Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Performance Considerations for Ground Source Heat Pumps in Cold Climates: Preprint

Remote, cold climates present challenges to finding safe and affordable options to heat homes. In Alaska, residential ground source heat pumps (GSHPs) have been gaining in popularity to fill this gap. However, there is little research on their long-term performance or effect on soil temperatures. The extended heating season and cold soils of Alaska provide a harsh testing ground for GSHPs, even those designed and marketed for colder climates. The large and unbalanced heating load of cold climates creates a challenging environment for GSHPs. In 2013 the Cold Climate Housing Research Center (CCHRC) installed a GSHP at its Research and Testing Facility (RTF) in Fairbanks, Alaska. The heat pump replaced an oil-fired condensing boiler heating a 464 m2 office space via an in-floor hydronic radiant heating system. The ground heat exchanger (GHE) was installed in moisture-rich silty soils underlain with permafrost near 0°C. The intent of the installation was to observe and monitor the system over a 10-year period in order to develop a better understanding of the performance of GSHPs in sites with permafrost and to help inform future design. As of this writing, the heat pump system has been running for seven heating seasons. The efficiency in those seven heating seasons has been variable with ups and downs that have been difficult to explain. This paper seeks to understand the variability in performance as well as make recommendations for GSHP use in other cold climates.

cold climate↗

Integrated and Advanced Lighting Controls: The Next Frontier in Energy Savings?

Lighting energy use has significantly declined as a portion of overall building energy usage due largely to the uptake of more efficient light-emitting diode technology. Although the per unit cost of lighting controls has declined, the installation and use of lighting controls are low and the installation and use of advanced controls are abysmally low. Increased use of advanced and connected lighting controls, and the ability to integrate lighting with other building systems (e.g., heat and air, plug loads, miscellaneous loads) that make the building “smarter,” offer the potential for additional energy savings. Studies into the performance of new, advanced lighting control technologies in commercial buildings have generated new findings. Although each field evaluation has interesting results individually, an analysis of their collective findings across a spectrum of commercial building types will help establish the current state of the technology and implications related to market readiness. This paper will analyze results from available field evaluation studies (recently completed as well as ongoing) of retrofit sites and share findings and insights including: • The amount of energy savings that may be expected from these systems. • Cost effectiveness, monetization, and cost points of these systems. • Ideal characteristics of these systems the most viable. • Lessons learned from the installation, commissioning, and occupant response of these systems. The results will support Department of Energy research investments and help inform efficiency programs of the potential of these emerging technologies and how they may fit within the clean energy future.

Myer, Michael↗

Analysis of Residential Time-of-Use Utility Rate Structures and Economic Implications for Thermal Energy Storage

Thermal energy storage (TES) is an increasingly popular tool to level out the daily electrical demand and add stability to the electrical grid as more intermittent renewable energy sources are installed. TES systems can locally decouple high thermal loads from the operation of a heat pump or reduce the electrical energy demand of the heat pump by providing a more favorable temperature gradient. In addition, many policy makers and utility providers have introduced time-of-use (TOU) rate schedules for residential customers to better reflect the price of electricity generation and demand for specific times. TOU rate schedules price grid-provided electricity differently throughout the day depending on the region’s climate, time of year, and electrical production. Large differences between on-peak and off-peak electrical prices may create an economic advantage for a residential customer to install a TES system. In this work, the economic and energy savings are calculated for a modeled 2,400 square foot residential building with water/ice-based TES using a TOU rate structure. The weather data is from Fresno County, CA, ASHRAE climate zone 3B, and a representative residential TOU utility rate structure from Pacific Gas and Electric (PG&E) was used. The results showed that total energy consumption could be reduced by 14.5% with an 87.5% reduction in on-peak energy usage when the TES is installed. The cost of operating this system for space cooling was reduced by nearly 20% using the sample utility rate plan.

