Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TESTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

AGR-2 Loose Particle Heating Tests in the Furnace for Irradiated TRISO Testing

A furnace system was developed to thermally expose individual tristructural-isotropic (TRISO) coated particles to expand upon established postirradiation examination (PIE) safety testing that is used to explore particle failures and fission product release from compacts. Two systems were installed in the Irradiated Fuels Examination Facility (IFEL) at Oak Ridge National Laboratory (ORNL). The targeted design was intended to be simple and flexible to allow a range in conditions to be explored. Initial inert atmosphere testing indicated the presence of particle failures, so modifications to the testing approach were implemented to improve the furnace operation. Ultimately, burnback particles were analyzed to provide a direct measurement of fission product release, thus avoiding the complications from integral release that were observed during whole compact testing. Particles were exposed to temperatures ranging 1,150–1,300°C for up to 1,500 h and 1,600°C up to 500 h. No indication of uniform release of fission products such as 106 Ru, 125 Sb, or 154 Eu was observed, however, indication of particle dependent 154 Eu release was suggested for select particles. Exploration of 110m Ag release was limited to 1,150°C and 1,300°C up to 500 h. The analysis indicated that there was nonuniform release of 110m Ag and supports a possible bimodal temperature dependence on silver release.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Summary Report for the Anti-Climb Coating Test Project: Simulated Attack and Skid-Resistance Tests

The Sandia National Laboratories Physical Security Center of Excellence (PSCOE) has been tasked by the Department of State (DOS) Bureau of Diplomatic Security Research and Development branch to investigate the potential anti-climb benefits of newly developed skid-resistant paint coatings - one light base and one dark base. DOS is interested in studying the application of the coatings on passive barriers commonly used at diplomatic facilities. The purpose of the anti-climb coating in this context is to deter and delay adversaries from climbing onto the passive barriers. PSCOE was tasked to perform delay testing that focused on the effectiveness of the coatings on the two DOS perimeter passive barriers - the DS-41 anti-ram fence and a 9 foot high by 1 foot thick reinforced concrete wall intended to mimic the DS-30 anti-ram perimeter wall. PSCOE was also tasked in performing skid-resistance testing using a British Pendulum skid-resistance tester. Delay testing and skid-resistance testing were also performed on two different passive barriers without any anti-climb coating to determine a baseline.

42 ENGINEERING↗

Gear Test Assembly – Experimental Testing and Gear Analysis (FY2021 Year End Report)

The Gear Test Assembly (GTA) is an experimental apparatus designed to test mechanical components used in fuel handling systems of liquid-sodium cooled fast-spectrum nuclear reactors. The performance and lifetime of gears, bearings, and dynamic seals are the primary focus of study. Three experimental campaigns have been completed since the start of operation in 2019, and the GTA is currently assembled and ready to begin the fourth experimental campaign. Sodium operations at the Mechanisms Engineering Test Loop (METL) have been paused while repairs are made to the Building 308 Alkali Metal Scrubber. This work is nearly complete, and once METL is brought back into operation the GTA will begin sodium testing immediately.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Senior Historian Alan Carr presents Lab-wide talk on testing-Nation’s last weapons test marks 30th anniversary

Join Senior Historian Alan Carr as he presents “Introduction to Nuclear Weapons Testing, 1945 to 1992” in commemoration of the 30th anniversary of the nation’s last full-scale nuclear test. Special guest retired Los Alamos test director Ron Cosimi will offer the opening remarks. Attendees will receive an original commemorative poster and can browse a new, temporary Divider test display.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2020 (Rev. 0)

