Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STONES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Disposing of waste package with respect to physico-chemical characteristics - 15041

The waste inventory to be taken into account for the design of the Cigeo project is defined in the industrial program for waste management established in cooperation between nuclear operators (EDF, AREVA, CEA) and Andra. This waste inventory has been constituted with a list of different families of radioactive waste packages from High Level Waste (HLW) to Intermediate Level Long-lived Waste (IL-LLW). IL-LLW include a large variety of items such as structural elements from fuel assemblies (cladding from the fuel rods called 'hulls', end pieces called 'end caps' and assembly spacer grids, etc.), sludge from effluent treatment or miscellaneous equipment (filters, pumps, etc.). Most ILLW (except solidified sludges) are basically metallic but organic and inorganic components such as plastics (cellulose, PVC...) and salts may also be included. The rules used for designing Cigeo are based on the separation of waste having different physico-chemical characteristics in different cells. However it could be possible to dispose of waste packages with different physico-chemical characteristics in the same cell if we can demonstrate that a type of waste does not generate significant physico-chemical perturbations on other co-stored families. The first step of our analysis has been the identification of categories of materials present in waste likely to interact with each other. The second step consisted in analysing qualitatively the physico-chemical interactions between these materials. In the third step, we defined criteria allowing evaluation of the consequences of these interactions on (i) gas production (mainly H{sub 2}), (ii) radionuclide release and transfer and (iii) degradation of concrete components of the disposal cell. We built then a table allowing qualitative comparison of the consequences of the interactions between the materials types defined in the first step. The conclusion of this study shows that it is necessary to pay a very careful attention before disposing of waste packages containing organic components nearby waste packages containing actinides radionuclides. The geochemical phenomena coupling must also be quantitatively evaluated so as to analyse possible interaction processes between the released organic compounds and the cementitious components of the cells, the near-field clay-stone and the radionuclides migration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deployment of large tank monosodium titanate strike to increase salt processing at the Savannah river site - 15115

The treatment of high level waste (HLW) salt solutions using the Actinide Removal Process (ARP) and Modular Caustic Side Solvent Extraction Unit (MCU) began at Savannah River Site (SRS) in 2008. Since that time, over 6 million gallons of liquid HLW have been treated and the resulting low level waste (LLW) effluent immobilized in cementitious grout at salt-stone. In addition to the continued stabilization of liquid HLW, operating experience from the ARP/MCU facilities has also been valuable in considering the design and construction of the Salt Waste Processing Facility (SWPF) which will utilize similar unit operations on a much larger scale. ARP removes actinides by contacting waste with monosodium titanate (MST) which is a solid adsorbent for soluble strontium and actinides. Once the sorption reaction is complete, the MST solids are separated from salt solution via ultrafiltration through a crossflow filter. The throughput of initial operations of ARP/MCU was limited by the flowrate through the extraction process. However, after the implementation of a new solvent flowsheet, filtration of MST will be the rate limiting step in salt processing. For the entirety of ARP/MCU operation, Savannah River Remediation (SRR) has sought to improve process efficiency and performance through optimization and modification of the original facility design. These efforts have resulted in a best-single-year throughput of 4.9 million liters of decontaminated salt solution. In keeping with these practices, SRR recently initiated a project to improve filtration throughput by relocating the MST strike from small batches immediately upstream of the filtration unit to the underground waste tank used to batch and store salt solution feed for ARP/MCU. This process change will allow the bulk of MST solids to decant in the waste tank prior to filtration which should improve both the nominal operational filter flux as well as the achieved utility of filter operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applying lean management to aging infrastructure - 15416

Currently the Savannah River Site liquid waste system consists of 51 waste tanks, two operating evaporators, a salt processing pilot plant, the DWPF vitrification facility, the salt-stone Processing Facility and an Effluent Treatment Plant. Six of the waste tanks have been grouted and closed and the full scale Salt Waste Processing Facility (SWPF) is under construction. Some of the waste tanks and associated infrastructure were placed into operation as early as 1954 and DWPF went into operation in 1996. Due to this long history of operation, the SRS liquid waste system is being challenged by aging infrastructure issues and the stored radioactive liquid waste has been identified by regulators as the highest environmental risk in the state. Much of the DOE complex faces similar infrastructure issues. Remedies that can mitigate the impact of those issues are needed all across the complex. At SRS, Lean Management has been adopted as a business process to help address some of the impacts. Lean Management got its start decades ago in the manufacturing sector and has its roots in the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health care, and now the DOE complex. Lean Management has a 'secret sauce' that must be correct to avoid becoming the 'flavor of the month'. The easy part is the talking. The hard part is the doing. The payoff is in the doing. Obviously as facilities and equipment age, more and more funds are needed to maintain, refurbish, and replace them. Funding of course is tight for all our sites. Lean management generates work efficiency so a given set of resources can produce more. It must be noted that this isn't by working harder but rather by focusing scarce resources on the few activities that truly add value. A positive aspect for companies that have been on this journey is employees feel less stress and higher motivation. The work they do matters and they have fewer outside impediments to distract and sap their energy. SRR has used the Lean process to streamline both work planning and control and the supply chain to improve maintenance efficiency and reduce the Corrective Maintenance backlog. This paper explains how this was done, the challenges encountered, and how organizations can use this methodology for their own improvements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The cementitious barriers partnership experimental programs and software advancing DOE's waste disposal/tank closure efforts - 15436

