Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

HEAO-A nominal scanning observation schedule

The HEAO-A observatory, scheduled for launch in late June 1977, will spend most of its orbital lifetime in a scanning mode, spining from 0.03 to 0.1 rpm about an axis aligned with the sun. The dates of availability in the scan band are given for a list of 248 X-ray sources. Celestial maps of source locations and scan planes, and examples of the nighttime elevation of available sources are presented. This document is intended to aid ground-based observers in planning coordinated observations with HEAO-A.

Fishman, G. J.↗

A Distributed Intelligent Automated Demand Response Building Management System

The goal of the 2.5 year Distributed Intelligent Automated Demand Response (DIADR) project was to reduce peak electricity load of Sutardja Dai Hall at UC Berkeley by 30% while maintaining a healthy, comfortable, and productive environment for the occupants. We sought to bring together both central and distributed control to provide “deep” demand response1 at the appliance level of the building as well as typical lighting and HVAC applications. This project brought together Siemens Corporate Research and Siemens Building Technology (the building has a Siemens Apogee Building Automation System (BAS)), Lawrence Berkeley National Laboratory (leveraging their Open Automated Demand Response (openADR), Auto-­Demand Response, and building modeling expertise), and UC Berkeley (related demand response research including distributed wireless control, and grid-­to-­building gateway development). Sutardja Dai Hall houses the Center for Information Technology Research in the Interest of Society (CITRIS), which fosters collaboration among industry and faculty and students of four UC campuses (Berkeley, Davis, Merced, and Santa Cruz). The 141,000 square foot building, occupied in 2009, includes typical office spaces and a nanofabrication laboratory. Heating is provided by a district heating system (steam from campus as a byproduct of the campus cogeneration plant); cooling is provided by one of two chillers: a more typical electric centrifugal compressor chiller designed for the cool months (Nov-­ March) and a steam absorption chiller for use in the warm months (April-­October). Lighting in the open office areas is provided by direct-­indirect luminaries with Building Management System-­based scheduling for open areas, and occupancy sensors for private office areas. For the purposes of this project, we focused on the office portion of the building. Annual energy consumption is approximately 8053 MWh; the office portion is estimated as 1924 MWh. The maximum peak load during the study period was 1175 kW. Several new tools facilitated this work, such as the Smart Energy Box, the distributed load controller or Energy Information Gateway, the web-­based DR controller (dubbed the Central Load-­Shed Coordinator or CLSC), and the Demand Response Capacity Assessment & Operation Assistance Tool (DRCAOT). In addition, an innovative data aggregator called sMAP (simple Measurement and Actuation Profile) allowed data from different sources collected in a compact form and facilitated detailed analysis of the building systems operation. A smart phone application (RAP or Rapid Audit Protocol) facilitated an inventory of the building’s plug loads. Carbon dioxide sensors located in conference rooms and classrooms allowed demand controlled ventilation. The extensive submetering and nimble access to this data provided great insight into the details of the building operation as well as quick diagnostics and analyses of tests. For example, students discovered a short-­cycling chiller, a stuck damper, and a leaking cooling coil in the first field tests. For our final field tests, we were able to see how each zone was affected by the DR strategies (e.g., the offices on the 7th floor grew very warm quickly) and fine-­tune the strategies accordingly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evidence of Completion of Milestone 3: Experimental Testbed

Construction and deployment of the experimental testbed encountered scheduling delays, and completion was subsequently further delayed by curtailment of LANL operations due to the COVID–19 pandemic. Between March and October, LANL was in a state of “Limited Operations” such that only certain “mission–critical” work was performed with approximately 25% on–site staffing. In spite of this, much of the lab space preparation was executed and the five initial model house” units were constructed and installed during this period. Still, the pace of construction was impacted by difficulty in coordinating personnel and minimizing contact between workers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Redesign of the Timeline Generator at Fermilab using a web-based Flutter Application, GraphQL API and an IOC

Redesign of the Timeline Generator at Fermilab using a web-based Flutter application, GraphQL API and an IOC ABSTRACT = The control system at Fermilab is undergoing an evolution with a shift towards web-based applications with connections to the EPICS infrastructure. The Timeline Generator (TLG) is an application that serves to coordinate events across the lab using different timing links. These links include the Tevatron clock (TCLK), a 10 MHz serial link with events encoded at 20Hz and Ma-chine Data (MDAT), a communication link with states encoded at 720Hz. This paper covers the redesign of the major components of the TLG. This includes a web-based Flutter application for building timelines. A placement service is in use that has a GraphQL interface and uses a timeline input to compute a schedule of events and states. The Flutter application sends this computed schedule to the TLG IOC via a GraphQL interface to the Data Pool Manager (DPM). The TLG IOC runs on an Arria FPGA, the Accelerator Clock Generator (ACLK-GEN), which is responsible for writing the events and states on to the different timing links.

