MH-1A Sturgis Decommissioning and Dismantlement - 20281

The U.S. Army Corps of Engineers (USACE) with its prime contractor, Aptim Federal Services, LLC (APTIM), recycled 5,260 metric tons (11.6 million pounds) of material from Sturgis Barge (Sturgis) during the Decommissioning and Dismantlement of the MH-1A nuclear power reactor. The overall objective of the project was to reduce residual radioactivity associated with MH-1A to levels that permitted release of Sturgis for dismantlement and termination of the Army Reactor Office permit. By effectively applying waste hierarchy's three Rs - reduce, reuse and recycle - the Sturgis project not only minimized the amount of waste that required disposal at landfills, but also reduced the potential for long-term environmental liability emanating from these landfills. The project team completed the physical decommissioning efforts in June 2018 in Galveston, TX. In September 2018, radiological surveys were completed to demonstrate the vessel could be released for shipbreaking. Sturgis was towed from Galveston, TX to Brownsville, TX in late September 2018. Shipbreaking, dismantlement and recycling efforts began in early October 2018 and were completed on 15 March 2019. As part of the decommissioning effort in Galveston, the team shipped 69 shipments (860 metric tons) of low-level radioactive waste and radioactive components to the Waste Control Specialist (WCS) facility in Andrews TX for disposal. Certain radioactive components had to be transferred to the Department of Energy prior to placing the materials into the Federal Waste Facility located within WCS. However, most of the radioactive waste was characterized, profiled, approved and managed under the WCS permitted radioactive waste exemption process authorized and implemented by the Texas Commission on Environmental Quality (TCEQ) and the Radioactive Materials Division. This allows LLRW and LLMW to be shipped as regulated waste and then upon receipt at WCS through satisfying the relevant waste acceptance criteria the waste is exempted and placed into the WCS RCRA permitted cell. An additional 35 shipments (544 metric ton) of contaminated hazardous waste water were transported to U.S. Ecology in Robstown, TX for treatment/disposal. An additional 36 shipments (500 metric tons) of non-hazardous wastewater was sent to Republic Waste Services' facility in Fresno, TX. The disposal of these materials required close coordination with State of Texas regulators. During decommissioning, the project team recycled approximately 270 metric tons (600,000 pounds) of lead and steel. As part of the dismantlement in Brownsville, TX the team recycled approximately 5,000 metric tons (11 million pounds) of ferrous and non-ferrous material, limiting our disposal requirements to about 180 metric tons (400,000 pounds) of material (<4% from entire shipbreaking activity). Although the primary hazard being mitigated by this project was radiological, recycling was always a priority for the project. The team strived to achieve sustainability goals as we implemented this one of a kind project. Scrap metal recycling has a large positive impact on the environment and can also favorably impact project disposal costs. Steel is among the most recycled material in the world. Nearly 40% of the world's steel production is made from scrap. Recycling steel also requires 75% less energy than producing it from raw materials. By using recycled steel rather than virgin materials, 2.33 kg of carbon emissions are eliminated per kg of steel [1]. The project recycled more than 4,500 metric tons (10 million pounds) of steel, which eliminated about 10,400 metric tons (23 million pounds) of CO{sub 2}. By implementing a recycling initiative for the Sturgis project, the team was able to realize cost avoidance for disposal of scrap, cost savings from the metals recycled, plus the project provided benefits to the environment through our recycling efforts. Once the dismantlement was complete, the team prepared a detailed decommissioning closure report, which allowed for the termination of the Army Reactor Decommissioning Permit. While it not only reduced any potential long-term environmental liability, this project to decommission and dismantle a floating nuclear power plant is truly unprecedented - it is a prime example of the USACE mission which is: 'Engineering solutions for the Nation's toughest challenges'. This unique, one of a kind, historical power plant was never designed to be taken apart, and the available information about its construction was lacking in many details. The hazards that required mitigation dictated a painstaking and deliberate process in order to avoid any release to the environment and the community, and to protect the health and safety of the workers involved while keeping the waste hierarchy's three R's - reduce, reuse and recycle at the forefront. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOE-GO-14154-1 OHIO FINAL report Velocys 30Sept08