This report provides the results of the annual post-closure use restriction (UR) inspections at corrective action sites (CASs) located on the Tonopah Test Range (TTR) and Nevada Test and Training Range (NTTR). This report covers post-closure UR inspections for calendar year 2020, and includes visual inspections and repair activities completed at the following corrective action units (CAUs): • CAU 407, Roller Coaster RadSafe Area (TTR) • CAU 424, Area 3 Landfill Complexes (TTR) • CAU 453, Area 9 UXO Landfill (TTR) • CAU 487, Thunderwell Site (TTR). Note: CAU 400, Bomblet Pit and Five Points Landfill (TTR) (CASs TA-19-001-05PT, Ordnance Disposal Pit; and TA-55-00-TAB2, Ordnance Disposal Pit) no longer requires inspection and reporting, as described in the Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2019. Site figures are included in Appendix A. The Post-Closure Inspection Plans and Record of Technical Change modifying the requirements for each UR are included in Appendix B. The Post-Closure Inspection Checklists are included in Appendix C. Field Notes are included in Appendix D. Appendix E, Inspection Photographs, does not include photographs because none were taken during the 2020 post-closure inspections. Appendix F, Post-Closure Vegetation Monitoring Report, does not include any data because vegetation monitoring was not conducted or required at any CAU in 2020. Visual inspections were conducted according to the post-closure requirements outlined in specific CAU and CAS URs, and approved by NDEP. The annual post-closure inspections for CASs associated with CAUs 407, 424, 453, and 487 were conducted on May 20, 2020. No maintenance or repair issues were noted at CAUs 487, or at CASs associated with CAU 424 (except CASs 03-08-002-A304 and 03-08-002-A308). Maintenance items and subsequent repairs include the following: • CAU 407, CAS TA-23-001-TARC (Roller Coaster RadSafe Area): A UR sign was loose and was rehung during the inspection. • CAU 424, CAS 03-08-002-A304 (Landfill Cell A3-4): The northeast monument needed a UR sign. The UR sign was attached to the monument on August 11, 2020. • CAU 424, CAS 03-08-002-A308 (Landfill Cell A3-8): The southeast monument needed additional lava rock. The lava rock was added during the inspection. • CAU 453, CAS 09-55-001-0952 (Area 9 Landfill): Two animal burrows were noted in the western portion of the northern and southern trenches (one burrow per trench). The animal burrows were repaired on August 11, 2020.

54 ENVIRONMENTAL SCIENCES↗

Test Site Verification Team: Optimal and Nominal Nuclear-Testing Programs [Slides]

Objectives of the Optimal and Nominal Nuclear-Testing Programs: Define optimal and nominal nuclear-testing programs; Discuss underground development for nuclear operations; Discuss underground nuclear operations, safety, and health; Compare drift complexes of optimal and nominal testing programs; Compare drift complexes for nuclear testing and commercial production; Discuss a potential future look of underground development and operations.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Cold Test Results of Pre-Production PIP-II SSR2 Cavities with High-Power Coupler in the Fermilab Spoke Test Cryostat

As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and undergo initial cold testing at our collaborating institution, IJCLab in France, utilizing low-power coupler. Subsequently, the cavities are subjected to final qualification at Fermilab, complete with tuner and high-power coupler assemblies. This paper provides an overview of the ongoing efforts dedicated to high-power testing of jacketed SSR2 cavities in the Spoke Test Cryostat (STC) at Fermilab. Performance parameters obtained from these tests are presented, offering valuable insights into the cavities operational characteristics and readiness for integration into the PIP-II cryomodule.

Sukhanov, A.↗

Test Plan for DOE-GENIORS Dyanamic Irradiation Tests

Dynamic irradiation tests will be performed within the DOE-GENIORS collaboration, to be finished by the end of March 2021. These tests will be performed using three different setups, one at INL, one at CEA, and one at CIEMAT. The cis-mTDDGA/PTD chemical system will be used, applying both "extraction" (cis-mTDDGA - n-dodecane/HNO3) and "stripping" (cis-mTDDGA - n-dodecane/PTD - HNO3) conditions. This test plan provides the details and parameters to be used to perform irradiation at the INL using the INL Radiolysis Test Loop.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

SITCOMTN-162: Testing the implementation of Metadetection and Cell-Based Coadds on Abell 360 LSSTComCam data

The purpose of this technote is to test the technical quality of LSSTComCam commissioning data, specifically the Rubin_SV_38_7 field, by utilizing cell-based coadds and Metadetection by measuring the tangential and cross weak lensing shear profiles of the massive cluster Abell 360 (called A360 throughout the technote). The process entails generating the cell-based coadds for Metadetection to run on, identifying and removing cluster member galaxies, applying quality cuts, calibrating the shear measurements, and validation. Cell-based coadds and Metadetection are both currently in the process of being implemented within the LSST Science Pipelines at the time of this technote. There is substantial technical value in attempting a difficult measurement prior to full implementation. Measuring the tangential shear around A360 will showcase the current abilities of these algorithms, as well as highlight where work is still needed. As seen from the resulting shear profile of A360, the cell-based coadds and Metadetection are able to work in tandem to produce a shear catalog and resulting reduced shear profile. This technote is one part of a series studying A360 in order to both stress test the commissioning camera and demonstrate the technical capabilities of the Vera Rubin Observatory. We study the quality of the PSF modeling and impact it can have on cluster WL in [Combet et al., 2025], implementation of cell-based coadds and subsequent use for Metadetect [Sheldon et al., 2023] in this technote, photometric calibration in (in prep), source selection and photometric redshifts in [Adari et al., 2025], use of Anacal [Li et al., 2024] to produce a cluster shear profile in [Li et al., 2025], and background subtraction in this field and Fornax in [Zhou et al., 2025].

