Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

GRO attitude control and determination

Design features of the attitude control and determination (ACAD) system for the Gamma Ray Observatory (GRO) that will eventually be launched on the Shuttle are described. A tabulation of the ACAD system components is provided and the various standby and normal pointing operational modes of the system are summarized. The system software and sensors will maintain a quaternion model of the GRO attitude on the bases of kinematic equations and inertial data. The software is standardized and has previously been used on the Solar Maximum Mission and Landsat-D. Details of the processing components, redundant electronics for sensor processing, data handling and actuator control are outlined and illustrated with block diagrams. Tests applied to validate the ACAD design are outlined, as are ground support which will be implemented once the GRO is launched.

Jerkovsky, W.↗

Recovering Swift-XRT Energy Resolution through CCD Charge Trap Mapping

The X-ray telescope on board the Swift satellite for gamma-ray burst astronomy has been exposed to the radiation of the space environment since launch in November 2004. Radiation causes damage to the detector, with the generation of dark current and charge trapping sites that result in the degradation of the spectral resolution and an increase of the instrumental background. The Swift team has a dedicated calibration program with the goal of recovering a significant proportion of the lost spectroscopic performance. Calibration observations of supernova remnants with strong emission lines are analysed to map the detector charge traps and to derive position-dependent corrections to the measured photon energies. We have achieved a substantial recovery in the XRT resolution by implementing these corrections in an updated version of the Swift XRT gain file and in corresponding improvements to the Swift XRT HEAsoft software. We provide illustrations of the impact of the enhanced energy resolution, and show that we have recovered most of the spectral resolution lost since launch

Pagani, C.↗

An Adaptable Power System with Software Control Algorithm

A low cost, flexible and modular spacecraft power system design was developed in response to a call for an architecture that could accommodate multiple missions in the small to medium load range. Three upcoming satellites will use this design, with one launch date in 1999 and two in the year 2000. The design consists of modular hardware that can be scaled up or down, without additional cost, to suit missions in the 200 to 600 Watt orbital average load range. The design will be applied to satellite orbits that are circular, polar elliptical and a libration point orbit. Mission unique adaptations are accomplished in software and firmware. In designing this advanced, adaptable power system, the major goals were reduction in weight volume and cost. This power system design represents reductions in weight of 78 percent, volume of 86 percent and cost of 65 percent from previous comparable systems. The efforts to miniaturize the electronics without sacrificing performance has created streamlined power electronics with control functions residing in the system microprocessor. The power system design can handle any battery size up to 50 Amp-hour and any battery technology. The three current implementations will use both nickel cadmium and nickel hydrogen batteries ranging in size from 21 to 50 Amp-hours. Multiple batteries can be used by adding another battery module. Any solar cell technology can be used and various array layouts can be incorporated with no change in Power System Electronics (PSE) hardware. Other features of the design are the standardized interfaces between cards and subsystems and immunity to radiation effects up to 30 krad Total Ionizing Dose (TID) and 35 Mev/cm(exp 2)-kg for Single Event Effects (SEE). The control algorithm for the power system resides in a radiation-hardened microprocessor. A table driven software design allows for flexibility in mission specific requirements. By storing critical power system constants in memory, modifying the system code for other programs is simple. These constants can be altered also by ground command, or in response to an anomolous event. All critical power system functions have backup hardware functions to prevent a software or computer glitch from propagating. A number of battery charge control schemes can be implemented by selecting the proper control terms in the code. The architecture allows the design engineer to tune the system response to various system components and anticipated load profiles without costly alterations. A design trade was made with the size, weight and power dissipation of the electronics versus the performance of the power bus to load variations. Linear, fine control is maintained with a streamlined electronics design. This paper describes the hardware design as well as the software control algorithm. The challenges of closing the system control loop digitally is discussed. Control loop margin and power system performance is presented. Lab measurements are shown and compared to the system response of a hardware model running actual flight software.

