Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “grid scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Quantification of Energy Savings and Demand Reduction for a Heat Pump Integrated with Thermal Energy Storage (Final Report)

To mitigate the variation in demand on the electric grid, thermal energy storage (TES) is an alternative to electric batteries or installing new peaking power plants. Stakeholders and policy makers across the United States have expressed interests in promoting TES, as demonstrated by the US Department of Energy’s Grid-Interactive Efficient Buildings program and the efforts of various state legislatures. However, the cost value provided by TES are unclear. If reliable cost benefits were determined, stakeholders would have a clearer picture of the financial returns that can be gained from their investment in TES. The study in this report is conducted by ORNL with collaboration with Emerson the Helix Innovation Center. In the first part of this report, EnergyPlus was used to perform whole-building simulations for two residential buildings in Indianapolis and Atlanta. The HVAC system in both buildings were equipped with phase change material TES. The TES tank was charged in off-peak hours and discharged in peak hours to perform load shifting. First, the economic value implied by existing time-of-use (TOU) rates offered by utility companies was analyzed via whole-building simulation. Second, existing demand reduction (DR) incentives sourced from 3 different electrical grid administrators (i.e., California, Texas, and New England region) were surveyed to determine their implied value. The study suggests that the traditional value analysis that focuses on ROI for the building owner significantly undervalues TES technology making economic viability difficult. A more comprehensive value analysis that includes peak demand management and deferred capital for peaking power plants shows that TES should be economically viable but here the value is greater for the utility and requires large market penetration and aggregation to fully realize the benefits. Therefore, to facilitate commercialization, new business models are needed that include a broader range of stakeholders and distribute the value of TES proportionally. In the 2 nd part of this project, the benefits of a novel phase change material (PCM) integrated heat pump configuration were evaluated via detailed component based simulation. A one-dimensional PCM heat exchanger model which discretizes the PCM tank and refrigerant tubes into small control volumes is developed. Each control volume can have different PCM temperatures, PCM properties, and heat transfer coefficients. The PCM tank is charged by a wrapped tank condenser and discharged by an internal refrigerant coil. The PCM heat exchanger model is integrated into DOE/ORNL Heat Pump Design Model for heat pump system simulation. To demonstrate the performance of the PCM integrated heat pump, a case study in Chicago was performed. A Time-of-Use utility structure-based control strategy is implemented to schedule the PCM tank charging and discharging mode switching. Compared with a conventional electric heat pump, the PCM integrated heat pump shows superior performance on load shifting and utility cost reduction. As a result, the proposed system demonstrates 24.6% utility saving for cooling application and 25.8% utility saving for heating application.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Envelope-driven comfort risk in residential demand response

Residential demand response (DR) is a valuable resource for grid reliability, but remains challenging because the highly heterogeneous residential building stock leads to widely varying and hard-to-predict load and comfort responses during DR events. Although prior research has estimated the technical potential of DR-capable technologies for achieving energy demand savings, little is known about how they affect thermal comfort. In particular, it remains unclear how indoor thermal conditions due to DR depend on the thermal envelope characteristics of the housing stock. To address this gap, this study provides a systematic, location-specific assessment of indoor thermal performance during DR-events across the US housing stock using both typical DR weather data and detailed building metadata. We evaluate how envelope characteristics influence indoor temperatures during realistic simulated summer and winter DR events across 37 US locations, applying both temperature threshold and rate of temperature change criteria to estimate region-level probabilities of discomfort. Additionally, we show the impact of distinct weather patterns that intensify or abate thermal stress on comfort outcomes. Results show a near-universal overheating risk in summer DR events, where comfort outcomes are strongly influenced by rapid risk of comfort violations. In contrast, overall winter DR discomfort risk is lower, risk escalation is more gradual and shows greater sensitivity to event duration. These findings offer a data-driven quantification of comfort risk across diverse climates and building envelopes, demonstrating the need for region-specific DR scheduling and discomfort mitigation strategies tailored to local weather patterns and the performance of existing residential buildings.