Carmichael, Linden [Fermilab]↗

ADS-B within a Multi-Aircraft Simulation for Distributed Air-Ground Traffic Management

Automatic Dependent Surveillance Broadcast (ADS-B) is an enabling technology for NASA s Distributed Air-Ground Traffic Management (DAG-TM) concept. DAG-TM has the goal of significantly increasing capacity within the National Airspace System, while maintaining or improving safety. Under DAG-TM, aircraft exchange state and intent information over ADS-B with other aircraft and ground stations. This information supports various surveillance functions including conflict detection and resolution, scheduling, and conformance monitoring. To conduct more rigorous concept feasibility studies, NASA Langley Research Center s PC-based Air Traffic Operations Simulation models a 1090 MHz ADS-B communication structure, based on industry standards for message content, range, and reception probability. The current ADS-B model reflects a mature operating environment and message interference effects are limited to Mode S transponder replies and ADS-B squitters. This model was recently evaluated in a Joint DAG-TM Air/Ground Coordination Experiment with NASA Ames Research Center. Message probability of reception vs. range was lower at higher traffic levels. The highest message collision probability occurred near the meter fix serving as the confluence for two arrival streams. Even the highest traffic level encountered in the experiment was significantly less than the industry standard "LA Basin 2020" scenario. Future studies will account for Mode A and C message interference (a major effect in several industry studies) and will include Mode A and C aircraft in the simulation, thereby increasing the total traffic level. These changes will support ongoing enhancements to separation assurance functions that focus on accommodating longer ADS-B information update intervals.

Barhydt, Richard↗

Evidence of Completion of Milestone 3: Experimental Testbed

Construction and deployment of the experimental testbed encountered scheduling delays, and completion was subsequently further delayed by curtailment of LANL operations due to the COVID-19 pandemic. Between March and October, LANL was in a state of “Limited Operations” such that only certain “mission-critical” work was performed with approximately 25% on-site staffing. In spite of this, much of the lab space preparation was executed and the five initial model house” units were constructed and installed during this period. Still, the pace of construction was impacted by difficulty in coordinating personnel and minimizing contact between workers. Currently, LANL is in the mode of “Normal Operations with Maximum Telework,” which continues to limit the availability of on-site personnel. Nevertheless, Milestone 3 is now complete. This document describes the experiment as it is deployed and provides status for each task for this milestone.

99 GENERAL AND MISCELLANEOUS↗

Coordinated NASA nickel-cadmium battery technology program

This paper describes the NASA nickel-cadmium (Ni-Cd) battery technology program which is being coordinated by JPL to provide NASA and other users with lighter and/or longer-lived Ni-Cd cells for low-earth-orbit, geosynchronous-orbit, and planetary spacecraft missions in the 1980s. The goal is to double the energy density and/or life of the system. Failure modes and mechanisms are differentiated and discussed to point out the critical design variables which affect Ni-Cd cell life. Cell component weights are listed, approaches for reducing weight are discussed, and program tasks and schedules are presented. The nine major tasks being worked on by various organizations are described. Progress has been made in weight reduction, understanding of life reliability mechanisms, and development of a process for manufacturing more stable electrodes. An accelerated and predictive life test program is approximately 30% complete. It appears feasible to double the life and/or usable energy density of the Ni-Cd cell.

