Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “altimeter”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Qualification of Laser Diode Arrays for Mercury Laser Altimeter Mission

NASA's requirements for high reliability, high performance satellite laser instruments have driven the investigation of many critical components; specifically, 808 nm laser diode array (LDA) pump devices. The MESSENGER mission is flying the Mercury Laser Altimeter (MLA) which is a diode-pumped Nd:YAG laser instrument designed to map the topography of Mercury. The environment imposed on the instrument by the orbital dynamics places special requirements on the laser diode arrays. In order to limit the radiative heating of the satellite from the surface of Mercury, the satellite is designed to have a highly elliptical orbit. The satellite will heat near perigee and cool near apogee. The laser power is cycled during these orbits so that the laser is on for only 30 minutes (perigee) in a 12 hour orbit. The laser heats 10 C while powered up and cools while powered down. In order to simulate these operational conditions, we designed a test to measure the LDA performance while being temperature and power cycled. Though the mission requirements are specific to NASA and performance requirements are derived from unique operating conditions, the results are general and widely applicable. We present results on the performance of twelve LDAs operating for several hundred million pulses. The arrays are 100 watt, quasi-CW, conductively-cooled, 808 nm devices. Prior to testing, we fully characterize each device to establish a baseline for individual array performance and status. Details of this characterization can be found in reference. Arrays are divided into four groups and subjected to the temperature and power cycling matrix are shown.

Stephen, Mark↗

Initial Validation and Results of Geoscience Laser Altimeter System Optical Properties Retrievals

Verification of Geoscience Laser Altimeter System (GLAS) optical retrievals is . problematic in that passage over ground sites is both instantaneous and sparse plus space-borne passive sensors such as MODIS are too frequently out of sync with the GLAS position. In October 2003, the GLAS Validation Experiment was executed from NASA Dryden Research Center, California to greatly increase validation possibilities. The high-altitude NASA ER-2 aircraft and onboard instrumentation of Cloud Physics Lidar (CPL), MODIS Airborne Simulator (MAS), and/or MODIS/ASTER Airborne Simulator (MASTER) under-flew seven orbit tracks of GLAS for cirrus, smoke, and urban pollution optical properties inter-comparisons. These highly calibrated suite of instruments are the best data set yet to validate GLAS atmospheric parameters. In this presentation, we will focus on the inter-comparison with GLAS and CPL and draw preliminary conclusions about the accuracies of the GLAS 532nm retrievals of optical depth, extinction, backscatter cross section, and calculated extinction-to-backscatter ratio. Comparisons to an AERONET/MPL ground-based site at Monterey, California will be attempted. Examples of GLAS operational optical data products will be shown.

Hlavka, Dennis L.↗

A Boresight Adjusment Mechanism For Use in Laser Altimeters

This paper describes the development of the Boresight Adjustment Mechanism (BAM) for the Geoscience Laser Altimeter System (GLAS) Instrument. The BAM was developed late in the integration and test phase of the GLAS instrument flight program. Thermal vacuum tests of the GLAS instrument indicated that the instrument-boresight alignment stability over temperature may be marginal. To reduce the risk that GLAS may not be able to meet the boresight alignment requirements an intensive effort was started to develop a BAM. Observatory-level testing and further evaluation of the boresight alignment data indicated that sufficient margin could be obtained utilizing existing instrument resources and therefore the BAM was never integrated onto the GLAS Instrument. However, the BAM was designed fabricated and fully qualified over a 4 month timeframe to be capable of precisely steering (less than 2 arcsec over plus or minus 300 arcsec) the output of three independent lasers to ensure the alignment between the transmit and receive paths of the GLAS instrument. The short timeline for the development of the mechanism resulted in several interesting design solutions. This paper discusses the requirement definition design, and testing processes of the BAM development effort how the design was affected by the extremely tight development schedule and the lessons learned throughout the process.

