Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load flexibility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Biomechanical Analysis of Multilevel Posterior Cervical Spinal Fusion Constructs

Study Design: Controlled Laboratory Study Objective: To compare multilevel posterior cervical fusion (PCF) constructs stopping at C7, T1, and T2 under cyclic load to determine the range of motion (ROM) between the lowest instrumented level and lowest instrumented-adjacent level (LIV-1). Summary of Background Data: PCF is a mainstay of treatment for various cervical spine conditions. The transition between the flexible cervical spine and rigid thoracic spine can lead to construct failure at the cervicothoracic junction. There is little evidence to determine the most appropriate level at which to stop a multilevel PCF. Methods: Fifteen human cadaveric cervicothoracic spines were randomly assigned to 1 of 3 treatment groups: PCF stopping at C7, T1, or T2. Specimens were tested in their native state, following a simulated PCF, and after cyclic loading. Specimens were loaded in flexion-extension), lateral bending, and axial rotation. Three-dimensional kinematics were recorded to evaluate ROM. Results: The C7 group had greater flexion-extension motion than the T1 and T2 groups following instrumentation (10.17±0.83 degree vs. 2.77±1.66 degree and 1.06±0.55 degree, P <0.001), and after cyclic loading (10.42±2.30 degree vs. 2.47±0.64 degree and 1.99±1.23 degree, P <0.001). There was no significant difference between the T1 and T2 groups. The C7 group had greater lateral bending ROM than both thoracic groups after instrumentation (8.81±3.44 degree vs. 3.51±2.52 degree, P =0.013 and 1.99±1.99 degree, P =0.003) and after cyclic loading. The C7 group had greater axial rotation motion than the thoracic groups (4.46±2.27 degree vs. 1.26±0.69 degree, P =0.010; and 0.73±0.74 degree, P =0.003) following cyclic loading. Conclusion: Motion at the cervicothoracic junction is significantly greater when a multilevel PCF stops at C7 rather than T1 or T2. This is likely attributable to the transition from a flexible cervical spine to a rigid thoracic spine. Although this does not account for in vivo fusion, surgeons should consider extending multilevel PCF constructs to T1 when feasible. Level of Evidence: Not applicable.

Neurosciences & Neurology↗

Electrolysis on a Chip with Tunable Thin Film Nanostructured PGM Electrocatalysts Generated from Self-Assembled Block Copolymer Templates

Self-assembled block copolymers are promising templates for fabricating thin film materials with tuned periodic feature sizes and geometry at the nanoscale. Here, a series of nanostructured platinum and iridium oxide electrocatalysts templated from poly(styrene)-block-poly(vinyl pyridine) (PSbPVP) block copolymers via an incipient wetness impregnation (IWI) pathway is reported. Both nanowire and nanocylinder electrocatalysts of varying feature sizes are assessed and higher catalyst loadings are achieved by the alkylation of the pyridine moieties in the PVP block prior to IWI. Electrocatalyst evaluations featuring hydrogen pump and water electrolysis demonstrations are carried out on interdigitated electrode (IDE) chips flexible with liquid supporting electrolytes and thin film polymer electrolytes. Notably, the mass activities of the nanostructured electrocatalysts from alkylated block copolymer templates are 35%–94% higher than electrocatalysts from non-alkylated block copolymer templates. Standing cylinder nanostructures lead to higher mass activities than lamellar variants despite their not having the largest surface area per unit catalyst loading demonstrating that mesostructure architectures have a profound impact on reactivity. Overall, IDE chips with model thin film electrocatalysts prepared from self-assembled block copolymers offer a high-throughput experimental method for correlating electrocatalyst nanostructure and composition to electrochemical reactivity.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Modeling and Control of Cascaded Bridgeless Multilevel Rectifier Under Unbalanced Load Conditions

The goal of this project is to model and control a novel unidirectional cascaded multilevel bridgeless rectifier as an active front end in medium and high voltage applications. This topology has many advantages over a conventional cascaded H-bridge rectifier, such as lower implementation cost, higher reliability, and greater flexibility with similar power quality.The steady-state mathematical model is used to develop a method for the voltage balancing of dc cells. Power factor analysis is discussed to achieve unity power factor using fully controlled hbridge cells. Power loss, efficiency, and cost comparison studies between the traditional cascaded H-Bridge converter and the proposed bridgeless converter demonstrate the advantages. A novel control strategy is proposed to achieve dc voltage balancing, fast and robust grid synchronization and power factor correction under unbalanced load conditions. Simulation and experimental results validate the models and control method.

