Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “market data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Recent advancements in high performance polymer electrolyte fuel cell electrode fabrication – Novel materials and manufacturing processes

The global effort to introduce polymer electrolyte fuel cells for clean and renewable energy to the market is increasing the demand for high performance, robust and affordable membrane electrode assemblies (MEAs). There is not yet a standard method for large scale production of MEAs, or the methods employed are generally unsatisfactory in terms of quality and performance. A large number of published data of newly developed catalyst and electrolyte materials, claim to improve the state of the art, but are often not fully comparable due to different experimental studies and experimental designs. This article summarizes the trends in material developments and emerging MEA-manufacturing techniques. The materials and techniques are systematically compared in terms of cell performance and scalability. Current and future scientific challenges are identified and analysed based on published findings over the past five years. Finally, the results of the cited papers have been quantitatively compared to each other and to the internal benchmarks used in each cited work to provide a complete picture of the state of the art in PEFC MEA manufacturing.

25 ENERGY STORAGE↗

BLEECAM™ (Benchmarking Life Cycle Environmental, Economic, and Social Metrics for Critical and Advanced Minerals and Materials) [SWR-25-125]

The National Laboratory of the Rockies' (NLR) Benchmarking Life Cycle Environmental, Economic, and Social Metrics for Critical and Advanced Minerals and Materials (BLEECAM™) is an open-source, integrated decision-support tool for evaluating the impacts, risks, and trade-offs across U.S. and global materials supply chains. Funded by the U.S. Department of Energy, BLEECAM supports supply chain and market analysis. The tool integrates multi-objective supply chain optimization, system dynamics, network design, lifecycle assessment, techno-economic modeling, and social impact assessment methods to evaluate how supply chains evolve over time, geography, and deployment scenarios. BLEECAM also supports analysis related to energy infrastructure, data centers and digital infrastructure, advanced manufacturing, and other sectors that depend on critical materials.

Khalifa, SherifA. [National Laboratory of the Rock↗

Utility-Scale Solar, 2022 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2022 Edition” provides an overview of key trends in the U.S. market, with a focus on 2021. Highlights of this year’s update include: -A record of nearly 12.5 GWAC of new utility-scale PV capacity came online in 2021, bringing cumulative installed capacity to more than 51.3 GWAC across 44 states. -90% of all new utility-scale PV capacity added in 2021 uses single-axis tracking. -Median installed project costs declined to $\$1.35$/WAC (or $\$1.02$/WDC) in 2021. -Project-level capacity factors vary widely, from 9% to 35% (on an AC basis), with a sample median of 24%. The report explores drivers of this variation. -Utility-scale PV’s LCOE fell to $\$33$/MWh in 2021 ($\$27$/MWh if factoring in the federal investment tax credit, or ITC). -PPA prices have largely followed the decline in solar’s LCOE over time, but have recently stagnated and even moved slightly higher. Prices from a sample of recent contracts average around $\$20$/MWh (levelized) in the West and $\$30-40$/MWh elsewhere in the continental US. In 2021, solar’s average market value (defined in the report to include only energy and capacity value) rose by 55% to $\$47$/MWh and exceeded average wholesale prices in 13 of the 17 balancing authorities analyzed. -Adding battery storage is one way to increase the value of solar. Our public data file tracks metadata and PPA prices from 67 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -At the end of 2021, there were at least 674 GW of utility-scale solar power capacity within the interconnection queues across the nation, 284 GW of which include batteries. For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Development of a Heavy-Duty Electric Vehicle Integration and Implementation (HEVII) Tool

As demand for consumer electric vehicles (EVs) has drastically increased in recent years, manufacturers have been working to bring heavy-duty EVs to market to compete with Class 6-8 diesel-powered trucks. Many high-profile companies have committed to begin electrifying their fleet operations, but have yet to implement EVs at scale due to their limited range, long charging times, sparse charging infrastructure, and lack of data from in-use operation. Thus far, EVs have been disproportionately implemented by larger fleets with more resources. To aid fleet operators, it is imperative to develop tools to evaluate the electrification potential of heavy-duty fleets. However, commercially available tools, designed mostly for light-duty vehicles, are inadequate for making electrification recommendations tailored to a fleet of heavy-duty vehicles. The main challenge is that light-duty tools do not estimate real-time vehicle mass, a factor that has a disproportionate impact on the energy consumption of large commercial vehicles. The Heavy-Duty Electric Vehicle Integration and Implementation (HEVII) tool advances the state of the art in evaluating electrification potential and infrastructure requirements for fleets of commercial vehicles. In this work, the HEVII tool is demonstrated with non-uniformly sampled telematics data from an existing fleet to assess the suitability for electrification of each individual vehicle, determine optimal locations for charging infrastructure to support a fleet of EVs and analyze associated costs. Payload mass is predicted using sparse ground-truth data for all input drive cycles and an initial data analysis is conducted to assess the characteristics driving behaviors and energy consumption of the fleet using an adaptable vehicle model. Battery size requirements are determined by applying a novel charger placement algorithm to maximize routes that are viable for EVs and balance time delays with infrastructure development costs. This work details and demonstrates the different aspects of the HEVII tool, presenting preliminary results from an example use case.

