Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “core drill”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Hawaii Play Fairway: Preliminary Core Box Photos, Lanai Island, Hawaii

Photos of core samples from Lanai Island. During the third phase of the Hawaii Play Fairway project, further exploration involved drilling a groundwater well in Lanai's Palawai Basin and performing more geophysical surveys. The project deepened an existing water well on Lanai. Drilling occurred 24/7 the entire month of June 2019 over which time Lanai Well 10 was deepened from 427 m to 1057 m, with continuous core collected. The roughly linear temperature gradient was an average of 42 degC/km, and a maximum bottom hole temperature, 66 degC. This gradient is more than twice the background for Hawaii and within a range of gradients measured in this depth range for some exploration wells within KERZ. The Hawaii Play Fairway project seeks to explore the geologic structures that exist in the caldera region of Hawaiian volcanoes; how those structures influence groundwater storage and flow; and how the magmatic heat from Hawaiian shield volcanoes cools over time. The Hawaii Groundwater and Geothermal Resources Center (Hawaii Institute of Geophysics and Planetology, University of Hawaii at Manoa) executed the Hawaii Play Fairway project. For more information, go to HGGRC's website that is linked in the resources.

15 GEOTHERMAL ENERGY↗

Micro- and nano-porosity of the active Alpine Fault zone, New Zealand

Porosity reduction in rocks from a fault core can cause elevated pore fluid pressures and consequently influence the recurrence time of earthquakes. We investigated the porosity distribution in the New Zealand's Alpine Fault core in samples recovered during the first phase of the Deep Fault Drilling Project (DFDP-1B) by using two-dimensional nanoscale and three-dimensional microscale imaging. Synchrotron X-ray microtomography-derived analyses of open pore spaces show total microscale porosities in the range of 0.1 %–0.24 %. These pores have mainly non-spherical, elongated, flat shapes and show subtle bipolar orientation. Scanning and transmission electron microscopy reveal the samples' microstructural organization, where nanoscale pores ornament grain boundaries of the gouge material, especially clay minerals. Our data imply that (i) the porosity of the fault core is very small and not connected; (ii) the distribution of clay minerals controls the shape and orientation of the associated pores; (iii) porosity was reduced due to pressure solution processes; and (iv) mineral precipitation in fluid-filled pores can affect the mechanical behavior of the Alpine Fault by decreasing the already critically low total porosity of the fault core, causing elevated pore fluid pressures and/or introducing weak mineral phases, and thus lowering the overall fault frictional strength. We conclude that the current state of very low porosity in the Alpine Fault core is likely to play a key role in the initiation of the next fault rupture.

58 GEOSCIENCES↗

The Subsurface Ice Probe (SIPR): A Low-Power Thermal Probe for the Martian Polar Layered Deposits

The distinctive layering visible in images from Mars Global Surveyor of the Martian polar caps, and particularly in the north polar cap, indicates that the stratigraphy of these polar layered deposits may hold a record of Martian climate history covering millions of years. On Earth, ice sheets are cored to retrieve a pristine record of the physical and chemical properties of the ice at depth, and then studied in exacting detail in the laboratory. On the Martian north polar cap, coring is probably not a practical method for implementation in an autonomous lander. As an alternative, thermal probes that drill by melting into the ice are feasible for autonomous operation, and are capable of reasonable approximations to the scientific investigations performed on terrestrial cores, while removing meltwater to the surface for analysis. The Subsurface Ice Probe (SIPR) is such a probe under development at JPL. To explore the dominant climate cycles, it is postulated that tens of meters of depth should be profiled, as this corresponds to the vertical separation of the major layers visible in the MOC images [1]. Optical and spectroscopic analysis of the layers, presumably demarcated by embedded dust and possibly by changes in the ice properties, would contribute to the construction of a chronology. Meltwater analysis may be used to determine the soluble chemistry of the embedded dust, and to monitor gradients of atmospheric gases, particularly hydrogen and oxygen, and isotopic variations that reflect atmospheric conditions at the time the layer was deposited. Thermal measurements can be used to determine the geothermal gradient and the bulk mechanical properties of the ice.