Cascaded Bridgeless Rectifier, Power factor analys↗

Accuracy of hourly energy predictions for demand flexibility applications

Decarbonization goals in the United States electricity sector are increasing the levels of renewable energy generation in the electricity supply system, and are driving increased attention to building electrification, which will increase the magnitude and shift the timing of the electricity system peak. These changes are motivating new approaches to coordinate building electricity demand with low-carbon renewable generation, elevating the importance of demand flexibility (DF) in buildings and the need to quantify the temporal impacts of DF. In this paper, we first characterize the hourly predictive accuracy of six commonly used baseline models in an application context of quantifying building-level load shift. Our analysis revealed insights such as hours of the day (afternoons), periods of the week (weekends), and seasons (summer) that were predicted with more accuracy than other time periods. In addition, the analysis showed tendencies toward overprediction or underprediction of load. Secondly, we provide the first published investigation of baseline erosion from repeated dispatch of building load shifting. We observed that as the baseline period is pushed back further from the prediction day, the distribution of errors across baseline model predictions increases, with notable inflection points near the three-week erosion point for two of the three models.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced co-simulation framework for assessing the interplay between occupant behaviors and demand flexibility in commercial buildings

With buildings contributing significantly to electricity usage, enabling demand flexibility becomes a challenge, especially when accounting for occupant comfort. This study introduces an innovative co-simulation framework integrating multiple models: heating, ventilation, and air conditioning (HVAC) system, building zone load, indoor airflow, supervisory control, and occupant comfort and behavior. Uniquely, this framework allows for a comprehensive and dynamic analysis of building systems and occupant interactions in demand response events. Using this framework, we conducted a case study using a typical small office building model. Specifically, we focused on three areas: (1) the impact of indoor airflow modeling on energy use, occupant comfort, and behaviors forecasting, (2) the impact of occupant behaviors on demand flexibility, and (3) occupant comfort and behaviors under demand response events. Key performance indicators such as energy use, flexibility factor, durations of occupant discomfort and occupant behaviors were analyzed. Our findings indicated variations in energy usage and occupant comfort within demand flexibility events, marked by uncertainty boundaries, with variability in demand shedding up to 57.9%. Here, we concluded that this framework is suitable for analyzing typical commercial buildings and their HVAC systems in terms of demand flexibility potential under the impact of occupant behaviors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Anodic arc discharge: Why pulsed?

Pulsed anodic arc discharge is a novel synthesis method of nanomaterials by means of low-temperature atmospheric plasma. The technique consists in periodically supplying DC power to two vertically aligned electrodes in the form of short unipolar pulses with peak currents of a few hundred Amperes in helium atmosphere. The pulsed arc plasmas are sustained at frequencies of the order of 1 Hz with around 10% of duty cycle. It constitutes a versatile technique thanks to a series of advantages compared to continuous DC arc processes, in particular: flexibility in the experimental conditions, process stability and repeatability, better utilization of ablating anode material, lower production of macroparticles, and lower thermal loads. Such features are discussed in this article. A brief overview concerning the recent accomplishments of pulsed arc discharge on deposition of carbon nanostructures (graphene and carbon nanotubes) and few-layer flakes of molybdenum disulphide (MoS 2 ) is provided, as well as an outlook on future applications of this method for the discovery of new materials with tailored functional properties.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Thermohydraulic Design Analysis of the Target Assembly in the Material Plasma Exposure Experiment Facility

