Surveyor 7 Mission Report. Part 2 - Science Results
Chemical analysis of rocks and soil and other scientific results obtained for Tycho landing site by Surveyor 7 lunar probe
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Chemical analysis of rocks and soil and other scientific results obtained for Tycho landing site by Surveyor 7 lunar probe
Automated fluorescent antibody for chemical analysis, discussing system design and instrument calibration
Optical properties and chemical analysis of contaminants on Gemini spacecraft windows
The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.
The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.
Chemical analysis of ablative materials
Alpha scattering chemical analysis of lunar surface materials at Surveyor landing sites and lunar geomorphology
Statistical mechanics, chemical analysis, and elasticity studies for macromolecular networks like rubber
Chemical analysis, isotopic composition, structure and mineralogy of meteorites for classification into irons and stones, discussing time variation of temperature, pressure, etc
Auger and photoelectron spectroscopy for chemical analysis, noting effects of sample thickness, sample potential, surface contamination and X ray incident angle
Chemical analysis and paragenesis of manganoan ilmenite from Sierran adamellite using electron microprobe
Switch mechanism limits the stroke of the piston by stopping the piston motor drive. This allows retention of a fluid sample in an automated wet-chemical analysis system.
Chemical analysis of polysaccharide produced by blue-green algae
Metallographic and chemical analysis by X-ray diffraction, microscopic examination, and electron microprobes of elevated temperature instability effects on Stellite 6B
Chemical analysis of cloud components in upper atmosphere of Venus
Chemical analysis of Australasian tektites inferring extraterrestrial igneous origin, noting similarity to preimpact parent rock
Microtektites chemical analysis data providing appraisal of strewn field boundaries, implying lunar origin
Chemical analysis methods for Apollo 11 lunar rocks, discussing calibration standards, spectral lines and Apollo 12 data