Cardell, G.↗

Big Sky Regional Carbon Sequestration Partnership (Phase III Final Scientific/Technical Report)

The Big Sky Carbon Sequestration Partnership (BSCSP) pursued a Phase III demonstration project at Kevin Dome in north central Montana. Kevin Dome covers approximately 700 square miles and is a naturally occurring CO 2 reservoir that is flanked by oil and gas fields. The carbon dioxide (CO 2 ) is in the upper Devonian Duperow (carbonate) formation and does not reach the spill point of the dome; therefore, the dome has potential as a CO 2 sequestration reservoir, a CO 2 supply, or as both if anthropogenic sources and enhanced oil recovery (EOR) operations are associated with the dome. Kevin Dome could potentially act as a buffer to continue accepting anthropogenic CO 2 when EOR flooding operations are interrupted or completed. The project objective was to produce one million tonnes of CO 2 from the gas cap of Kevin Dome, pipe it laterally, inject, and re-store it in the brine leg of the same formation to test the hub / buffer storage concept. This was to be accomplished by drilling up to five production wells, building a short pipeline and compression facilities, and drilling an injection well and several monitoring wells. BSCSP commenced outreach and site characterization activities including acquiring baseline data for near-surface insurance monitoring, acquiring 3-dimensional, 9-component surface seismic over the project area, drilling two test wells (one in the production area and one in the injection area), coring key intervals, and performing comprehensive logging. Well tests of those wells revealed two barriers to the project. The production (Danielson 33-17) well was perforated in multiple zones but failed to produce any significant CO 2 . This was despite being drilled in the near vicinity of a historic well that had produced 3700 MCF per day in a drill stem test. Modeling indicated that this was likely due to a phase change during production causing a temperature drop resulting in hydrate and/or water ice formation that clogged the formation. Tests of the injection zone (Wallewein 22-1) well indicated total dissolved solids (TDS) slightly below the EPA required 10,000 parts per million (ppm) for a Class VI underground injection control permit. While the project was initiated before Class VI rules were promulgated, and this was an experimental project (seemingly qualified for a Class V permit), the Environmental Protection Agency (EPA) indicated that injection would require a Class VI permit. The low salinity result was unexpected as contours plotted based on regional formation water quality data indicated an expected TDS above 20,000 ppm, and wells between the recharge zone and the Wallewein well tested above 10,000 ppm. Faced with the inability to obtain an injection permit, the demonstration project could not proceed. However, the project had generated valuable samples and data on a large natural analog including 32 sq. mi. of 3-D, 9-C seismic, 430 ft. of carbonate core covering seven different depositional environments taken from areas with, and without the presence of CO 2 , 30 ft. of core of two caprocks, a tight carbonate and an anhydrite, a full set of modern logs on both wells, and well tests. DOE decided to re-scope the project around completing studies utilizing this data. This report covers both the initial scope and the re-scope (Task / Section numbers preceded with an R). While the report covers a wide range of project activities, highlights of this work include: Development of a geostatic model using neural nets to match well logs to facies and using multi-waveform seismic to inform reservoir heterogeneity; Unique mechanical testing of permeability – stress relationship in two caprock materials; Development of full waveform inversion to generate a high resolution velocity model; Model development for dual permeability (fracture and matrix) systems to better account for matrix-matrix interactions; Joint seismic wave inversion (including the first quadr-joint inversion) exhibiting better imaging of a challenging reservoir zone in stiff rock; Core flow and core flood results on a reactive carbonate; and Innovative laboratory measurements of seismic response of fractured core as a function of fluid fill.

54 ENVIRONMENTAL SCIENCES↗

Optimizing Deep Geothermal Drilling for Energy Sustainability in the Appalachian Basin

This study investigates the geological and geomechanical characteristics of the MIP 1S geothermal well in the Appalachian Basin to optimize drilling and address the wellbore stability issues encountered. Data from well logs, sidewall core analysis, and injection tests were used to derive elastic and rock strength properties, as well as stress and pore pressure profiles. A robust 1D-geomechanical model was developed and validated, correlating strongly with wellbore instability observations. This revealed significant wellbore breakout, widening the diameter from 12 ¼ inches to over 16 inches. Advanced technologies like Cerebro Force™ In-Bit Sensing were used to monitor drilling performance with high accuracy. This technology tracks critical metrics such as bit acceleration, vibration in the x, y, and z directions, Gyro RPM, stick-slip indicators, and bending on the bit. Cerebro Force™ readings identified hole drag caused by poor hole conditions, including friction between the drill string and wellbore walls and the presence of cuttings or debris. This led to higher torque and weight on bit (WOB) readings at the surface compared to downhole measurements, affecting drilling efficiency and wellbore stability. Optimal drilling parameters for future deep geothermal wells were determined based on these findings.