Demand response↗

DRAGONS - A Micrometeoroid and Orbital Debris Impact Sensor

The Debris Resistive/Acoustic Grid Orbital Navy Sensor (DRAGONS) is intended to be a large area impact sensor for in-situ measurements of micrometeoroids and orbital debris (MMOD) in the approx.0.2 to 1 mm size regime. These MMOD particles are too small to be detected by groundbased radars and optical telescopes, but still large enough to be a safety concern for human space activities and robotic missions in the low Earth orbit (LEO) region. The nominal detection area of DRAGONS is 1 sq m, consisting of four 0.5 m x 0.5 m independently operated panels. The concept of the DRAGONS design is to combine three different detection technologies to maximize information extracted from each detected impact. The first technology is a resistive grid consisting of 62.5-microns-wide resistive lines, coated in parallel and separated by 62.5 micron gaps on a Kapton film. When a particle a few hundred micrometers or larger strikes the grid, it world penetrate the film and sever some resistive lines. The size of the damage area can be estimated from the increased resistance. The second technology employs a dual-layer, 25-microns-thick Kapton film with a 10 cm separation. By measuring the time difference between impacts on the two films, the impact speed can be calculated. The third technology is based on polyvinylidene fluoride (PVDF) acoustic impact sensors. Multiple PVDF sensors are attached to the backside of both Kapton films to provide impact timing measurements. The impact location on each film can be identified from the triangulation of signals received at different PVDF sensors and provides an estimate of the impact direction. The development of DRAGONS is supported by the NASA Orbital Debris Program Office. The project is led by the U.S. Naval Academy (USNA), with additional collaboration from the U.S. Naval Research Laboratory (NRL), the University of Kent at Canterbury in Great Britain, and Virginia Tech (VT). The short-term goal of DRAGONS is to advance its Technology Readiness Level to 9 and to demonstrate the system capabilities of detecting and characterizing submillimeter MMOD impacts. The long-term goal is to deploy a large detection area (>1 sq m) DRAGONS to 700-1000 km altitude and collect sufficient data for better environment definition of MMOD in the 0.2- to 1-mm size regime. The Preliminary Design Review (PRD) of DRAGONS was held at the USNA in June 2012. The Critical Design Review (CDR) is scheduled for early 2013. A flight-ready unit with a 0.25 sq m detection area will be completed and tested by the end of September 2013. The biggest challenge for the project, however, is to identify a demonstration opportunity on the International Space Station in the coming years.