The Material Plasma Exposure eXperiment (MPEX) project seeks to design a steady-state linear plasma facility at Oak Ridge National Laboratory that will be used to study plasma-material interactions (PMIs) at fusion prototypic levels, supporting the evaluation and development of materials for the next generation of fusion devices. This study is focused on PMI exposure of small-size neutron-irradiated specimens, which are clamped onto an actively cooled component. A thermohydraulic evaluation of a new MPEX target assembly design to assess the appropriate operation during MPEX operation is presented. To further guide the design and assess the structural integrity of the components under expected loads, preliminary thermomechanical stress analyses were also conducted. To ensure good thermal contact between the components, thermal interface materials, such as silver flexible graphite, were used in the assembly. It was found that the maximum target temperatures of 1572, 1463, and 1315 K were obtained for Grafoil thicknesses of 0.61, 0.38, and 0.25 mm, respectively. The distribution of the axial deformation at high heat fluxes showed that there are no gaps between components, indicating good contact at material interfaces. Moreover, the contact pressure between the target and other components indicated that very good contact was established at these interfaces. Furthermore, the stress-strain conditions for the target will be further used to assess the appropriate operation during MPEX experiments and gain insight into materials science phenomena during PMI experiments.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A 75 kVA Intelligent Power Stages (IPS) Unit Design for Future Grid-interface Application

The demand for grid-interface converter with flexible dc bus is driven by the fast development of energy storage system (ESS), electric vehicle (EV) charging system, and versatile residential load. This paper first proposes a two-stage intelligent power stage (IPS) unit for future grid-interface applications. To achieve zero common-mode (CM) voltage emissions, step-up and step-down voltage gain, a 3-level four-switch buck-boost (3-L FSBB) dc-dc converter is adopted with fully zero voltage switching (ZVS). In one IPS unit, an advanced fiberoptic communication with sub-nanosecond synchronization is developed for different enhanced gate drivers. Moreover, an enhanced gate driver integrated current and voltage sensors is designed for monitoring and diagnostics. To achieve a whole low-profile design, three 12 oz heavy copper planar ac inductors are designed and implemented. Finally, a 75 kVA IPS unit was built to verify both the thermal and electrical design.

Cao, Yuliang↗

SCUC-DER Integration Report: Integrating Distributed Energy Resources (DER) Using Advanced Unit Commitment Models and DER Aggregation Methodologies

Distributed energy resources (DERs) are continuing to grow due to regulatory, policy, and market shifts, and it needs to be ensured that small DERs are given a level playing field with traditional resources. Legacy market processes such as unit-commitment problems were designed for a power grid consisting largely of centralized power plants. In contrast, DERs consist of many small devices with distinct operating characteristics that may or may not be connected at the transmission interconnection points, limiting their visibility to the independent system operators (ISOs) who operate wholesale electricity markets. This report details the development and initial results from a simulation platform that integrates state-of-the-art security-constrained unit commitment software, detailed feeder models, and a DER aggregator model to quantify potential DER integration issues. Quantitative results to date illustrate potential infeasible scheduling solutions from SCUC when the DERA includes aggregations of energy-limited energy storage resources. Likewise, if aggregations are not penalized for dispatch deviations, they may have incentives to deviate from the SCUC-determined resource schedules. Assumptions about the amount of aggregated demand response resources (DRRs) and the ability of DERAs to follow profit incentives have an important impact – DRRs have significant flexibility and can typically feasibly meet their SCUC schedule, but on the other hand, their profit incentives can cause unscheduled increases in load before and after DRR dispatch. Computation time results on the SCUC solver and simulation platform only show a modest increase in SCUC solution time as the number of DERAs is increased, but results to date only reflect the RTS-GMLC test system; results may show more significant solver slowdown in larger transmission systems. The largest contribution to simulation time is attributed to the DERA offer generation method, which is suggested for future improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Identifying Regions Favorable for Geothermal Heating and Cooling Storage

Space heating and cooling represents the single largest category of in building energy use for U.S. residential and commercial buildings, with heating representing 61% of residential and 46% commercial energy consumption. Building heating technologies are dominated by natural gas technologies, and are an important opportunity for building electrification to enable a transition to a low CO 2 energy system. FLXenabler study is a joint analysis effort among multiple analysis teams at NREL and focused on examining the role of geothermal heating and cooling (GHC) system with thermal energy storage (TES) providing flexibility. Utilizing information from ResStock the amount of energy consumption associated with heating and cooling by state was calculated. We applied adjusted load shapes to estimate the a maximum grid savings potential of using TES to address building space conditioning. Normalizing grid, fuel, and emissions impacts locations with higher favorability for further study in FLXenabler were identified.