Environmental Sciences & Ecology↗

Multi-Scale Lithofacies and Chemostratigraphic Analysis of Two Middle Devonian Marcellus Shale Wells in Northern West Virginia, USA

The Marcellus Shale Energy and Environmental Laboratory (MSEEL) consists of two project areas within the dry gas producing region of the Marcellus shale play in Monongalia County, West Virginia. MSEEL is a collaborative field project led by West Virginia University, with Northeast Natural Energy LLC, several industrial partners, and sponsored by the US Department of Energy National Energy Technology Laboratory. The study areas are drilled approximately 8.5 miles apart to better understand the vertical and lateral changes in stratigraphy over a short distance. Two vertical pilot wells, MIP-3H and Boggess 17H were drilled in the fall of 2015 and spring of 2019, respectively. Core was recovered from the MIP-3H (API: 47-061-01707-00-00) 112 feet (34m) between depths of 7445 to 7557 feet, and from the Boggess 17H (API: 47-061-01812-00-00) 139 feet (42m) between depths of 7908 and 8012 ft. A full suite of triple combo (gamma ray, neutron, density logs), image logs, and advanced logging tools were run in both wells and calibrated to core analysis. Core analysis includes medical computed tomography (CT) scans, mineralogy and chemostratigraphy determined from handheld X-Ray fluorescence (hhXRF) and X-Ray powder diffraction (XRD) measurements, and determination of total organic content (TOC). Lithofacies were determined at core-scale using traditional core description techniques and medical CT-scan images. Log-scale facies are based on mineralogy and TOC data and developed using petrophysical logging data calibrated to core data (XRD and pyrolysis data). Chemostratigraphic analysis utilized hhXRF data to determine the major and trace element trends in the cores. In the two wells six shale lithofacies were recognized at the core and log scale. Both wells show organic-rich facies (TOC > 6.5%) primarily in the middle and lower Marcellus, with a slight decrease in thickness of this interval in the Boggess 17H. This interval is interpreted as an increase in paleo-productivity (increased Ni, Zn, and V), decreased sedimentation (decreased detrital proxies), and anoxic to euxinic conditions (increased Mo and chalcophile elements). Paleo-redox conditions in both wells are dynamic throughout deposition transitioning between euxinic/anoxic to dysoxic/oxic. This trend is seen through elemental proxies and calcite/pyrite concretion distributions.

03 NATURAL GAS↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 4.0 Deliverable – Geologic Analysis Report

Project OASIS (Optimizing Alabama’s CO 2 Storage in Shelby County) is a geologic and reservoir characterization study designed to evaluate deep saline formations for potential long-term carbon dioxide (CO 2 ) storage in central Alabama near the National Carbon Capture Center (NCCC) and Alabama Power’s Plant Gaston. The project centers on the Cambro-Ordovician Knox Group and underlying strata such as the Conasauga and Rome Formations, which were investigated through the drilling of two stratigraphic test wells to obtain electronic well logs, core, and sidewall core plugs. These data provide direct measurements of porosity, permeability, and lithologic variability critical for reservoir characterization. Complementing the well program, a limited 2D seismic survey was acquired to help select the site for Westover #2, and a more regional Seismic Exchange (SEI) seismic survey was licensed and interpreted to define structural and stratigraphic frameworks in a new Static Earth Model (SEM), map reservoir continuity, and identify potential sealing intervals. Integrated with geologic and reservoir modeling, these datasets form the basis for evaluating storage capacity, injectivity, and containment.

20 FOSSIL-FUELED POWER PLANTS↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 6.0 Deliverable – CarbonSAFE Phase III Readiness