The overall goal of the OHIO project was to develop a commercially viable high intensity process to produce ethylene by controlled catalytic reaction of ethane with oxygen in a microchannel reactor. Microchannel technology provides a breakthrough solution to the challenges identified in earlier development work on catalytic ethane oxidation. Heat and mass transfer limitations at the catalyst surface create destructively high temperatures that are responsible for increased production of waste products (CO, CO2, and CH4). The OHIO project focused on microscale energy and mass transfer management, designed to alleviate these transport limitations, thereby improving catalyst selectivity and saving energy-rich feedstock. The OHIO project evaluated ethane oxidation in small scale microchannel laboratory reactors including catalyst test units, and full commercial length single- and multi-channel reactors. Small scale catalyst and single channel results met target values for ethylene yields, demonstrating that the microchannel concept improves mass and heat transport compared to conventional reactors and results in improved ethylene yield. Earlier economic sensitivity studies of ethane oxidation processes suggested that only modest improvements were necessary to provide a system that provides significant feedstock, energy, and capital benefits compared to conventional steam ethane cracking. The key benefit derived from the OHIO process is energy savings. Ethylene production consumes more energy than any other U.S. chemical process.1 The OHIO process offers improved feedstock utilization and substantial energy savings due to a novel reaction pathway and the unique abilities of microchannel process technology to control the reaction temperature and other critical process parameters. Based on projected economic benefits of the process, the potential energy savings could reach 150 trillion Btu/yr by the year 2020, which is the equivalent of over 25 million barrels of oil.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SRS Strategy for Tank 3 Salt Dissolution - Performance and Lessons Learned - 20441

The Savannah River Site (SRS) Tank Farms have 51 underground waste tanks used to store and process liquid nuclear waste materials. There are 4 different tank types, ranging in capacity from 2,840,000 to 4,920,000 L (750,000 to 1,300,000 Gal). Twenty-four of the tanks are older style and do not meet full secondary containment standards. The older style tanks are the initial focus of waste removal efforts for tank closure at SRS. Eight of these twenty-four tanks have completed waste removal and are filled with grout. Prior to salt dissolution, Tank 3 was a dry salt tank that contained 5.06 m (199.3 in) of salt and sludge waste. Additional salt waste was present on cooling coils above the salt layer up to approximately 5.59 m (220 in). Three mixing eductors were installed in Tank 3 to aid in dissolving salt waste in three tank riser access ports. A transfer pump was installed, and the transfer pump suction was located 25.4 cm (10 in) from the tank bottom. Well water was added to the tank through a downcomer until the dry bulk salt was covered with liquid. During the initial fill of Tank 3, approximately 242,000 L (64,000 Gal) of rain water were added from periodic F-Tank Farm (FTF) Catch Tank additions and approximately 17,000 L (4,500 Gal) of well water were added. Following liquid additions to cover the dry bulk salt, well water was added through the three mixing eductors in batches during each stage. Additionally, during the salt dissolution campaigns, the FTF Catch Tank was utilized to add rain water through a downcomer in the center tank riser access port as needed for volume relief in the FTF Catch Tank. Following liquid additions, the water was recirculated (internal to the tank) using the transfer pump, and a sample was pulled to confirm the target specific gravity (SpG) of the dissolved salt solution was achieved. The dissolved salt solution was then transferred to the receipt tank (Tank 7), and the mixing eductors were lowered as close to the new bulk salt layer as possible, to support subsequent dissolution campaigns. While the mixing jets were able to dissolve salt successfully in Tank 3, they did not do so in a completely uniform manner. Throughout dissolution, mounds were discovered under Riser 1, Riser 2, and the Center Riser. The mixing jets dissolved the salt around the edges of the tank well but were not as effective toward the center of the tank. FTF Catch Tank additions through the center tank riser access port downcomer were required to impact the mound under the center tank riser. FTF Catch Tank additions were sporadic as they were dependent on rainfall in the area. Additionally, all mixing jets were rarely able to be lowered to the same elevation, indicating some mounding in the bulk salt layer. Indexing of the mixing jets was also utilized to impact the salt mounds. Overall, Tank 3 salt dissolution was successful as approximately 1,476,000 L (390,000 Gal) of dissolved salt solution was transferred to Tank 7 over six stages. Slightly less than 852,000 L (225,000 Gal) of water were added to Tank 3. The original material balance prediction estimated that the bulk salt level in Tank 3 would be 3.88 m (152.8 in) after six salt dissolution stages. After six stages the actual bulk salt level was 3.38 m (133 in). This paper will discuss the salt removal strategy, each salt dissolution stage, and lessons learned for future salt dissolution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Water retention and gas relative permeability of two industrial concretes

