Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “delivery”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Mobile work station concept for assembly of large space structures (zero gravity simulation tests)

The concept presented is intended to enhance astronaut assembly of truss structure that is either too large or complex to fold for efficient Shuttle delivery to orbit. The potential of augmented astronaut assembly is illustrated by applying the result of the tests to a barebones assembly of a truss structure. If this structure were assembled from the same nestable struts that were used in the Mobile Work Station assembly tests, the spacecraft would be 55 meters in diameter and consist of about 500 struts. The struts could be packaged in less than 1/2% of the Shuttle cargo bay volume and would take up approximately 3% of the mass lift capability. They could be assembled in approximately four hours. This assembly concept for erectable structures is not only feasible, but could be used to significant economic advantage by permitting the superior packaging feature of erectable structures to be exploited and thereby reduce expensive Shuttle delivery flights.

Heard, W. L., Jr.↗

Comparative cost assessment of planetary missions

A study to explore the cost differences resulting from implementing a series of representative solar system exploration missions in either ballistic or low-thrust flight modes is presented. Cost comparisons of missions using a solar electric propulsion delivery systems with ballistic equivalent mission designs were made. The mission set, cost elements, and delivery modes are detailed. Objectives for each of the six mission sets including two asteroid missions, a comet mission, a Mercury mission, and two outer planet missions are given.

Source record↗

SPS program review transportation perspective

The delivery of cargo and space workers to the SPS construction site requires the development of two different systems, one to handle large cargo deliveries and a smaller system to accommodate crew. The overall scenario of the transportation system is shown. Eight major elements comprise the transportation system: personnel launch vehicle (PLV) or shuttle; personnel orbital transfer vehicle (POTV); the heavy lift launch vehicle (HLLV); the electric orbital transfer vehicle (EOTV); intra orbit transfer vehicle (IOTV); LEO support facility; GEO support facility and a shuttle derived HLLV (SDHLLV) for supporting the early SPS Demonstration Program. The HLLV and EOTV represent the cargo carriers while the PLV and POTV represent the people carriers. The IOTV is utilized to ferry people and cargo modules over short distances in the vicinity of its station.

Wales, W. W., Jr.↗

Mass driver reaction engine characteristics and performance in earth orbital transfer missions

Configurations of a typical mass driver reaction engine (MDRE) are presented and its use for delivery of payloads to geosynchronous orbit (GEO) from low earth orbit (LEO) is discussed. Basic rocket equations are developed for LEO to GEO round-trip missions using a single exhaust velocity. It is shown that exhaust velocities in the 5-10 km/sec range (specific impulse of 500-1000 sec) are well suited for mass drivers, minimizing the overall cost of missions. Payload delivery rate fractions show that there is little to be gained by stretching out LEO to GEO transfer times from 90 to 180 days. It therefore pays to use the shorter trip time, approximately doubling the amount of delivered payload during any fixed time of use of the MDRE.

Snow, W. R.↗

The elements of a space operations system

The Space Shuttle has completed its flight test program and is entering operational service with its fifth flight in November 1982. With the completion of Shuttle development, its entry to operational service, and delivery of additional units into field service, it is timely to initiate development of the next elements of the system. The elements of a Space Operations System are the Shuttle, a Station in low earth orbit, and upper stages for low and high energy orbit delivery. To design these elements properly will require a substantial operations analysis effort to characterize the most effective performance tradeoffs among the discrete elements. The Shuttle establishes a new context for the design and execution of operations in space. The components of the Shuttle, Space Station, and upper stages will need to share technology and components to minimize the cost and complexity of the logistics of ownership and operation.