Castell, Karen↗

V and V of ISHM Software for Space Exploration

NASA has established a far-reaching and long-term program for robotic and manned exploration of the solar system, beginning with missions to the moon and Mars. The Crew Transportation System (CTS), a key system for space exploration, imposes four requirements' that ISHM addresses. These requirements have a wide range of implications for V&V and certification of ISHM. There is a range of time-criticality for ISHM actions, from prognostication, which is often (but not always) non-time-critical, to time-critical state estimation and system management under off-nominal emergency conditions. These are externally imposed requirements on ISHM that are subject to V&V. - In addition, a range of techniques are needed to implement an ISHM. The approaches to ISHM are described elsewhere. These approaches range from well-understood algorithms for low-level data analysis, validation and reporting, to AI techniques for state estimation and planning. The range of techniques, and specifically the use of AI techniques such as reasoning under uncertainty and mission planning (and re-planning), implies that several V&V approaches may be required. Depending on the ISHM architecture, traditional testing approaches may be adequate for some ISHM functionality. The AI-based approaches to reasoning under uncertainty, model-based reasoning, and planning share characteristics typical of other complex software systems, but they also have characteristics that set them apart and challenge standard V&V techniques. The range of possible solutions to the overall ISHM problem impose internal challenges to V&V. The V&V challenges increase when hard real-time constraints are imposed for time-critical functionality. For example, there is an external requirement that impending catastrophic failure of the Launch Vehicle (LV) at launch time be detected and life-saving action be taken within two seconds. In this paper we outline the challenges for ISHM V&V, existing approaches and analogs in other software application areas, and possible new approaches to the V&V challenges for space exploration ISHM.

Markosian, Lawrence↗

cyme-launcher

cyme-launcher is a script for helping launch CYME on HPC clusters. It ensures that a license manager is running on a node, that sufficient licenses for the software are available to run, and running CYME using WINE on Linux.

Mast, RyanA.↗

NEAMS Update: Quarterly report for January - March 2012

Quarterly highlights are: (1) The integration of Denovo and AMP was demonstrated in an AMP simulation of the thermo-mechanics of a complete fuel assembly; (2) Bison was enhanced with a mechanistic fuel cracking model; (3) Mechanistic algorithms were incorporated into various lower-length-scale models to represent fission gases and dislocations in UO2 fuels; (4) Marmot was improved to allow faster testing of mesoscale models using larger problem domains; (5) Component models of reactor piping were developed for use in Relap-7; (6) The mesh generator of Proteus was updated to accept a mesh specification from Moose and equations were formulated for the intermediate-fidelity Proteus-2D1D module; (7) A new pressure solver was implemented in Nek5000 and demonstrated to work 2.5 times faster than the previous solver; (8) Work continued on volume-holdup models for two fuel reprocessing operations: voloxidation and dissolution; (9) Progress was made on a pyroprocessing model and the characterization of pyroprocessing emission signatures; (10) A new 1D groundwater waste transport code was delivered to the used fuel disposition (UFD) campaign; (11) Efforts on waste form modeling included empirical simulation of sodium-borosilicate glass compositions; (12) The Waste team developed three prototypes for modeling hydride reorientation in fuel cladding during very long-term fuel storage; (13) A benchmark demonstration problem (fission gas bubble growth) was modeled to evaluate the capabilities of different meso-scale numerical methods; (14) Work continued on a hierarchical up-scaling framework to model structural materials by directly coupling dislocation dynamics and crystal plasticity; (15) New 'importance sampling' methods were developed and demonstrated to reduce the computational cost of rare-event inference; (16) The survey and evaluation of existing data and knowledge bases was updated for NE-KAMS; (17) The NEAMS Early User Program was launched; (18) The Nuclear Regulatory Commission (NRC) Office of Regulatory Research was introduced to the NEAMS program; (19) The NEAMS overall software quality assurance plan (SQAP) was revised to version 1.5; and (20) Work continued on NiCE and its plug-ins and other utilities, such as Cubit and VisIt.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Digital flight control software design requirements

The objective of the integrated digital flight control system is to provide rotational and translational control of the space shuttle orbiter in all phases of flight: from launch ascent through orbit to entry and touchdown, and during powered horizontal flights. The program provides a versatile control system structure while maintaining uniform communications with other programs, sensors, and control effects by using an executive routine/function subroutine format. The program reads all external variables at a single point, copies them into its dedicated storage, and then calls the required subroutines in the proper sequence. As a result, the flight control program is largely independent of other programs in the GN and C computer complex and is equally insensitive to the characteristics of the processor configuration. The integrated structure of the control system and the DFCS executive routine which embodies that structure are described. The specific estimation and control algorithms used in the various mission phases are shown. Attitude maneuver routines that interface with the DFCS are also described.