Liou, J. C.↗

Space Transformation -- Localizing the Remote and Connecting the Isolated

In motivating the Space Transformation theme for this year’s 4S symposium, the organizers provided the following context, “Transformation of economies are driven by a change in values and accelerated by new technologies.” These words rang particularly true when I read them at the beginning of the holiday season. Like so many others, I was in the early phases of my Christmas shopping procrastination campaign, and I’d just been reflecting on how Amazon Prime was the transformational tool I’d been waiting for. Basic limiting principles of time and space, supply and demand, were all but erased by the Amazon Prime phenomenon. Coupled with emerging 3D printing and other adaptive manufacturing technologies, a transformation from deliberate planning to “think it … have it” had occurred, empowering me to procrastinate longer than I’d ever dreamed possible. The organizers went on to ponder, “Will space transformation also affect society?”, just as our team at the Air Force Research Lab’s (AFRL) Center for Rapid Innovation (CRI) were working alongside partners within our larger Integrated Capabilities Directorate, NASA’s Flight Opportunities and Small Spacecraft Technology programs, and DARPA’s Luna-10 program to develop technologies and execute demonstration missions that leverage the space domain to genuinely connect even the most remote and austere domains on the timeline of need. Picking apart the miracle that is Amazon prime, where does the model fail, and why? More relevantly to the theme of this year’s symposium, how can the space domain be used to overcome its limitations and minimize its weaknesses? Perhaps it is best assessed in the context of Use Cases. What are the Amazon delivery cost, schedule, and cargo limiters to the Amundsen-Scott South Pole Research Station, or the Lunar South Pole Research Station? This paper will explore enabling infrastructure that allows Amazon prime to thrive and assess the transformational enabling technologies that would be necessary to extend that miracle to the truly remote or the truly austere. Localizing the Remote • First, it will evaluate the ability of the on-going AFRL Rocket Cargo and Space Initiatives Ringside Seats systems, coupled with Astrobotic’s Xodiak and Xogdor capabilities, developed to support the NASA Flight Opportunities Program (FOP), to supply orbital/suborbital delivery to both improved and austere sites on the Earth and Moon. • Then, it will add the surface terminal distribution leg, with an examination of Lunar Outpost’s Mobile Autonomous Prospecting Platform (MAPP), equipped with Mobile Autonomous Robotic Swarm (MARS) software, and Intuitive Machine’s Hopper, developed with support of AFRL and NASA’s Commercial Lunar Payload Services (CLPS) program. Connecting the Isolated From there, it will focus on the destination, asking what implied destination services are required to support highly assured autonomous delivery. • Specifically, it will highlight Astrobotic’s Skymage mesh-networked publish and subscribe communication and navigation service, as well as AFRL’s on-going developments of radioisotope and reactor nuclear-sourced thermoelectric power generation and distribution systems under development under the Joint Emergent Technology Supplying On-orbit Nuclear Power (JETSON) program by Lockheed Martin, Westinghouse, Intuitive Machines, and Zeno Power, to provide the power service to locations well off the grid. • Finally, the paper will connect to the “human machine”. What connects the remote or in-situ human consumer to the remote domain? What connects the diverse international government and commercial services to each other? The former will focus on AFRL’s OraCloud feeding their Space Defense Control and Characterization System (SDCCS) and Lunar Station’s MoonHacker systems, while the latter will focus on the BlueHalo/Tensor LunX Technology Platform for the Cislunar Commodity Marketplace. In 1984, Krafft Ehricke famously remarked that, “If God wanted man to become a spacefaring species, He would have given man a Moon.” This paper is not about the Moon, but is about humans as a spacefaring species, shedding the pesky land/air limitations of the Amazon Prime model … so that we can all live a procrastinator’s “think it … have it” existence.

Charles Finley↗

Electrifying education: Exploring the electrification potential of U.S. School bus fleets

We analyze the operations of 270 diesel school buses across the United States to assess their electrification potential and evaluate the impact of various charging strategies on electricity demand. We find that school buses typically follow a two-route schedule on weekdays, featuring extended dwell times between morning and evening trips. Weekday trip distances average 25 miles, while weekend trips average 42 miles. Charging simulations indicate over 90% of the U.S. school bus fleet could be electrified using current technologies (300-mile range at 1.21 kWh/mile with 19.2-kW depot charging) without modifying existing operating patterns. Depot charging is a key enabler of school bus electrification, however, the strategic placement of charging stations at other locations (e.g., schools) can further increase electrification potential. Additionally, we find electric school bus charging to be highly flexible, with charge management capable of reducing peak charging loads at depots by up to 77%.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhancing Power System Operational Flexibility With Flexible Ramping Products: A Review

With the increased variability and uncertainty of net load induced from high penetrations of renewable energy resources and more flexible interchange schedules, power systems are facing great operational challenges in maintaining balance. Among these, the scarcity of ramp capability is an important culprit of power balance violations and high scarcity prices. To address this issue, market-based flexible ramping products (FRPs) have been proposed in the industry to improve the availability of ramp capacity. This paper presents an in-depth review of the modeling and implementation of FRPs. The major motivation is that although FRPs are widely discussed in the literature, it is still unclear to many how they can be incorporated into a co-optimization framework that includes energy and ancillary services. The concept and a definition of power system operational flexibility as well as the needs for FRPs are introduced. The industrial practices of implementing FRPs under different market structures are presented. Market operation issues and future research topics are also discussed. In conclusion, this paper can provide researchers and power engineers with further insights into the state of the art, technical barriers, and potential directions for FRPs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operating Dynamic Reserve Dimensioning Using Probabilistic Forecasts