Bogner, R. S.↗

TPSAS-NF1676L-12441-DND

The increasing presence of airport surface surveillance technologies has spawned a strong interest in airport surface traffic management research; the vast majority has assumed that the airport’s runway configuration is known and constant. Tactical Runway Configuration Management (TRCM), one component of NASA’s System Oriented Runway Management concept, plans the airport configuration to optimize traffic efficiency for the forecast weather, traffic, and other factors. While planning runway configuration can provide benefit and is required by other automation concepts, larger benefits are possible by planning other airport configuration decisions, such as runway assignment policies, that are currently made manually by controllers. A laboratory prototype of the TRCM algorithm which selects optimal airport configuration schedules has been implemented and studied within a simulation environment. The presentation will describe simulation results for several airports, under various weather and traffic conditions. The sequence of airport configurations recommended by TRCM result in significantly less delay than the airport configurations that were actually used by controllers, illustrating both the potential benefit from airport configuration optimization and the ability of TRCM to provide effective airport configuration schedules. The application to several, distinct airports demonstrates the approach is capable of handling the differences between airports with a common algorithm, while providing decision support that respects the current procedures at those airports. Consequently, TRCM is able to be deployed to any airport within the current National Airspace System. The TRCM algorithmic approach is also extensible to future operational scenarios. NASA is in the process of transferring the initial TRCM technology to the FAA. Future research will extend the concept and algorithm to provide coordinated plans for metroplex airports and study NextGen applications.

Stephen Atkins↗

TPSAS-NF1676L-12263-DND

The increasing presence of airport surface surveillance technologies has spawned a strong interest in airport surface traffic management research; the vast majority has assumed that the airport’s runway configuration is known and constant. Tactical Runway Configuration Management (TRCM), one component of NASA’s System Oriented Runway Management concept, plans the airport configuration to optimize traffic efficiency for the forecast weather, traffic, and other factors. While planning runway configuration can provide benefit and is required by other automation concepts, larger benefits are possible by planning other airport configuration decisions, such as runway assignment policies, that are currently made manually by controllers. A laboratory prototype of the TRCM algorithm which selects optimal airport configuration schedules has been implemented and studied within a simulation environment. The presentation will describe simulation results for several airports, under various weather and traffic conditions. The sequence of airport configurations recommended by TRCM result in significantly less delay than the airport configurations that were actually used by controllers, illustrating both the potential benefit from airport configuration optimization and the ability of TRCM to provide effective airport configuration schedules. The application to several, distinct airports demonstrates the approach is capable of handling the differences between airports with a common algorithm, while providing decision support that respects the current procedures at those airports. Consequently, TRCM is able to be deployed to any airport within the current National Airspace System. The TRCM algorithmic approach is also extensible to future operational scenarios. NASA is in the process of transferring the initial TRCM technology to the FAA. Future research will extend the concept and algorithm to provide coordinated plans for metroplex airports and study NextGen applications.

Stephen Atkins↗

Exascale workflow applications and middleware: An ExaWorks retrospective

Exascale computers offer transformative capabilities to combine data-driven and learning-based approaches with traditional simulation applications to accelerate scientific discovery and insight. However, these software combinations and integrations are difficult to achieve due to the challenges of coordinating and deploying heterogeneous software components on diverse and massive platforms. Here, we present the ExaWorks project, which addresses many of these challenges. We developed a workflow Software Development Toolkit (SDK), a curated collection of workflow technologies that can be composed and interoperated through a common interface, engineered following current best practices, and specifically designed to work on HPC platforms. ExaWorks also developed PSI/J, a job management abstraction API, to simplify the construction of portable software components and applications that can be used over various HPC schedulers. The PSI/J API is a minimal interface for submitting and monitoring jobs and their execution state across multiple and commonly used HPC schedulers. We also describe several leading and innovative workflow examples of ExaWorks tools used on DOE leadership platforms. Furthermore, we discuss how our project is working with the workflow community, large computing facilities, and HPC platform vendors to address the requirements of workflows sustainably at the exascale.

97 MATHEMATICS AND COMPUTING↗

Multiscale simulation of integrated energy system and electricity market interactions

