Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Stakeholder”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Improving Project Management with Simulation and Completion Distribution Functions

Despite the critical importance of project completion timeliness, management practices in place today remain inadequate for addressing the persistent problem of project completion tardiness. A major culprit in late projects is uncertainty, which most, if not all, projects are inherently subject to. This uncertainty resides in the estimates for activity durations, the occurrence of unplanned and unforeseen events, and the availability of critical resources. In response to this problem, this research developed a comprehensive simulation based methodology for conducting quantitative project completion time risk analysis. It is called the Project Assessment by Simulation Technique (PAST). This new tool enables project stakeholders to visualize uncertainty or risk, i.e. the likelihood of their project completing late and the magnitude of the lateness, by providing them with a completion time distribution function of their projects. Discrete event simulation is used within PAST to determine the completion distribution function for the project of interest. The simulation is populated with both deterministic and stochastic elements. The deterministic inputs include planned project activities, precedence requirements, and resource requirements. The stochastic inputs include activity duration growth distributions, probabilities for events that can impact the project, and other dynamic constraints that may be placed upon project activities and milestones. These stochastic inputs are based upon past data from similar projects. The time for an entity to complete the simulation network, subject to both the deterministic and stochastic factors, represents the time to complete the project. Repeating the simulation hundreds or thousands of times allows one to create the project completion distribution function. The Project Assessment by Simulation Technique was demonstrated to be effective for the on-going NASA project to assemble the International Space Station. Approximately $500 million per month is being spent on this project, which is scheduled to complete by 2010. NASA project stakeholders participated in determining and managing completion distribution functions produced from PAST. The first result was that project stakeholders improved project completion risk awareness. Secondly, using PAST, mitigation options were analyzed to improve project completion performance and reduce total project cost.

Cates, Grant R.↗

Web Based Tool for Mission Operations Scenarios

A conventional practice for spaceflight projects is to document scenarios in a monolithic Operations Concept document. Such documents can be hundreds of pages long and may require laborious updates. Software development practice utilizes scenarios in the form of smaller, individual use cases, which are often structured and managed using UML. We have developed a process and a web-based scenario tool that utilizes a similar philosophy of smaller, more compact scenarios (but avoids the formality of UML). The need for a scenario process and tool became apparent during the authors' work on a large astrophysics mission. It was noted that every phase of the Mission (e.g., formulation, design, verification and validation, and operations) looked back to scenarios to assess completeness of requirements and design. It was also noted that terminology needed to be clarified and structured to assure communication across all levels of the project. Attempts to manage, communicate, and evolve scenarios at all levels of a project using conventional tools (e.g., Excel) and methods (Scenario Working Group meetings) were not effective given limitations on budget and staffing. The objective of this paper is to document the scenario process and tool created to offer projects a low-cost capability to create, communicate, manage, and evolve scenarios throughout project development. The process and tool have the further benefit of allowing the association of requirements with particular scenarios, establishing and viewing relationships between higher- and lower-level scenarios, and the ability to place all scenarios in a shared context. The resulting structured set of scenarios is widely visible (using a web browser), easily updated, and can be searched according to various criteria including the level (e.g., Project, System, and Team) and Mission Phase. Scenarios are maintained in a web-accessible environment that provides a structured set of scenario fields and allows for maximum visibility across the project. One key aspect is that the tool was built for a scenario process that accounts for stakeholder input, review, comment, and concurrence. By creating well-designed opportunities for stakeholder input and concurrence and by making the scenario content easily accessible to all project personnel, we maximize the opportunities for stakeholders to both understand and agree on the concepts for how their mission is to be carried out.