The rapid integration of variable energy sources (VRES) into power grids increases variability and uncertainty of the net demand, making the power system operation challenging. Operating reserve is used by system operators to manage and hedge against such variability and uncertainty. Traditionally, reserve requirements are determined by rules-of-thumb (static reserve requirements, e.g., NERC Reliability Standards), and more recently, dynamic reserve requirements from tools and methods which are in the adoption process (e.g., DynADOR, DRD, and RESERVE, among others). While these methods/tools significantly improve the static rule-of-thumb approaches, they rely exclusively on deterministic data (i.e., best guess only). Consequently, these methods disregard the probabilistic uncertainty thresholds associated with specific days and their weather conditions (i.e., best guess plus probabilistic uncertainty). This work presents practical approaches to determine the operating reserve requirements leveraging the wealth information from probabilistic forecasts. Proposed approaches are validated and tested using actual data from the CAISO system. Furthermore, results show the benefits in terms of risk reduction of considering the probabilistic forecast information into the dimensioning process of operating reserve requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Joint Optimization Scheme for the Planning and Operations of Shared Autonomous Electric Vehicle Fleets Serving Mobility on Demand

As the transportation sector undergoes three major transformations—electrification, shared/on-demand mobility, and automation—there are new challenges to analyzing the impacts of these trends on both the transportation system and the power sector. Most models that analyze the requirements of fleets of shared autonomous electric vehicles (SAEVs) operate at the scale of an urban region, or smaller. A quadratically constrained, quadratic programming problem is formulated, designed to model the requirements of SAEVs at a national scale. The size of the SAEV fleet, the necessary charging infrastructure, the fleet charging schedule, and the dispatch required to serve demand for trips in a region are treated as decision variables. By minimizing both the amortized cost of the fleet and chargers as well as the operational costs of charging, it is possible to explore the coupled interactions between system design and operation. To apply the model at a national scale, key complications about fleet operations are simplified; but a detailed agent-based regional simulation model to parameterize those simplifications is leveraged. Preliminary results are presented, finding that all mobility in the United States (U.S.) currently served by 276 million personally owned vehicles could be served by 12.5 million SAEVs at a cost of $\$ 0.27$/vehicle-mile or $ 0.18/passenger-mile. In conclusion, the energy requirements for this fleet would be 1142 GWh/day (8.5% of 2017 U.S. electricity demand) and the peak charging load 76.7 GW (11% of U.S. power peak). Several model sensitivities are explored, and it is found that sharing is a key factor in the analysis.

33 ADVANCED PROPULSION SYSTEMS↗

2015 Wind Technologies Market Report

Annual wind power capacity additions in the United States surged in 2015 and are projected to continue at a rapid clip in the coming five years. Recent and projected near-term growth is supported by the industry’s primary federal incentive—the production tax credit (PTC)—having been extended for several years (though with a phase-down schedule, described further on pages 68-69), as well as a myriad of state-level policies. Wind additions are also being driven by improvements in the cost and performance of wind power technologies, yielding low power sales prices for utility, corporate, and other purchasers. At the same time, the prospects for growth beyond the current PTC cycle remain uncertain: growth could be blunted by declining federal tax support, expectations for low natural gas prices, and modest electricity demand growth. This annual report—now in its tenth year—provides a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2015. The report begins with an overview of key installation-related trends: trends in U.S. wind power capacity growth; how that growth compares to other countries and generation sources; the amount and percentage of wind energy in individual states; the status of offshore wind power development; and the quantity of proposed wind power capacity in various interconnection queues in the United States. Next, the report covers an array of wind power industry trends: developments in turbine manufacturer market share; manufacturing and supply-chain developments; wind turbine and component imports into and exports from the United States; project financing developments; and trends among wind power project owners and power purchasers. The report then turns to a summary of wind turbine technology trends: turbine size, hub height, rotor diameter, specific power, and IEC Class. After that, the report discusses wind power performance, cost, and pricing trends. In so doing, it describes trends in project performance, wind turbine transaction prices, installed project costs, and operations and maintenance (O&M) expenses. It also reviews the prices paid for wind power in the United States and how those prices compare to short-term wholesale electricity prices and forecasts of future natural gas prices. Next, the report examines policy and market factors impacting the domestic wind power market, including federal and state policy drivers as well as transmission and grid integration issues. The report concludes with a preview of possible near-term market developments. This edition of the annual report updates data presented in previous editions while highlighting key trends and important new developments from 2015. The report concentrates on larger, utility-scale wind turbines, defined here as individual turbines that exceed 100 kW in size.