Source record↗

Microfabricated Hydrogen Sensor Technology for Aerospace and Commercial Applications

Leaks on the Space Shuttle while on the Launch Pad have generated interest in hydrogen leak monitoring technology. An effective leak monitoring system requires reliable hydrogen sensors, hardware, and software to monitor the sensors. The system should process the sensor outputs and provide real-time leak monitoring information to the operator. This paper discusses the progress in developing such a complete leak monitoring system. Advanced microfabricated hydrogen sensors are being fabricated at Case Western Reserve University (CWRU) and tested at NASA Lewis Research Center (LeRC) and Gencorp Aerojet (Aerojet). Changes in the hydrogen concentrations are detected using a PdAg on silicon Schottky diode structure. Sensor temperature control is achieved with a temperature sensor and heater fabricated onto the sensor chip. Results of the characterization of these sensors are presented. These sensors can detect low concentrations of hydrogen in inert environments with high sensitivity and quick response time. Aerojet is developing the hardware and software for a multipoint leak monitoring system designed to provide leak source and magnitude information in real time. The monitoring system processes data from the hydrogen sensors and presents the operator with a visual indication of the leak location and magnitude. Work has commenced on integrating the NASA LeRC-CWRU hydrogen sensors with the Aerojet designed monitoring system. Although the leak monitoring system was designed for hydrogen propulsion systems, the possible applications of this monitoring system are wide ranged. Possible commercialization of the system will also be discussed.

Hunter, Gary W.↗

Simulations of the Unsteady Flow through the Fastrac Supersonic Turbine

Analysis of the unsteady aerodynamic environment in the Fastrac supersonic turbine is presented. Modal analysis of the turbine blades indicated possible resonance in crucial operating ranges of the turbopump. Unsteady computational fluid dynamics (CFD) analysis was conducted to support the aerodynamic and structural dynamic assessments of the turbine. Before beginning the analysis, two major problems with current unsteady analytical capabilities had to be addressed: modeling a straight centerline nozzle with the turbine blades and exit guide vanes (EGVs), and reducing run times significantly while maintaining physical accuracy. Modifications were made to the CFD code used in this study to allow the coupled nozzle/blade/EGV analysis and to incorporate Message Passing Interface (MPI) software. Because unsteadiness is a key issue for the Fastrac turbine [and future rocket engine turbines such as for the Reusable Launch Vehicle (RI.V)], calculations were performed for two nozzle-to-blade axial gaps. Calculations were also performed for the nozzle alone, and the results were imposed as an inlet boundary condition for a blade/EGV calculation for the large gap case. These results are compared to the nozzle/blade/EGV results.

Griffin, Lisa W.↗

The ISS EXPRESS Rack: An Innovative Approach of Rapid Integration

The EXpedite the PRocessing of Experiments to Space Station or EXPRESS Rack System, was developed to provide Space Station accommodations for small, subrack payloads. The EXPRESS Rack accepts Space Shuttle middeck locker type payloads and International Subrack Interface Standard (ISIS) Drawer payloads, allowing previously flown payloads an opportunity to transition to the International Space Station. The EXPRESS Rack provides power, data, command and control, video, water cooling, air cooling, vacuum exhaust, and Nitrogen supply to payloads. The EXPRESS Rack system also includes transportation racks to transport payloads to and from the Space Station, Suitcase Simulators to allow a payload developer to verify power and data interfaces at the development site, Functional Checkout Units to allow Payload checkout at KSC prior to launch, and trainer racks for the astronauts to learn how to operate the EXPRESS Racks prior to flight. Standard hardware and software interfaces provided by the EXPRESS Rack simplify the analytical and physical integration processes, and facilitates simpler ISS payload development. The EXPRESS Rack has also formed the basis for the U.S. Life Sciences payload racks and the Window Observational Research Facility on Space Station.

Sledd, Annette M.↗

EXPRESS Rack Overview

The EXpedite the PRocessing of Experiments to Space Station or EXPRESS Rack System, was developed to provide Space Station accommodations for small, subrack payloads. The EXPRESS Rack accepts Space Shuttle middeck locker type payloads and International Subrack Interface Standard (ISIS) Drawer payloads, allowing previously flown payloads an opportunity to transition to the International Space Station. The EXPRESS Rack provides power, data, command and control, video, water cooling, air cooling, vacuum exhaust, and Nitrogen supply to payloads. The EXPRESS Rack system also includes transportation racks to transport payloads to and from the Space Station, Suitcase Simulators to allow a payload developer to verify power and data interfaces at the development site, Functional Checkout Units to allow Payload checkout at KSC prior to launch, and trainer racks for the astronauts to learn how to operate the EXPRESS Racks prior to flight. Standard hardware and software interfaces provided by the EXPRESS Rack simplify the analytical and physical integration processes, and facilitates simpler ISS payload development. The EXPRESS Rack has also formed the basis for the U.S. Life Sciences payload racks on Space Station.