Boyles, Carole A.↗

An Integrated Extravehicular Activity Research Plan

Multiple organizations within NASA and outside of NASA fund and participate in research related to extravehicular activity (EVA). In October 2015, representatives of the EVA Office, the Crew and Thermal Systems Division (CTSD), and the Human Research Program (HRP) at NASA Johnson Space Center agreed on a formal framework to improve multi-year coordination and collaboration in EVA research. At the core of the framework is an Integrated EVA Research Plan and a process by which it will be annually reviewed and updated. The over-arching objective of the collaborative framework is to conduct multi-disciplinary cost-effective research that will enable humans to perform EVAs safely, effectively, comfortably, and efficiently, as needed to enable and enhance human space exploration missions. Research activities must be defined, prioritized, planned and executed to comprehensively address the right questions, avoid duplication, leverage other complementary activities where possible, and ultimately provide actionable evidence-based results in time to inform subsequent tests, developments and/or research activities. Representation of all appropriate stakeholders in the definition, prioritization, planning and execution of research activities is essential to accomplishing the over-arching objective. A formal review of the Integrated EVA Research Plan will be conducted annually. External peer review of all HRP EVA research activities including compilation and review of published literature in the EVA Evidence Book is already performed annually. Coordination with stakeholders outside of the EVA Office, CTSD, and HRP is already in effect on a study-by-study basis; closer coordination on multi-year planning with other EVA stakeholders including academia is being actively pursued. Details of the current Integrated EVA Research Plan are presented including description of ongoing and planned research activities in the areas of: Benchmarking; Anthropometry and Suit Fit; Sensors; Human-Suit Modeling; Suit Trauma Monitoring and Countermeasures; EVA Workload and Duration Effects; Decompression Sickness Risk Mitigation; Deconditioned EVA Performance; and Exploration EVA Concept of Operations.

Abercromby, Andrew F. J.↗

Effort to Accelerate MBSE Adoption and Usage at JSC

This paper describes the authors' experience in adopting Model Based System Engineering (MBSE) at the NASA/Johnson Space Center (JSC). Since 2009, NASA/JSC has been applying MBSE using the Systems Modeling Language (SysML) to a number of advanced projects. Models integrate views of the system from multiple perspectives, capturing the system design information for multiple stakeholders. This method has allowed engineers to better control changes, improve traceability from requirements to design and manage the numerous interactions between components. As the project progresses, the models become the official source of information and used by multiple stakeholders. Three major types of challenges that hamper the adoption of the MBSE technology are described. These challenges are addressed by a multipronged approach that includes educating the main stakeholders, implementing an organizational infrastructure that supports the adoption effort, defining a set of modeling guidelines to help engineers in their modeling effort, providing a toolset that support the generation of valuable products, and providing a library of reusable models. JSC project case studies are presented to illustrate how the proposed approach has been successfully applied.

Wang, Lui↗

Integrated Extravehicular Activity Human Research Plan: 2017

Multiple organizations within NASA as well as industry and academia fund and participate in research related to extravehicular activity (EVA). In October 2015, representatives of the EVA Office, the Crew and Thermal Systems Division (CTSD), and the Human Research Program (HRP) at NASA Johnson Space Center agreed on a formal framework to improve multi-year coordination and collaboration in EVA research. At the core of the framework is an Integrated EVA Human Research Plan and a process by which it will be annually reviewed and updated. The over-arching objective of the collaborative framework is to conduct multi-disciplinary cost-effective research that will enable humans to perform EVAs safely, effectively, comfortably, and efficiently, as needed to enable and enhance human space exploration missions. Research activities must be defined, prioritized, planned and executed to comprehensively address the right questions, avoid duplication, leverage other complementary activities where possible, and ultimately provide actionable evidence-based results in time to inform subsequent tests, developments and/or research activities. Representation of all appropriate stakeholders in the definition, prioritization, planning and execution of research activities is essential to accomplishing the over-arching objective. A formal review of the Integrated EVA Human Research Plan will be conducted annually. Coordination with stakeholders outside of the EVA Office, CTSD, and HRP is already in effect on a study-by-study basis; closer coordination on multi-year planning with other EVA stakeholders including academia is being actively pursued. Details of the preliminary Integrated EVA Human Research Plan are presented including description of ongoing and planned research activities in the areas of: physiological and performance capabilities; suit design parameters; EVA human health and performance modeling; EVA tasks and concepts of operations; EVA informatics; human-suit sensors; suit sizing and fit; and EVA injury risk and mitigation. This paper represents the 2017 update to the Integrated EVA Human Research Plan.