ADVANCED PROPULSION SYSTEMS↗

2022 GETEM Geothermal Drilling Cost Curve Update: Preprint

The Geothermal Electricity Technology Evaluation Model (GETEM) is an essential tool for the Department of Energy's (DOE) Geothermal Technology Office (GTO) to understand the performance and cost of technologies it is seeking to improve. This detailed model is used for supply curve analyses, assessing the current economic feasibility and Levelized Cost of Energy (LCOE) of hydrothermal geothermal systems and EGS, and evaluating the potential impact of advanced geothermal technologies. GETEM can be used to estimate the performance and costs of currently available U.S. geothermal power systems. It is also used to estimate the costs of technologies 5 to 20 years in the future, given the direction of potential research, development, and demonstration (RD&D) projects. The model is intended to help GTO determine which proposed RD&D programs and projects might offer the most efficient improvement when using taxpayer funding. The model requires annual updates as well as revisions to reflect the current state of the art. Drilling costs are a significant portion of total geothermal development costs. The current GETEM drilling cost inputs rely on drilling data from 2009 and require an updated analysis of more recent data to ensure they remain representative of current technologies. An updated, more accurate understanding of costs could help the geothermal industry secure project development financing and investment funding and better allow the oil and gas (O&G) industry (both operators and service companies) weigh potential geothermal market participation and customization. This report details recent drilling improvements from the Utah Frontier Observatory for Research in Geothermal Energy (FORGE) and O&G, comparing drilling performance and costs with values in GETEM, particularly the baseline drilling cost curves. Though drilling performance at FORGE has improved significantly, we did not find associated cost decreases that would justify lowering the GETEM baseline cost curves as of now.

API↗

Foundations of an Electric Mobility Strategy for the City of Mexicali

The Foundations of an Electric Mobility Strategy for the city of Mexicali aligns with numerous energy, environmental, and transport plans and will help Mexicali meet multiple related goals. Mexicali’s energy mix, with 28% renewables, already enables plugin electric vehicles (PEVs) to reduce the mass of greenhouse gases (GHGs) per km driven 2/3 below that of their conventional counterparts. This GHG benefit will increase should Mexicali take steps to further increase their share of renewables in their electricity supply. Beyond increasing renewables, Mexicali could possibly deploy PEVs so that electric load is added in the right location (depending on further analysis of substations and feeders) and at the right time (between 21:00 and 11:00) in order to minimize grid upgrade costs. There are a handful of charge timing control mechanisms –at various stages of development– that Mexicali could implement. Transport electrification can facilitate mass transit by powering buses, trains, and small vehicles that get people from their homes or work to the transit stations and vice versa. Mexicali could utilize fleets as early PEV adopters in order to gain acceptance and add electric vehicle supply equipment (EVSE). Recommended prioritization of different types of fleets are suggested in this report: transit buses, school buses, airport ground support equipment (GSE), refuse trucks, taxis, shuttle buses, campus vehicles, delivery trucks, utility trucks, and finally semitrailers. There are a handful of policy options that Mexicali could use to incentivize fleets to purchase PEVs, including mandates, economic incentives, energy performance contracts, waivers to access restrictions, electricity discounts, and EVSE requirements in building codes. Mexicali’s taxi fleet was an early adopter of PEVs and had experienced some challenges—mostly related to the insufficient range of the taxis due to hot weather. In this report, we strategize ways to extend the range of the current electric taxis, including ways to make charging more convenient to the drivers, and more suggestions for appropriate vehicles to purchase in the future. This report also includes the groundwork of geotracking Mexicali’s taxi fleet so that more detailed recommendations can be made in the future. Once fleets have increased PEV acceptance and EVSE installations, the market will be ready to expand to private vehicle owners. In order to do this, more EVSE needs to be installed in the right locations. This mobility strategy lays out general local areas where EVSE could be well utilized, based on traffic patterns, land use, and demographic data. Mexicali could approach businesses within these areas that would likely make suitable hosts, based on how well they can profit from the additional business that EVSE would bring. Mexicali could then adopt a series of purchase incentives (including sales tax waivers or access to high-occupancy vehicles [HOV] lanes) that would encourage private vehicle owners to purchase PEVs. Purchase incentives run the risk of creating equity issues, which can be countered by promoting electrification in mass transit, creating more HOV lanes that have PEV exemptions, and installing EVSEs in underserved communities. Private PEV ownership will require a set of experts that Mexicali can help train, including PEV repair technicians, EVSE installation electricians, and first responders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2022 GETEM Geothermal Drilling Cost Curve Update

