysis of daily throughput capacity was performed by varying seven parameters in a throughput capacity model. Results: The mean monthly equipment clinical availability for the spot scanning port in April 2012–March 2015 was 98.5%. Approximately 1500 patients had received spot scanning proton therapy as of March 2015. The major disease sites treated in September 2012–August 2014 were the genitourinary system (34%), head and neck (30%), central nervous system (21%), and thorax (14%), with other sites accounting for the remaining 1%. Spot scanning beam delivery time increased with total target volume and accounted for approximately 30%–40% of total treatment time for the total target volumes exceeding 200 cm{sup 3}, which was the case for more than 80% of the patients in this study. When total treatment time was modeled as a function of the number of fields and total target volume, the model overestimated total treatment time by 12% on average, with a standard deviation of 32%. A sensitivity analysis of throughput capacity for a hypothetical four-room spot scanning proton therapy center identified several priority items for improvements in throughput capacity, including operation time, beam delivery time, and patient immobilization and setup time. Conclusions: The spot scanning port at our proton therapy center has operated at a high performance level and has been used to treat a large number of complex cases. Further improvements in efficiency may be feasible in the areas of facility operation, beam delivery, patient immobilization and setup, and optimization of treatment scheduling.

60 APPLIED LIFE SCIENCES↗

Imprinting high-gradient topographical structures onto optical surfaces using magnetorheological finishing: Manufacturing corrective optical elements for high-power laser applications

Corrective optical elements form an important part of high-precision optical systems. We have developed a method to manufacture high-gradient corrective optical elements for high-power laser systems using deterministic magnetorheological finishing (MRF) imprinting technology. Several process factors need to be considered for polishing ultraprecise topographical structures onto optical surfaces using MRF. They include proper selection of MRF removal function and wheel sizes, detailed MRF tool and interferometry alignment, and optimized MRF polishing schedules. Dependable interferometry also is a key factor in high-gradient component manufacture. A wavefront attenuating cell, which enables reliable measurement of gradients beyond what is attainable using conventional interferometry, is discussed. The results of MRF imprinting a 23 μm deep structure containing gradients over 1.6 μm / mm onto a fused-silica window are presented as an example of the technique’s capabilities. As a result, this high-gradient element serves as a thermal correction plate in the high-repetition-rate advanced petawatt laser system currently being built at Lawrence Livermore National Laboratory.

42 ENGINEERING↗

Development of Prognostic Models Using Plant Asset Data

The recent growth of machine learning and artificial intelligence technologies provides opportunities for leveraging data-driven algorithms to address the problems of diagnostics and prognostics in the nuclear power industry. The use of machine learning and other statistical methods as prognostic models is of particular interest in the nuclear industry to accurately predict future equipment or plant state given a set of measurements. Such predictive capability will enable predictive assessment of component condition and remaining life and allow for condition-based predictive maintenance. The resulting optimization of maintenance scheduling and reduction in unnecessary maintenance activities will lower overall maintenance costs and improve the economics of nuclear power. This report discusses the various aspects of data processing and model development that are likely to influence the performance of prognostic models. Data from a boiling-water reactor was used to evaluate several prognostic models to identify key considerations for developing such models to predict data-driven plant state and equipment degradation condition. Preliminary results indicate the need for data sets that are relevant to the problem at hand and contain signatures that may be correlated to the prediction problem. Assuming such data exist, development of prognostic models using data-driven methods requires an understanding of the various sources of influence on the prediction accuracy (such as the model architecture, data preprocessing approaches, and potentially external factors influencing the equipment or plant system under assessment). Ongoing research is evaluating these factors in greater detail and examining techniques for calculating prediction uncertainty bounds.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of Novel Ferritic-Martensitic Steels with Superior Creep Properties for Power Plant Applications