Abercromby, Andrew↗

NASA Earth Observations Informing Energy Management Decision Making

The Energy Sector is experiencing increasing impacts from severe weather and shifting climatic trends, as well as facing a changing political climate, adding uncertainty for stakeholders as they make short- and long-term planning investments. Climate changes such as prolonged extreme heat and drought (leading to wildfire spread, for example), sea level rise, and extreme storms are changing the ways that utilities operate. Energy infrastructure located in coastal or flood-prone areas faces inundation risks, such as damage to energy facilities. The use of renewable energy resources is increasing, requiring more information about their intermittency and spatial patterns. In light of these challenges, public and private stakeholders have collaborated to identify potential data sources, tools, and programmatic ideas. For example, utilities across the country are using cutting-edge technology and data to plan for and adapt to these changes. In the Federal Government, NASA has invested in preliminary work to identify needs and opportunities for satellite data in energy sector application, and the Department of Energy has similarly brought together stakeholders to understand the landscape of climate vulnerability and resilience for utilities and others. However, have these efforts improved community-scale resilience and adaptation efforts? Further, some communities are more vulnerable to climate change and infrastructure impacts than others. This session has two goals. First, panelists seek to share existing and ongoing efforts related to energy management. Second, the session seeks to engage with attendees via group knowledge exchange to connect national energy management efforts to local practice for increased community resilience.

Eckman, Richard↗

MBSE-Driven Visualization of Requirements Allocation and Traceability

In a Model Based Systems Engineering (MBSE) infusion effort, there is a usually a concerted effort to define the information architecture, ontologies, and patterns that drive the construction and architecture of MBSE models, but less attention is given to the logical follow-on of that effort: how to practically leverage the resulting semantic richness of a well-formed populated model to enable systems engineers to work more effectively, as MBSE promises. While ontologies and patterns are absolutely necessary, an MBSE effort must also design and provide practical demonstration of value (through human-understandable representations of model data that address stakeholder concerns) or it will not succeed. This paper will discuss opportunities that exist for visualization in making the richness of a well-formed model accessible to stakeholders, specifically stakeholders who rely on the model for their day-to-day work. This paper will discuss the value added by MBSE-driven visualizations in the context of a small case study of interactive visualizations created and used on NASA's proposed Europa Mission. The case study visualizations were created for the purpose of understanding and exploring targeted aspects of requirements flow, allocation, and comparing the structure of that flow-down to a conceptual project decomposition. The work presented in this paper is an example of a product that leverages the richness and formalisms of our knowledge representation while also responding to the quality attributes SEs care about.

Model Based Systems Engineering↗

NASA Human Spaceflight Scenarios - Do All Our Models Still Say No?