This experimental study aims at identifying the water retention properties of two industrial concretes to be used for long term underground nuclear waste storage structures. Together with water retention, gas transfer properties are identified at varying water saturation level, i.e. relative gas permeability is assessed directly as a function of water saturation level S{sub w}. The influence of the initial de-sorption path and of the subsequent re-saturation are analysed both in terms of water retention and gas transfer properties. Also, the influence of concrete microstructure upon water retention and relative gas permeability is assessed, using porosity measurements, analysis of the BET theory from water retention properties, and MIP. Finally, a single relative gas permeability curve is proposed for each concrete, based on Van Genuchten-Mualem's statistical model, to be used for continuous modelling approaches of concrete structures, both during drying and imbibition.

36 MATERIALS SCIENCE↗

BLENDING ANALYSIS FOR RADIOACTIVE SALT WASTE PROCESSING FACILITY

Savannah River National Laboratory (SRNL) evaluated methods to mix and blend the contents of the blend tanks to ensure the contents are properly blended before they are transferred from the blend tank such as Tank 21 and Tank 24 to the Salt Waste Processing Facility (SWPF) feed tank. The tank contents consist of three forms: dissolved salt solution, other waste salt solutions, and sludge containing settled solids. This paper focuses on developing the computational model and estimating the operation time of submersible slurry pump when the tank contents are adequately blended prior to their transfer to the SWPF facility. A three-dimensional computational fluid dynamics approach was taken by using the full scale configuration of SRS Type-IV tank, Tank 21H. Major solid obstructions such as the tank wall boundary, the transfer pump column, and three slurry pump housings including one active and two inactive pumps were included in the mixing performance model. Basic flow pattern results predicted by the computational model were benchmarked against the SRNL test results and literature data. Tank 21 is a waste tank that is used to prepare batches of salt feed for SWPF. The salt feed must be a homogeneous solution satisfying the acceptance criterion of the solids entrainment during transfer operation. The work scope described here consists of two modeling areas. They are the steady state flow pattern calculations before the addition of acid solution for tank blending operation and the transient mixing analysis during miscible liquid blending operation. The transient blending calculations were performed by using the 95% homogeneity criterion for the entire liquid domain of the tank. The initial conditions for the entire modeling domain were based on the steady-state flow pattern results with zero second phase concentration. The performance model was also benchmarked against the SRNL test results and literature data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of a Sulfate Solubility Limit Greater Than 0.65 Weight Percent in Sludge Batch 10 Glasses