Hakun, Claef↗

A Boresight Adjustment Mechanism for use on Laser Altimeters

This paper describes the development of the Boresight Adjustment Mechanism (BAM) for the Geoscience Laser Altimeter System (GLAS) Instrument. The BAM was developed late in the integration and test phase of the GLAS instrument flight program. Thermal vacuum tests of the GLAS instrument indicated that the instrument boresight alignment stability over temperature may be marginal. To reduce the risk that GLAS may not be able to meet the boresight alignment requirements, an intensive effort was started to develop a BAM. Observatory-level testing and further evaluation of the boresight alignment data indicated that sufficient margin could be obtained utilizing existing instrument resources and therefore the BAM was never integrated onto the GLAS Instrument. However, the BAM was designed fabricated and fully qualified over a 4 month timeframe to be capable of precisely steering (< 1 arcsec over 300 arcsec) the output of three independent lasers to ensure the alignment between the transmit and receive paths of the GLAS instrument. The short timeline for the development of the mechanism resulted in several interesting design solutions. This paper discusses the requirement definition, design, and testing processes of the BAM development effort, how the design was affected by the extremely tight development schedule, and the lessons learned throughout the process.

Hakun, Claef↗

Geoscience Laser Altimeter System (GLAS) Loop Heat Pipes: An Eventual First Year On-Orbit

Goddard Space Flight Center's Geoscience Laser Altimeter System (GLAS) is the sole scientific instrument on the Ice, Cloud and land Elevation Satellite (ICESat) that was launched on January 12, 2003 from Vandenberg AFB. A thermal control architecture based on propylene Loop Heat Pipe technology was developed to provide selectable/stable temperature control for the lasers and other electronics over the widely varying mission environment. Following a nominal LHP and instrument start-up, the mission was interrupted with the failure of the first laser after only 36 days of operation. During the 5-month failure investigation, the two GLAS LHPs and the electronics operated nominally, using heaters as a substitute for the laser heat load. Just prior to resuming the mission, following a seasonal spacecraft yaw maneuver, one of the LHPs deprimed and created a thermal runaway condition that resulted in an emergency shutdown of the GLAS instrument. This paper presents details of the LHP anomaly, the resulting investigation and recovery, along with on-orbit flight data during these critical events.

Grob, E.↗

Observations of the north polar region of Mars from the Mars orbiter laser altimeter

Elevations from the Mars Orbiter Laser Altimeter (MOLA) have been used to construct a precise topographic map of the martian north polar region. The northern ice cap has a maximum elevation of 3 kilometers above its surroundings but lies within a 5-kilometer-deep hemispheric depression that is contiguous with the area into which most outflow channels emptied. Polar cap topography displays evidence of modification by ablation, flow, and wind and is consistent with a primarily H2O composition. Correlation of topography with images suggests that the cap was more spatially extensive in the past. The cap volume of 1.2 x 10(6) to 1.7 x 10(6) cubic kilometers is about half that of the Greenland ice cap. Clouds observed over the polar cap are likely composed of CO2 that condensed out of the atmosphere during northern hemisphere winter. Many clouds exhibit dynamical structure likely caused by the interaction of propagating wave fronts with surface topography.

Flight Experiment↗

Topography of the northern hemisphere of Mars from the Mars Orbiter Laser Altimeter

The first 18 tracks of laser altimeter data across the northern hemisphere of Mars from the Mars Global Surveyor spacecraft show that the planet at latitudes north of 50 degrees is exceptionally flat; slopes and surface roughness increase toward the equator. The polar layered terrain appears to be a thick ice-rich formation with a non-equilibrium planform indicative of ablation near the periphery. Slope relations suggest that the northern Tharsis province was uplifted in the past. A profile across Ares Vallis channel suggests that the discharge through the channel was much greater than previously estimated. The martian atmosphere shows significant 1-micrometer atmospheric opacities, particularly in low-lying areas such as Valles Marineris.

unmanned↗

Geoscience Laser Altimeter System (GLAS) on the ICESat Mission: Science Measurement Performance since Launch

The Geoscience Laser Altimeter System is the primary space lidar on NASA's ICESat mission. Since launch in January 2003 GLAS has produced about 544 million measurements of the Earth's surface and atmosphere. It has made global measurements of the Earth's icesheets, land topography and atmosphere with unprecedented vertical resolution and accuracy. GLAS was first activated for science measurements in February 2003. Since then its operation and performance has confirmed many pre-launch expectations and exceed a few of the most optimistic expectations in vertical resolution. However GLAS also suffered an unexpected failure of its first laser, and the GLAS measurements have yielded some surprises in other areas. The talk will give a post launch assessment of the science measurement performance of the GLAS instrument, and compare the science measurements and engineering operation to pre-launch expectations. It also will address some of what has been learned from the GLAS operations and data, which may benefit future space lidar.