Historically, NASA human spaceflight planning has included healthy doses of life cycle cost analysis. Planners put projects and their cost estimates in a budget context. Estimated costs became expected budgets. Regardless, real budgets rarely matched expectations. So plans would come and go as NASA canceled projects. New projects would arise and the cycle would begin again. Repeatedly, NASA schedule and performance ambitions come up against costs growing at double-digit rates while budgets barely rise a couple of percent a year. Significant skepticism greets proposed NASA programs at birth, as cost estimates for new projects are traditionally very high, and worse, far off the mark for those carried forward. In this environment the current "capability driven framework" for NASA human spaceflight evolved, where long term life cycle cost analysis are even viewed as possibly counter-productive. Here, a space exploration project, for example the Space Launch System, focuses on immediate goals. A life cycle is that of a project, not a program, and for only that span of time to a near term milestone like a first test launch. Unfortunately, attempting to avoid some pitfalls in long-term life cycle cost analysis breeds others. Government audits have noted that limiting the scope of cost analysis "does not provide the transparency necessary to assess long-term affordability" making it difficult to understand if NASA "is progressing in a cost-effective and affordable manner." Even in this short-term framework, NASA realizes the importance of long-term considerations, that it must "maximize the efficiency and sustainability of the Exploration Systems development programs", that this is "critical to free resources for re-investment...such as other required deep space exploration capabilities." Assuming the value of long-term life cycle cost analysis, where due diligence meets reconnaissance, and accepting past shortcomings, the work here approaches life cycle cost analysis for human spaceflight differently. 1) If costs have traditionally been so high that adding them up is discouraging, are there any new facts on the ground offering paths to significantly lower costs? 2) If NASA's spaceflight budget and process is an over-arching constraint, with its planning limitations favoring short-term outlooks, is there a way to step outside the budget box? 3) If life cycle answers have historically been too uncertain to be useful, is there a process where stakeholders gain valuable insights merely from emphasizing a common understanding around questions? We analyze the potential life cycle cost of assorted NASA human spaceflight architectures - an architecture as a sum of individual systems, working together. With the prior questions of high costs, limited budgets and uncertainties in mind, public private partnerships are central in these architectures. The cost data for current commercial public private partnerships is encouraging, as are cost estimates for future partnership approaches beyond low Earth orbit. Private capital, directly or indirectly, an ingredient of public private partnerships, may be a significant factor in finding a path around the limits of the NASA spaceflight budget. Also, understanding and reviewing the pros, cons and uncertainties of assorted architectures can assist in developing a common understanding around key questions as important if not more so than the numbers and answers. Lastly, a scenario planning technique is briefly explored that can mature a common understanding about the agencies situation at hand and how diverse stakeholders can go forward together. Scenario planning, rather than focusing on answers, places emphasis on stakeholders developing a common understanding about the future. Putting aside costs, this is especially true of questions about sustainability and growth, results, benefits and expectations. While efficiency exercises or analysis look to reduce resources in one place to apply them elsewhere, moving around slices in a pie, scenario planning can get at the heart of the matter, growing the pie, transforming it, and making the pieces relevant. Especially important is the question of sustainability for different scenarios in the broad sense of the word - not just the narrow ability to survive or continue, but also the ability to adapt, prosper and grow.

space systems life cycle costs↗

Overview of the Exploration Exercise Device Validation Study Plans

The NASA has determined that a multi-functional exercise device will be developed for use as an exercise device during exploration missions. The device will allow for full body resistance and metabolic exercise necessary to minimize physiological losses during space flight and to maintain fitness necessary to perform critical mission tasks. Prior to implementation as an exercise device on an Exploration vehicle, there will be verification and validation testing completed to determine device efficacy at providing the necessary training stimuli to achieve desired goals. Because the exploration device will be new device that has yet be specified, specific Verification and Validation (V&V) protocols have yet to be developed. Upon delivery of an exploration exercise device training unit, stakeholders throughout NASA will develop V&V plans that include ground-based testing and testing on the International Space Station (ISS). Stakeholders will develop test protocols that include success criterion for the device. Ground tests will occur at NASA Johnson Space Station prior to flight testing. The intents of the ground tests are to allow crew, spaceflight medicine, science, engineering, Astronaut Strength, Conditioning, and Reconditioning staff, and others to gain experience in the best utilization of the device. The goal is to obtain an evidence base for recommending use of the device on the ISS. The developed protocol will be created to achieve multiple objectives, including determining if the device provides an adequate training stimulus for 5th - 95th percentile males and females, allows for exercise modalities that protect functional capability, and is robust and can withstand extensive human use. Although protocols are yet to be determined, current expectations include use of the device by test subjects and current crew in order to obtain quantitative and qualitative feedback. Information obtained during the ground tests may be used to influence device modifications during design iterations. Assuming successful ground tests, the device will be installed on the ISS for testing during space flight. Spaceflight testing is envisioned to include an activation and checkout (ACO) phase and a V&V phase. During the ACO phase, 1-2 crewmembers will exercise with the device to ensure proper function. ACO is expected to last multiple months because of the many modes and methods of exercise that need to be assessed. However, the goal is to complete the ACO as quickly as possible. Once successful ACO occurs, the crew will be free to use the device for normal exercise pending concurrence from stakeholders. V&V tests on the ISS will ideally consist of crew using the device for all of their exercise for an entire mission. Exercise prescriptions will be supplied that replicate expected prescriptions during exploration missions. Crew that are not enrolled in the V&V studies would be also free to use the device as their schedule permits. As experience is gained by users, exercise protocols could change. The intent of all V&V testing is to ensure that all have thorough understanding of experience at optimizing device capability

