Linear Numerical Stability Analysis of a Galerkin Reduced Order Model (ROM) for Coupled Fluid/Structure Interaction (FSI) Problems.
Abstract Not Provided
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract Not Provided
Abstract not provided.
Abstract not provided.
Abstract not provided.
Explore the source record for details and available documents.
Abstract not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
The Savannah River Site (SRS) 3H high-level-waste Evaporator (242-25H) entered service in January 2000 and was discovered to be leaking in February 2016. It was robotically repaired and resumed operation in July 2018. During initial restart in December 2017, salt deposits were discovered on the evaporator's lower shell near welds, indicating two more small leak sites. The leak sites have an estimated hydraulic diameter of about 0.1 mm or less - about the diameter of a human hair. The estimated leak rates are about a factor of 10,000 smaller than the robotically repaired leak. An API 579-1/ASME FFS-1 fitness-for-service evaluation determined that if the leak sites are cracks, then they would need to be about 60 mm long (∼ 2 inches) to actively and catastrophically grow. Furthermore, a crack of this length would have been detected earlier since it would leak thousands of liters per day. The evaporator was designed with engineered features that minimize risks posed by these small leaks. The path-forward involves operating the evaporator in a deliberate manner with enhanced surveillance. The 3H Evaporator is key to SRS safely and timely reducing its 130 million liter liquid high-level-waste inventory, closing remaining waste tanks, and reducing associated risks to workers, the public, and the environment. (author)
Energy method extended to stability analysis of linear system under action of nonconservative forces