Loftus, J. P., Jr.↗

Preprototype SAWD subsystem

A regenerable, three man preprototype solid amine, water desorbed (SAWD) CO2 removal and concentation subsystem was designed, fabricated, and successfully acceptance tested by Hamilton Standard. The preprototype SAWD incorporates a single solid amine canister to perform the CO2 removal function, an accumulator to provide the CO2 storage and delivery function, and a microprocessor which automatically controls the subsystem sequential operation and performance. The SAWD subsystem was configured to have a CO2 removal and CO2 delivery capability at the rate of 0.12 kg/hr (0.264 lb/hr) over the relative humidity range of 35 to 70%. The controller was developed to provide fully automatic control over the relative humidity range via custom software that was generated specifically for the SAWD subsystem. The preprototype SAWD subsystem demonstrated a total of 281 hours (208) cycles of operation during ten acceptance tests that were conducted over the 3 to 70% relative humidity range. This operation was comprised of 178 hours (128 cycles) in the CO2 overboard mode and 103 hours (80 cycles) in the CO2 reduction mode. The average CO2 removal/delivery rate met or exceeded the design specification rate of 0.12 kg/hr (0.254 lb/hr) for all ten of the acceptance tests.

Nalette, T. A.↗

Analytical fuel property effects: Small combustors

The study performed in Phase 1 of this program applies only to a T700/CT7 engine family type combustor functioning in the engine as defined and does not necessarily apply to other cycles or combustors of differing stoichiometry. The study was not extended to any of the fuel delivery accessories such as pumps or control systems, nor was there any investigation of potential systems problems which might arise as a consequence of abnormal properties such as density which might affect delivery schedules or aromatics content which might affect fuel system seals. The T700/CT7 engine is a front drive turboshaft or turboprop engine in the 1500-1800 shp (1120-1340 kW) class as currently configured with highpower core flows of about 10 lb/sec (4.5 kg/sec). It employs a straight-through annular combustion system less than 5 in. (12.5 cm) in length utilizing a machined ring film cooled construction and twelve low-pressure air blast fuel injectors. Commercial and Naval versions employ two 0.5 Joule capacitive discharge surface gap ignitors.

Cohen, J. D.↗

Galileo Jupiter approach orbit determination

Orbit determination characteristics of the Jupiter approach phase of the Galileo mission are described. Predicted orbit determination performance is given for the various mission events that occur during Jupiter approach. These mission events include delivery of an atmospheric entry probe, acquisition of probe science data by the Galileo orbiter for relay to earth, delivery of an orbiter to a close encounter of the Galilean satellite Io, and insertion of the orbiter into orbit about Jupiter. The orbit determination strategy and resulting accuracies are discussed for the data types which include Doppler, range, optical imaging of Io, and a new Very Long Baseline Interferometry (VLBI) data type called Differential One-Way Range (DOR).

Miller, J. K.↗

Moderate lift-to-drag aeroassist

Significant performance benefits are realized via aerodynamic braking and/or aerodynamic maneuvering on return from higher altitude orbits to low Earth orbit. This approach substantially reduces the mission propellant requirements by using the aerodynamic drag, D, to brake the vehicle to near circular velocity and the aerodynamic lift, L, to null out accumulated errors as well as change the orbital inclination to that required for rendezvous with the Space Shuttle Orbiter. Broad concept evaluations were performed and the technology requirements and sensitivities for aeroassisted OTV's over a range of vehicle hypersonic L/D from 0.75 to 1.5 were systematically identified and assessed. The aeroassisted OTV is capable of evolving from an initial delivery only system to one eventually capable of supporting manned roundtrip missions to geosynchronous orbit. Concept screening was conducted on numerous configurations spanning the L/D = 0.75 to 1.5 range, and several with attractive features were identified. Initial payload capability was evaluated for a baseline of delivery to GEO, six hour polar, and Molniya (12 hours x 63.4 deg) orbits with return and recovery of the aeroassist orbit transfer vehicle (AOTV) at LEO. Evolutionary payload requirements that were assessed include a GEO servicing mission (6K up and 2K return) and a manned GEO mission (14K roundtrip).