DeWitt, J. K.↗

MBSE-Driven Visualization of Requirements Allocation and Traceability

In a Model Based Systems Engineering (MBSE) infusion effort, there is a usually a concerted effort to define the information architecture, ontologies, and patterns that drive the construction and architecture of MBSE models, but less attention is given to the logical follow-on of that effort: how to practically leverage the resulting semantic richness of a well formed populated model to enable systems engineers to work more effectively, as MBSE promises. While ontologies and patterns are absolutely necessary, an MBSE effort must also design and provide practical demonstration of value (through human-understandable representations of model data that address stakeholder concerns) or it will not succeed. This paper will discuss opportunities that exist for visualization in making the richness of a well-formed model accessible to stakeholders, specifically stakeholders who rely on the model for their day-to-day work. This paper will discuss the value added by MBSE-driven visualizations in the context of a small case study of interactive visualizations created and used on NASA’s proposed Europa Mission. The case study visualizations were created for the purpose of understanding and exploring targeted aspects of requirements flow, allocation, and comparing the structure of that flow-down to a conceptual project decomposition. The work presented in this paper is an example of a product that leverages the richness and formalisms of our knowledge representation while also responding to the quality attributes SEs care about.

Model Based Systems Engineering↗

Demonstrating Early-Adopter Benefits of Submitting Multiple Trajectory Options for Airlines

A workshop at NASA Ames Research Center was held with airline industry stakeholders to demonstrate the impact of using Trajectory Options Sets (TOSs) during a Collaborative Trajectory Options Program (CTOP) for severe weather operations. The demonstration was conducted using apart-task Human-in-the-Loop (HITL) simulation of the Integrated Demand Management (IDM) concept, which is an air traffic management method that uses CTOP to deliver preconditioned traffic to the Time-Based Flow Management (TBFM) region. The demonstration addressed the following research objectives: first, determine who receives a greater benefit, TOS-participating or TOS-excluded airlines? Second, determine which method of trajectory selection yields a better solution, human/manual selection or automation? Finally, obtain feedback from stakeholders on their impression of the concept and recommendations for future work. The results showed that TOS-participating airlines received greater benefit in terms of total ground delay, ground delay savings, number of reroute options, and additional flight time, compared to TOS-excluded airlines. However, this result was dependent on the situational context, such as the number and location of flights. We found that all airlines benefitted when just a subset of airlines submitted TOS, but the greatest benefit went to the TOS-participating airlines. These benefits to the TOS-participating airlines were diminished as the number of TOS-participants in the system increased. Therefore, there was an “early-adopter” effect that suggested airlines could benefit by becoming the first to equip TOS without causing unfair disadvantages to those who do not equip TOS. In addition, we found that manual selection of trajectory options performed similarly to CTOP, but the CTOP solution was more efficient in terms of number of reroutes, additional flight time, and average ground delay for rerouted flights. Feedback from the stakeholders was solicited, and their overall impressions of the demonstrations were positive. They remarked that CTOP could do a better job than current day solutions, and they thought airlines could benefit from continuing to develop TOS capabilities.