The U.S. Department of Energy Environmental Management (DOE-EM) Office of Tank Waste Management sponsored Cementitious Barriers Partnership (CBP) is chartered with providing the technical basis for implementing cement-based waste forms and radioactive waste containment structures for long-term disposal. DOE needs in this area include the following to support progress in final treatment and disposal of legacy waste and closure of High-Level Waste (HLW) tanks in the DOE complex: - Long-term performance predictions and - Flow sheet development and flow sheet enhancements - Conceptual designs for new disposal facilities The DOE-EM Cementitious Barriers Partnership is producing software and experimental programs resulting in new methods and data needed for end-users involved with environmental cleanup and waste disposal. Both the modeling tools and the experimental data have already benefited the DOE sites in the areas of performance assessments by increasing confidence backed up with modeling support, leaching methods, and transport properties developed for actual DOE materials. In 2014, the CBP Partnership released the CBP Software Toolbox - 'Version 2.0' which provides concrete degradation models for: 1) sulfate attack, 2) carbonation, 3) chloride initiated rebar corrosion, and includes constituent leaching. These models are applicable and can be used by both DOE and the Nuclear Regulatory Commission (NRC) for service life and long-term performance evaluations and predictions of nuclear and radioactive waste containment structures across the DOE complex (Figure 1) including Future SRS salt-stone and HLW tank performance assessments and special analyses - Hanford site HLW tank closure projects and other projects in which cementitious barriers are required - The Advanced Simulation Capability for Environmental Management (ASCEM) project which requires source terms from cementitious containment structures as input to their flow simulations - Regulatory reviews of DOE performance assessments - Nuclear Regulatory Commission reviews of commercial nuclear power plant (NPP) structures which are part of the overall US Energy Security program to extend the service life of NPPs In addition, the CBP experimental programs have had a significant impact on the DOE complex by providing specific data unique to DOE sodium salt wastes at Hanford and SRS which are not readily available in the literature. Two recent experimental programs on cementitious phase characterization and on technetium (Tc) mobility have provided significant conclusions as summarized below: Recent mineralogy characterization discussed in this paper illustrates that sodium salt waste form matrices are somewhat similar to but not the same as those found in blended cement matrices which to date have been used in long-term thermodynamic modeling and contaminant sequestration as a first approximation. Utilizing the CBP generated data in long-term performance predictions provides for a more defensible technical basis in performance evaluations. - In addition, recent experimental studies related to technetium mobility indicate that conventional leaching protocols may not be conservative for direct disposal of Tc- containing waste forms in vadose zone environments. These results have the potential to influence the current Hanford supplemental waste treatment flow sheet and disposal conceptual design. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Leaning the tank closure process at the Savannah River Site - 15515

The Savannah River Site liquid waste system consists of multiple facilities that safely receive and store legacy radioactive waste prior to treatment and disposition. The liquid radioactive waste is stored in large underground tanks. The waste inventory currently stored in these tanks is a complex mixture of insoluble metal hydroxide solids and soluble salt supernate. The high-level (radioactive) portion of the waste is vitrified into a glass waste form, while the low-level waste is immobilized into a cementitious grout waste form called salt-stone. Once the waste is retrieved and processed, the tanks are closed. The closure process includes; waste removal, characterizing residuals, isolating the tank systems, and stabilizing the tank with tailored grout formulations. The core of Lean is to eliminate waste or non-value added steps from processes to maximize customer value. From the perspective of the customer, 'value' is defined as any action or process for which a customer would willingly pay. In this case our product is to safely and efficiently remove waste from the underground storage tanks and demonstrate operational closure to the State of South Carolina. Savannah River Remediation (SRR) initiated the use of the Lean process in late 2013 and identified the Tank Closure process as one of the targeted areas to improve. The first step in the Lean process is to 'map' out the value stream and identify areas where non-value added steps are present and then prioritize Rapid Improvement Events (RIE). Based on this mapping process, there were a number of areas that SRR determined warranted further evaluation for improvements, including; standard equipment design, characterization, standard work packages, regulatory documentation, tank characterization, structural evaluations, engineering documentation and equipment re-use. This paper focuses on the application of the Lean process at SRR and more specifically, effective application to the Tank Closure Process. This paper discusses the value stream mapping process for Tank Closures, as well as, summarizes the RIEs and demonstrate the realized benefits. Benefits can come in a variety of forms, from schedule compression to decreased costs. Through the Lean process we have been able to identify close to $10 M in savings over the life cycle of the tank closure process and a 4 year schedule compression. Cost and schedule savings are used to accomplish further risk reduction efforts. In addition to hard benefits, there are also soft benefits. These soft benefits are a result of the process itself and help drive improved efficiencies through better communication with key stakeholders, such as regulators and customers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigating the Depth of Penetration of Radionuclides in Concrete - 16292