Previous laboratory-scale crucible testing with batch chemicals confirmed that the sulfate (SO 4 2- ) limit for Sludge Batch 10 (SB10) was 0.65 weight percent (wt.%) in glass. This limit signifies that 0.65 wt.% SO 4 2- can be retained in the glass without the formation of a sulfate phase. The Defense Waste Processing Facility imposes this constraint in the Material Tracking Program. Based on preliminary calculations to support the Material Tracking Program, it was anticipated that transfer volumes of the monosodium titanate/sludge solids (MST/SS) stream from the Salt Waste Processing Facility (SWPF) may need to be reduced to maintain projected sulfate concentrations below 0.65 wt.% in glass. Savannah River Mission Completion requested that the Savannah River National Laboratory perform additional sulfate testing to determine whether a sulfate solubility limit greater than 0.65 wt.% is feasible for SB10, which could allow for higher transfer volumes of the MST/SS stream. This report documents the results of the testing at higher sulfate concentrations for the glass composition region defined by the most recent SB10 projection (November 2022) and Frits 473 and 625. Frit 473 was recommended for SB10 and Frit 625 was used during SB9 processing and the SB9 to SB10 transition. A total of twenty-one glass compositions were developed based on the expected compositional variables, which include sludge-only (SO) and coupled processing with the SWPF, waste loading (WL), and frit composition. The target sulfate concentrations were varied from 0.65-0.85 wt.% at 32 and 40% WL. Each glass was prepared from reagent grade chemicals and melted at 1150 °C. Visual observations were used to confirm the presence of a sulfate salt phase on the cooled glass surfaces. Representative samples of each glass were submitted for chemical composition analysis by inductively coupled plasma-optical emission spectroscopy and Cs analysis by inductively coupled plasma-mass spectrometry. Overall the majority of mean measured values are consistent with the target values for each major oxide of interest with less than 5% error. The percent errors for the measured SO 4 2- concentrations are generally less than 10%, which is comparable with previous sulfate solubility study measurements and acceptable. Only the SO glasses based on Frit 625 formed a sulfate phase at a 0.80 wt.% SO 4 2- target concentration at both 32 and 40% WL. The remainder of the glasses did not form a sulfate layer. Due to the formation of the sulfate phase, the limit is conservatively set at 0.70 wt.% based on the measured sulfate concentrations of 0.71 wt.% and 0.75 wt.% for these two glasses. None of the SO or coupled operation glasses based on Frit 473 formed a sulfate salt phase, which supports a sulfate limit of 0.80 wt.%. The following SO 4 2- concentration limits are recommended during SO and coupled SB10 processing: (1) 0.70 wt.% during processing with Frit 625, and (2) 0.80 wt.% during processing with Frit 473.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLUDGE WASHING AND DEMONSTRATION OF THE DWPF FLOWSHEET IN THE SRNL SHIELDED CELLS FOR SLUDGE BATCH 7A QUALIFICATION

Waste Solidification Engineering (WSE) has requested that characterization and a radioactive demonstration of the next batch of sludge slurry (Sludge Batch 7a*) be completed in the Shielded Cells Facility of the Savannah River National Laboratory (SRNL) via a Technical Task Request (TTR). This characterization and demonstration, or sludge batch qualification process, is required prior to transfer of the sludge from Tank 51 to the Defense Waste Processing Facility (DWPF) feed tank (Tank 40). The current WSE practice is to prepare sludge batches in Tank 51 by transferring sludge from other tanks. Discharges of nuclear materials from H Canyon are often added to Tank 51 during sludge batch preparation. The sludge is washed and transferred to Tank 40, the current DWPF feed tank. Prior to transfer of Tank 51 to Tank 40, SRNL simulates the Tank Farm and DWPF processes with a Tank 51 sample (referred to as the qualification sample). Sludge Batch 7a (SB7a) is composed of portions of Tanks 4, 7, and 12; the Sludge Batch 6 heel in Tank 51; and a plutonium stream from H Canyon. SRNL received the Tank 51 qualification sample (sample ID HTF-51-10-125) following sludge additions to Tank 51. This report documents: (1) The washing (addition of water to dilute the sludge supernate) and concentration (decanting of supernate) of the SB7a - Tank 51 qualification sample to adjust sodium content and weight percent insoluble solids to Tank Farm projections. (2) The performance of a DWPF Chemical Process Cell (CPC) simulation using the washed Tank 51 sample. The simulation included a Sludge Receipt and Adjustment Tank (SRAT) cycle, where acid was added to the sludge to destroy nitrite and reduce mercury, and a Slurry Mix Evaporator (SME) cycle, where glass frit was added to the sludge in preparation for vitrification. The SME cycle also included replication of five canister decontamination additions and concentrations. Processing parameters were based on work with a non-radioactive simulant. (3) Vitrification of a portion of the SME product and characterization and durability testing (as measured by the Product Consistency Test (PCT)) of the resulting glass. (4) Rheology measurements of the initial slurry samples and samples after each phase of CPC processing. This program was controlled by a Task Technical and Quality Assurance Plan (TTQAP), and analyses were guided by an Analytical Study Plan. This work is Technical Baseline Research and Development (R&D) for the DWPF. It should be noted that much of the data in this document has been published in interoffice memoranda. The intent of this technical report is bring all of the SB7a related data together in a single permanent record and to discuss the overall aspects of SB7a processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operational and Compositional Factors that Affect the Performance Properties of ARP/MCU Saltstone Grout

