Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Proposed Application for an Entity Component System in an Energy Services Interface

An Entity Component System is a data-oriented architecture originally developed to streamline video game performance. Despite being quite new, Entity Component Systems are relatively well established within the video game industry due to the cutting edge nature of research into performance, especially around graphics. However, Entity Component Systems have not been widely examined or adopted outside of that industry. We propose adopting an Entity Component Systems framework to serve the needs of an Energy Service Interfaces. We examine the needs of an Energy Service Interface, give an overview of open-source Entity Component Systems (ECSs) libraries, examine some preliminary performance results for ECSs, and explore the traditional approach to fulfilling the needs of an Energy Service Interface (ESI) with database architectures.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Valuation of ecosystem services in alternative bioenergy landscape scenarios

Abstract Agricultural land in the Midwest is a source of food and fuel, as well as biodiversity. It is also a cause of excess nutrients that make their way to the Mississippi River and the Gulf of Mexico. To address unsustainable changes to biogeochemical cycles and ecosystem functions, a multidisciplinary approach involving social science, natural science, and engineering is often effective. Given the potential of second‐generation biofuels, and capitalizing on the deep‐rooted perennial bioenergy crops capable of thriving in poor soils, we demonstrated an integrated socio‐environmental analysis of the impacts of growing switchgrass within row‐crop landscapes in Illinois. In this study, we model land use scenarios that incorporate switchgrass as a biofuel crop in a Midwest corn‐belt watershed using the Soil Water Assessment Tool coupled with an economic analysis for the Vermilion Basin in Illinois. We estimated the values of ecosystem services under an alternative bioenergy landscape, including commodity and bioenergy crops, changes in biogeochemistry, and recreational services. The estimated annual values of nitrate and sediment reduction attributed to bioenergy crops range from $38 million to $97 million and $16,000 to $197,000, respectively. The annual value of carbon dioxide emission reduction ranges from $1.8 million to $6.1 million based on the initial crop rotation pattern. Estimated average annual values for wildlife viewing, water‐based recreation, and pheasant hunting are $1.24 million, $0.17 million, and $0.3 million, respectively. To our knowledge, this study represents the first effort to comprehensively quantify ecosystem services using a process‐based model, and estimate their value in an alternative bioenergy landscape. The information we generate could aid in understanding the potential for biomass production from marginal land and the total economic value of the landscape at various spatial scales. The framework is useful in fostering alternative bioenergy landscapes with synergies in a food, energy, and conservation nexus.

54 ENVIRONMENTAL SCIENCES↗

Use of Shared Automated Vehicles for First-Mile Last-Mile Service: Micro-Simulation of Rail-Transit Connections in Austin, Texas

Shared fleets of fully automated vehicles (SAVs) coupled with real-time ride-sharing to and from transit stations are of interest to cities and nations in delivering more sustainable transportation systems. By providing first-mile last-mile (FMLM) connections to key transit stations, SAVs can replace walk-to-transit, drive-to-transit, and drive-only trips. Using the SUMO (Simulation of Urban MObility) toolkit, this paper examines mode splits, wait times, and other system features by micro-simulating two fleets of SAVs providing an FMLM ride-sharing service to 10% of central Austin’s trip-makers near five light-rail transit stations. These trips either start or end within two geofenced areas (called automated mobility districts [AMDs]), and travel time and wait time feedbacks affect mode choices. With rail service headways of 15?min, and 15 SAVs serving FMLM connections to and from each AMD, simulations predict that 3.7% of the person-trip-making will shift from driving alone to transit use in a 3?mi?×?6?mi central Austin area. During a 3-h morning peak, 30 SAVs serve about 10 person-trips each (to or from the stations), with 3.4?min average wait time for SAVs, and an average vehicle occupancy of 0.74 persons (per SAV mile-traveled), as a result of empty SAV driving between riders. Sensitivity analysis of transit headways (from 5 to 20?min) and fleet sizes (from 5 to 20 vehicles in each AMD) shows an increase in FMLM mode share with more frequent transit service and larger fleet size, but total travel time served as the biggest determinant in trip-makers’ mode share.