The OASIS CarbonSAFE Phase II Project OASIS (Optimizing Alabama’s CO 2 Storage in Shelby County) is a geologic and reservoir characterization study designed to evaluate deep saline formations for potential long-term carbon dioxide (CO 2 ) storage in central Alabama near the National Carbon Capture Center (NCCC) and Alabama Power’s Plant Gaston. The project centers on understanding the potential of the Cambro-Ordovician Knox Group and underlying strata such as the Conasauga and Rome Formations for geologic storage of CO 2 . These formations were investigated as part of SECARB-USA (DE-FE0031830) and Project OASIS through the drilling of two stratigraphic test wells to obtain electronic well logs, core, and sidewall core plugs. These data provide direct measurements of porosity, permeability, and lithologic variability critical for reservoir characterization. Complementing the well program, a limited 2D seismic survey was conducted to help select the site for Westover #2 as part of SECARB-USA (DE-FE0031830), and a more regional Seismic Exchange (SEI) seismic survey was licensed and interpreted to define structural and stratigraphic frameworks in a new Static Earth Model (SEM), map reservoir continuity, and to identify potential sealing intervals. Integrated with geologic and reservoir modeling, these datasets form the basis for evaluating storage capacity, injectivity, and containment. While this document endeavors to provide readers with a high-level overview of Project OASIS activities and its suitability for subsequent CarbonSAFE Phases, such as a Phase III effort. Other project deliverables and milestones will provide more details on individual subjects.

20 FOSSIL-FUELED POWER PLANTS↗

Technique for anchoring fasteners to honeycomb panels

Two-piece fastener bushing provides mounting surface for components on a three-inch thick honeycomb structure. Specially constructed starter drill and sheet metal drill permit drilling without misalignment. Tapered knife-edge cutting tool removes honeycomb core material without tearing the adjacent material.

Brown, W. J.↗

Chicxulub Impact Melts: Geochemical Signatures of Target Lithology Mixing and Post-Impact Hydrothermal Fluid Processes

Impact melts within complex impact craters are generally homogeneous, unless they differentiated, contain immiscible melt components, or were hydrothermally altered while cooling. The details of these processes, however, and their chemical consequences, are poorly understood. The best opportunity to unravel them may lie with the Chicxulub impact structure, because it is the world s most pristine (albeit buried) large impact crater. The Chicxulub Scientific Drilling Project recovered approx. 100 meters of impactites in a continuous core from the Yaxcopoil-1 (YAX-1) borehole. This dramatically increased the amount of melt available for analyses, which was previously limited to two small samples N17 and N19) recovered from the Yucatan-6 (Y-6) borehole and one sample (N10) recovered from the Chicxulub-1 (C-1) borehole. In this study, we describe the chemical compositions of six melt samples over an approx. 40 m section of the core and compare them to previous melt samples from the Y-6 and C-1 boreholes.