Integrated Demand Management↗

NASA’s Carbon Monitoring System (CMS) and Arctic-Boreal Vulnerability Experiment (ABoVE) Social Network and Community of Practice

The NASA Carbon Monitoring System (CMS) and Arctic-Boreal Vulnerability Experiment (ABoVE) have been planned and funded by the NASA Earth Science Division. Both programs have a focus on engaging stakeholders and developing science useful for decision making. The resulting programs have funded significant scientific output and advancements in understanding how satellite remote sensing observations can be used to not just study how the Earth is changing, but also create data products that are of high utility to stakeholders and decisions makers. In this paper we focus on documenting thematic diversity of research themes and methods used, and how the CMS and ABoVE themes are related. We do this through developing a Correlated Topic Model on the 521 papers produced by the two programs and plotting the results in a network diagram. Through analysis of the themes in these papers, we document the relationships between researchers and institutions participating in CMS and ABoVE programs and the benefits from sustained engagement with stakeholders due to recurring funding. We note an absence of policy engagement in the papers and conclude that funded researchers need to be more ambitious and explicit in drawing the connection between their research and carbon policy implications in order to meet the stated goals of the CMS and ABoVE programs.

Molly E Brown↗

Hydrologic Baseline Conditions and Projected Trends for Kennedy Space Center and the Cape Canaveral Barrier Island Complex

The purpose of this document is the creation of a comprehensive collection of data, information and knowledge on the eco-hydrologic setting, and current and predicted (2030 -2080) hydrologic conditions that will directly and indirectly influence the Kennedy Space Center (KSC) industrial and ecological system. Focus is on identification of existing data sources (web based, published, in-house) and identification of future possible needs. The document will aid in assessment of risks to the National Aeronautics and Space Administration (NASA) and stakeholder missions associated with changing local, regional and global conditions. This living document will allow for rapid updates as new data and improved spatial data (LiDAR elevations, land use, land cover, runoff coefficients, etc.) are accumulated by the Environmental Management Branch (EMB), stakeholders, and supporting staff from the NASA Environmental and Medical Contract (NEMCON) currently managed by Herndon Solutions Group LLC. (HSG).The report summarizes and visualizes hydrologic conditions supporting long-term trends monitoring, management and regulatory compliance needs, climate risk mitigation, and achievement of KSC and stakeholder’s sustainability goals. Future utility may extend to implementation actions of the KSC future development plan, KSC updates to future KSC Environmental Resource Documents (ERD), and the regional multi-agency Indian River Lagoon Health Initiative.

Carlton Hall↗

Directed Acyclic Graph Guidance Documentation

For over a decade, the National Aeronautics and Space Administration (NASA) has tracked and configuration-managed approximately 30 risks to astronaut health and performance that occur before, during and after spaceflight. The Human System Risk Board (HSRB), a Health and Medical Technical Authority (HMTA) Board at NASA Johnson Space Center, is the entity responsible for identifying, assessing, analyzing, and monitoring the official understanding of the risk or risk posture for each of the Human System Risks and determining – based on evaluation of the available evidence – when that risk posture changes. The ultimate purpose of tracking and researching these risks is to find ways to reduce the risk that astronaut crews face during spaceflight. Historically, research, development and operations relevant to one risk have been conducted in isolation from other risks; these individual risk ‘silos’ enabled initial characterization of each specific risk. In spaceflight however, the impact of exposure to risk for astronaut crews is cumulative, and not independent of exposures or other risks, as all the adverse effects of the spaceflight environment begin at launch, continue throughout the duration of the mission and in some cases across the lifetime of the crews. In January of 2020, the HSRB at NASA embarked on a pilot project designed to assess the potential value of causal diagramming as a tool to facilitate understanding these cumulative and interdependent effects as applied within Human System Risk management. This process uses directed acyclic graphs as a means of formalizing a shared mental model of the causal flow of risk among Risk Board stakeholders. Initially this model was to improve communication among those stakeholders, but the potential value exceeds communication alone. Formalization of the process for creating these causal diagrams will enable the creation of a composite risk network that is vetted by members of the NASA community and configuration managed. The causal diagrams are formulated as directed acyclic graphs (DAGs) to function as a type of knowledge graph for reference for the board and its stakeholders. This document outlines the pilot process, the standardized approaches, and guidance for risk custodian teams when creating and updating DAGs as a part of the NASA Human System Risk Management process.