47 OTHER INSTRUMENTATION↗

Utility-Scale Operational Consequences for Solar Grid Services

This report delves into the critical aspects of grid services provided by solar inverter-based resources (IBRs), with an emphasis on the evolving landscape of microgrids, virtual power plants (VPPs), aggregators, and distributed energy resource management systems (DERMS). As the energy sector undergoes a transformative shift towards more decentralized and resilient grid architectures, understanding the multifaceted risks associated with these technologies becomes paramount. The report categorizes these risks into organizational, technical, and procedural domains, providing a thorough risk assessment framework that stakeholders can utilize to anticipate and mitigate potential issues. In addressing the increasing complexity of grid interconnections, the report highlights the importance of Cyber-Informed Engineering (CIE). By embedding engineering controls and cybersecurity measures into the early stages of system design, this approach aims to fortify grid infrastructure against emerging cyber threats. The analysis includes an exploration of best practices and strategies for integrating CIE principles to enhance grid security and resilience. To provide practical insights, the report conducts a detailed consequence analysis of various grid services and cyber mitigations that can be applied through the interconnection process. This analysis evaluates the potential impacts of different failure modes and vulnerabilities, offering a clear understanding of the consequences that could arise from disruptions within the energy grid. The findings are further enriched by a series of case studies that illustrate real-world scenarios and lessons learned from past incidents. Through this comprehensive examination of grid services and their criticality, the report aims to prepare industry professionals with the knowledge and tools necessary to navigate the complexities of modern energy systems. By providing a comprehensive approach that includes risk assessment, cybersecurity, and consequence analysis, solar stakeholders can more effectively guarantee the reliability, efficiency, and security of the energy grid.

14 SOLAR ENERGY↗

Performance Assurance Planning Guide for Utility Energy Service Contracts: 2025 Edition

Administered by the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), the Utility Program has fostered collaboration among federal agencies and their serving utilities for more than 25 years. The Utility Program supports agencies using Utility Energy Service Contracts (UESCs), a well-developed, effective contracting vehicle that enable the latest approaches to cost-effective energy management at federal sites. Federal agencies have successfully used UESCs to award over 2,000 energy and water efficiency and renewable energy projects, investing approximately $\$$2.8 billion in furthering the Federal Government's efforts to reduce energy intensity. Authorized by 42 U.S. Code section 8256 (10 U.S. Code section 2913 for the Department of Defense), a UESC is a limited-source acquisition between a federal agency and an eligible serving utility for energy management services that generate savings from the implementation of energy- and water -conservation measures (collectively referred to as ECMs), with 42 U.S. Code section 8287 (Defense Federal Acquisition Regulation Supplement, Part 241), providing the term of a UESC, which may extend up to 25 years. Through a UESC, the utility partner assesses designs, and implements the desired ECMs - which can range from lighting retrofits and renewable energy systems, to combined heat and power plants or other technologies and strategies, and may provide financing for the project. The agency may use any combination of appropriations and third-party financing to pay for the project, providing useful flexibility. There is no limit to the project size, big or small, that can be implemented using a UESC. To assist agencies implementing a UESC, FEMP has developed a Utility Energy Service Contract Guide and this companion guidance document to help agencies and their utility partners better understand the best practices for to ensure UESCs continue to perform and generate savings throughout their performance period. These best practices utilize a combination of effective project management, communication, documentation, and a detailed Performance Assurance Plan. This plan is a project specific set of actionable protocols that define important tasks and responsibilities throughout the contract term and reflects the site conditions, complexities, agency capabilities, and operating and maintaining planned ECMs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

BIL GRID-READY WIND: Reliable and Economical Grid Services Design, Implementation, and Demonstration at the Great Pathfinder Wind Power Plant

The GRID-READY WIND project aimed to demonstrate the ability of utility-scale wind power plants (WPPs) to deliver traditional and emerging grid services (GSs) in both grid-following (GFL) and grid-forming (GFM) modes through a centralized control framework, supplemented by local control adjustments at the wind turbine generator as needed. Throughout the project, the team offered recommendations on how the grid services demonstrated with WPPs could be applied to other inverter-based resources (IBRs), such as photovoltaic (PV) systems and battery energy storage systems (BESS), while considering the unique dynamics of these resources arising from their energy generation characteristics. The project sought to enhance the confidence of system operators (SOs) and planners in utilizing WPPs, alongside other IBRs such as PV plants and BESS, to provide essential grid services over extended periods under diverse operating conditions, thereby supporting their integration into the bulk power system.

17 WIND ENERGY↗

Integrated Transmission and Distribution Co-Simulation Platform for Demonstration of Bulk Grid Services Using Distributed Energy Resources

In September 2020, the Federal Energy Regulatory Commission (FERC) released Order 2222, which opens wholesale markets to small-capacity distributed energy resources (DERs), recognizing their potential in improving operational efficiency by providing bulk grid services. Therefore, a co-simulation capability that can connect transmission and distribution (T&D) simulations and evaluate the impacts of DER provision of bulk grid services is needed. In this paper, we present a new integrated T&D co-simulation platform that incorporates T&D system simulators, DER aggregator/group strategies, and a co-simulation coordinator. Industry-standard communication protocols are employed to mimic real-world conditions. Secondary frequency regulation is selected as the representative bulk grid service, and we simulate the responses of DERs to the frequency regulation signals. The simulation results for a solar-rich distribution feeder in Colorado, USA, demonstrate how the T&D co-simulation setup is used to evaluate the contributions of DERs to minimize the bulk grid frequency deviation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Telerobotic Architecture for an on-Orbit Servicer