A creep resistant martensitic steel, CPJ-7, was developed with an operating temperature approaching 650°C. Subsequently, another creep resistant martensitic steel, JMP, was designed with the potential to operate at, or slightly above, 650°C. This report describes the development of these alloys from early iterations of CPJ steels to the final CPJ-7 formulation as well as the more heat resistant JMP steel formulation. The design originated from computational modeling for phase stability and precipitate strengthening using fifteen constituent elements. Approximately forty heats of CPJ and ten of JMP, each weighing ~7 kg, were vacuum induction melted. A computationally optimized heat treatment schedule was developed to homogenize the ingots prior to hot forging and rolling prior to final normalization and tempering. Overall, wrought and cast versions of CPJ-7 present superior creep properties when compared to wrought and cast versions of COST alloys for steam turbine and wrought and cast versions of P91/92 for boiler applications. For instance, the Larson Miller Parameter curve for CPJ-7 at 650°C almost coincides with that of COST E at 620°C. The prolonged creep life was attributed to slowing down the process of the destabilization of the MX and M 23 C 6 precipitates at 650°C. On the other hand, the cast version of CPJ-7 also revealed superior mechanical performance, well above commercially available cast 9% Cr martensitic steel or derivatives, especially for creep life at 650°C. The casting process employed slow cooling to simulate the conditions of a thick wall full-size steam turbine casing but utilized a separate homogenization step prior to final normalization and tempering. To advance the development of CPJ-7 for commercial applications, a process was used to scale up the production of the alloy using vacuum induction melting (VIM) and electroslag remelting (ESR), which underlined the importance of melt processing control of intentionally designed minor and trace elements in these advanced alloys. Following the work on CPJ-7, the JMP steels were designed with higher Co for increased solid solution strengthening, Si for oxidation resistance and increased W (with low Mo content) for matrix strength and stability as well as solid solution strengthening. The JMP steels showed increases in creep life compared to CPJ-7 between 118 to 150% at 650°C for testing at various stresses between 138 MPa and 207 MPa. On a Larson-Miller plot, the performance of the JMP steels surpasses that of state-of-the-art MARBN and other MARBN-type steels. The influence of various elements within the composition of the alloys on the microstructure and mechanical properties are discussed. This report presents approximately 420,000 h of in-house creep testing, the equivalent of almost 50 years of cumulative creep tests.

36 MATERIALS SCIENCE↗

Hardware Specification and Reference Design for the Low-Cost, Interoperable, User-Centric, Supervisory Controller Kit for Small and Medium Size Commercial Buildings

Commercial buildings are responsible for approximately 20 percent of the total United States energy consumption and greenhouse gas emissions. Over 85 percent of these buildings lack building automation systems to manage the various building systems they have. Many of these buildings are small (< 50,000 square feet), underserved, and use rooftop units (RTUs) for heating, ventilation, and air-conditioning needs. Because these buildings lack proper control systems, they have several operational deficiencies that lead to excess energy consumption. Studies have shown that managing the RTU’s heating and cooling setpoints, schedules, setbacks, and optimal start times can result in 20 to 25 percent reduction in electricity consumption in small and medium commercial buildings (SMBs). In addition, improving the demand flexibility of these buildings will result in additional cost savings for the building owner. To address the needs of the SMBs, the Department of Energy’s Building Technologies Office jointly funded Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to design, develop, test, and validate a low-cost, interoperable, user-centric, retrofit supervisory controller kit (SC-SMB) that can be used to continuously optimize energy consumption and deliver demand flexibility of SMBs, including all-electric buildings, and provide a means for maximizing decarbonization benefits. The team also includes industry partners Edo and Intellimation. Previously, the team drafted an SC-SMB system specification document (Goodman et al. 2023). This document describes a reference design of a low-cost supervisory control system for SMBs, including the various hardware components, software system, and an example implementation of the reference design. The final release of the reference design is planned for December 2025. Section 2.0 of the report documents the relevant building types that the SC-SMB system is suitable for. Section 3.0 documents the various hardware components, their function, cost, whether they are off-the-shelve, support standard communication, etc., and the software system. An example deployment in a 10,000-sf building with six rooftop units, a hot water heater, solar, and storage is described in Section 4.0. The planned next steps are described in Section 5.0, and references are listed in Section 6.0.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