The Geothermal Electricity Technology Evaluation Model (GETEM) is an essential tool for the U.S. Department of Energy's (DOE) Geothermal Technologies Office (GTO) to understand the performance and cost of technologies it is seeking to improve. This detailed model is used for supply curve analyses, assessing the current economic feasibility and levelized cost of energy (LCOE) of hydrothermal geothermal systems and enhanced geothermal systems (EGS), and evaluating the potential impact of advanced geothermal technologies. GETEM can be used to estimate the performance and costs of currently available U.S. geothermal power systems. It is also used to estimate the costs of technologies 5 to 20 years in the future, given the direction of potential research, development, and demonstration (RD&D) projects. The model is intended to help GTO determine which proposed RD&D programs and projects might offer the most efficient improvement when using taxpayer funding. The model requires annual updates as well as revisions to reflect the current state of the art. Drilling costs are a significant portion of total geothermal development costs. The current GETEM drilling cost inputs rely on drilling data from 2009 and require an updated analysis of more recent data to ensure they remain representative of current technologies. An updated, more accurate understanding of costs could help the geothermal industry secure project development financing and investment funding and better allow the oil and gas (O&G) industry (both operators and service companies) to weigh potential geothermal market participation and customization. This report details recent drilling improvements from the Utah Frontier Observatory for Research in Geothermal Energy (FORGE) and the O&G sector, comparing drilling performance and costs with values in GETEM, particularly the baseline drilling cost curves. Although drilling performance at FORGE has improved significantly, we did not find associated cost decreases that would justify lowering the GETEM baseline cost curves at this time.

API↗

DEPRECATED - Sharing the Sun Community Solar Project Data (December 2023)

This data set is no longer current – The most current data and all historical data sets can be found at https://data.nrel.gov/submissions/244 This database represents a list of community solar projects identified through various sources as of Dec 2023. In addition, this dataset updated the low-income (LI) and low- and moderate-income (LMI) provisions for both complete and pending projects, based on the most recent program data we collected as of March 2024. The list has been reviewed but errors may exist and the list may not be comprehensive. Errors in the sources e.g. press releases may be duplicated in the list. Blank spaces represent missing information. NREL invites input to improve the database including to - correct erroneous information - add missing projects - fill in missing information - remove inactive projects. Updated information can be submitted to the contact(s) located on the current data set page linked at the top.

14 SOLAR ENERGY↗

Assessment of Cloud-based Applications for Enabling a Scalable Riskinformed Predictive Maintenance Strategy

The current light-water reactor fleet uses time-based maintenance strategies to achieve high-capacity factors. But to make nuclear more competitive in the energy market, these reactors could utilize emerging artificial intelligence (AI) and cloud computing technologies to achieve a cost-effective, predictive-maintenance strategy. This paper presents discussion and results on the application of cloud computing in the nuclear industry. The technical viability of cloud computing was analyzed using data from a boiling-water reactor’s safety relief valve. The models were hosted on three different systems: a local personal computer, Idaho National Laboratory’s high-performance computer system, and Microsoft Azure. The data were loaded and processed, and two types of models were trained in an A/B fashion. Based on the speed at which these actions were completed, it was determined that cloud computing affords adequate computing resources. Additionally, the computing power can scale with the demanded load. To enable cloud computing in the existing fleet, additional sensors, networks, and other requirements must be implemented to ensure a smooth transition from current maintenance strategies. However, the benefit is that the plants no longer need to manage their own servers, software, cybersecurity, and information technology support staff for in-house data analytics purpose. Many of these features can be offloaded to the cloud provider for a potential cost savings. Demonstrating how AI can improve the maintenance and operation of non-safety-related systems seems the likely path forward for implementing AI and cloud computing resources inside nuclear power plants.