An on-orbit servicer system has unique functional and human factors requirements. The servicing, whether it be teleoperation task, a supervised control task or an autonomous robotic task, the man-machine interface function is likely to be a bottleneck to the operation of the whole system. The man-machine interface system for a space servicer, namely the operator control station, includes several subsystems with a hierarchical architecture. Those subsystems include a reasoning and planning subsystem (also known as the artificial intelligence planner), a run-time control subsystem, a manipulator control and mechanization subsystem, and a sensing and perception subsystem. Indicative of these potentials, certain generic tasks, suggestive of space assembly, maintenance and repair, were performed in a testbed environment. Through performance in several modes: direct teleoperation, shared control, traded control, and robotic operation, the benefits of the individual technology contributions to the operation were quantized and recommendations for use in telerobotic systems were established.

Operator Control Station↗

SCaN Network Ground Station Receiver Performance for Future Service Support

Objectives: Examine the impact of providing the newly standardized CCSDS Low Density Parity Check (LDPC) codes to the SCaN return data service on the SCaN SN and DSN ground stations receivers: SN Current Receiver: Integrated Receiver (IR). DSN Current Receiver: Downlink Telemetry and Tracking (DTT) Receiver. Early Commercial-Off-The-Shelf (COTS) prototype of the SN User Service Subsystem Component Replacement (USS CR) Narrow Band Receiver. Motivate discussion of general issues of ground station hardware design to enable simple and cheap modifications for support of future services.

Deep Space Network (DSN)↗

An Overview of the Concept of Operations for Assembly, Integration, Testing and Ground Servicing Developed for the MPCV-ESM Propulsion System

A concept of operations for the Assembly, Integration and Testing (AIT) and the Ground Systems Development Operations (GSDO) of the European Service Module (ESM) propulsion system has been developed. The AIT concept of operations covers all fabrication, integration and testing activities in both Europe and in the United States. The GSDO Program develops the facilities, equipment, and procedures for the loading of hypergolic propellants, the filling of high-pressure gases, and contingency de-servicing operations for the ESM. NASA and ESA along with the Lockheed Martin and Airbus Space and Defense are currently working together for the EM-1 and EM-2 missions in which the ESM will be flown as part of the Orion Multi-Purpose Crew Vehicle (MPCV). The NASA/ESA SM propulsion team is collaborating with the AIT personnel from ESA/Airbus and NASA/Lockheed Martin to ensure successful integration of the European designed Service Module propulsion system, the Lockheed Martin designed Crew Module Adapter and the heritage Space Shuttle Orbital Maneuvering System Engines (OMS-E) being provided as Government Furnished Equipment (GFE). This paper will provide an overview of the current AIT and GSDO concept of operations for the ESM propulsion system.

Propulsion↗

An Overview of the Concept of Operations for Assembly, Integration, Testing and Ground Servicing Developed for the MPCV-ESM Propulsion System

A concept of operations for the Assembly, Integration and Testing (AIT) and the Ground Systems Development Operations (GSDO) of the European Service Module (ESM) propulsion system has been developed. The AIT concept of operations covers all fabrication, integration and testing activities in both Europe and in the United States. The GSDO Program develops the facilities, equipment, and procedures for the loading of hypergolic propellants, the filling of high-pressure gases, and contingency de-servicing operations for the ESM. NASA and ESA along with the Lockheed Martin and Airbus Space and Defense are currently working together for the EM-1 and EM-2 missions in which the ESM will be flown as part of the Orion Multi-Purpose Crew Vehicle (MPCV). The NASA/ESA SM propulsion team is collaborating with the AIT personnel from ESA/Airbus and NASA/Lockheed Martin to ensure successful integration of the European designed Service Module propulsion system, the Lockheed Martin designed Crew Module Adapter and the heritage Space Shuttle Orbital Maneuvering System Engines (OMS-E) being provided as Government Furnished Equipment (GFE). This paper will provide an overview of the current AIT and GSDO concept of operations for the ESM propulsion system.

Ground Servicing↗

IsoWAN: A NASA Science and Engineering Information and Services Framework

We believe that the next evolutionary step in supporting wide-area application and services delivery to customers is a network framework that provides for collocation of applications and services at distinct sites in the network, an interconnection between these sites that is performance optimized for these applications, and value-added services for applications.

IsoWAN↗

International DORIS Service (IDS): The IDS at 20 and the IVS at 25; Together on a Long Journey

This is an invited presentation to the the IVS General Meeting 2024 to celebrate the 25th anniversary of the International VLBI Service (IVS). The presentation shares aspects of the common journey of the International DORIS Service (IDS), and IVS over the last 20 years, as sibling services of the International Association of Geodesy, and as space geodetic techniques that contribute to the International Terrestrial Reference Frame (ITRF).