Sun, Xiao-Li↗

Optical System Design and Integration of the Mercury Laser Altimeter

The Mercury Laser Altimeter (MLA). developed for the 2004 MESSENGER mission to Mercury, is designed to measure the planet's topography via laser ranging. A description of the MLA optical system and its measured optical performance during instrument-level and spacecraft-level integration and testing are presented.

Ramos-Izquierdo, Luis↗

Mars 1064-nm Spectral Radiance Measurements from the Receiver Noise Response of the Mars Orbiter Laser Altimeter

The Mars Orbiter Laser Altimeter not only provides surface topography from the laser pulse time-of-flight, but also two radiometric measurements, the active measurement of transmitted and reflected laser pulse energy, and the passive measurement of reflected solar illumination. The passive radiometry measurement is accomplished in a novel fashion by monitoring the noise density at the output of the photodetector and solving for the amount of background light. The passive radiometry measurements provide images of Mars at 1064-nm wavelength over a 2 nm bandwidth with sub-km spatial resolution and with 2% or better precision under full illumination. We describe in this paper the principle of operation, the receiver mathematical model, its calibration, and performance assessment from sample measurement data.

Sun, Xiaoli↗

On Orbit Receiver Performance Assessment of the Geoscience Laser Altimeter System (GLAS) on ICESAT

The GLAS instrument on the NASA's ICESat mission has provided over a billion measurements of the Earth surface elevation and atmosphere backscattering at both 532 and 1064-nm wavelengths. The receiver performance has stayed nearly unchanged since ICESat launch in January 2003. The altimeter receiver has achieved a less than 3-cm ranging accuracy when excluding the effects of the laser beam pointing angle determination uncertainties. The receiver can also detect surface echoes through clouds of one-way transmission as low as 5%. The 532-nm atmosphere backscattering receiver can measure aerosol and clouds with cross section as low as 1e-7/m.sr with a 1 second integration time and molecular backscattering from upper atmosphere with a 60 second integration time. The 1064-nm atmosphere backscattering receiver can measure aerosol and clouds with a cross section as low as 4e-6/m.sr. This paper gives a detailed assessment of the GLAS receiver performance based on the in-orbit calibration tests.

Sun, Xiaoli↗

In Orbit Performance of Si Avalanche Photodiode Single Photon Counting Modules in the Geoscience Laser Altimeter System on ICESat

Si avalanche photodiode (APD) single photon counting modules (SPCMs) are used in the Geoscience Laser Altimeter System (GLAS) on Ice, Cloud, anti land Elevation Satellite (ICESat), currently in orbit measuring Earth surface elevation and atmosphere backscattering. These SPCMs are used to measure cloud and aerosol backscatterings to the GLAS laser light at 532-nm wavelength with 60-70% quantum efficiencies and up to 15 millions/s maximum count rates. The performance of the SPCMs has been closely monitored since ICESat launch on January 12, 2003. There has been no measurable change in the quantum efficiency, as indicated by the average photon count rates in response to the background light from the sunlit earth. The linearity and the afterpulsing seen from the cloud and surface backscatterings profiles have been the same as those during ground testing. The detector dark count rates monitored while the spacecraft was in the dark side of the globe have increased almost linearly at about 60 counts/s per day due to space radiation damage. The radiation damage appeared to be independent of the device temperature and power states. There was also an abrupt increase in radiation damage during the solar storm in 28-30 October 2003. The observed radiation damage is a factor of two to three lower than the expected and sufficiently low to provide useful atmosphere backscattering measurements through the end of the ICESat mission. To date, these SPCMs have been in orbit for more than three years. The accumulated operating time to date has reached 290 days (7000 hours). These SPCMs have provided unprecedented receiver sensitivity and dynamic range in ICESat atmosphere backscattering measurements.