azure↗

Techno-Economic Simulation Results Using dGeo for EGS-Based District Heating in the Northeastern United States

This dataset presents the results of techno-economic simulations performed using the Distributed Geothermal Market Demand Model (dGeo) to evaluate the feasibility of Enhanced Geothermal Systems (EGS)-based district heating in the Northeastern United States. Developed by the National Renewable Energy Laboratory (NREL), dGeo is a geospatially resolved, bottom-up modeling framework designed to explore the deployment potential of geothermal distributed energy resources. The dataset, created as part of the Cornell EGS Ground-Truthing Project, provides census tract-level data that includes inputs and outputs such as thermal demand, road length, energy prices, geothermal system sizing, annual energy contributions from geothermal and natural gas peaking boilers, system capital costs (CAPEX), operation and maintenance costs (OPEX), and the levelized cost of heat (LCOH). Key simulation parameters include geothermal gradients, measured well depths, production temperatures, and district heating piping lengths based on S1400 neighborhood road lengths. The simulations assume a target bottom hole temperature of 80C and the development of new district heating networks in each census tract.

15 GEOTHERMAL ENERGY↗

CalCharge CRADA000008852 Master Agreement Amendment 1, Battery Consortium – Proprietary Activities

Lawrence Berkeley National Laboratory (LBNL) is partnering with the California Clean Energy Fund to launch CalCharge, an energy storage innovation accelerator, comprised of emerging and established California companies and related organizations developing battery technologies for the electric/hybrid vehicle transportation, the electric grid and consumer electronics markets. The vision of CalCharge is to accelerate the pace of technology innovation, business growth, and cluster development. Calcharge programs will deliver technology acceleration and technical expertise to the energy storage industry, as well as policy and market development support to strengthen the regional economy. LBNL shall collaborate with CalCharge members on the analysis and testing of battery and energy storage technologies. LBNL’s work will include analysis and testing of external design, examination of materials and components either separately or as a whole, and providing data and observations resulting from each collaboration. LBNL shall maintain and provide access to LBNL specialized facilities for research activities performed by or for CalCharge members. In addition, LBNL will provide expertise for short-term consultation, interpretation of testing data, or to clarify technical obstacles if requested by a Member. Over this time frame, Calcharge partnered with several start-ups to provide analytical resources. Those companies include Halotechnics, ZAF Energy Systems, Volkswagen Group of America, Toyota Motor Corporation, and Ensor Inc.

25 ENERGY STORAGE↗

Nine Canyon Long-Duration Energy Storage: A Feasibility Study

The Nine Canyon Long Duration Energy Storage (LDES) Feasibility Study explores the technical and economic viability of deploying advanced energy storage technologies at Energy Northwest's (EN) Nine Canyon (9C) Wind Project site in Benton County, Washington. Supported by the Washington State Department of Commerce and the U.S. Department of Energy’s Office of Electricity under its LDES Voucher Program, the study represents a collaborative effort between EN, Pacific Northwest National Laboratory (PNNL), and ARES North America. At the core of this effort is the development of a generalized techno-economic modeling framework and evaluation tool designed to assess the value proposition of LDES projects across a variety of contexts. The modeling tool is technology-agnostic and accommodates user-defined parameters such as rated power, energy duration, round-trip efficiency, capital and operational costs, and dispatch constraints. It also integrates economic inputs, including market prices, energy revenue structures, and financing parameters to evaluate performance through key metrics. The tool provides utilities with a transparent, adaptable platform to support decision-making, investment prioritization, and portfolio planning for various storage technologies. To guide scenario design and interpretation, the study first surveyed the LDES technology landscape, including lithium-ion batteries, flow batteries, non-hydro gravity storage, and thermo-mechanical systems, comparing cost trajectories, technical performance, safety and hazards, materials sourcing and recyclability, and spatial/siting considerations. This literature-grounded review highlights technology trade-offs and reinforces the need to align technology choice with site characteristics, use cases, and project objectives. A companion chapter examines ownership structures (EN ownership, third-party ownership, shared models) and offtake options (energy marketing, capacity/energy PPAs, time-of-use PPAs, block-delivery PPAs, and tolling), where PPAs (power purchase agreements) represent contractual arrangements for buying and selling electricity. The chapter also highlights implications for risk allocation, capital access, operational control, and revenue certainty. The study also evaluates supervisory control and data acquisition (SCADA) and transmission interconnection pathways, options include upgrading the existing SCADA or deploying a dedicated LDES controller, with attention to protection schemes, data telemetry, cybersecurity, and regulatory coordination with BPA. In addition, an ARES-specific geotechnical and hydrology assessment presented in the appendix screens multiple corridors for slope stability, bearing capacity, cut-and-fill magnitude, and stormwater behavior.