15 GEOTHERMAL ENERGY↗

Purpose, Design, and Analysis of the NSTX-U Centerstack Casing Lateral Support Shims

The National Spherical Torus Experiment Upgrade (NSTX-U) centerstack casing surrounds the central magnet core of NSTXU. It provides the inner vacuum boundary of the plasma chamber and supports the radially inboard plasma facing components lining the plasma chamber. The casing is supported like a cantilever, fixed at the lower flange by a connection to the TF Bundle through a G-10 ring. It is flexibly supported at the top by bellows, and insulated shims intended to react the largest part of the inventory of the disruption loads at the upper support, thereby protecting the upper and lower connections from excessive loads. A large part of the qualification of the casing and tiles requires addressing and quantifying disruption loads. These have been estimated based on extensions of the behavior of NSTX during its run period roughly 15 years ago. Structural qualification of the Upgrade used these estimates of the loading as input to calculations to demonstrate adequacy for a “most probable” disruption. The estimates are included in a requirements document to guide conservative design of all components loaded by disruptions. However, the changes made for the upgrade made the extrapolation of disruption behavior uncertain. Disruptions include axisymmetric loading from axisymmetric currents induced in the vessel shells. In addition, more complex currents called Halo currents are a result of plasma poloidal currents impinging on the casing. The halo currents add another layer of uncertain behavior and net lateral loading to the casing. As a result, NSTX-U is equipped with a number of instruments intended to assess the nature and severity of disruptions. The casing shims are required for lateral support of the casing, but these have also been converted to load cells to provide another measure of the magnitude of symmetric and asymmetric loading. Some of the logic in the development of the requirements document are presented. Electromagnetic analysis of axisymmetric and halo loading is described. Global simulations of the casing transient dynamic response, and local analysis and testing of the shim/load cell are included. The shim load cells and other instrumentation will be an important guide in planning NSTX-U experiments beyond its next run period expected in late 2026 or early 2027.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Hidden Flexibility of the Natural Gas Network for Electric Power Operations: A Case Study of a Near-Miss Winter Event

The U.S. power sector has become increasingly reliant on gas pipeline networks to deliver fuel to natural gas power plants. In addition to supplying relatively low-cost fuel, gas networks offer generators flexibility in their operations through the ability to deliver fuel when needed by using gas storage facilities or linepack if the gas network is at an operating point below its design capacity. However, disruptions or stress events on the gas network - like those occurring in the Northeast and Texas in recent years - can result in limitations on gas availability to generators at times when generation is in short supply. Here we examine a period of stress that occurred in the winter of 2022 in the Western United States. Using data on the region's natural gas pipeline network and electric generators, we build an integrated gas and electric model that closely replicates the actual dispatch of the period. We then evaluate the implications of removing flexibility employed by the gas network operator, which during that period curtailed scheduled gas deliveries to other parties to increase deliveries to natural gas power plants, which requested more gas than initially forecasted. We find that without the flexibility supplied by the gas network operator, there would have been curtailment of gas generation due to gas offtake constraints, requiring the power system operator to redispatch relying on more expensive generation or to potentially shed load. A sensitivity exploring a wind drought further exacerbates the strain, illustrating the potential challenge of managing gas and grid interactions as systems move to higher shares of variable renewable electricity. Based on this example, we discuss potential coordination strategies between the two system operators to ensure that the power system can successfully utilize and rely on the flexibility offered by natural gas networks.

