Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installation tests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Experimental and simulational result multipactors in 112 MHz QWR injector

The first RF commissioning of 112 MHz QWR superconducting electron gun was done in late 2014. The coaxial Fundamental Power Coupler (FPC) and Cathode Stalk (stalk) were installed and tested for the first time. During this experiment, we observed several multipacting barriers at different gun voltage levels. The simulation work was done within the same range. The comparison between the experimental observation and the simulation results are presented in this paper. The observations during the test are consisted with the simulation predictions. We were able to overcome most of the multipacting barriers and reach 1.8 MV gun voltage under pulsed mode after several round of conditioning processes.

43 PARTICLE ACCELERATORS↗

First Performance Results of the PIP2IT MEBT 200 Ohm Kicker Prototype

The PIP-II project is a program to upgrade the Fermilab accelerator complex. The PIP-II linac includes a 2.1 MeV Medium Energy Beam Transport (MEBT) section that incorporates a unique chopping system to perform arbitrary, bunch-by-bunch removal of 162.5 MHz structured beam. The MEBT chopping system will consist of two identical kickers working together and a beam absorber. One design of two having been proposed has been a 200 Ohm characteristic impedance traveling wave dual-helix kicker driven with custom designed high-speed switches. This paper reports on the first performance results of one prototype kicker built, installed and tested with beam at the PIP-II Injector Test (PIP2IT) facility. The helix deflector design details are discussed. The electrical performance of the high-speed switch driver operating at 500 V bias is presented. Tests performed were chopping beam at 81.25 MHz for microseconds as well as with a truly arbitrary pattern for 550 $\mu$s bursts having a 45 MHz average switching rate and repeating at 20 Hz.

43 PARTICLE ACCELERATORS↗

Characteristics of refrigerant leaks from small HVAC&R systems

Reduced use of high global warming potential (GWP) hydrofluorocarbon (HFC) refrigerants is desired. However, many lower-GWP alternatives are flammable, some of higher flammability levels, or A3, and others of lower flammability (A2 or A2L).Safety standards for A2 and A3 flammable refrigerants, including the International Electrotechnical Commission (IEC) standard IEC 60335-2-40 calculate maximum flammable refrigerant charge limits using a fixed 4-minute leak time based on the time to leak 150 g of CO2 through a capillary tube.Actual refrigerant leak times depend on the equipment type, leak location, leak orifice diameter and equipment operation condition (on or off).Five systems were installed in test chambers with leak quantities and rates measured by tracking total system weight during the leak event. Among the major results were that almost all of the system charge was shown to escape the units, >80% within the first 10 minutes.

Patel, Viral↗

Advanced Materials Program Summary

Materials solutions - enabling design, construction, and operation of licensable Advanced Nuclear Material, design, fabrication, installation, examination, testing, overpressure protection, inspection, stamping, and certification

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Experimental characterization of pressure drops and channel instabilities in helical coil SG tubes

Helical tube heat exchangers provide better heat transfer characteristics, an improved capability to accommodate stresses due to thermal expansions and a more compact design with respect to straight tube heat exchangers. For these advantages they are considered as an option for the Steam Generator (SG) of many new reactor projects of Generation III+ and Generation IV. In particular, their compactness fits well with the requirements of Small-medium Modular Reactors (SMRs) of integral design, where all the primary system components are located inside the reactor vessel. In this framework, thermal hydraulics of helical pipes has been studied in recent years by Politecnico di Milano in different experimental campaigns. Experiments have been carried out in a full-scale open loop test facility installed at SIET labs in Piacenza (Italy)), to simulate the SG of a typical SMR. The facility includes two helical pipes (1 m coil diameter, 32 m length, 8 m height), connected via lower and upper headers. Following recently completed experimental campaigns dedicated to pressure drops and density wave instabilities, this paper deals with a new experimental campaign focused on both pressure drops (single-phase flow and two-phase flow, laminar and turbulent regimes) and flow instabilities. The availability of a large number of experimental data, in particular on two-phase flow, is of fundamental interest for correlation development, model validation and code assessment. Two-phase pressure drops have been measured in adiabatic conditions, ranging from 200 to 600 kg/m{sup 2}s for the mass flux, from 30 to 60 bar for the pressure and from 0.1 to 1.0 for the flow quality. The channel characteristics mass flow rate - pressure drop has been determined experimentally in the range 10-40 bar, varying the mass flow rate at a fixed value of the thermal flux. In addition, single-phase pressure drops have been measured in both laminar and turbulent conditions. Density wave instabilities have been studied at mass flux from 100 to 400 kg/m{sup 2}s and pressure from 10 to 20 bar, to confirm the particular behavior of the stability boundary in helical geometry at low pressure and low mass flow rate. Finally, starting from the unstable regions identified from the experimental channel characteristics, Ledinegg type instabilities have been investigated to drawn stability maps with complete stable and unstable regions in the dimensionless plane N sub-N pch. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Fully Robotic Hot Cell Crane for Target Hall Operations at Isotope Research Facility - 18329