Florence, D. E.↗

Design study of an integrated aerobraking orbital transfer vehicle

An aerobraking orbital transfer vehicle (AOTV) concept, which has an aerobrake structure that is integrated with the propulsion stage, is discussed. The concept vehicle is to be assembled in space and is space-based. The advantages of aeroassist over an all propulsive vehicle are discussed and it is shown that the vehicle considered is very competitive with inflatable and deployable concepts from mass and performance aspects. The aerobrake geometry is an ellipsoidally blunted, raked-off, elliptical wide-angle cone with a toroidal skirt. Propellant tanks, engines, and subsystems are integrated into a closed, isogrid aerobrake structure which provides rigidity. The vehicle has two side-firing, gimbaled RL-10 type engines and carries 38,000 kg of useable propellant. The trajectory during aerobraking is determined from an adaptive guidance logic, and the heating is determined from engineering correlations as well as 3-D Navier-Stokes solutions. The AOTV is capable of placing 13,500 kg payload into geosynchronous Earth orbit (GEO) or carrying a LEO-GEO-LEO round-trip payload of 7100 kg. A two-stage version considered for lunar missions results in a lunar surface delivery capability of 18,000 kg or a round-trip capability of 6800 kg with 3860 kg delivery-only capability.

Scott, C. D.↗

Intermediate load modules for test and evaluation

Photovoltaic modules were tested for qualification. Tests involved the following: (1) delivery of 20 solar cells for use as reference cells; (2) module documentation and inspection plans specifying the 10 Group I modules; (3) design review of module documentation from Group I modules; (4) revise module documentation to overcome any problems of deficiencies associated with the Group I modules; (5) delivery of 10 Group II modules built to revised specifications; (6) testing of Group II modules to the criteria as outlined in qualification specification. It is found that the solarvolt MSP43E40B satisfies the design criteria of qualification specification for intermediate load modules. Design changes were made in the Group I modules to overcome the deficiencies which allowed Group II modules to pass the qualification tests.

Source record↗

Development of solid amine CO2 control systems for extended duration missions

This paper briefly discusses the development history of solid amine CO2 control systems, describes two distinct CO2 control system concepts, and presents the performance characteristics for both system concepts. The first concept (developed under NASA Contract NAS9-13624) incorporates a solid amine canister, an automatic microprocessor controller, and an accumulator to collect CO2 and to provide regulated CO2 delivery to an oxygen recovery system. This system is currently operating in the Crew Systems Division's Advanced Life Support Development Laboratory (ALSDL). The second system concept (being developed under NASA Contract NAS9-16978) employs multiple solid amine canisters, an advanced automatic controller and system status display, the ability to regulate CO2 delivery for oxygen recovery, and energy saving features that allow system operation at lower power levels than the first concept.

Dresser, K. J.↗

An evolutionary GEO transportation system

Several transportation system options that utilize the Space Station as a base for delivery of payloads to geosynchronous earth orbit are examined and compared to each other as well as to the reference case, which uses the orbiter as the staging base. The factors evaluated include impact on Kennedy Space Center (KSC) flow, STS traffic, load factor, and the cost effectiveness of each transportation system option. With respect to KSC flow, it is determined that utilizing the Space Station as a staging base could lead to a reduction of 3000 man-hours off-line and an additional 475 man-hours on-line. Launch costs for STS are reduced by 10 percent. The actual number of STS flights varies depending on the transportation system option, and the delivery of multiple payloads results in the least cost.

Markus, G.↗

Shuttle derived launch vehicle wind tunnel tests

Studies are being conducted regarding new launch vehicle configurations which may effectively and economically share the delivery of payloads to orbit with the present Space Transportation System (STS). The role envisaged for these launch vehicles is related to the execution of missions whose requirements exceed the STS Shuttle capabilities, taking into account the delivery of much heavier or larger payloads. One class of advanced launch vehicles is configured to take advantage of the existing Shuttle hardware and facilities. Such vehicles are referred to as Shuttle Derived Vehicles (SDV). One version of an SDV consists of two STS elements, including the external tank (ET) and solid rocket boosters, and a cargo carrier. Attention is given to wind tunnel tests, which are being conducted with SDV sidemount configurations incorporating various size payload modules.