17 WIND ENERGY↗

Preparing Distribution Utilities for the Future - Unlocking Demand-Side Management Potential: A Novel Analytical Framework

The balance of supply and demand in the power systems has traditionally been served solely through generation and network capacity planning and operations. However, with increased requirements for flexibility due to the uptake in variable renewable generation sources such as wind and solar there is a need to increased demand-side flexibility. In addition, there are increased communications and flexibility capabilities emerging on the demand-side from the adoption of advanced metering infrastructures and smart meter deployment and intelligent loads such as smart thermostats and schedulable white goods (e.g. dishwashers and washing machines). Unlocking demand-side flexibility can bring system benefits from peak load reduction bringing about generation capacity and network upgrade deferral, to reducing demand and more efficient utilization of generation and network capacity. Unlocking demand-side flexibility is an evolving process for utilities and solutions must be tailored to each specific customer group. Demand-side management (DSM) is a broad set of tools that can include demand response (both dispatchable and non-dispatchable), energy efficiency and distributed energy resources and demand-side technologies. The National Renewable Energy Laboratory (NREL), in collaboration with BSES Rajdhani Power Ltd. (BRPL) and Deloitte, examined the potential of DSM in BRPL’s service territory, developing detailed information on customer classes and willingness to participate in DSM. The study developed modeling frameworks for load analysis and the analysis tools to assess the potential of time-of-use tariffs in motivating customers to reduce their peak period energy consumption. The study shows that BRPL customers, specifically their domestic customers, are willing to participate in DSM programs and that time-of-use pricing can help BRPL reduce their peak demand and help unlock demand-side flexibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dispatch optimization of concentrating solar power with utility-scale photovoltaics

Concentrating solar power (CSP) tower technologies capture thermal radiation from the sun utilizing a field of solar-tracking heliostats. When paired with inexpensive thermal energy storage (TES), CSP technologies can dispatch electricity during peak-market-priced hours, day or night. The cost of utility-scale photovoltaic (PV) systems has dropped significantly in the last decade, resulting in inexpensive energy production during daylight hours. The hybridization of PV and CSP with TES systems has the potential to provide continuous and stable energy production at a lower cost than a PV or CSP system alone. Hybrid systems are gaining popularity in international markets as a means to increase renewable energy portfolios across the world. Typically, CSP-PV hybrid systems have been evaluated using either monthly averages of hourly PV production or scheduling algorithms that neglect the time-of-production value of electricity in the market. To more accurately evaluate a CSP-PV-battery hybrid design, we develop a profit-maximizing mixed-integer linear program ($\mathcal{H}$) that determines a dispatch schedule for the individual sub-systems with a sub-hourly time fidelity. We introduce the mathematical formulation of such a model and show that it is computationally expensive to solve. To improve model tractability and reduce solution times, we offer techniques that: (1) reduce the problem size, (2) tighten the linear programming relaxation of ($\mathcal{H}$) via reformulation and the introduction of cuts, and (3) implement an optimization-based heuristic (that can yield initial feasible solutions for (($\mathcal{H}$) and, at any rate, yields near-optimal solutions). Applying these solution techniques results in a 79% improvement in solve time, on average, for our 48-h instances of (($\mathcal{H}$); corresponding solution times for an annual model run decrease by as much as 93%, where such a run consists of solving 365 instances of (($\mathcal{H}$), retaining only the first 24 h' worth of the solution, and sliding the time window forward 24 h. We present annual system metrics for two locations and two markets that inform design practices for hybrid systems and lay the groundwork for a more exhaustive policy analysis. A comparison of alternative hybrid systems to the CSP-only system reflects that hybrid models can almost double capacity factors while resulting in a 30% improvement related to various economic metrics.