Sultan, Sara↗

U.S. Solar System Decommissioning Policies

In the United States, cumulative installed utility-scale solar photovoltaic (PV) capacity reached more than 60 gigawatts (GW)dc at the end of 2020. Federal and state renewable energy and net-zero emissions policies will continue to drive solar development in the United States with installed utility-scale PV projected to quadruple (240 GWdc) by 2030. Although more than 75% of all U.S. installed utility-scale PV came online in the last 5 years, federal, state, and local governments are planning for system decommissioning. Our research found that as of April 2021, one federal agency, the Bureau of Land Management (BLM), and 15 U.S. states have solar decommissioning policies in place. North Carolina is also in the process of drafting solar decommissioning regulations, and at least 4 states (Maine, Pennsylvania, West Virginia, Texas) proposed solar decommissioning bills in the 2021 legislative session. This presentation looks at U.S. federal and state solar decommissioning policies who they apply to, when they apply, the requirements/responsibilities, and what the impacts are.

circular economy↗

Life Cycle Assessment for Closed-Loop Pumped Hydropower Energy Storage in the United States

The federal government has initiated an aggressive set of policies to achieve a net-zero carbon emission goal for the electricity sector by 2050. As a result, rapid growth in deployment of renewable energy technologies is expected. Most commercially mature technologies are temporally variable and do not provide grid inertia, while renewable technologies with high projected deployment have intermittent generation methods. Energy storage technologies are needed to both dispatch power on-demand and help provide the needed grid inertia. Pumped storage hydro (PSH) is a well-established technology that has gained renewed interest in recent years offering energy-balancing, grid stability, control of electrical network frequency, and large-scale storage capacity. For widespread adoption of PSH, more information is needed regarding its current life cycle environmental impacts. The objective of this study is to perform a full life cycle assessment (LCA) of new closed-loop PSH in the U.S. The functional unit for this study is 1 kWh of electrical power delivered to the grid and the base case project lifetime is 80 years. The life cycle inventory for this project accounts for all material and energy flows associated with the green-field construction, operation, maintenance, and decommissioning of a closed-loop PSH plant in the U.S. Collected data represents a range of potential PSH specifications and geographic locations coming from all prospective closed-loop PSH installations in the U.S. with data available. In addition, existing PSH installations are used to provide assumptions for inventory inputs. Results presented will include the global warming potential (GWP IPCC 100a) and Energy Return on Investment (EROI) from our base case (average PSH installation) as well as from scenario analyses and model sensitivity. These results will be compared to the impacts from existing PSH sites and alternate storage technologies. Methods align with the assumptions and guidelines put in place by previous PSH LCAs to ensure an accurate comparison with the results from this report.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

Experimental Evaluation of Thermal Storage Performance of a Dual-Purpose Underground Thermal Battery

A geothermal heat pump (GHP) system is an energy-efficient building heating and cooling technology with great potential for reducing energy consumption and decarbonization. However, applications of GHP are still limited due to the high cost, of which 30% is related to the cost of installing the conventional vertical bore ground heat exchangers, which are usually installed in boreholes 60 meters deep. A dual-purpose underground thermal battery (DPUTB) has been developed to offer a low-cost ground heat exchanger with a built-in thermal storage capacity. The DPUTB innovatively integrates a shallow-bore ground heat exchanger (the outer tank), which can be installed in a borehole less than 6 m deep, with thermal energy storage (TES) (the inner tank). DPUTB has the potential to reduce the cost of a ground source heat pump system while allowing shifting the electric demand of the building served by the GHP system from peak to off-peak hours of the electric grid by charging and discharging the thermal storage. A lab-scale (1:125 in volume) DPUTB prototype was built. Phase change material (PCM) was added to increase the thermal storage capacity and maintain the supply water temperature from the TES within the desired range for direct cooling operation during the discharge period. As PCMs are critical to the TES performance of the DPUTB, this study compared the influence of different PCMs (including salt hydrate and organic PCMs) on the discharge performance of the DPUTB. The thermal State of Charge (SoC) of the DPUTB was used to compare the performance resulting from using different PCMs. Test results indicate that the organic PCM (Methyl Laurate) outperforms salt-hydrate PCMs due to a lower melting temperature and a narrower melting temperature range during the phase change process. The results of this study provide a guide for PCM selection and the optimal design of DPUTB.