Sledd, Annette M.↗

The NASA IVHM Technology Experiment for X-37

The NASA IVHM (Integrated Vehicle Health Management) technology experiment for X-37 is presented. The goals and objectives of this program are: to reduce cost and increase reliability of space transportation; to demonstrate benefits of in-flight IVHM to the operation of a Reusable Launch Vehicle; to advance this IVHM technology to Technology Readiness Level approx. 7 within a flight environment; and to operate IVHM software on the Vehicle Management Computer. The following sections are included: Background (X-37 & Livingstone), Livingstone model example from DS-1, Experiment overview, X-37 IVHM scope, Stanley interface to livingstone model, Right ruddervator actuator, Motor state diagram, inferred nominal state, and X-37 informed maintenance experiment.

Source record↗

The Extension of ISS Resources for Multi-Discipline Subrack Payloads

The EXpedite the processing of Experiments to Space Station or EXPRESS Rack System was developed to provide Space Station accommodations for subrack payloads. The EXPRESS Rack accepts Space Shuttle middeck locker type payloads and International Subrack Interface Standard (ISIS) Drawer payloads, allowing previously flown payloads an opportunity to transition to the International Space Station. The EXPRESS Rack provides power, data command and control, video, water cooling, air cooling, vacuum exhaust, and Nitrogen supply to payloads. The EXPRESS Rack system also includes transportation racks to transport payloads to and from the Space Station, Suitcase Simulators to allow a payload developer to verify data interfaces at the development site, Functional Checkout Units to allow payload checkout at KSC prior to launch, and trainer racks for the astronauts to learn how to operate the EXPRESS Racks prior to flight. Standard hardware and software interfaces provided by the EXPRESS Rack simplify the integration processes, and facilitate simpler ISS payload development. Whereas most ISS Payload facilities are designed to accommodate one specific type of science, the EXPRESS Rack is designed to accommodate multi-discipline research within the same rack allowing for the independent operation of each subrack payload. On-orbit operations began with the EXPRESS Rack Project on April 24, 2001, with one rack operating continuously to support long-running payloads. The other on-orbit EXPRESS Racks operate based on payload need and resource availability. Sustaining Engineering and Logistics and Maintenance functions are in place to maintain operations and to provide software upgrades.

Sledd, Annette M.↗

EXPRESS Rack: The Extension of International Space Station Resources for Multi-Discipline Subrack Payloads

The EXpedite the PRocessing of Experiments to Space Station or EXPRESS Rack System was developed to provide Space Station accommodations for subrack payloads. The EXPRESS Rack accepts Space Shuttle middeck locker type payloads and International Subrack Interface Standard (ISIS) Drawer payloads, allowing previously flown payloads an opportunity to transition to the International Space Station. The EXPRESS Rack provides power, data command and control, video, water cooling, air cooling, vacuum exhaust, and Nitrogen supply to payloads. The EXPRESS Rack system also includes transportation racks to transport payloads to and from the Space Station, Suitcase Simulators to allow a payload developer to verify data interfaces at the development site, Functional Checkout Units to allow payload checkout at KSC prior to launch, and trainer racks for the astronauts to learn how to operate the EXPRESS Racks prior to flight. Standard hardware and software interfaces provided by the EXPRESS Rack simplify the integration processes, and facilitate simpler ISS payload development. Whereas most ISS Payload facilities are designed to accommodate one specific type of science, the EXPRESS Rack is designed to accommodate multi-discipline research within the same rack allowing for the independent operation of each subrack payload. On-orbit operations began with the EXPRESS Rack Project on April 24, 2001, with one rack operating continuously to support long-running payloads. The other on-orbit EXPRESS Racks operate based on payload need and resource availability. Sustaining Engineering and Logistics and Maintenance functions are in place to maintain operations and to provide software upgrades.