14 SOLAR ENERGY↗

Fast Track Characterization of Highly Radioactive Waste Pits Combining Off-the-Shelf Robotics with Innovative Investigation Protocols

The investigation and characterization of radioactive waste pits and effluent storage tanks represents a substantial and challenging step in the overall decommissioning programme launched by AREVA NC in 1998 on the site of Marcoule on behalf of the French Atomic Energy commission. Physical ,radiological and regulatory constraints, combined with a tight schedule, have lead our teams to use proven conventional instrumentation and robotics in innovative configurations . One such investigation, conducted on a particularly challenging radioactive effluent storage pit, is described below. The 'H' pit is a stainless steel clad concrete cavity, located in the second basement of the de-cladding building of Marcoule site. It was used for forty years as buffer storage for high activity effluents and has a length of 5 meters, a width of 3 meters , a height of 2.5 meters, and is topped by lead plates over 5 cm thick and The bottom of the cavity is covered with a layer of mud containing mainly graphite, diatoms and resins. The mud level ranges from about 20 centimeters to over 50 centimeters. The overall mud volume is around 2.4 cubic meters. Ambient dose rates above the lead plates exceed 10 mSv/h. The main purpose of our investigation was to characterize the muds for future recovery and conditioning prior to decontaminating the pit. The history of the pit together with the varying mud altimetry lead us to believe that sedimentation had probably occurred throughout the years. We thus decided to combine dose rate measurements using IF104 probes, gamma spectroscopy with CdTe probes and sample collections at different depths to ensure the representativeness and full characterization of the muds. Poor access, ambient dose rates have lead us to conceive a robotic arm, mounted on an shaft which can be modified to fit a wide range of pits and tanks. Custom built robotic tools with maximum manoeuvrability generally involve costs and delays far exceeding our purposes. SIT, a French manufacturer of high precision handling equipment for the nuclear industry, supplied us with a user customized 'Python' Robotic arm and the associated computerized command and control equipment within 6 months of the order. The arm allowed the necessary free movement for a precise characterization of the entire pit while being flexible enough to carry varying measuring and sample collection tools. Investigations included video imaging, precise dimensional checks, collection of effluent samples, gamma spectroscopy and collimated dose rate measurements. Specific tooling and arm extensions were created by SIT for each measurement type. The investigations were conducted successfully, providing a detailed view of the pit condition, a complete mapping of collimated dose rates, a grid of gamma spectroscopy, as well as 8 samples of radioactive mud which were subsequently analyzed in our laboratory . A simple yet innovative technology allowed us to fully characterize this pit and its content within a time frame of less than Eight months We subsequently developed a mud recovery scenario, a process for the conditioning of radioactive muds by cementation, and a complete scenario for the pit decontamination and dismantling. The robotic arm is now being used for the characterization and decontamination of other similar environments on the site of Marcoule.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Eastern Renewable Generation Integration Study

The Eastern Interconnection (EI) is one of the largest power systems in the world, and its size and complexity have historically made it difficult to study in high levels of detail in a modeling environment. In order to understand how this system might be impacted by high penetrations (30% of total annual generation) of wind and solar photovoltaic (PV) during steady state operations, the National Renewable Energy Laboratory (NREL) and the U.S. Department of Energy (DOE) conducted the Eastern Renewable Generation Integration Study (ERGIS). This study investigates certain aspects of the reliability and economic efficiency problem faced by power system operators and planners. Specifically, the study models the ability to meet electricity demand at a 5-minute time interval by scheduling resources for known ramping events, while maintaining adequate reserves to meet random variation in supply and demand, and contingency events. To measure the ability to meet these requirements, a unit commitment and economic dispatch (UC&ED) model is employed to simulate power system operations. The economic costs of managing this system are presented using production costs, a traditional UC&ED metric that does not include any consideration of long-term fixed costs. ERGIS simulated one year of power system operations to understand regional and sub-hourly impacts of wind and PV by developing a comprehensive UC&ED model of the EI. In the analysis, it is shown that, under the study assumptions, generation from approximately 400 GW of combined wind and PV capacity can be balanced on the transmission system at a 5-minute level. In order to address the significant computational burdens associated with a model of this detail we apply novel computing techniques to dramatically reduce simulation solve time while simultaneously increasing the resolution and fidelity of the analysis. Our results also indicate that high penetrations of wind and PV (collectively variable generation (VG)), significantly impact the operation of traditional generating resources and cause these resources to be used less frequently and operate across a broader output range because wind and PV have lower operating costs and variable output levels.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Technical Analysis of Installed Micro-Combined Heat and Power Fuel-Cell System