03 NATURAL GAS↗

Systematic Catalyst Variation for Improved Stereoselective Epoxide Polymerization: Subtle Modifications Resulting in Superior Efficiency

Isotactic poly(propylene oxide) (iPPO) is a semicrystalline polyether that has emerged as a high-strength, photodegradable material for marine applications. To improve the accessibility of i PPO, catalysts with higher activity and selectivity are required. Using rational catalyst design informed by computational insights, we developed a flexibly tethered, bimetallic chromium catalyst exhibiting high enantioselectivity ( k rel ∼ 100) and unprecedented activity (TOF ∼ 50,000 h −1 ) for propylene oxide (PO) polymerization. Mechanistic studies reveal that high enantioselectivity originates from increased steric bulk at the ortho position of the salicylimine moiety, which increases steric repulsion between the alkoxide chain end and the ligand in the disfavored transition state. Furthermore, introducing geminal dimethyl groups that rigidify the flexible tether between the two ligand moieties significantly enhances catalyst activity by destabilizing the resting state during polymerization. The catalyst remains active at loadings as low as 0.5 ppm, enabling the synthesis of colorless, tough i PPO.

Ren, Bai-Hao [Cornell Univ., Ithaca, NY (United St↗

An analysis of the hybrid internal mass modeling approach in EnergyPlus

Accurate simulation of building system dynamics is particularly important for understanding building energy flexibility. Among all dynamics in a building, a zone temperature’s variation is especially important, as it significantly affects a building’s electricity load profile when its heating, ventilating, and air conditioning (HVAC) system is controlled with on/off cycles or setpoint reset strategies. To accurately simulate a zone temperature’s dynamics, internal mass needs to be modeled carefully. In this paper, we compare the two internal mass modeling approaches provided by EnergyPlus, i.e., internal mass object and zone air capacitance multiplier, to better understand their impacts on zone temperature simulation. Real building zone temperature dynamic data from small- and medium-sized office buildings are analyzed and compared with simulated data. In particular, we illustrate the effectiveness of a hybrid method of the two EnergyPlus modeling approaches, which yields more realistic zone temperature dynamics, especially when the zone is conditioned with heat pump systems with on/off cycling.

Chen, Zhelun↗

Hybrid Analytics Solution for Power Plant Operations

Expert Microsystems, Inc., MapEx Software Inc. and XMPLR Energy LLC have teamed to submit a proposal to the US Department of Energy’s Office of Fossil Energy to improve the efficiency, reliability and flexibility of existing coal-based power plants. The project, titled Hybrid Analytics Solution to Improve Coal Power Plant Operations (the “Hybrid Analytics” project), will develop, demonstrate and commercialize a novel approach that integrates two proven real-time monitoring techniques. The Hybrid Analytics approach integrates into a single, integrated solution: a) an established, advanced data-driven analytics solution that includes artificial intelligence, advanced pattern recognition and machine-learning techniques and b) a well-proven, first principle thermal heat balance model solution. The future role of coal plants will depend on the ability to cycle and follow loads to meet marginal power demands, accommodate renewables and support the grid. Essential to success in this new role is a plant’s ability to maintain high reliability, efficiency and flexibility. However, these changing operational demands put significant stresses on power plant components that directly impact the ability to deliver these requirements. In the past, plants have independently monitored performance using physics-based solutions (heat rate, boiler losses, etc.) and reliability using data-driven analytics (advanced pattern recognition). The Hybrid Analytics solution integrates both approaches to enhance fault detection, provide automated diagnostics and estimates of remaining time to act, and provide critical, enhanced and accurate real-time information to coal plant operators. As a result, coal plants can improve efficiency, reliability, and flexibility and can cost-effectively maintain their key role in the power delivery system.