There are many types of equipment used in high radiation environments, but the super-sized and high precision lifting requirements for an isotope research facility in the USA called for one of the largest fully robotic cranes in the US. The 20 Ton Remote Handling Bridge Crane provided by PaR Systems met many challenging requirements for accuracy, repeatability and unique lifting motions in the radiation-shielded target hall of this facility. This robotic system was designed to address four main issues. The first is that the crane needed to be operated remotely due to high radioactivity during the time when it is needed most. Second is that high precision is needed due to the complex fit of multiple heavy shielding blocks. Third problem is that automated routines and exclusion areas were needed due to the remote operation of the system around high capital cost equipment. Lastly is the survivability of the equipment due to the high radiation environment. The facility robotic crane is an overhead top running multiple girder hot cell bridge crane (hereafter referred to as the system). The system is intended to be used in either manually operated or automated operation under computer control. Under automated control, the system provides highly accurate motion control in three linear axes as well as hook rotation. Using motion control programming, this highly accurate system ensures safe, remote movement of in-cell components. The system was designed to be remotely operated by a technician from the remote handling control room in the facility. This is facilitated by computer control using the System Graphical User Interface with feedback from a facility supplied video system. It can also be operated using a wireless hand held controller. The system will be used to place sensitive components with high precision in locations that will be difficult to observe directly. In order to accomplish this, it is critical that the system be capable of moving its payload with minimal swing, and with high accuracy, repeatability and reliability. The system will be operating in an environment where it will be exposed to both high energy neutrons and gamma radiation. Under beam-off conditions, the target hall will be hands-on accessible to accommodate crane maintenance. The system was installed and tested in early 2017 in advance of the live operations of the facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ASME Section III

This presentation is for ASME Section III at University of Tennessee Student Event on October 18, 2023. Includes ASME Section III - Rules for construction of nuclear facility components, including an all-inclusive term that includes material, design, fabrication, installation, examination, testing, overpressure protection, inspection, stamping, and certification, and discusses Division 1-5.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FPGA-based Upgrade to RITS-6 Control System, Designed with EMP Considerations

The existing control system for the RITS-6, a 20-MA 3-MV pulsed-power accelerator located at Sandia National Laboratories, was built as a system of analog switches because the operators needed to be close enough to the machine to hear pulsed-power breakdowns, yet the electromagnetic pulse (EMP) emitted would disable any processor-based solutions. The resulting system requires operators to activate and deactivate a series of 110-V relays manually in a complex order. The machine is sensitive to both the order of operation and the time taken between steps. A mistake in either case would cause a misfire and possible machine damage. Based on these constraints, a field-programmable gate array (FPGA) was chosen as the core of a proposed upgrade to the control system. An FPGA is a series of logic elements connected during programming. Based on their connections, the elements can mimic primitive logic elements, a process called synthesis. The circuit is static; all paths exist simultaneously and do not depend on a processor. This should make it less sensitive to EMP. By shielding it and using good electromagnetic interference-reduction practices, it should continue to operate well in the electrically noisy environment. The FPGA has two advantages over the existing system. In manual operation mode, the synthesized logic gates keep the operators in sequence. In addition, a clock signal and synthesized countdown circuit provides an automated sequence, with adjustable delays, for quickly executing the time-critical portions of charging and firing. The FPGA is modeled as a set of states, each state being a unique set of values for the output signals. The state is determined by the input signals, and in the automated segment by the value of the synthesized countdown timer, with the default mode placing the system in a safe configuration. Unlike a processor-based system, any system stimulus that results in an abort situation immediately executes a shutdown, with only a tens-of-nanoseconds delay to propagate across the FPGA. This paper discusses the design, installation, and testing of the proposed system upgrade, including failure statistics and modifications to the original design.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design, Implementation, and Experiences of Third-Party Software Administration at the ORNL NCCS