Sledd, Annette↗

Progress on the International Space Station - We're Part Way up the Mountain

The first phase of the International Space Station construction has been completed, and research has begun. Russian, U.S., and Canadian hardware is on orbit, and Italian logistics modules have visited often. With the delivery of the U.S. Laboratory, Destiny, significant research capability is in place, and dozens of U.S. and Russian experiments have been conducted. Crew members have been on orbit continuously since November 2000. Several "bumps in the road" have occurred along the way, and each has been systematically overcome. Enormous amounts of hardware and software are being developed by the International Space Station partners and participants around the world and are largely on schedule for launch. Significant progress has been made in the testing of completed elements at launch sites in the United States and Kazakhstan. Over 250,000 kilograms of flight hardware have been delivered to the Kennedy Space Center and integrated testing of several elements wired together has progressed extremely well. Mission control centers are fully functioning in Houston, Moscow, and Canada, and operations centers Darmstadt, Tsukuba, Turino, and Huntsville will be going on line as they are required. Extensive coordination efforts continue among the space agencies of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved significant successes. This paper will discuss the contributions of the International Space Station partners and participants, their accomplished milestones, and upcoming events. The International Space Station program, the largest and most complicated peacetime project in history, has progressed part way up the mountain, and the partners are continuing their journey to the top. The International Space Station (ISS) is unprecedented in its technological, engineering, and management complexity, and is one of the largest international collaborations ever undertaken. The ISS is a dramatic example of the ability of nations to work together as a team toward common goals and dreams. The challenges encountered and overcome by the international ISS team have been likened to climbing a mountain. Construction of the ISS has progressed rapidly in the past year. ISS is now a functioning microgravity laboratory in space hosting a permanent human presence, prompting the characterization that we are "part way up the mountain, and the team continues its climb."

Fortenberry, Lindy↗

NASA’s Space Launch System: Artemis I Results and the Path Forward

On Nov. 16, 2022, NASA launched the Artemis I mission on the agency’s new SLS (Space Launch System) rocket. The debut launch of the integrated vehicle sent an uncrewed Orion spacecraft into a distant retrograde (DRO) orbit about the Moon to accomplish multiple mission objectives, including evaluating Orion’s heatshield at lunar return velocities and collecting critical data from the first flight of the new superheavy lift launch vehicle. Post-flight data analyses show that the rocket performed with a high degree of precision and accuracy. In addition to completing testing and launch of the Artemis I SLS in 2022, notable progress was made on hardware for future launch vehicles that will support Artemis missions II, III, IV, and V. The Artemis II core stage is mostly complete, and its RS-25 engines were integrated in the fall of 2023. The Artemis II solid rocket booster motor segments were shipped to the launch site in September 2023. Propellant tanks are being manufactured for additional missions, solid booster segments are being cast and prepared, software is being developed, and production of new RS-25 engines is underway. A more capable upper stage is in development, as well as a large adapter to encapsulate a 10-metric ton (t) co-manifested payload. This paper will provide details on the Artemis I flight as well as cover hardware progress for the future flights as available.

John Honeycutt↗

Ground Software Technologies – Embracing Change: Mission Drivers and Technology Opportunities to Enable Long Lived Missions

Mission lifecycles have proven to extend well beyond their original design. The benefits to this are countless but introduce challenges in today’s rapidly changing ground infrastructure and software technologies used to enable mission success. What remains constant is the risk posture missions maintain when accepting change and the use of new technologies. Larger missions are ready for change in early lifecycle development but near launch and especially in operations, few continue to evolve beyond what is set in place in phase C. This paper will discuss how the Advance Multi-Mission Operations System (AMMOS) intends to address, three driving missions concerns: Maintaining functionality (hardware/software) for decades, rapidly responding to security vulnerabilities in software, and finally the ability to quickly evolve infrastructure and software changes. These driving concerns are briefly described below: 1. Maintaining functionality (hardware/software) for decades. Hardware updates considerably faster than 10 years ago. Expectations that a system can remain in place for more than 10 years is no longer valid. Expecting to find hardware replacements for a system older than 5 years will increasingly become more and more challenging. How than do missions plan for hardware changes for long lived missions? Principle Objective: Provide abstraction by virtualizing and containerizing software abstract away any hardware dependencies and package up the application lightweight units. 2. Rapidly responding to security vulnerabilities in software. Cost is often the main impediment and largely driven by the revalidation and testing of system that undergo change. In todays, environment security updates are a major diver demanding systems remain up to date. How then do missions accept these changes and avoid large testing efforts? Principle Objective: Help reduce the cost of re-testing by automation of testing, deployment, and compartmentalizing change. 3. Ability to quickly evolve infrastructure and software changes. Responding quickly to change is similar to the second concern in this paper regarding security vulnerabilities. In this case, it address broader concerns of updating software and infrastructure on a more realistic timeline. How do missions stay up to date with the most recent versions of software and allowing for improved functionality? Principle Objective: Use continuous integration techniques at the system level to ensure rapid turnaround. This paper explores each of these concerns in more detail. It focuses the AMMOS’s current plans, challenges and current roadmap.

Giovannoni, Brian J.↗