First heated jettison test on the Centaur standard shroud
The first in a planned series of heated jettison tests on the Centaur Standard Shround was conducted at NASA Plum Brook Station's Space Power Facility on November 19, 1973. The first 250-second portion of the test sequence involved heating the shroud with a specially-built fixture designed to provide a simulation of the heating environment encountered by the shroud during its ascent through the earth's atmosphere. The two heater halves, which were mounted on a rail system, were then retracted. This was followed by the jettison of the two shroud halves into catch nets positioned at 90 deg to the heater rails. The condition which made this test unique compared to the planned subsequent tests was the location of the maximum thermal line at 32 deg from the shroud separation plane. Information on the test hardware, configuration, and sequence is presented. Shroud thermal and deflection data encountered during the heating portion of the test sequence is compared with free-skin design temperatures in various graphical formats.