Wang, Lingshi↗

Split HPWHs as an Efficient Solution for Multifamily Buildings with In-Unit Water Heaters

A quarter of all housing units in the United States are found in multifamily buildings, but few efficiency innovations have been made to improve electric water heating systems in this building type. Domestic hot water in multifamily buildings can either be provided by a large central water heater or smaller in-unit water heaters. Integrated heat pump water heaters that are installed in single-family homes are often a poor fit for individual multifamily units because the water heaters are often located in small internal closets. This confined space can limit the airflow to the heat pump, and the cold exhaust air can cause discomfort and reduced efficiency. Split CO2 HPWHs separate the tank from the heat pump, which allows for installation location flexibility. Further, CO2 heat pumps can operate under colder ambient conditions, making them a better fit for multifamily units across a wide range of climate regions. As part of a larger project to characterize split HPWH performance, we evaluated the feasibility of installing an additional, parallel tank that could provide hot water to a second housing unit using a single CO2 heat pump. This approach would reduce the first costs of these more expensive units. Based on the high draw volume that we imposed on both tanks, the same heat pump may be able to support more tanks, depending on hot water usage. This paper will describe the split CO2 HPWH technology, how the two-tank system was controlled, and results from our laboratory evaluation.

CO2 HPWH↗

Split HPWHs as an Efficient Solution for Multifamily Buildings with In-Unit Water Heaters: Preprint

A quarter of all housing units in the country are found in multifamily buildings but few efficiency innovations have been made to improve electric water heating systems in this building type. Domestic hot water in multifamily buildings can either be provided by a large central water heater or smaller in-unit water heaters. Integrated heat pump water heaters that are installed in single family homes are often a poor fit for individual multifamily units since the water heaters are often located in small internal closets. This confined space can limit the air flow to the heat pump and the cold exhaust air can cause discomfort and reduced efficiency. Split CO2 HPWHs separate the tank from the heat pump, which allows for installation location flexibility. Further, CO2 heat pumps can operate under colder ambient conditions, making them a better fit for multifamily units across a wide range of climate regions. As part of a larger project to characterize split HPWH performance, we evaluated the feasibility of installing an additional, parallel tank that could provide hot water to a second housing unit using a single CO2 heat pump. This approach would reduce the first costs of these more expensive units. Based on the high draw volume that we imposed on both tanks, the same heat pump may be able to support more tanks, depending on hot water usage. This paper will describe the split CO2 HPWH technology, how the two-tank system was controlled, and results from our laboratory evaluation.

CO2 HPWH↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

Barbier, Charlotte↗

Progress on the Proton Power Upgrade at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory will double the proton power capability from 1.4 to 2.8 MW. This will be accomplished through an energy increase from 1.0 to 1.3 GeV and a beam current increase from 26 to 38 mA. The energy increase will be accomplished through the addition of 7 cryomodules to the linear accelerator (Linac). The beam current increase will be supported by upgrading several radio-frequency systems in the normal-conducting section of the Linac. Upgrades to the accumulator ring injection and extraction regions will accommodate the increase in beam energy. A new 2-MW-capable target and supporting systems will be developed and installed. Conventional facility upgrades include build-out of the existing klystron gallery and construction of a tunnel stub to facilitate future beam transport to the second target station. The project received approval to proceed with construction in October 2020. Procurements are in progress, and some installation activities have already occurred. Most of the installation will take place during three outages in 2022-2023. The project early finish is planned for 2025.