Accelerating the deep decarbonization of the world's electric grids requires the coordination of complex energy systems and infrastructures across timescales from seconds to decades. Here, we present a new multiscale simulation framework that integrates process- and grid-centric modeling paradigms to better design, operate, and control integrated energy systems (IESs), which combine multiple technologies, in wholesale energy markets. Traditionally, IESs are analyzed with a process-centric paradigm such as levelized cost of electricity (LCOE) or annualized net revenue, ignoring important interactions with electricity markets. This framework explicitly models the complex interactions between an IES's bidding, scheduling, and control decisions and the energy market's clearing and settlement processes, while incorporating operational uncertainties. Through two case studies, we show the importance of understanding and quantifying complex resource-grid interactions. In case study 1, we demonstrate that optimized bidding from one resource shifts the profit distribution for all energy systems in the market. This result suggests new and more flexible IES technologies can disrupt the economics of all market participants, possibly leading to accelerated retirements of less flexible resources. Interestingly, the optimized bidding has little impact on grid-level aggregate statistics, such as total generation costs and renewable penetration rate. While aggregate modeling strategies may remain valid under some IES adoption scenarios for analysis focused on regional outcomes, direct comparisons of IES technologies at specific locations without considering these interactions may lead to misleading or incorrect conclusions. In case study 2, we consider the design and flexible operation of IESs that hybridize conventional generators with energy storage. Through a sensitivity analysis, we find that as the size of the storage system increases, the total number of start-ups for coal- and natural gas-based IESs reduced by 25% and 33.6%, and the total thermal generator ramping (i.e., mileage) reduced by 86.5% and 62.5%, respectively. This shows the primary benefit of storage may not be reduced operational costs (which do not change significantly) but fewer start-ups and less ramping, which may greatly simplify the design, operation, and control of carbon capture systems. The new modeling and optimization capabilities from this work enable the coupling of rigorous, dynamic process models with grid-level production cost models to quantitatively identify the nuanced interdependencies across these vast timescales that must be addressed to realize clean, safe, and secure energy production. Moreover, the proposed general multiscale simulation framework is applicable to all IES technologies and can be easily extended to consider other energy carriers (e.g., hydrogen, ammonia) and energy infrastructures (e.g., natural gas pipelines).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of Different Trajectory Option Set Participation Levels within an Air Traffic Management Collaborative Trajectory Option Program

This paper presents the methodology and results of a Human-In-The-Loop (HITL) simulation study conducted in the Airspace Operations Laboratory at NASA Ames Research Center. This study is a part of NASA's ongoing research into developing an Integrated Demand Management (IDM) concept, whose aim is to improve traffic flow management (TFM) by coordinating the FAA's strategic Traffic Flow Management System (TFMS) with its more tactical Time-Based Flow Management (TBFM) system. The purpose of TFM is to regulate air traffic demand so that it is delivered efficiently through constrained airspace resources without exceeding their capacity limits. The IDM concept leverages a new TFMS capability called the Collaborative Trajectory Options Program (CTOP) to strategically pre-condition traffic demand flowing into a TBFM-managed arrival environment, where TBFM is responsible for managing traffic tactically by generating precise arrival schedules. Unlike other TFM tools, CTOP gives flight operators the option of submitting a set of user-preferred alternative trajectories for each flight. CTOP can then use these trajectory option sets (or TOSs) to find user-preferred alternative routes to reduce demand on an overloaded resource. CTOP's effectiveness in redistributing demand is limited, however, by the availability of flights with alternative routes. The research presented in this paper focuses on evaluating the impact on TFM operations by varying the percentage of flights that submit a multiple-option TOS ('TOS participation levels'). Results show the impact on overall system performance and on the rerouted flights themselves. The simulation used a Newark (EWR) airport arrival scenario, with en route weather affecting traffic inbound from the west. Participants were asked to control each of the three arrival flows (north, west, and south) to meet their individual capacity constraints while simultaneously ensuring efficient utilization of the capacity at the destination airport. A large, permeable convective weather cell located southeast of Chicago severely reduced the capacity of the west flow. The study evaluated the impact of five different TOS participation levels on CTOP's ability to re-allocate traffic from the west and improve TFM performance in terms of delay assignment and traffic delivery rate to the airport. Overall, the results showed that increasing TOS submissions allowed the overall system delays to be reduced and fairly distributed among the three arrival flows, at the same time achieving the airport throughput rate. Moreover, it was found that aircraft who submitted a TOS saw a greater reduction in delay, even when they were assigned longer routes. This was particularly true when fewer aircraft submitted a TOS. The results confirm that the CTOP operations with higher TOS participation levels helped utilize the overall National Airspace System (NAS) resources as well as benefited the users who participated.