25 ENERGY STORAGE↗

ISO 50001-Based Energy Management Systems as a Practical Path for Decarbonization: Initial Findings from a Survey of Technical Assistance Cohort Participants

Organizations face rising pressure to take action to reduce their climate-affecting emissions (i.e., decarbonize). While many responses are possible, an essential approach—strategically managing their energy consumption as an essential business practice via an ISO 50001-based energy management system—is not yet widely recognized as a framework for decarbonization. This study analyzes interim survey results from 24 organizations (a 48% response rate) implementing a rigorous energy management system, one deployed by the U.S. Department of Energy as “50001 Ready”, to test whether participating organizations perceive the energy management system under development as an essential aspect of their decarbonization efforts. The results are preliminary in nature, given the ongoing nature of the program and associated data collection; however, they are sufficient to refute our hypothesis that energy management systems are perceived by organizations participating in 50001 Ready cohorts to primarily affect energy performance with little-to-no connection regarding decarbonization efforts. Major findings include that participants’ decarbonization targets and commitments are driven by market imperatives (highlighting the importance of ISO 50001 as a management system tool) and that they see energy efficiency as vital to decarbonizing. We conclude by suggesting future research directions to further establish the premise that energy management systems are an effective, efficient, and long-lasting decarbonization strategy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Predictive Assessment of the Chemical Composition of Coal Ash in Reserve at U.S. Disposal Sites

In the United States, more than 2 Gt of coal combustion residuals (i.e., coal ash) are stored in hundreds of disposal units. Recent federal regulations mandate the closure or retrofitting of most coal ash impoundments, presenting significant challenges for waste management. These regulatory pressures also present opportunities to reuse coal ash. However, the quality and quantity of discarded coal ash across the U.S. are not well known, even though this information is crucial for spurring its reuse for conventional and new material applications. This study describes a predictive model for the major element composition of coal ash in reserve at disposal sites of major U.S. coal-fired power plants. This model was constructed from coal purchase records of 705 power stations from 1973 to 2022 and was trained on coal ash composition data, showing that coal ash elemental composition is strongly associated with the source of feedstock coal. The model showed regional shifts in the major element contents of ash produced by power plants in the last 50 years, particularly for calcium and iron (expressed as %CaO and %Fe2O3), as power stations changed their source of coal over this time frame. Our approach enables an estimation of chemical composition for ash stored in waste impoundments at individual power stations. Such information can help to delineate the regional market resource potential of supplementary cements for concrete and other material innovations that would utilize coal ash harvested from disposal sites across the U.S.

01 COAL, LIGNITE, AND PEAT↗

Logging Crew Attributes by Region in the Southeast USA

Urbanization, shrinking markets, and reduced forestry investment may affect harvesting efficiency in regions of the US South. To monitor these conditions, logging businesses have been tracked by surveys conducted by universities and trade associations. This project used a sampling approach coordinated with FIA utilization studies to sample logging crews based on a harvesting location. The approach was used to develop relationships among firm attributes and site attributes in six southeastern states (AL, GA, FL, NC, SC, and VA) from 2011 to 2018. The data included harvest attributes (location, harvest size and stand type) and logging firm attributes (production, crew labor, crew number, the number of machines by type, and machine age). For crew capital value, an equation was developed for this study using machine number and average machine age. The data from logging crews on 419 harvests were analyzed by region, harvest size, and stand type. Mean values for crew labor ranged from 3.1 to 7.1 workers. The average capital value per crew ranged from $\$220,000$ to $\$524,000$ per crew in the Coastal Plain with a narrower range in the Piedmont. In the Coastal Plain, higher productivity was detected for larger harvests and pine versus hardwood and mixed stands; however, in the Piedmont those trends were less obvious. Ratio of feller-bunchers, skidders and loaders were mostly 1:1:1 or 1:2:1 with 41% and 24% of samples, respectively. There were notable trends among Coastal Plain loggers regarding capital value and productivity with evidence supported by a production function. The differences in Piedmont (e.g., ownership size, market access, terrain, population density, etc.) may combine to limit daily production and labor productivity.

54 ENVIRONMENTAL SCIENCES↗