At the ORNL NCCS, the structure and policy surrounding how we install third-party applications. This change is most notable for its effect on our quad-core Cray XT4 (Jaguar) computer. Of particular interest is the addition of many scripts to automate installing and testing system software, as well as the addition of automated reporting mechanisms. We will present an overview of the design and implementation, and also present our experiences to date

97 MATHEMATICS AND COMPUTING↗

Funnel cone for focusing intense ion beams on a target

We describe a funnel cone for concentrating an ion beam on a target. The cone utilizes the reflection characteristic of ion beams on solid walls to focus the incident beam andincrease beam intensity on target. The cone has been modeled with the TRIM code. A prototype has been tested and installed for use in the 350-keV K+ NDCX target chamber.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

STATUS OF BEAM IMAGING DEVELOPMENTS FOR THE SNS TARGET

The Spallation Neutron Source (SNS) continues a ramp up in proton beam power toward the design goal of 1.4 MW on target. At Megawatt levels, US and Japanese studies have shown that cavitation in the Mercury target could lead to dramatically shortened target lifetime. Therefore, it will be critical to measure and control the proton beam distribution on the target, in a region of extremely high radiation and limited accessibility. Several sources of photons have been considered for imaging the beam on or near the target. These include a freestanding temporary screen, a scintillating coating, Helium gas scintillation, optical transition radiation, and a beam- heated wire mesh. This paper will outline the selection process that led to the current emphasis on coating development. In this harsh environment, the optics design presented significant challenges. The optical system has been constructed and characterized in preparation for installation. Optical test results will be described along with predictions of overall system performance.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Experimental Studies on Grooved Surfaces to Suppress Secondary Electron Emission

Grooved surfaces are effective to suppress the secondary electron emission, and can be a promising technique to mitigate the electron cloud effect in positron/proton storage rings. Aiming for the application in a dipole-type magnetic field, various shapes of triangular grooved surfaces have been studied at KEK. The grooves tested here have vertex angles of 20-30{sup o}, depths of 2.5-5.0 mm, and vertex roundness of 0.05-0.2 mm. In a laboratory, the secondary electron yields (SEY) of small test pieces were measured using an electron beam in a magnetic-free condition. The grooved surfaces clearly had low SEY compared to flat surfaces of the same materials. The grooves with sharper vertexes had smaller SEY. A test chamber installed in a wiggler magnet of the KEKB positron ring was used to investigate the efficacy of the grooved surface in a strong magnetic field. In the chamber, a remarkable reduction in the electron density around the beam orbit was observed compared to the case of a flat surface with TiN coating.

43 PARTICLE ACCELERATORS↗

Operating envelope charts for the Langley 0.3-meter transonic cryogenic wind tunnel

To take full advantage of the unique Reynolds number capabilities of the 0.3-meter Transonic Cryogenic Tunnel (0.3-m TCT) at the NASA Langley Research Center, it was designed to accommodate test sections other than the original, octagonal, three-dimensional test section. A 20- by 60-cm two-dimensional test section was installed in 1976 and was extensively used, primarily for airfoil testing, through the fall of 1984. The tunnel was inactive during 1985 so that a new test section and improved high speed diffuser could be installed in the tunnel circuit. The new test section has solid adaptive top and bottom walls to reduce or eliminate wall interference for two-dimensional testing. The test section is 33- by 33-cm in cross section at the entrance and is 142 cm long. In the planning and running of past airfoil tests in the 0.3-m TCT, the use of operating envelope charts have proven very useful. These charts give the variation of total temperature and pressure with Mach number and Reynolds number. The operating total temperature range of the 0.3-m TCT is from about 78 K to 327 K with total pressures ranging from about 17.5 psia to 88 psia. This report presents the operating envelope charts for the 0.3-m TCT with the adaptive wall tes t section installed. They were all generated based on a 1-foot chord model. The Mach numbers vary from 0.1 to 0.95.