Barbier, Charlotte↗

A Machine Learning-Assisted Framework to Control Thermally Anisotropic Building Envelopes in Residential Buildings

To curb the energy consumption of buildings and their related CO2 emissions, Oak Ridge National Laboratory (ORNL) has developed the thermally anisotropic building envelope (TABE) —a multi-layer design comprising insulation materials and metal foils connected to thermal loops. In this study, a machine learning-assisted framework was developed to control the TABE in residential buildings to reduce the computation load for future optimal rule-based control and application. First, a 2D finite element model was established in COMSOL to calculate the hourly heat flux through exterior walls installed with the TABE. Then, TABE wall heat fluxes were simulated for various given indoor and outdoor boundary conditions, as well as thermal loops fluid temperatures and flow rates. Since the finite element simulations are computationally expensive, an artificial neural network (ANN) was then trained to use as a proxy of the finite element (COMSOL) modeling. Finally, the trained ANN model was coupled with the EnergyPlus model to predict the energy consumption of a US Department of Energy prototype single-family house installed with the TABE. An optimal simple rule-based control was determined from predefined rules for a case study. The results demonstrate that the developed machine learning–assisted framework can reduce 99.9% of the computation time while efficiently managing residential building energy for installed TABE walls.

Shen, Zhenglai↗

High Power Radiofrequency Operation of the Radiofrequency Quadrupoles in the Spallation Neutron Source

The Spallation Neutron Source (SNS) recently took delivery of a third Radiofrequency Quadrupole (RFQ03) that will ultimately be installed on the front-end (FE) of the SNS Linac. The first RFQ (RFQ01) operated in the SNS FE for more than a decade before being replaced with the second RFQ (RFQ02). RFQ01 was relocated to the Beam Test Facility (BTF) where it operated for five more years. The RFQ02 was initially installed in the BTF for high power testing and used with H- beam for BTF operation. It replaced RFQ01 in the SNS FE in 2017 and has been operating for beam production since then. There are some differences between the three RFQs. RFQ01 has a square cross-section with pi-mode stabilizing loops (PISLs) with the structure being fabricated using two layers of materials, GlidCop outside and OFHC inside. RFQ02 and RFQ03 has an octagonal cross-section with end-wall stabilizer rods and was fabricated using OFHC only. RFQ01 suffered some field flatness distortion incidents that resulted in degradation in beam transmission efficiency and required RF tuning. RFQ02 has performed well but had a melted RF seal in the high energy end wall, that was ultimately mitigated by a redesign of the end flange seals. The SNS decided to order RFQ03 that has a design that followed that of RFQ02 closely, but end-wall contacts were modified to prevent RF seal failure. This report presents the testing, installation, high power RF operation, and design improvements of the RFQ03.

Ren, Haitao↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) Quality Assurance Program - 20237

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous HEPA filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The SSCVS project has proceeded with the awarding of CD-3A for Long Lead Procurements followed by CD-2/3 approval for the construction of the facilities. The SSCVS project team made the decision to increase the quality oversight throughout the complete project per the Project Quality Assurance Plan (PQAP) such that it can ensure the final products meet applicable NQA-1 requirements and general quality requirements, and that the project will proceed to operations without significant delays due to post installation quality concerns. The PQAP was established prior to approval of the project at the CD-2/3 milestone. The SSCVS project has 2 major long lead procurements which commenced with the awarding of CD-3A. These procurements include the HEPA filter housing assemblies and the Exhaust Fans. There are 22 HEPA filter assemblies for the SSCVS, which are designated Safety Significant for pressure boundary confinement, per the approved PDSA. The exhaust fans also have Safety Significant components to maintain the pressure confinement boundary. NWP made the decision to install resident Quality Inspectors at the fabrication facilities to ensure the documentation for each fabricated unit meets all the QA requirements as defined in the respective contract documents. For the construction of the SSCVS Salt Reduction Building (SRB) and New Filter Building (NFB), dedicated, on-site quality inspectors have been utilized to ensure that all work being performed will comply with quality requirements and the Special Inspections as defined in IBC-2015. At each stage of inspection, hold points are placed into the work packages to ensure NWP QA personnel are present to inspect and verify the installations are in accordance with the design specifications, codes and standards. With this level of oversight, NWP anticipates that the level of quality related issues, as seen on multiple other DOE complex site projects, will be avoided and that the commissioning, start-up and hot operations will progress in a timely fashion, as all documentation will be in place and approved prior to initiation of these activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Zero-Valent Iron Permeable Reactive Barrier to Remediate Volatile Organic Compounds in Groundwater - 20209