Kring, David A.↗

Sediment Properties: E-Area Completion Project

To accommodate a future need for additional waste disposal facilities at the Savannah River Site, the Solid Waste Management Division (SWMD) designated nine additional plots for development (Kasraii 2007; SRS 2010); these plots are collectively known as the E Area Completion Project (ECP). Subsurface samples were collected from ECP plots 6, 7, 8 and 9 (Figure 1) for chemical and physical property analyses to support Performance Assessment (PA) and Special Analyses (SA) modeling. This document summarizes the sampling and analysis scheme and the resultant data, and provides interpretations of the data particularly in reference to existing soil property data. Analytical data in this document include: gamma log, cone penetrometer log, grain size (sieve and hydrometer), water retention, saturated hydraulic conductivity (falling head permeameter), porosity, dry bulk density, total organic carbon, x-ray diffraction, and x-ray fluorescence data. SRNL provided technical and safety oversight for the fieldwork, which included completion of eight soil borings, four geophysical logs, and the collection of 522 feet of core and 33 Shelby tubes from ECP plots 6, 7, 8, and 9. Boart Longyear provided sonic drilling and logging services. Two soil borings were completed at each location. The first set of boreholes extended into (but did not fully penetrate) the Warley Hill Formation. These boreholes were continuously cored, then geophysically (gamma ray) logged. The recovered core was split, photographed, and described; one half of the core was archived at SRS's Core Lab facilities, and the remaining half was consumed as necessary for testing at SRS and off-site labs. Core descriptions and geophysical data were used to calculate target elevations for Shelby tube samples, which were obtained from the second set of boreholes. Shelby tubes were shipped to MACTEC Engineering and Consulting Inc. (MACTEC) in Atlanta for physical property testing. SRNL deployed their Site Characterization and Analysis Penetrometer System (SCAPS) cone penetrometer test (CPT) truck at ECP plots 6, 7, 8 and 9 to collect inferred lithology data for the vadose zone. Results from this study are used to make recommendations for future modeling efforts involving the ECP plots. The conceptual model of the ECP hydrogeology differs from the conceptual model of the current ELLWF disposal area in that for the ECP plots, the topography (ground surface) is generally lower in elevation; The Upland and top of Tobacco Road lithostratigraphic units are missing (eroded); The water table occurs lower in elevation (i.e., it occurs in lower stratigraphic units); and the Tan Clay Confining Zone (TCCZ) often occurs within the vadose zone (rather than in the saturated zone). Due to the difference in the hydrogeology between the current ELLWF location and the ECP plots, different vadose zone properties are recommended for the ECP plots versus the properties recommended by Phifer et al. (2006) for the current disposal units. Results from this study do not invalidate or conflict with the current PA's use of the Upper and Lower Vadose Zone properties as described by Phifer et al. (2006) for the current ELLWF disposal units. The following modeling recommendations are made for future modeling of the ECP plots where vadose zone properties are required: (1) If a single vadose zone property is preferred, the properties described by Phifer et al. (2006) for the Upper Vadose Zone encompass the general physical properties of the combined sands and clays in the ECP vadose zone sediments despite the differences in hydrostratigraphic units. (2) If a dual zone system is preferred, a combination of the Lower Zone properties and the Clay properties described by Phifer et al. (2006) are appropriate for modeling the physical properties of the ECP vadose zone. The Clay properties would be assigned to the Tan Clay Confining Zone (TCCZ) and any other significant clay layers, while the Lower Zone properties would be assigned for the remainder of the vadose zone. No immediate updates or changes are recommended for the saturated zone properties for modeling of the ECP plots. The hydrogeology and saturated hydraulic conductivity values resulting from the ECP work are consistent with existing data for the area. The following recommendations are provided for consideration in future work: (1) When the database is next updated, we recommend checking/refining hydrostratigraphic interpretations (picks) in addition to revising physical property data for both the vadose zone and saturated zone. (2) Results from this work suggest that separate ECP vadose zone properties may be appropriate for the various ECP plots. Consideration should be given to the fact that the plots toward the northwest (ECP plots 6, 7 and 8) all have the TCCZ within the vadose zone whereas the TCCZ occurs within the saturated zone to the east (ECP plot 9). (3) Further data may be needed at ECP plot 7.

54 ENVIRONMENTAL SCIENCES↗

Successes and Lessons Learned in the Design, Construction and Use of a Tool for Sampling the WR-1 Reactor Core - 1900z

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. The facility was centered on an organically cooled, heavy water moderated nuclear reactor in the world, Whiteshell Reactor 1 (WR-1). WR-1 was safely shut down in 1985, de-fueled and drained, and has been in a safe Storage with Surveillance (Deferred Decommissioning) state until present day. In support of an Environmental Assessment for proposed In Situ Decommissioning of WR-1, detailed characterization information regarding the reactor core components (calandria, calandria tubes, pressure tubes) was necessary to verify inventory estimates and neutron activation models produced circa 1992. The Fuel Channels of WR-1 (pressure tubes) were expected to be the most activated components of the reactor core, and to account for about 60% of the reactor core inventory. The interior surface of the fuel channel is also the most readily accessible surface within the reactor core. As such the decision was made to collect a sample of one of each of 3 Fuel Channel material types (Stainless Steel, Zr-2.5Nb, Ozhenite) for comparison to modelled estimates of neutron activation of various core materials. The expected dose rates from the samples were between 5 and 100 mSv (500-10,000 mrem) on contact based on a 200 mg sample. Sampling the Fuel Channels required verification the Fuel Channel was drained of organic coolant, removal of residual organic coolant from the Fuel Channel wall, removal of material from the interior surface of the Fuel Channel at the centerline of flux (∼25' below the operator position), and extraction of that material from the core. Several options for existing tooling and technologies, including hydraulic scrapers, and horizontal drill technologies, were looked at for their applicability to WR-1. While suitable approaches to higher radiation field sample collection, they were overly complex, costly and time consuming for the configuration at WR-1. In an effort to reduce costs, and to simplify the sampling process, a specialized and simple tool was developed to mechanically scrape a small sample of the interior wall of the Fuel Channels, collect the sample into a vial, and remove the sample from the core for analysis. The tool was designed, constructed, tested and implemented in the field entirely by Canadian Nuclear Laboratories Staff. The tool required no powered components, or electronic guidance or measurements; and was designed and constructed for a fraction of the cost of other commercially available technologies for sample collection within reactor cores. The samples were successfully collected without any injuries, contamination events or equipment failures. The tool remains operational in the event additional sampling is required. This paper provides additional details of the design, construction, testing and use of the tool and the successes and lessons learned during the various stages of design and implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lunar regolith dynamics based on analysis of the cosmogenic radionuclides Na-22, Al-26, and Mn-53