Sun, X.↗

Optomechanical Design and Analysis Considerations on the Lunar Orbiter Laser Altimeter

This paper presents the mechanical design and analysis work completed on the Lunar Orbiter Laser Altimeter (LOLA). LOLA is one of six instruments on the Lunar Reconnaissance Orbiter (LRO), scheduled to launch in 2008. LOLA's main objective is to produce a high-resolution global lunar topographic model to aid in safe landings and enhance surface mobility in future exploration missions. LOLA will also look for evidence of ice water in the permanently shadowed regions around the lunar poles. Beryllium was chosen as the primary material for the LOLA Optical Transmitter Assembly to take advantage of the material's low mass density for light weight optical instrument design and for CTE matching of the refractive optical components. In addition, the thermal conductivity and specific heat of beryllium minimizes thermal gradients and thermal excursions. Special consideration must be made for the planning and preparation to fabricate beryllium components, as well as the preparation and cleaning of the components for gold plating. Assembly challenges include handling, precision cleaning and integration and testing. Structural analysis considerations include following General Environmental Verification Specification (GEVS) guidelines for GSFC payloads. The GEVS random environment for LOLA has an acceptance level of 10.0 Grms, which was analyzed for higher frequency transients. The low frequency transients were analyzed using a Mass Acceleration Curve to obtain an equivalent static loading. In addition, Structural-Thermal-Optical analysis, commonly referred to as STOP analysis, was completed to predict optical performance under the instrument's operational thermal environment. This included stress and distortion analysis on the receiver telescope lens.

Schmidt. Stephen↗

DTED Integrity Monitoring Using Differential GPS and Radar Altimeter

This paper discusses a real-time digital terrain elevation data (DTED) integrity monitor for Civil Aviation applications. Providing pilots with Synthetic Vision (SV) displays containing terrain information has the potential to improve flight safety by improving situational awareness and thereby reducing the likelihood of Controlled Flight Into Terrain (CFIT). Utilization of the DTED for flight-critical terrain-displays, however, requires a DTED integrity check and timely integrity alerts to the pilots in those cases where DTED may provide hazardous misleading information. The discussed integrity monitor checks the consistency between the sensed terrain profile as computed from DGPS and radar altimeter data and the terrain profile as given by the DTED. Probability of agreement between these two profiles is used to monitor the DTED integrity. A case study to verify the integrity monitor#s performance is presented based on data collected during flight testing performed by NASA at Asheville, NC.

Young, Steve↗

Storm Surge Measurement with an Airborne Scanning Radar Altimeter

Over the years, hurricane track and intensity forecasts and storm surge models and the digital terrain and bathymetry data they depend on have improved significantly. Strides have also been made in knowledge of the detailed variation of the surface wind field driving the surge. The area of least improvement has been in obtaining data on the details of the temporal/spatial variation of the storm surge dome of water as it evolves and inundates the land to evaluate the performance of the numerical models. Tide gages in the vicinity of the landfall are frequently destroyed by the surge. Survey crews dispatched after the event provide no temporal information and only indirect indications of the maximum surge envelope over land. The landfall of Hurricane Bonnie on 26 August 1998, with a surge less than 2 m, provided an excellent opportunity to demonstrate the potential benefits of direct airborne measurement of the temporal/spatial evolution of storm surge. Despite a 160 m variation in aircraft altitude, an 11.5 m variation in the elevation of the mean sea surface relative to the ellipsoid over the flight track, and the tidal variation over the 5 hour data acquisition interval, a survey-quality Global Positioning System (GPS) aircraft trajectory allowed the NASA Scanning Radar Altimeter carried by a NOAA hurricane research aircraft to produce storm surge measurements that generally fell between the predictions of the NOAA SLOSH model and the North Carolina State University storm surge model.

Wright, C. W.↗