DORIS↗

Developing a Cloud-Based ArcGIS Image Service for TROPOMI Level 2 Data: Preprocessing, Transformation, and Publication

TROPOMI, the Tropospheric Monitoring Instrument aboard the Sentinel-5 Precursor satellite, provides high spatiotemporal resolution atmospheric measurements. It is essential for monitoring air quality, greenhouse gases, and other trace gases. Integrating TROPOMI Level 2 data into an ArcGIS Image Service marks a significant advancement in the accessibility and utility of satellite-derived environmental information for GIS applications. This paper details the methodology for building an ArcGIS Image Service tailored to handle TROPOMI Level 2 data, with a focus on preprocessing, transformation, and cloud-based publication. The workflow utilizes Python and ArcPy for data reformatting, reprojection, and updating, ensuring efficient processing and cloud-based notifications. By establishing a robust pipeline, the ArcGIS Image Service provides real-time access to TROPOMI Level 2 data, enabling users to visualize, analyze, and interpret atmospheric phenomena effectively.

Level 2 Data, ArcGIS, Image Service, ArcPy, OGC↗

Resilient Operation of Power Distribution Systems Using MPC-Based Critical Service Restoration

Power distribution systems are more prone to disruptions and cause most power system outages. We propose a service restoration technique to recover the system service (electricity delivery) following an extreme event-triggered substation outage. The proposed technique considers the problem of controlling distributed energy resources (DERs) of a distribution system with the objective of achieving maximum load pick up while satisfying network flow and voltage constraints. The problem is formulated as a model predictive control (MPC), where a linearized optimal power flow (OPF) model is employed to describe the network. The formulation is augmented with a ramping (up) reserve product for the DERs to ensure an upward monotonic load restoration as time evolves. We perform simulations considering the IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage devices. We demonstrate the efficacy of the devised technique in restoring the system loads monotonically, without shedding previously restored loads. We also show the benefit of co-optimization of power and reserve products for DERs on service restoration. In addition, the capability of the technique in regulating nodal voltages and reducing renewable power curtailment is demonstrated.

61 RADIATION PROTECTION AND DOSIMETRY↗

A Model for Hybrid Systems for Production Cost Modeling Studies Considering Ancillary Services: Preprint

This paper introduces a model for simulating hybrid plants participating in energy and ancillary services for bulk power system studies. The model considers a hybrid plant comprised of a renewable energy source, a thermal power unit, a storage unit, fixed power loads, or any combination of these technologies. The model focuses on Production Cost Modeling (PCM) studies under the assumption of centralized dispatch. We present an example case study to illustrate the use of the model in a single-stage production cost model similar to those conducted by planning agencies. We explore the allocation of behind-themeter ancillary services products and total energy participation to hybrid plant sub-assets and the resulting impacts on the system's ancillary service allocation. The model is implemented and simulated in a unit commitment problem in the RTS test system, which was modified to include a hybrid plant asset.

ancillary services↗

Relationship Between γ′ Phase Degradation and In-Service GTD-111 First-Stage Blade Local Temperature

The Ni-based superalloy GTD-111 is used in manufacturing of first-stage blades for industrial gas turbines due to its high stability and strength at high temperatures. The remarkable properties of this alloy are related to its suitable microstructure obtained by the precipitation hardening mechanism. The microstructure of superalloys nevertheless degrades when they are exposed to long-term service. In this paper, the microstructure of a service-exposed GTD-111 blade was evaluated at different positions along the airfoil. Pores, carbides, eta and γ′ phases were analyzed. As a result of this study, it was found that only the γ′ phase exhibited significant differences in size and shape. The coalescence and coarsening of the γ′ phase near to the trailing edge tip were evident, which may be related to the typical failure of the blade in this region. Based on the Ostwald ripening theory, coarsening of this phase was used to calculate the in-service temperatures in the airfoil. In five locations of the trailing edge, temperature was found to vary from 679 to 961 °C.

36 MATERIALS SCIENCE↗

Simulating dispatchable grid services provided by flexible building loads: State of the art and needed building energy modeling improvements

End-use electrical loads in residential and commercial buildings are evolving into flexible and cost-effective resources to improve electric grid reliability, reduce costs, and support increased hosting of distributed renewable generation. This article reviews the simulation of utility services delivered by buildings for the purpose of electric grid operational modeling. We consider services delivered to (1) the high-voltage bulk power system through the coordinated action of many, distributed building loads working together, and (2) targeted support provided to the operation of low-voltage electric distribution grids. Although an exhaustive exploration is not possible, we emphasize the ancillary services and voltage management buildings can provide and summarize the gaps in our ability to simulate them with traditional building energy modeling (BEM) tools, suggesting pathways for future research and development.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