The US DOE-SRS, the US EPA, and the South Carolina Department of Health and Environmental Control determined it was appropriate to perform a non-time critical removal action at the P-Area Groundwater Operable Unit at the SRS to reduce the mass and downgradient transport of trichloroethylene in the P-Area groundwater plume. Contaminated groundwater discharges to a nearby stream, Steel Creek, within the SRS boundaries, resulting in trichloroethylene concentrations above the maximum contaminant level. Impact to surface water is limited in areal extent and supported by recently collected characterization data. The P-Area Groundwater Operable Unit encompasses the groundwater beneath an industrial area within SRS, P Area, where the P-Reactor once operated. The boundaries of the P-Area Groundwater Operable Unit extend northwest to Steel Creek, northeast toward PAR Pond, and southeast to Meyers Branch. Groundwater in the Upper Three Runs Aquifer of the P-Area Groundwater Operable Unit has been impacted by reactor and facility operations between 1954 and 1991, including tritium and volatile organic compounds. The P-Area surface units contributing to groundwater contamination were remediated as part of the P-Area Operable Unit in 2011. The P-Reactor closure is one of the first of its kind in the DOE Complex and is one of only a few full-sized production reactors in the US to undergo completion of final closure activities. The nature and extent of groundwater contamination was determined using a variety of investigative approaches such as groundwater monitoring wells, direct-push technology, and surface water samples. Groundwater contamination associated with trichloroethylene is primarily exhibited in a narrow plume that extends from the source area at P-Reactor and west to Steel Creek. Maximum contaminant level exceedances in groundwater occur over an area of ∼6.9 hectares for trichloroethylene with concentrations as high as 7.7 milligrams per liter. To the west of the P-Area facility area, the trichloroethylene groundwater plume is controlled by a buried geologic feature, assumed to be an old stream bed, that further narrows the groundwater plume in what has been designated as the 'neck area.' This narrowing of the groundwater plume provides an ideal location for a treatment barrier. The non-time critical removal action alternative chosen is to install a zero-valent iron permeable reactive barrier within the neck area of the trichloroethylene groundwater plume, perpendicular to groundwater flow direction. This technology will provide a treatment barrier that will reduce trichloroethylene groundwater concentrations by 90% and has an anticipated useful life of at least 25 years. A pre-design investigation was performed in the neck area to confirm site lithology, hydrogeology, geochemistry, and extent of trichloroethylene contamination prior to a final design. A treatability study, conducted as part of the pre-design investigation, indicated that the subsurface and groundwater in the PArea Groundwater Operable Unit is compatible with the zero-valent iron and will not lead to excessive buildup from mineralization/precipitation or biofouling. Probabilistic modeling was conducted using field and laboratory data to determine the expected performance of the zero-valent iron permeable reactive barrier. The model simulations indicated that a 3.81-centimeter thick barrier would provide greater than 90% reduction of trichloroethylene groundwater concentration. The final design of the zero-valent iron permeable reactive barrier is a barrier that will extend 80.5 linear meters in a 'zigzag' orientation to best transect the trichloroethylene plume and account for varying groundwater flow. The barrier will be installed from 13.7 meters below ground surface to 41.1 meters below ground surface for 65.8 linear meters and from 13.7 meters below ground surface to 36.6 meters below ground surface for 14.6 linear meters, the base of which is 'keyed' into a low permeability zone. The barrier is designed to a thickness of 10.2 centimeters, which was determined to reduce the trichloroethylene groundwater concentrations by greater than 90% with a safety factor of 2.67. A total of approximately 689 metric tons of zero-valent iron will be injected through 22 injection wells spaced 3.66 meters apart, using guar to suspend the zero-valent iron. Zero-valent iron permeable reactive barrier construction will be monitored through 23 installed resistivity receivers offset 7.32 meters from the zerovalent iron permeable reactive barrier. The zero-valent iron will be energized with a low-voltage 100 Hertz signal during injection and will be monitored using the resistivity receivers to ensure complete coalescence of the zero-valent iron permeable reactive barrier. The zero-valent iron was sized to have a hydraulic conductivity greater than the natural subsurface, thus promoting groundwater flow through the barrier. As contaminated groundwater contacts the zero-valent iron, volatile organic compounds, including trichloroethylene, are immediately degraded to harmless compounds such as ethylene. The performance of the zero-valent iron permeable reactive barrier will be monitored using three upgradient monitoring well clusters, six downgradient monitoring well clusters, and four in-wall monitoring wells. The in-wall monitoring wells will indicate immediate reduction of trichloroethylene mass in the groundwater and allow analyses of the zero-valent iron permeable reactive barrier health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modular, Mobile Systems for the Treatment of Contaminated Water at Three Magnox Sites in the United Kingdom - 20421