Depth profiles of Na-22 and Al-26 in the upper portions of five lunar cores are analyzed. From the analyses, it is concluded that the natural gardening processes on the lunar surface result in mixing of the regolith to a depth of 2-3 cm over a time period which is short compared with the half-life of Al-26 (0.73 m.y.). It is also concluded that the rotary drill processes which were used to obtain the deep drill samples generally resulted in loss and/or mixing of the upper portions of the cores. In contrast, the near-surface regions of the drive tube cores appear to have a well-preserved stratigraphy. Analysis of Mn-53 in samples of six lunar rocks helps substantiate the accuracy of age date estimates by other means, and provides definite information that the total lunar surface exposure of two of these rocks has occurred during a single surface event which continued to their collection.

Fruchter, J. S.↗

Discovery and analysis of a blind geothermal system in southeastern Gabbs Valley, Western Nevada

This study assessed the potential for high-temperature (≥130°C) blind geothermal systems in southeastern Gabbs Valley by employing a geothermal play fairway analysis approach involving integration of geologic, geophysical, and geochemical datasets. Gabbs Valley is a complex, tectonically active basin within the Great Basin on the boundary between the transtensional central Walker Lane domain and extensional Basin and Range province. The termination of the Petrified Springs fault, a major dextral fault of the central Walker Lane, in an array of normal faults indicates that southeastern Gabbs Valley occupies a displacement transfer zone, which is a favorable structural setting for geothermal activity. The displacement transfer zone is a structurally complicated area with many faults of varying geometries, kinematics, and ages. A substantial northwest-trending gravity high within the south-central part of southeastern Gabbs Valley is produced from offsets along concealed northwest-striking dextral-normal faults that intersect strands of north-northeast-to east-northeast-striking normal faults. This area of tightly spaced faults and fault intersections is a particularly favorable structural setting within the broader-scale displacement transfer zone. Multiple lines of direct and indirect evidence suggest the presence of a relatively high-temperature (≥130°C) blind geothermal system in this area, including collocated intersecting gravity gradients, magnetic-low, low-resistivity, and 2-m temperature anomaly. Potentially related, water samples from agricultural wells ~7 km northwest of the 2-m anomaly yield geothermometers indicating subsurface fluid temperatures of 130-140°C. Six temperature-gradient holes were drilled to target the extent of the shallow-temperature and geophysical anomalies to define the geothermal system in southeastern Gabbs Valley. Two wells contained high temperatures exceeding boiling with bottom-hole temperatures ii of 114.5°C and 124.9°C, respectively, and the remaining wells displayed elevated to background temperatures ranging from 79.2°C to 28.7°C. The observed temperature gradients for the two hottest drill holes necessitate drill-hole intercepts of convecting hydrothermal fluids. The 2-m survey is spatially and thermally consistent with the temperature-gradient holes and constrains the core of upflow at a shallow depth interval (<250m) to an area <0.5-1 km west-southwest of the hottest drill hole. The zone of inferred upwelling occupies the area corresponding to the center of the magnetic-low. This project has several significant implications. The newly discovered blind geothermal system in southeastern Gabbs Valley may be capable of supporting a binary-type geothermal power plant. This detailed study provides an initial validation of the play fairway approach to geothermal exploration. It also demonstrates both the broad applicability of the play fairway exploration strategy and the large untapped potential for commercial-grade blind geothermal systems in many of the basins in the Great Basin region.