79 ASTRONOMY AND ASTROPHYSICS↗

Test fixture insures high degree of accuracy in flexure tests

Modified die set improves accuracy in load application, minimizes problems of parallelism, and eliminates testing errors normally encountered during flexure tests. Test results are given for a comparison test of the old and new fixtures.

Duran, E. M.↗

Testing methods and techniques: Testing electrical and electronic devices: A compilation

The methods, techniques, and devices used in testing various electrical and electronic apparatus are presented. The items described range from semiconductor package leak detectors to automatic circuit analyzer and antenna simulators for system checkout. In many cases the approaches can result in considerable cost savings and improved quality control. The testing of various electronic components, assemblies, and systems; the testing of various electrical devices; and the testing of cables and connectors are explained.

Source record↗

A review of cryogenic testing performed by the thermochemical test branch, Manned Spacecraft Center in support of Apollo 13 and14

The Apollo 13 anomaly provided considerable impetus for a variety of types of cryogenic and ignition tests. The logic of the various test program designs, the test techniques, and their final impact upon the investigation findings are described. In addition, several test programs initiated to determine the thermal performance and general performance characteristics of the redesigned Apollo 14 cryogenic storage system are presented.

Propp, C. E.↗

Structural testing of concorde aircraft: Further report on United Kingdom tests

A summary of tests conducted on the Concorde aircraft nacelle structure is presented. The tests were conducted as a part of the structural development and certification program. The nacelle structural specimens are described. The problems associated with the intake testing and engine-bay and nozzle testing are discussed.

Harpur, N.↗

Testing techniques and comparisons between theory and test for vibration modes of ring stiffened truncated-cone shells.

Vibration tests were carried out on truncated-cone shells with widely spaced ring stiffeners. The models were excited by an air shaker for LF modes and by small electrodynamic shakers for HF modes. The Novozhilov thin shell theory according to which a ring is an assembly of an arbitrary number of segments, each being a short truncated-cone shell of uniform thickness, is used in the analysis of the results. A mobile, noncontacting, displacement-sensitive sensor system developed by the author was used in the tests. Tests results are given for a free-free 60-deg cone and for a clamped-free 60-deg cone. The tests are characterized as having considerable value for the classification of prevalent multimode responses in shells of this type.

Naumann, E. C.↗

Test results of six-month test of two water electrolysis systems

The two water electrolysis systems used in the NASA space station simulation 90-day manned test of a regenerative life support system were refurbished as required and subjected to 26-weeks of testing. The two electrolysis units are both promising systems for oxygen and hydrogen generation and both needed extensive long-term testing to evaluate the performance of the respective cell design and provide guidance for further development. Testing was conducted to evaluate performance in terms of current, pressure, variable oxygen demands, and orbital simulation. An automatic monitoring system was used to record, monitor and printout performance data at one minute, ten minute or one-hour intervals. Performance data is presented for each day of system operation for each module used during the day. Failures are analyzed, remedial action taken to eliminate problems is discussed and recommendations for redesign for future space applications are stated.

Mills, E. S.↗

Test fixture design for boron-aluminum and beryllium test panels

A detailed description of the test fixture design and the backup analysis of the fixture assembly and its components are presented. The test fixture is required for the separate testing of two boron-aluminum and two beryllium compression panels. This report is presented in conjunction with a complete set of design drawings on the test fixture system.

Breaux, C. G.↗

Review of mechanical vibration tests conducted on control moment gyros and life test fixtures

Experimental vibration studies performed on a number of flight control moment gyros and bearing life test fixtures are summarized. Tests were performed at MSFC, at Wyle Laboratories, Huntsville, Alabama, and at the Bendix Corporation facilities in Teterboro, New Jersey. A description of test and analysis equipment is included as well as test procedures and overall performance rankings. Advanced ultrasonic rolling element bearing fault detection techniques were applied for bearing analysis along with conventional vibration and sound analysis procedures.

Burchill, R. F.↗

Shuttle active thermal control system development testing. Volume 6: Water ejector plume tests

Results are given of vacuum testing of nozzles designed to eject water vapor away from the space shuttle to prevent contamination of the spacecraft surfaces and payload. The water vapor is generated by an active cooling system which evaporates excess fuel cell water to supplement a modular radiator system (MRS). The complete heat rejection system including the MRS, flash evaporator or sublimator and nozzle were first tested to demonstrate the system operational characteristics. The plume tests were performed in two phases and the objectives of this test series were: (1) to determine the effectiveness of a supersonic nozzle and a plugged nozzle in minimizing impingement upon the spacecraft of water vapor exhausted by an active device (flash evaporator or sublimator); and (2) to obtain basic data on the flow fields of exhaust plumes generated by these active devices, both with and without nozzles installed.

Mcginnis, F. K.↗