Risk↗

A Systems Model for System-Wide Safety Safety Demonstrator (SD-1): Wildfire Response Operations

The aim of this internship-based project was to contribute to the ongoing development of a systems model for System-Wide Safety’s first Technical Challenge 5 (TC5) series Safety Demonstrator (SD-1), which will be a demonstration of an In-Time Aviation Safety Management System (IASMS) in emerging wildfire response operations. Using Models-Based Systems Engineering (MBSE) principles to develop the model, I organized and traced previously collected stakeholder needs from the Spring 2022 NASA System-Wide Safety Wildland Firefighting Operations Virtual Workshop (https://nari.arc.nasa.gov/sws-wildfire) to system elements, creating connections which can be used in the future by the project engineers to identify and address requirements gaps throughout the system design process. I also identified and modeled preliminary use case scenarios for aerial assets in the demonstrator and, building on previously produced preliminary high-level models of the 8 SD-1 Services, Functions, and Capabilities (SFCs) and their IASMS data flows, worked to model the Real-Time Risk Assessment (RTRA) tool as an implementation of Risk Assessment and Management that can take in multiple sets of data monitored by SFCs. Project deliverables include stakeholder requirements tables and matrices and systems model diagrams produced with MagicDraw software in the SysML Systems Modeling Language, with eventual plans to connect model diagrams to a Department of Defense Operational Viewpoint (OV-1) graphic, a high-level operational concept graphic that will be used to visualize the SD-1 scenarioin a future phase. The system model serves to provide a common understanding of the scope of and activities necessary for the completion of SD-1,and traces how stakeholder needs are to be addressed.

model-based systems engineering↗

NASA System-Wide Safety Wildland Firefighting Operations Workshop Report

On March 9-11, 2022, NASA’s System-Wide Safety Wildland Firefighting Operations Workshop engaged the broader wildland firefighting management ecosystem in a safety-oriented discussion via a virtual platform. This enabled a better understanding of how NASA and community expertise can be leveraged in the safe development of current and future firefighting systems and operations. The goals of the workshop were to: (1) identify and prioritize the top safety-oriented risks, gaps in capabilities, and emerging technologies to enhance wildland firefighting for both near-term and far-term concepts, with a specific focus on aviation operations and (2) engage the stakeholder community in defining emergent safety-oriented scope, roles, responsibilities, and procedures for agents undergoing increasingly complex wildland firefighting operations in information-rich, but uncertain environments. Workshop participants were solicited from wildland firefighting stakeholders across government, industry, and academia. All levels of government were engaged, as NASA sought attendees from federal, state, local, and tribal government agencies. Industry participants from traditional wildland firefighting domains such as data visualization and equipment manufacturers were invited, and corporate attendees from novel application domains such as aerial robotics and autonomous systems were present as well. The top three findings were as follows: (1) Enhancing situation awareness is a safety priority, especially in the use of aerial assets; (2) Timely access to information along with data fusion and integrated displays will enhance safety-critical decision-making both inside and outside aviation contexts; and (3) Tailorable standards and common operating pictures in the field will enhance inter-agency cooperation in the wildland firefighting lifecycle and enable the optimal use of limited resources such as aerial assets. The workshop helped inform NASA of the relevant safety-related wildland firefighting concerns and aided the broader ecosystem in understanding the potential safety-oriented role NASA might play in this community. Increased engagement with crucial governmental stakeholders (e.g., U.S. Forest Service, CAL FIRE, etc.) along with industry partners in cutting- edge information -centric domains is a fundamental next step. Additionally, the workshop findings will help define the first of a series of operationally challenging demonstrations, held in concert with strategic ecosystem partners, known as the Safety Demonstrator Series for NASA’s System-Wide Safety project. The first demonstration is set in the wildland firefighting application domain and will: (1) examine high risk operational scenarios to reduce their overall risk via services, functions or capabilities that act as risk mitigators (or transfer that risk to automated systems better able to tolerate it) and (2) explore novel tools and technologies that will enhance safety margins by enabling non-traditional or neoteric operational paradigms.

wildland firefighting↗

Directed Acyclic Graphs: A Tool for Understanding the NASA Human Spaceflight System Risks - Human System Risk Board