Combined heat and power fuel cell systems (CHP-FCSs) provide consistent electrical power and hot water with greater efficiency and lower emissions than alternative sources. These systems can be used either as baseload, grid-connected, or as off-the-grid power sources. This report presents a technical analysis of 5 kWe CHP-FCSs installed in different locations in the U.S. At some sites as many as five 5 kWe system is used to provide up to 25kWe of power. Systems in this power range are considered “micro”-CHP-FCS. To better assess performance of micro-CHP-FCS and understand their benefits, the U.S. Department of Energy worked with ClearEdge Power to install fifteen 5-kWe PBI high temperature PEM fuel cells (CE5 models) in the commercial markets of California and Oregon. Pacific Northwest National Laboratory evaluated these systems in terms of their economics, operations, and technical performance. These units were monitored from September 2011 until June 2013. During this time, about 190,000 hours of data were collected and more than 17 billion data points were analyzed. Beginning in July 2013, ten of these systems were gradually replaced with ungraded systems (M5 models) containing phosphoric acid fuel cell technology. The new units were monitored until June 2014 until they went offline because ClearEdge was bought by Doosan at the time and the new manufacturer did not continue to support data collection and maintenance of these units. During these two phases, data was collected at once per second and data analysis techniques were applied to understand behavior of these systems. The results of this analysis indicate that systems installed in the second phase of this demonstration performed much better in terms of availability, consistency in generation, and reliability. The average net electrical power output increased from 4.1 to 4.9 kWe, net heat recovery from 4.7 to 5.4 kWth, and system availability improved from 94% to 95%. The average net system electric efficiency, average net heat recovery efficiency, and overall net efficiency of the system increased respectively from 33% to 36%, from 38% to 41%, and from 71% to 76%. The temperature of water sent to sit however reduced by about 16% from 51⁰C to 43 ⁰C. This was a control strategy and the temperature can be controlled depending on building heat demands. More importantly, the number of shutdowns and maintenance events required to keep the systems running at the manufacturer’s rated performance specifications were substantially reduced by about 76% (for 8 to 10 units running over a one-year period). From July 2012 to June 2013, there were eight CE5 units in operation and a total of 134 scheduled and unscheduled shutdowns took place. From July 2013 to June 2014, between two to ten units were in operation and only 32 shutdowns were reported (all unscheduled). In summary, the number of shutdowns reduced from 10 shutdowns per month on average for eight CE5units to an average of 2.7 shutdowns per month for M5 units (between two to ten units).

combined heat and power↗

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗

Energy transport corridors: the potential role of Federal lands in states identified by the Energy Policy Act of 2005, section 368(b).