Veolia Nuclear Solutions (VNS), and its mitigated entity, Veolia Nuclear Solutions Federal Services (VNSFS), are designing, overseeing the fabrication and installation, and supporting the commissioning of highly mobile and modular skid-based water treatment systems to assist in the decommissioning of three Magnox reactor sites based in the U.K. These Modular Active Effluent Treatment Plants (MAETP) will be deployed at the Chapelcross, Hinkley Point A, and Dungeness A sites to process contaminated water through the use of ion exchange systems and/or filtration units. At the time of writing, two systems have been installed and inactively commissioned, and the third system is expected to be delivered in 2020. Veolia has utilized a multi-national team of engineers, based in the UK and the US, to effectively leverage the best of Veolia expertise in the design and delivery of mobile, modular systems. The VNS team continues to refine the modular, mobile, and scalable approach to water processing system delivery, and has successfully patented the evolving technology for proprietary protection. The intent of this technology investment is to improve the functionality, mobility, and modularity, resulting in a system which can be adapted to a broad range of throughput and isotope removal requirements to achieve the most cost effective, flexible system possible for customers. Designing, fabricating, and factory-testing the modules off site followed by onsite installation, testing, start-up, and commissioning ensures expedited delivery and setup, as well as cost savings for nuclear applications. For the MAETP systems, VNS's previous nuclear site experience and ongoing Research and Development (R and D), combined with the resulting mobile/modular water processing systems developed and successfully deployed by VNS, have proven to be important inputs for the successful end-design of the systems, materials selection, system testing and commissioning. The lessons learned in the development and continued enhancement of the patented systems described in this paper will prove useful in advancing and deploying future systems for other nuclear sites, where rapid customizing and cost-effective implementation are critical factors. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of a Soil Flushing Treatability Test for Hanford Site Hexavalent Chromium Removal - 20446

U.S. Department of Energy contractor CH2M Hill Plateau Remediation Company has made significant progress remediating hexavalent chromium in groundwater near the Columbia River through the operation of pump and treat facilities and source removal activities. To mitigate risks associated with hexavalent chromium contamination, which was identified in a CERCLA interim action record of decision as the primary groundwater contaminant of concern for the 100-KR-4 Operable Unit from discharging to the Columbia River, three ion-exchange pump and treat systems were installed between 1997 and 2009. Between 2010 and 2016, operation of the K West pump and treat system, located near the former 105K West plutonium production reactor, reduced concentrations below the groundwater remediation target for hexavalent chromium. In 2016, a rebound study was performed to evaluate the effectiveness of the pump and treat remedy and assess the potential for any residual hexavalent chromium sources continuing to contribute to groundwater contamination. As a result of the rebound study, a source of continued groundwater contamination was identified. To address this condition, a soil flushing treatability test was written and approved by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The test included saturating about a 1-acre area of soil with treated water with the goal of forcing the residual hexavalent chromium to groundwater where existing extraction wells could remove it for treatment, accelerating the cleanup process. In spring and summer 2019, CH2M Hill Plateau Remediation Company installed and began operating a shallow underground leach system to support the treatability test. Preliminary sampling data show the test was effective in removing the residual contamination. Following further evaluation and analysis from the initial test, the process will be considered for implementation elsewhere on the Hanford Site, particularly at locations where there is a known or suspected continuing contamination source in the soil column. The paper will cover the goals of the study, as well as more details about the following: - Overview of pump and treat exit strategy (using U.S. Environmental Protection Agency guidance); - The design and installation of the soil flushing technology in the 100-K Area; - The testing process and results of sampling data; - Post-study evaluation and potential for implementation in other locations at the Hanford Site. Innovative solutions for cleanup, such as the soil flushing technology, have resulted in substantial progress in the removal of groundwater contaminants at the Hanford Site, potentially shortening the time frame required to meet cleanup goals and resulting in significant cost savings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Considerations for the Removal and Disposal of Micro-Reactor Experiments