The Saltstone Production Facility (SPF) receives low level waste (LLW) salt solution from Tank 50H for treatment and disposal. Tank 50H receives transfers from the Effluent Treatment Project (ETP), the H-Canyon General Purpose Evaporator, and the Actinide Removal Process/Modular Caustic Side Solvent Extraction Unit (ARP/MCU) Decontaminated Salt Solution Hold Tank (DSS-HT). At the SPF, the LLW is mixed with premix (a cementitious mixture of portland cement (PC), blast furnace slag (BFS) and Class F fly ash (FA)) in a Readco mixer to produce fresh (uncured) saltstone that is transferred to the Saltstone Disposal Facility (SDF) vaults. The saltstone formulation (mix design) must produce a grout waste form that meets both placement and performance properties. In previous simulated saltstone studies, multiple compositional factors were identified that drive the performance properties of saltstone made from the projected ARP/MCU salt solution. This composition was selected as salt solution simulant since ARP/MCU is the primary influent into Tank 50H. The primary performance property investigated was hydraulic conductivity since it is a variable input property to the saltstone Performance Assessment (PA) transport model. In addition, the porosity, also referred to as void structure, is another variable that impacts the PA response. In addition, Young's modulus and cured density are other performance properties analyzed in this report; however they are indicators of the performance of saltstone and not direct inputs into the PA. The data from previous studies showed that the largest impact on the performance properties of saltstone was due to curing temperature, followed by aluminate concentration in the salt solution, water to premix ratio and premix composition. However, due to the scope of the previous studies, only a few mixes were cured and analyzed at higher temperatures. The samples cured at 60°C had an increased hydraulic conductivity of approximately 600 times that of the sample cured at room temperature. The hydration reactions initiated during the mixing of the premix and salt solution continue during the curing period in the vaults to produce the hardened waste form product. The heat generated from exothermic hydration reactions results in a temperature increase in the vaults that depends on the composition of the decontaminated salt solution being dispositioned, the grout formulation (mix design) and the pour frequency and volume. This heat generation is a contributing factor to the temperature increase in the vaults that leads to an increased cure temperature for the grout. This report will further investigate the impact of curing temperature on saltstone performance properties (hydraulic conductivity, Young's modulus, porosity, etc.) over a range of aluminate concentration, water to premix (w/p) ratio and weight percent fly ash in the premix processed at the SPF. The three curing temperatures selected for this study were chosen to provide data at fixed cure temperatures that represent measured temperatures in the SDF vaults. This does not represent the conditions in the vault where the temperature of the saltstone is continually changing with time. For example, it may take several days for the saltstone to reach 60°C at a given elevation. Previous results demonstrated that the rates at which a selected curing temperature is reached affect the performance properties. The approach taken in this task, a rapid increase to the curing temperature, may be conservative with respect to decreased performance. Nevertheless, the data will provide a basis from which to determine the impact of curing temperature on saltstone performance as a function of key variables. A statistical evaluation of the results for these mixes will be performed to provide the range, and associated uncertainties, of hydraulic conductivity and other properties over this factor space.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLUDGE BATCH 7B QUALIFICATION ACTIVITIES WITH SRS TANK FARM SLUDGE