On August 8, 2005, the President signed the Energy Policy Act of 2005 (EPAct) into law. In Subtitle F of EPAct, Congress set forth various provisions that would change the way certain federal agencies (Agencies) coordinate to authorize the use of land for a variety of energy-related purposes. As part of Subtitle F of EPAct, Section 368 addresses the issue of energy transportation corridors on federal land for oil, gas, and hydrogen pipelines, as well as electricity transmission and distribution facilities. Because of the critical importance of improving the nation's electrical transmission grid, Congress recognized that electricity transmission issues should receive added attention when the Agencies address corridor location and analysis issues. In Section 368, Congress specifically directed the Agencies to consider the need for upgraded and new facilities to deliver electricity: In carrying out [Section 368], the Secretaries shall take into account the need for upgraded and new electricity transmission and distribution facilities to (1) improve reliability; (2) relieve congestion; and (3) enhance capability of the national grid to deliver electricity. Section 368 does not require the Agencies to consider or approve specific projects, applications for rights-of-way (ROWs), or other permits within designated energy corridors. Importantly, Section 368 does not direct, license, or otherwise permit any on-the-ground activity of any sort. If an applicant is interested in obtaining an authorization to develop a project within any corridor designated under Section 368, the applicant would have to apply for a ROW authorization and applicable permits. The Agencies would consider each application by applying appropriate project-specific reviews under requirements of laws and related regulations, including, but not limited to, the National Environmental Policy Act (NEPA), the Clean Water Act, the Clean Air Act, Section 7 of the Endangered Species Act (ESA), and Section 106 of the National Historic Preservation Act (NHPA). Under Section 368, Congress divided the United States into two groups of states: the 11 contiguous western states and the remaining states. Direction for energy transportation corridor analysis and selection in the 11 western states was addressed in Section 368(a) of EPAct, while direction for energy transportation corridor analysis and selection in all other states was addressed under Section 368(b) of EPAct. It was clearly the priority of Congress to conduct corridor location studies and designation first on federal lands in the western states. Under Section 368(a), the Agencies produced a programmatic environmental impact statement (EIS), Designation of Energy Corridors on Federal Land in the 11 Western States (DOE and DOI 2008), that was used in part as the basis for designating more than 6,000 mi (9,656 km) of energy transportation corridors on federal land in 11 western states. Under Section 368(a) of EPAct, Congress clearly stated the Agencies needed to (1) designate energy transportation corridors on federal land, (2) conduct the necessary environmental review of the designated corridors, and (3) incorporate the designated corridors into the appropriate land use plans. Congressional direction under Section 368(b) of EPAct differs from that provided under Section 368(a). Specifically, Section 368(b) requires the secretaries of the Agencies, in consultation with the Federal Energy Regulatory Commission (FERC), affected utility industries, and other interested persons, to jointly: (1) Identify corridors for oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities on federal land in states other than the 11 western states identified under Section 368(a) of EPAct, and (2) Schedule prompt action to identify, designate, and incorporate the corridors into the applicable land use plans. While Section 368(a) clearly directs designation as a necessary first step for energy transportation corridors in the 11 western states, Section 368(b) directs the Agencies to first identify corridors and then schedule prompt action to identify, designate, and incorporate the corridors into applicable land use plans. To comply with the congressional direction provided in Section 368(b), the Agencies investigated corridor identification issues in the Section 368(b) states; this report to Congress provides information that could be relevant to possible future designation of energy corridors. Future designations, if appropriate and necessary, would occur when the Agencies undertake revisions and/or updates to land use plans that guide management decisions on lands located within individual administrative units, such as specific National Forests, National Parks, or Wildlife Refuges. At this time, the Agencies are not proposing any actions or decisions related directly or indirectly to designating energy corridors on federal land under Section 368(b) of EPAct.

08 HYDROGEN↗

Evidence of Completion of Milestone 3: Experimental Testbed

Construction and deployment of the experimental testbed encountered scheduling delays, and completion was subsequently further delayed by curtailment of LANL operations due to the COVID-19 pandemic. Between March and October, LANL was in a state of “Limited Operations” such that only certain “mission-critical” work was performed with approximately 25% on-site staffing. In spite of this, much of the lab space preparation was executed and the five initial model house” units were constructed and installed during this period. Still, the pace of construction was impacted by difficulty in coordinating personnel and minimizing contact between workers. Currently, LANL is in the mode of “Normal Operations with Maximum Telework,” which continues to limit the availability of on-site personnel. Nevertheless, Milestone 3 is now complete. This document describes the experiment as it is deployed and provides status for each task for this milestone.

99 GENERAL AND MISCELLANEOUS↗