Rallo, R. A.↗

Design and Installation of a Disposal Cell Cover Field Test

The U.S. Department of Energy’s Office of Legacy Management (LM) initiated a cover assessment project in September 2007 to evaluate an inexpensive approach to enhancing the hydrological performance of final covers for disposal cells. The objective is to accelerate and enhance natural processes that are transforming existing conventional covers, which rely on low-conductivity earthen barriers, into water balance covers, that store water in soil and release it as soil evaporation and plant transpiration. A low conductivity cover could be modified by deliberately blending the upper layers of the cover profile and planting native shrubs. A test facility was constructed at the Grand Junction, Colorado, Disposal Site to evaluate the proposed methodology. The test cover was constructed in two identical sections, each including a large drainage lysimeter. The test cover was constructed with the same design and using the same materials as the existing disposal cell in order to allow for a direct comparison of performance. One test section will be renovated using the proposed method; the other is a control. LM is using the lysimeters to evaluate the effectiveness of the renovation treatment by monitoring hydrologic conditions within the cover profile as well as all water entering and leaving the system. This paper describes the historical experience of final covers employing earthen barrier layers, the design and operation of the lysimeter test facility, testing conducted to characterize the as-built engineering and edaphic properties of the lysimeter soils, the calibration of instruments installed at the test facility, and monitoring data collected since the lysimeters were constructed.

disposal cells, Grand Junction, Colorado, Disposal↗

PSL Icing Facility Upgrade Overview

The NASA Glenn Research Center Propulsion Systems Lab (PSL) was recently upgraded to perform engine inlet ice crystal testing in an altitude environment. The system installed 10 spray bars in the inlet plenum for ice crystal generation using 222 spray nozzles. As an altitude test chamber, the PSL is capable of simulating icing events at altitude in a groundtest facility. The system was designed to operate at altitudes from 4,000 to 40,000 ft at Mach numbers up to 0.8M and inlet total temperatures from -60 to +15 degF. This paper and presentation will be part of a series of presentations on PSL Icing and will cover the development of the icing capability through design, developmental testing, installation, initial calibration, and validation engine testing. Information will be presented on the design criteria and process, spray bar developmental testing at Cox and Co., system capabilities, and initial calibration and engine validation test. The PSL icing system was designed to provide NASA and the icing community with a facility that could be used for research studies of engine icing by duplicating in-flight events in a controlled ground-test facility. With the system and the altitude chamber we can produce flight conditions and cloud environments to simulate those encountered in flight. The icing system can be controlled to set various cloud uniformities, droplet median volumetric diameter (MVD), and icing water content (IWC) through a wide variety of conditions. The PSL chamber can set altitudes, Mach numbers, and temperatures of interest to the icing community and also has the instrumentation capability of measuring engine performance during icing testing. PSL last year completed the calibration and initial engine validation of the facility utilizing a Honeywell ALF502-R5 engine and has duplicated in-flight roll back conditions experienced during flight testing. This paper will summarize the modifications and buildup of the facility to accomplish these tests.

Griffin, Thomas A.↗

Cryopumping Field Joint Can Testing

For long installations, vacuum jacketed piping often comes in 40 foot sections that are butt welded together in the field. A short can is then welded over the bare pipe connection to allow for insulation to be protected from the environment. Traditionally, the field joint is insulated with multilayer insulation and a vacuum is pulled on the can to minimize heat leak through the bare section and prevent frost from forming on the pipe section. The vacuum jacketed lines for the Ares I mobile launch platform were to be a combined 2000 feet long, with 60+ pipe sections and field joint cans. Historically, Kennedy Space Center has drilled a hole in the long sections to create a common vacuum with the field joint can to minimize maintenance on the vacuum jacketed piping. However, this effort looked at ways to use a passive system that didn't require a vacuum, but may cryopump to create its own vacuum. Various forms of aerogel, multilayer insulations, and combinations thereof were tested to determine the best method of insulating the field joint while minimizing maintenance and thermal losses.

Johnson, Wesley L.↗