Waste Solidification Engineering (WSE) has requested that characterization and a radioactive demonstration of the next batch of sludge slurry - Sludge Batch 7b (SB7b) - be completed in the Shielded Cells Facility of the Savannah River National Laboratory (SRNL) via a Technical Task Request (TTR). This characterization and demonstration, or sludge batch qualification process, is required prior to transfer of the sludge from Tank 51 to the Defense Waste Processing Facility (DWPF) feed tank (Tank 40). The current WSE practice is to prepare sludge batches in Tank 51 by transferring sludge from other tanks. Discharges of nuclear materials from H Canyon are often added to Tank 51 during sludge batch preparation. The sludge is washed and transferred to Tank 40, the current DWPF feed tank. Prior to transfer of Tank 51 to Tank 40, SRNL typically simulates the Tank Farm and DWPF processes with a Tank 51 sample (referred to as the qualification sample). With the tight schedule constraints for SB7b and the potential need for caustic addition to allow for an acceptable glass processing window, the qualification for SB7b was approached differently than past batches. For SB7b, SRNL prepared a Tank 51 and a Tank 40 sample for qualification. SRNL did not receive the qualification sample from Tank 51 nor did it simulate all of the Tank Farm washing and decanting operations. Instead, SRNL prepared a Tank 51 SB7b sample from samples of Tank 7 and Tank 51, along with a wash solution to adjust the supernatant composition to the final SB7b Tank 51 Tank Farm projections. SRNL then prepared a sample to represent SB7b in Tank 40 by combining portions of the SRNL-prepared Tank 51 SB7b sample and a Tank 40 Sludge Batch 7a (SB7a) sample. The blended sample was 71% Tank 40 (SB7a) and 29% Tank 7/Tank 51 on an insoluble solids basis. This sample is referred to as the SB7b Qualification Sample. The blend represented the highest projected Tank 40 heel (as of May 25, 2011), and thus, the highest projected noble metals content for SB7b. Characterization was performed on the Tank 51 SB7b samples and SRNL performed DWPF simulations using the Tank 40 SB7b material. This report documents: (1) The preparation and characterization of the Tank 51 SB7b and Tank 40 SB7b samples. (2) The performance of a DWPF Chemical Process Cell (CPC) simulation using the SB7b Tank 40 sample. The simulation included a Sludge Receipt and Adjustment Tank (SRAT) cycle, where acid was added to the sludge to destroy nitrite and reduce mercury, and a Slurry Mix Evaporator (SME) cycle, where glass frit was added to the sludge in preparation for vitrification. The SME cycle also included replication of five canister decontamination additions and concentrations. Processing parameters were based on work with a nonradioactive simulant. (3) Vitrification of a portion of the SME product and characterization and durability testing (as measured by the Product Consistency Test (PCT)) of the resulting glass. (4) Rheology measurements of the SRAT receipt, SRAT product, and SME product. This program was controlled by a Task Technical and Quality Assurance Plan (TTQAP), and analyses were guided by an Analytical Study Plan. This work is Technical Baseline Research and Development (R&D) for the DWPF. It should be noted that much of the data in this document has been published in interoffice memoranda. The intent of this technical report is bring all of the SB7b related data together in a single permanent record and to discuss the overall aspects of SB7b processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of the Waste-Incidental-to-Reprocessing Citation Process at the West Valley Demonstration Project - 12250

The West Valley Demonstration Project recently achieved a breakthrough in management of radioactive waste from reprocessing of spent nuclear fuel by taking advantage of lessons learned at other Department of Energy (DOE) sites in implementation of the waste-incidental-to-reprocessing citation process of DOE Manual 435.1-1, Radioactive Waste Management. This breakthrough involved a revision to the site procedure on waste-incidental to reprocessing. This procedure revision served as the basis for a determination by the DOE West Valley field office using the citation process that three secondary waste streams consisting of equipment that had once been contaminated by association with HLW are not HLW following decontamination and may be disposed of as low-level waste (LLW) or transuranic waste. These waste streams, which comprised much of the approximately 380 cubic meters of West Valley waste contaminated by association with HLW, included several vessels and certain tank farm equipment. By making use of lessons learned in use of the citation process by other DOE sites and information developed to support use of the citation process at the Hanford site and the Savannah River Site, the team developed a technical basis for showing that use of the citation process of DOE Manual 435.1-1 for the three new waste stream was appropriate and technically justified. The Waste Management Working Group of the EFCOG assisted in transferring lessons learned by drawing on experience from around the DOE complex. This process shared knowledge about effective implementation of the citation process in a manner that proved to be beneficial to the West Valley Demonstration Project and resulted in a technical basis document that could be used to determine that the three new waste streams were not HLW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone First Quarter Calendar Year 2021 (1QCY21) Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from Tank 50 (salt solution) is sampled quarterly for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z00023, Revision 0, two SDF waste form (saltstone) samples were prepared in the Savannah River National Laboratory (SRNL) from the Tank 50 Waste Acceptance Criteria (WAC) sample and Z-Area premix material for the first quarter of calendar year 2021(1QCY21). One sample contained a Full Premix which included 10:45:45 (by weight) of cement, slag and fly ash. The second sample contained 60:40 (by weight) of slag and fly ash only referred to as the “Cement-Free grout sample”. Results from this technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Remediation (SRR). After at least 28 days cured, a sample of each of the SDF waste forms was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The 1QCY21 saltstone (Full Premix) and the Cement-Free grout samples met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79-268.48 requirements for a non-hazardous waste form with respect to Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and also met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11