15 GEOTHERMAL ENERGY↗

Drilling on the Moon and Mars: Developing the Science Approach for Subsurface Exploration with Human Crews

DOMEX (Drilling on the Moon and Mars in Human Exploration) is using analog missions to develop the approach for using human crews to perform science activities on the Moon and Mars involving exploration and sampling of the subsurface. Subsurface science is an important activity that may be uniquely enabled by human crews. DOMEX provides an opportunity to plan and execute planetary mission science activities without the expense and overhead of a planetary mission. Objectives: The objective of this first in a series of DOMEX missions were to 1) explore the regional area to understand the geologic context and determine stratigraphy and geologic history of various geologic units in the area. 2) Explore for and characterize sites for deploying a deep (10 m depth) drilling system in a subsequent field season. 3) Perform GPR on candidate drill sites. 4) Select sites that represent different geological units deposited in different epochs and collect soil cores using sterile procedures for mineralogical, organic and biological analysis. 5) Operate the MUM in 3 different sites representing different geological units and soil characteristics. 6) Collect rock and soil samples of sites visited and analyze them at the habitat. Results: At mission start the crew performed a regional survey to identify major geologic units that were correlated to recognized stratigraphy and regional geologic maps. Several candidate drill sites were identified. During the rest of the mission, successful GPR surveys were conducted in four locations. Soil cores were collected in 5 locations representing soils from 4 different geologic units, to depths up to 1m. Soil cores from two locations were analyzed with PCR in the laboratory. The remainder were reserved for subsequent analysis. XRD analysis was performed in the habitat and in the field on 39 samples, to assist with sample characterization, conservation, and archiving. MUM was deployed at 3 field locations and 1 test location (outside the habitat) where it operated autonomously for 2-4 hours at each site. Depths achieved ranged from 15 to 70 cm depending on the soil compressive strength and the presence and depth of subsurface indurated layers. Subsurface samples weighing 0.5 to 1 g were collected at the deepest depth encountered at each of the sites using the MUM automated sample collection system, and subsequently analyzed with XRD. Downhole inspection of holes produced by MUM with the Raman spectrometer was acquired on two of the holes and spectral features associated with selenite were identified in specific soil layers. Previously unreported fossilized remains of vertebrate fauna from the Jurassic era were discovered during our mission. Analysis of mineral biomarkers associated with this discovery are underway.

Stoker, C. R.↗

Distinguishing Indigenous from Contaminating Microorganisms in Rock Samples from a Deep Au Mine in South Africa

The concentration and distribution of microbial biomass within deep subsurface rock strata is not well known To date, most analyses are from water samples and a few cores. Hand samples, block samples and cores from an actively mined Carbon Leader ore zone at 3.2 kilometers depth were collected for microbial analyses. The Carbon Leader was comprised of quartz, S-bearing aromatic hydrocarbons, Fe(III) oxyhydroxides, sulfides, uraninite, Au and minor amounts of sulfate. The porosity of the ore was 1% and the maximum pore throat diameter was less than 0.1 microns; whereas, the porosity of the adjacent quartzite was .02 to .9% with a maximum pore throat diameter of 0.9 microns. Rhodamine dye, fluorescent microspheres, microbial enrichments, autoradiography, phospholipid fatty acid (PLEA) and 16S rDNA analyses were performed on these rock samples and the mining water. The date indicate that the levels of solute contamination less than 0.01% for pared rock samples. Despite this low level of contamination, PLEA, microbial enrichment, DNA and tracer analyses and calculations indicate that most of the viable microorganisms in the Carbon Leader represent gram negative aerobic heterotrophs and ammonia oxidizers that are phylogenetically identical or closely related to service water microorganisms. These microbial contaminants probably infiltrated the low permeability rock through mining-induced microfractures. Geochemical data also detected drilling water in a fault zone approx. 1 meter behind the rock face encountered during coring. The mining induced macrofractures that are common at these great depths act as pathways for the drilling water borne microorganisms into the lower temperature zone that extends several meters into rock strata from the rock face. Combined PLEA and T- RFLP analyses of the service water and Carbon Leader samples indicate that the concentration of indigenous microorganisms was less than 10(exp 2) cells/gram. Such a low concentrations result from the submicron pore throat diameters. PLFA. SO4-35 autoradiography and tracer analyses indicate that the bounding quartzite contains thermophilic sulfate reducing bacteria at 10(exp 3) cells/gram that are not attributable to drilling water contamination. The microorganisms may be surviving on sulfate generated by oxidation of sulfide by radiolytic reactions resulting from the high U concentration in the ore zone. The presence of up to 8,000 ppm of Fe(III) oxyhydroxides in the host rock will also act to recycle sulfide generated by the sulfate reducing bacteria into sulfate. The activity of these sulfate-reducing bacteria may be enhanced by mining induced fracturing which can propagate up to 40 meters into virgin rock where the temperatures are ca. 50 C, and decrepitate of sulfate rich fluid inclusions. In ultra deep mines, judicious application of tracers and multiple microbial characterization techniques can distinguish microbial contamination caused by the near field fracturing and drilling water migration from the indigenous microbial communities in rock strata. The importance of far field fracturing on indigenous microbial communities, however, remains unknown.