Yoo, Hyo-Sang↗

Impact of Glen Canyon Generation Loss

Colorado River Basin hydropower generation has faced challenges due to droughts and ecological and social water requirements. Specifically, Glen Canyon hydropower generation fluctuates substantially with recent extreme weather trends. Further, the western grid evolves with higher wind and solar share, and Glen Canyon hydropower's contribution to grid flexibility services is essential. The Western Area Power Administration (WAPA) markets and schedules electricity production at GCD, and the loss of this power could have significant financial consequences for the WAPA Colorado River Storage Project's (CRSP) Office because it may need to purchase relatively large amounts of energy to serve its firm electrical obligations. In addition, GCD provides grid reliability services for the WAPA Colorado-Missouri (WACM) balancing authority (BA). Both WAPA and DOE's Water & Power Technology Office (WPTO) are interested in researching how these drier hydrological conditions will impact federal electrical energy production, the Western Electricity Coordinating Council (WECC) power grid, and the value of hydropower in the face of lower production. We study multiple hydrologic and power grid scenarios to understand the grid impacts of the loss of Glen Canyon generation. The study uses a production cost model, water resources planning models, water-centric grid models, and various data analytic techniques. The study progress presentation discusses the selection of probable CRSP' hydropower scenarios and power grid scenarios to understand the impacts of Glen Canyon generation, which includes technologies that compensate the Glen Canyon energy and ancillary services contributions, transmission availability, and energy local marginal prices at interested grid locations of WAPA operation.

droughts↗

Precision Departure Release Capability (PDRC) Overview and Results: NASA to FAA Research Transition

NASA researchers developed the Precision Departure Release Capability (PDRC) concept to improve the tactical departure scheduling process. The PDRC system is comprised of: 1) a surface automation system that computes ready time predictions and departure runway assignments, 2) an en route scheduling automation tool that uses this information to estimate ascent trajectories to the merge point and computes release times and, 3) an interface that provides two-way communication between the two systems. To minimize technology transfer issues and facilitate its adoption by TMCs and Frontline Managers (FLM), NASA developed the PDRC prototype using the Surface Decision Support System (SDSS) for the Tower surface automation tool, a research version of the FAA TMA (RTMA) for en route automation tool and a digital interface between the two DSTs to facilitate coordination.

PDRC↗

Hydropower Flexibility and Environmental Tradeoffs Analysis

The importance of hydropower increases as the power grid evolves with the higher variable renewable contribution. As conventional thermal power plants are retired, the importance of hydropower contribution increases to balance the variability of solar and wind generation. However, reservoir water resources are constrained by multiple constraints, and variability of water inflow to the reservoirs creates limitations to dam water releases for power grid needs. Coordinating multiple tools, including water resources, ecological, and technical and economic power grid modeling, informs dam water releases. The case study, the Columbia River Basin multipurpose reservoir project, is operated for hydropower production and many other purposes considering the aquatic habitat of the river basin. Specifically, the river basin fish population is a vital element for the tribal community of the river basin. We integrated a production cost model, a water resource model, and decades of tribal knowledge to analyze the fish-friendly way of operating Columbia hydropower scheduling and grid impacts. We measure power grid impacts for various water resources planning scenarios in terms of total system operating cost, system reliability indicators, changes in wind and solar generation and curtailments, local marginal prices, and revenue for hydropower producers. The study results inform reservoir operating rules decisions from hydropower power producers, system operators, other water users, tribes, environmentalists, and other stakeholders.

Columbia River↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Literature Survey on Operational Voltage Control and Reactive Power Management on Transmission and Sub-Transmission Networks

Voltage and reactive power system control is generally performed following usual patterns of loads, based on off-line studies for daily and seasonal operations. This practice is currently challenged by the inclusion of distributed renewable generation, such as solar. There has been focus on resolving this problem at the distribution level; however, the transmission and sub-transmission levels have received less attention. This paper provides a literature review of proposed methods and solution approaches to coordinate and optimize voltage control and reactive power management, with an emphasis on applications at transmission and sub-transmission level. The conclusion drawn from the survey is that additional research is needed in the areas of optimizing switch shunt actions and coordinating all available resources to deal with uncertain patterns from increasing distributed renewable generation in the operational time frame. These topics are not deeply explored in the literature.

capacitors↗

NASA ATD-2 Trajectory Option Set Prototype Capability for Rerouting Departures in Metroplex Airspace

This paper describes NASA’s Airspace Technology Demonstration 2 (ATD-2) Phase 3 prototype capability that is being tested in the North Texas region through summer 2021. For the first time, a shared Decision Support Tool (DST) provides opportunities for participating Flight Operators (FOs) and Air Traffic Controllers (ATCs) to coordinate using a Trajectory Option Set (TOS). When the metroplex airspace is impacted by demand/capacity imbalances, TOS enables departure flights to be rerouted to alternative departure routes with less surface delay.

trajectory option set↗