Savannah River Nuclear Solutions has a need to discard spent nuclear fuel (SNF), currently stored in L Basin, to the Defense Waste Processing Facility (DWPF) for vitrification. The Department of Energy (DOE) has approved the Accelerated Basin De-inventory (ABD) Program for discarding SNF via transfers from H-Canyon to the Savannah River Site (SRS) Liquid Waste (LW) system. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. An initial impact evaluation of the LW flowsheet was performed by the Savannah River National Laboratory (SRNL) prior to the approval of the ABD Program. This evaluation addressed the LW downstream facilities based on the current H-Canyon flowsheet sequence for the average ABD discard. The flowsheet evaluation only included aluminum-clad SNF, specifically Materials Test Reactor (MTR) fuel and High Flux Isotope Reactor (HFIR) fuel similar to the planned SB11 discard. Following this evaluation, the flowsheet has been slightly altered to address (i) new nuclear criticality safety controls for DWPF that credit a higher amount of gadolinium as a neutron poison for all of the enriched uranium contained in a SB and (ii) potential additions of the H-Canyon neutralized fuel stream prior to the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51. The early introduction of ABD material into the SB assembly process is being investigated to provide flexibility regarding transfer opportunities for H-Canyon to Tank 51 for SB11 and future sludge batches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone third quarter calendar year 2019 (3QCY19) toxicity characteristic leaching procedure (TCLP) results

The aqueous waste from Tank 50 (salt solution) is sampled quarterly for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TAR-Z-00008, Revision 01, two SDF waste form (saltstone) samples were prepared in the Savannah River National Laboratory (SRNL) from the Tank 50 Waste Acceptance Criteria (WAC) sample and Z-Area premix material for the third quarter of calendar year 2019 (3QCY19). One sample contained a Full Premix which included 10:45:45 (by weight) of cement, slag and fly ash. The second sample contained 60:40 (by weight) of slag and fly ash only referred to as the “Cement-Free grout sample”. Results from this technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Remediation (SRR). After a 28 day cure, a sample of each of the SDF waste forms was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The 3QCY19 saltstone (Full Premix) and the Cement-Free grout samples met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79-268.48 requirements for a non-hazardous waste form with respect to Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and also met the SPF WAC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone Third Quarter Calendar Year 2021 (3QCY21) Toxicity Characteristic Leading Procedure (TCLP) Results

The aqueous waste from Tank 50 (salt solution) is sampled quarterly for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00023, Revision 0, two SDF waste form (saltstone) samples were prepared in the Savannah River National Laboratory (SRNL) from the Tank 50 Waste Acceptance Criteria (WAC) sample and Z-Area premix material for the third quarter of calendar year 2021(3QCY21). One sample contained a Full Premix which included 10:45:45 (by weight) of cement, slag and fly ash. The second sample contained 60:40 (by weight) of slag and fly ash only referred to as the “Cement-Free grout sample”. Results from this technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Remediation (SRR). After at least 28 days cured, a sample of each of the SDF waste forms was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The 3QCY21 saltstone (Full Premix) and the Cement-Free grout samples met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79-268.48 requirements for a non-hazardous waste form with respect to Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and also met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

January 2022 Semiannual Saltstone Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from Tank 50 (salt solution) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00025, Revision 0, two SDF waste form (saltstone) samples were prepared in the Savannah River National Laboratory (SRNL) from the Tank 50 Waste Acceptance Criteria (WAC) sample and Z-Area premix material for the January 2022 semiannual Toxicity Characteristic Leaching Procedure (TCLP) samples. One sample contained a Full Premix which included 10:45:45 (by weight) of cement, slag and fly ash. The second sample contained 60:40 (by weight) of slag and fly ash only referred to as the “Cement-Free grout sample.” Results from this technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). After at least 28 days cured, a sample of each of the SDF waste forms was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The January 2022 semiannual saltstone (Full Premix) and the Cement-Free grout samples met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79-268.48 requirements for a non-hazardous waste form with respect to Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and also met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