Idaho National Laboratory (INL) is preparing to host several microreactor experiments through 2030 and beyond. Two new test beds currently under development will operate as microreactor or nuclear system experiment user facilities. Test bed experiments will be performed in series, with each nuclear experiment installed, operated, and removed before installation of the subsequent experiment. The necessarily brief transition period between experiments introduces unique equipment removal and radioactive waste disposal challenges. This paper evaluates equipment removal and radioactive waste management topics associated with tight sequencing of nuclear experiments and presents some of the solutions and approaches currently planned to meet these special considerations for one such experiment, the Molten Chloride Reactor Experiment (MCRE), slated for operation at INL’s Laboratory for Operation and Testing in the United States (LOTUS). The MCRE project is a collaboration between Southern Company Services, TerraPower, and INL, among others, to provide integral nuclear data that will advance molten salt fast reactor technology. MCRE will be the first critical fast-spectrum circulating fuel system ever operated and the first experiment operated in the LOTUS test bed. The experiment will nominally operate at zero power with planned low power excursions as part of operational planning for MCRE has been to minimize at-power operations to limit fission product formation while still achieving experimental objectives. After the experiment is complete, MCRE will be allowed to radioactively decay for a short period (nominally 90 days) prior to system defueling, flushing, removal, and disposal of all MCRE equipment, readying the test bed for the next nuclear experiment. Equipment removal and radioactive waste disposal have been integral to MCRE project planning since the Cooperative Research and Development Agreement was formalized in 2021. Due to requirements for future use of the test bed, the MCRE system, of necessity, must be removed in a much shorter time frame than typical for historic reactor decommissioning projects at INL. This results in minimal time for radioactive decay, resulting in not only elevated radiation dose rates but also the presence of short-to-medium-lived isotopes not typically encountered in the reactor decommissioning and radioactive waste management space. Additional unique constraints placed on the project include lack of intrinsic remote-operations capabilities in the test bed, space constraints in the test bed once MCRE has been installed, and contamination minimization requirements to return the test bed to as-found conditions to enable future use. This paper discusses planned solutions to these challenges. Approaches for implementing remote or semi-remote technologies in a non-hot cell environment with limited space availability are discussed. The paper also summarizes the systems engineering approach for concept development and design of equipment removal systems, which are being implemented concurrent with the MCRE design phase, providing feedback to system designers to incorporate features enabling efficient and safe equipment removal approaches. The timing of this paper at a relatively early phase of the project is meant to highlight the importance of early planning for nuclear system decommissioning while reactor design is ongoing to allow design feedback on componentry driven from decommissioning system needs. As new, innovative nuclear reactor technologies enter the nuclear market sector, reactor experiments are crucial for providing new integral nuclear data that establish safe operational margins for technology advancement. Microreactor experiments at INL will require safe, effective, and timely decommissioning approaches, which in turn require nuclear systems designed to expedite decommissioning. In addition to the advancement of nuclear reactor technologies, these nuclear experiments provide an opportunity to demonstrate, deploy, and test new removal and disposal capabilities to support the next generation of nuclear reactor technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