For over a decade, the National Aeronautics and Space Administration (NASA) has tracked and configuration-managed approximately 30 risks to astronaut health and performance that occur before, during and after spaceflight. The Human System Risk Board (HSRB), a Health and Medical Technical Authority (HMTA) Board at NASA Johnson Space Center, is the entity responsible for identifying, assessing, analyzing, and monitoring the official understanding of the risk or risk posture for each of the Human System Risks and determining – based on evaluation of the available evidence – when that risk posture changes. The ultimate purpose of tracking and researching these risks is to find ways to reduce the risk that astronaut crews face during spaceflight. Historically, research, development and operations relevant to one risk have been conducted in isolation from other risks; these individual risk ‘silos’ enabled initial characterization of each specific risk. In spaceflight however, the impact of exposure to risk for astronaut crews is cumulative, and not independent of exposures or other risks, as all the adverse effects of the spaceflight environment begin at launch, continue throughout the duration of the mission and in some cases across the lifetime of the crews. In January of 2020, the HSRB at NASA embarked on a pilot project designed to assess the potential value of causal diagramming as a tool to facilitate understanding of these cumulative and interdependent effects as applied within Human System Risk management. This process uses directed acyclic graphs as a means of formalizing a shared mental model of the causal flow of risk among Risk Board stakeholders. Initially this model was to improve communication among those stakeholders, but the potential value exceeds communication alone. The causal diagrams are formulated as directed acyclic graphs (DAGs) to function as a type of knowledge graph for reference for the board and its stakeholders. This document is a sister document to NASA/TM 20220006812 Directed Acyclic Graph Guidance Documentation (1). In that document, the basic guidance for creating and standardizing directed acyclic graphs as tools for cross-risk analysis is provided. This document contains the initial configuration managed DAGs that were created as a result of applying those principles. These initial versions were accepted by the HSRB in January of 2022. Each of the Human System Risks are represented by a DAG that has been reviewed by the larger Human Health and Performance community at NASA including life scientists, physical scientists, physicians, nurses, pharmacists, exercise specialists and more. These results show the starting point for Human System Risk DAGs as shared mental models and communication aids across the boundaries of the various expertise needed to understand and mitigate the human risks in spaceflight. Because they are a starting point, each of these DAGs can be expected to change over time as new or refined evidence becomes available. The process for updating these DAGs can be found in the JSC-66705 Human System Risk Management Plan (2) that is publicly available on the NASA Technical Reports Server.

Erik L. Antonsen↗

Dissemination of Global Flood Information Through Nasa Disasters Program Global Initiative for Flood Forecasting and Alerting (GIFFT)

The Global Initiative for Flood Forecasting and Alerting (GIFFT) is an initiative to disseminate flood products from different sensors to global stakeholders via the Pacific Disaster Center’s (PDC) DisasterAWARE®, the NASA Disasters Mapping Portal and potentially other mechanisms. GIFFT will also generate an integrated product(s) using ensembled hydrologic models and Earth observation derived flood outputs to stakeholders globally. This initiative combines the results of several Disasters Program funded projects that focus on flood forecasting, flood severity estimation, post-event flood mapping, flooddepth estimation and resulting flood severity using remote sensing-based flood information derived from SAR and optical imagery. PDC’s DisasterAWARE platform is a global multi-hazard alerting platform that currently incorporatesModel of Models (MoM) outputs as flood “incidents,” visually depicting potential floods in the context ofpopulation and infrastructure that may become affected. Automated procedures are being developed tocategorize MoM outputs as DisasterAWARE “hazards,” allowing for their dissemination to users alongwith other flood products that assess potential impacts. PDC’s stakeholders include UN, DoD, FEMA andtheir equivalents around the world. Additionally, the DisasterALERT mobile platform has 2 million usersworldwide and is a fully functional and sustained platform used to disseminate alerts and analyticalproducts for 18 different hazard types. GIFFT has incorporated HydroSAR products that will bedistributed via DisasterAWARE.

remote sensing↗