July 2022 Semiannual Saltstone Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from Tank 50 (salt solution) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Salstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00025, Revision 0, two SDF waste form (salstone) samples were prepared in the Savannah River National Laboratory (SRNL) from the Tank 50 Waste Acceptance Criteria (WAC) sample and Z-Area premix material for the July 2022 Semiannual Toxicity Characteristic Leaching Procedure (TCLP) samples. One sample contained a Full Premix which included 10:45:45 (by weight) of cement, slag and fly ash. The second sample contained 60:40 (by weight) of slag and fly ash only referred to as the "Cement-Free grout sample." Results from this technical report support Task 2: 'Grout Leaching Analyses' of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). After at least 28 days cured, a sample of each of the SDF waste forms was collected and shipped to a certified laboratory for analysis using Toxicity Characteristic Leaching Procedure (TCLP). The July 2022 semiannual salstone (Full Premix) and the Cement-Free grout samples met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79-268.48 requirements for the non-hazardous waste form with respect to Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and also met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

January 2023 Semiannual Saltstone Toxicity Characteristic Leaching Procedure (TCLP) Results

The aqueous waste from Tank 50 (salt solution) is sampled semiannually for transfers to the Saltstone Production Facility (SPF). Salt solution is treated at SPF and disposed of in the Saltstone Disposal Facility (SDF). Per request of customer, X-TTR-Z-00027, Revision 0, two SDF waste form (saltstone) samples were prepared in the Savannah River National Laboratory (SRNL) from the Tank 50 Waste Acceptance Criteria (WAC) sample and Z-area premix material for January 2023 semiannual Toxicity Characteristic Leaching Procedure (TCLP) samples. One sample contained a Full Premix which included 10:45:45 (by weight) of cement, slag, and fly ash. The second sample contained 60:40 (by weight) of slag and fly ash only referred to as the “Cement-Free grout sample.” Results from the technical report support Task 2: ‘Grout Leaching Analyses’ of the Task Technical Request (TTR) prepared by Savannah River Mission Completion (SRMC). After at least 28 days cured, a sample of each of the SDF waste forms was collected and shipped to a certified laboratory for analysis using the Toxicity Characteristic Leaching Procedure (TCLP). The January 2023 semiannual saltstone (Full Premix) and the Cement-Free grout samples met the South Carolina (SC) Code of Regulations for Hazardous Waste Management Regulations (HWMR) 61-79.261.24 and 61-79.268.48 requirements for a non-hazardous waste form with respect to the Resource Conservation and Recovery Act (RCRA) metals and Underlying Hazardous Constituents (UHCs), and also met the SPF WAC that was in effect at the time of the tank sampling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Waste Storage Facility at the Armenian NPP - 12462

We present a detailed contaminant transfer dynamics model for radionuclide in geosphere and biosphere medium. The model describes the transport of radionuclides using full equation for the processes of advection, diffusion, decay and sorption. The overall objective is to establish, from a post-closure radiological safety point of view, whether it is practical to convert an existing radioactive waste storage facility at Armenian NPP, to a waste disposal facility. The calculation includes: - Data sources for: the operational waste-source term; options for refurbishment and completion of the waste storage facility as a waste disposal facility; the site and its environs; - Development of an assessment context for the safety assessment, and identification of waste treatment options; - A description of the conceptual and mathematical models, and results calculated for the base case scenario relating to the release of contaminants via the groundwater pathway and also precipitation especially important for this site. The results of the calculations showed that the peak individual dose is < 7 E-8 Sv/y arising principally from I-129 after 700 years post closure. Other significant radionuclides, in terms of their contribution to the total dose are I-129, Tc-99 and in little C-14 (U- 234 and Po-210 are not relevant). The study does not explore all issues that might be expected to be presented in a safety case for a near surface disposal facility it mainly focuses on post- closure dose impacts. Most emphasis has been placed on the development of scenarios and conceptual models rather than the presentation and analyses of results and confidence building (only deterministic results are presented). The calculations suggest that, from a perspective the conversion of the waste-storage facility is feasible such that all the predicted doses are well below internationally recognized targets, as well as provisional Armenian regulatory objectives. This conclusion applies to the disposal of the ANPP present and future arising of L/ILW operating wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