Tewell, J. R.↗

Metal powder production by gas atomization

The confined liquid, gas-atomization process was investigated. Results from a two-dimensional water model showed the importance of atomization pressure, as well as delivery tube and atomizer design. The atomization process at the tip of the delivery tube was photographed. Results from the atomization of a modified 7075 aluminum alloy yielded up to 60 wt pct. powders that were finer than 45 microns in diameter. Two different atomizer designs were evaluated. The amount of fine powders produced was correlated to a calculated gas-power term. An optimal gas-power value existed for maximized fine powder production. Atomization at gas-power greater than or less than this optimal value produced coarser powders.

Ting, E. Y.↗

Titan Probe navigation analysis

In the proposed Cassini mission, a combined Saturn Orbiter/Titan Probe spacecraft will be launched from the Space Shuttle to arrive at Saturn around 2002, by means of a delta-VEGA trajectory. After Saturn-orbit insertion and a pericrone raise maneuver, the probe will be released to enter the Titan atmosphere and impact onto its surface. During its descent phase and impact onto Titan, the probe will maintain radio contact with the orbiter. Since the Titan-probe experimental phase lasts for only about four hours, probe-orbiter geometry and probe-delivery accuracy are critical to successful completion of this part of the mission. From a preliminary navigation analysis for probe delivery accuracy, it seems feasible to deliver the probe within 50 km (1-sigma value) of the desired aim-point in the Titan B-plane. The covariance study, however, clearly indicates the need for optical data, in addition to radio metric data. A Monte Carlo study indicates that a Delta-V capability of 98 m/sec for trajectory correction maneuvers will be sufficient to cover 99 percent of all contingencies during the segment from Saturn-orbit insertion to Titan-probe release.

Vijayaraghavan, A.↗

System technology analysis of aeroassisted orbital transfer vehicles: Moderate lift/drag (0.75-1.5),volume 1B, part 1, study results

Significant performance benefits can be realized via aerodynamic breaking and/or aerodynamic maneuvering on return from higher altitude orbits to low Earth orbit. This approach substantially reduces the mission propellant requirements by using the aerodynamic drag, D, to brake the vehicle to near circular velocity and the aerodynamic lift, L, to null out accumulated errors as well as change the orbital inclination to that required for rendezous with the Space Shuttle Orbiter. A study was completed where broad concept evaluations were performed and the technology requirements and sensitivities for aeroassisted Orbital Transfer Vehicles (AOTVs) over a range of vehicle hypersonic L/D from 0.75 to 1.5 were systematically identified and assessed. The AOTV is capable of evolving from an initial delivery only system to one eventually capable of supporting manned roundtrip missions to geosynchronous orbit. Concept screenings were conducted on numerous configurations spanning the L/D = 0.75 to 1.5 range, and several with attractive features were identified. Initial payload capability was evaluated for a baseline of delivery to GEO, six hour polar, and Molniya orbits with return and recovery of the AOTV at LEO. Evolutionary payload requirements that were assessed include a GEO servicing mission and a manned GEO mission.

Source record↗

On-board processing satellite network architecture and control study

For satellites to remain a vital part of future national and international communications, system concepts that use their inherent advantages to the fullest must be created. Network architectures that take maximum advantage of satellites equipped with onboard processing are explored. Satellite generations must accommodate various services for which satellites constitute the preferred vehicle of delivery. Such services tend to be those that are widely dispersed and present thin to medium loads to the system. Typical systems considered are thin and medium route telephony, maritime, land and aeronautical radio, VSAT data, low bit rate video teleconferencing, and high bit rate broadcast of high definition video. Delivery of services by TDMA and FDMA multiplexing techniques and combinations of the two for individual and mixed service types are studied. The possibilities offered by onboard circuit switched and packet switched architectures are examined and the results strongly support a preference for the latter. A detailed design architecture encompassing the onboard packet switch and its control, the related demand assigned TDMA burst structures, and destination packet protocols for routing traffic are presented. Fundamental onboard hardware requirements comprising speed, memory size, chip count, and power are estimated. The study concludes with identification of key enabling technologies and identifies a plan to develop a POC model.

Campanella, S. Joseph↗