01 COAL, LIGNITE, AND PEAT↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Report

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of subcritical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Program Review

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of sub-critical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Coupled Aerodynamic and Hydrodynamic Hybrid Simulation of Floating Offshore Wind Turbines

The development and innovation of floating offshore wind energy in the U.S. requires detailed high-fidelity observations and measurements of turbine and platform loading due to wind, waves, and currents. However, full-scale and quasi-full-scale experiments require significant financial and temporal investments for construction, experimental testing, and long-term field campaigns. To support the commercial advancement of the offshore wind energy industry, specialized wind tunnel and wave basin experimental facilities are critical to be able to test FOWT designs at small scale under controlled conditions prior to full-scale deployment. Oregon State University (OSU) is internationally known as a leader in water and energy research, development, and testing. The O.H. Hinsdale Wave Research Laboratory (HWRL) and the Wallace Energy Systems and Renewables Facility (WESRF) at OSU have extensive experience building, modeling, monitoring, controlling, and actuating scaled systems. Experiments on wave-structure interaction have been performed at the HWRL since its establishment in 1972. Studies have included the interaction of waves with coastal structures (breakwaters, seawalls, buildings, cylinders, bridges, fixed foundations of offshore wind turbines, etc.) and with floating structures (e.g., wave energy converters, maneuvering of vessels, etc.). Hinsdale is actively used by marine energy technology developers, both for private testing and OSU-collaborative research projects. However, despite the availability of several large-scale facilities for hydrodynamic testing (at OSU and elsewhere in the U.S.), existing experimental laboratories are generally limited in their ability to accurately generate combined wind and wave conditions. The simulation of both wind and waves in experimental testing is complicated due to a number of constraints, including: [i] incompatible similitude laws governing the wind and waves for scaled experiments, [ii] producing accurate wind over a large enough control volume via fans, and [iii] generating wind that reasonably represents the atmospheric boundary layer in existing wave basins/flumes. Hence, physical test data providing insight into the simultaneous wave- and wind-structure response of floating offshore wind components can be difficult to generate. Given the aforementioned challenges in classic hydrodynamic experiments, the motivation of this project is to establish a real-time hybrid simulation (RTHS) approach that can apply aero- and hydro-dynamic loading by augmenting wave-only experimental facilities with virtual aerodynamic forces through numerical models representing the remaining dynamic forces. RTHS is a physical-numerical approach that partitions a prototype system into physical and numerical sub-assemblies that interact with each other through actuators and sensors in real time. In coupling physical and numerical models, the hybrid simulation approach applied herein is ideal for problems with: (1) structures subjected to different scaling laws, such as floating offshore wind turbines subjected to combined aero/hydro-dynamic loading, (2) structures that are too large or complex to be tested entirely in a laboratory setting, such as deep-water mooring applications, and (3) component testing, where the behavior of a portion of the assembly is uncertain but still interacts with other portions of the structure, such as testing the fatigue life of turbine blades. Few U.S. experimental facilities are able to test simultaneous aero- and hydro-dynamic loading and none can accurately produce aero/hydro-dynamic response on scaled FOWT models due to conflicting similitude laws between the wind (commonly Reynolds) and the waves (commonly Froude). To aid in accelerating the development of the U.S. floating offshore industry, there is a significant need to develop a flexible, modular framework that can expand the capacities of existing wave-only laboratories. The project goal is to demonstrate a hydrodynamic real-time hybrid simulation (hydro-RTHS) framework that couples numerical wind and physical waves acting on a FOWT, thus representing simultaneous aero/hydro-dynamic loading. The FOWT is partitioned into a full-scale numerical sub-assembly associated with the aerodynamics and a model-scale physical sub-assembly associated with the hydrodynamics. The numerical-physical partition associated with hydro-RTHS mitigates scaling constraints by supplying different scaling laws to the physical and numerical sub-assemblies. Herein, length, force, and time are scaled and exchanged between the sub-assemblies using Froude scaling to represent the open-channel flow in the physical sub-assembly. Other similitude laws could also be utilized depending on the problem definition. It is envisioned that the ability to model FOWTs under waves and wind, with mitigation of similitude distortions, would result in reduced development costs (currently, FOWT concept development is performed with full-size pro- totypes at enormous expense and risk) and increase the reliability of the FOWT industry (since extreme wave and wind conditions and contingency events can be tested safely in a controlled environment).

16 TIDAL AND WAVE POWER↗