Onstott, T. C.↗

High-Resolution Characterization of Comingled Contaminants in the Deep Vadose Zone, Hanford Site, Washington - 17387

The contaminated deep vadose zone in the Central Plateau of the Hanford Site in Washington state presents a unique challenge to remediation. The Comprehensive Environmental Response, Compensation, and Liability Act, commonly known as the CERCLA project responsible for addressing these deep contaminants is designated as the 200-Deep Vadose Zone Operable Unit (DV-1 project). The vadose zone is 55-82 meters (180-270 feet) thick and is contaminated with both radiological and chemical contaminants from multiple historical waste streams. The mobile contaminants from this waste are still present in the deep vadose zone and pose a potential threat to the groundwater. Characterizing the nature and extent of the comingled mobile contaminants is an important step before assessing possible remedial alternatives. One factor controlling the migration and distribution of subsurface contaminants is the lithologic heterogeneity of the vadose zone sediments. A sampling plan for the DV-1 project includes continuous sediment core collection and analysis to identify key lithologic factors (i.e., small-scale bedding and structural features) that act as barriers, preferential pathways or conduits for mobile contaminants migrating through the vadose zone. Over six hundred meters (2,000 feet) of intact sediment core from 26 boreholes were collected in 1.5 meters (5 feet) long, 10 centimeter (4-inch) diameter segments. These intact sediment samples provide significant improvement in the level of detail and understanding of mechanisms and features controlling contaminant distribution that is not possible with traditional homogenized drill cuttings or conventional split-spoon samples. Detailed geological descriptions and photographs of the intact core are correlated to high-resolution geophysical logs which aid in the development of a comprehensive contaminant distribution profile of the borehole. These lithologic interpretations are used to define specific depth intervals for sampling based on changes in moisture, lithology, and elevated gamma radiation. The selected samples are analyzed for contaminants of concern, geochemical parameters, and hydraulic properties. Significant lithologic features observed in the intact cores include sharp contact boundaries to graded bedding, iron-oxide and carbonate cementation, silty laminations, clastic dike intrusions, and soft sediment deformation. Preliminary geologic logs integrated with the sample analysis indicate features that correlate to the variable distribution of contaminants both laterally and vertically. Integration of measured hydraulic parameters to lithologic units in individual borehole profiles provide key inputs for more precise geo-framework and vadose zone flux models supporting the DV-1 project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Magnetic Resonance Imaging-Guided Osseous Biopsy in Children With Chronic Recurrent Multifocal Osteomyelitis

Purpose: To report the safety and diagnostic performance of magnetic resonance (MRI)-guided core biopsy of osseous lesions in children with chronic recurrent multifocal osteomyelitis (CRMO) that were visible on MRI but were occult on radiography and computed tomography (CT). Materials and Methods: A retrospective analysis of MRI-guided osseous biopsy performed in seven children (four girls and three boys; mean age 13 years (range 11 to 14) with CRMO was performed. Indication for using MRI guidance was visibility of lesions by MRI only. MRI-guided procedures were performed with 0.2-Tesla (Magnetom Concerto; Siemens, Erlangen, Germany; n = 5) or 1.5-T (Magnetom Espree; Siemens; n = 2) open MRI systems. Core needle biopsy was obtained using an MRI-compatible 4-mm drill system. Conscious sedation or general anesthesia was used. Parameters evaluated were lesion visibility, technical success, procedure time, complications and microbiology, cytology, and histopathology findings. Results: Seven of seven (100%) targeted lesions were successfully visualized and sampled. All obtained specimens were sufficient for histopathological analysis. Length of time of the procedures was 77 min (range 64 to 107). No complications occurred. Histopathology showed no evidence of malignancy, which was confirmed at mean follow-up of 50 months (range 28 to 78). Chronic nonspecific inflammation characteristic for CRMO was present in four of seven (58%) patients, and edema with no inflammatory cells was found in three of seven (42%) patients. There was no evidence of infection in any patient. Conclusion: MRI-guided osseous biopsy is a safe and accurate technique for the diagnosis of pediatric CRMO lesions that are visible on MRI only.

62 RADIOLOGY AND NUCLEAR MEDICINE↗