This paper focuses on some chemical and structural aspects for mature concrete structural substrate that functions as a barrier to radioactive material migration. Exposure to radioactive material may be a consequence of surface contact, such as resulting from exposure by spills or leaks. In properly-prepared waste storage areas, undamaged paint and sealant helps to protect the structural cement. However, damaged surfaces, cracks, and relatively porous slab seams can offer a preferred migration pathway for spilled contaminates, including radionuclides. The cost of remediation of concrete structures is directly related to the amount of concrete that must be removed and subsequently disposed. A carefully implemented investigative plan can be utilized to determine how much concrete must be removed and the approximate level of volumetric radiological contamination can be used to estimate disposal costs. Normal concrete pore solution is saturated with calcium hydroxide and also contains sodium and potassium hydroxide; the pH is typically 13 to 14. Contaminants (such as uranium) that hydrolyze in alkaline media that form precipitant phases and tend to deposit at the near-surface. However, more soluble contaminants, such as Cs-137 (as Cs{sup +}) and Tc-99 (as the pertechnetate anion TcO{sub 4}{sup -}) diffuse more rapidly (and deeply) into the porous substrate. Profiling the migration of the water-soluble radionuclides into a cure (hardened) cement surface is a challenge, since water-cooled saws, borers and similar implements are often used to excise and/or slice the core. Alternately, dry mechanical fracturing for excavation of cement may introduce the possibility of material cross-contamination and uncertainty for the average sampling depth for the sample collection event, potentially yielding non-representative samples, and may preclude determination of crack formation that may have been present in the native (non-fractured) substrate. Structural concrete is comprised of cement and pozzolan paste, relatively impervious aggregate (typically stone and/or sand), and rebar (iron reinforcement). Near-surface aggregate may act as a hydrolytic barrier, causing contaminants leached into the pore water to by-pass the impervious grains, causing deeper-than expected penetration, especially if there are grain boundary cracks also present to facilitate migration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote-Controlled Removal of Bricks from a Reactor Shaft: An Unconventional Approach - 16406

The first German prototype Fast Breeder Nuclear Reactor (KNK) is currently being dismantled after being the only operating Fast Breeder-type reactor in Germany. The complete dismantling is based on 10 decommissioning permits. Package 3 of the 9. decommissioning permit, which is currently under preparation, comprises the dismantling of the biological shield. Package 2 comprised the dismantling of the Primary Shield. In preparation to lift the 14 primary shield segments on height of the reactor core, these were milled at 16 positions and equipped with a total of 26 holes. As a result of the milling and drilling process, an estimated amount of 500-600 kg cast iron swarfs accumulated at the bottom of the 12 m deep reactor shaft. The cobalt in the cast iron was activated to cobalt-60 during operation. This results in a measurable dose-rate of 30-35 mSv/h. At the conical bottom of the reactor shaft were still the remaining parts of the thermal insulation consisting of a lining with brick stones, covered with loose remnants of the thermal insulation, loose metallic residues and cut-off wheels of the angel grinder. For the next dismantling step, the removal of the activated part of the biological shield, it is necessary that the cast iron swarfs must be removed as well as the remains of the thermal insulation. Firstly, this is necessary to reduce the dose rate inside the shaft for subsequent breakthrough operations and, secondly to have a statically resilient surface for the installation of a necessary working platform for next dismantling tools. There was no access for personnel. A manual removal was also not possible due to the existing dose rate. The cast iron swarfs supposed to be removed by a remote controlled suction unit, which was installed on top of a drum and mounted in a special rack. The complete system was lowered into the reactor shaft by using a crane. After removing the major amount of swarfs, the remaining swarfs as well as the sheet metal liner should be collected with a magnetic grabber. The solution for the metal removal was easy to realize, but there was no idea how to remove the remaining bricks remote controlled out of the reactor shaft. Another boundary was that only existing facilities were supposed to be used in addition to the new suction system, i.e. the existing cranes, gripper, as well as the double lid lock of the encasing for the handling of the vacuum cleaner, the transport of the drum and the lock procedure. The design essentially consists of a suction unit and a collecting unit. Both units are connected hooked by the three single suspension chains on the rack on the traverse and connection of the suction tube. Subsequently the entire unit was drained in the 12 m deep reactor shaft. The entire unit has been lifted out of the reactor shaft and placed on a defined set-down position. At this position, now both of the units could be separated by using the Master-Slave-Manipulator in the encasing (A100). By using different suction pipes the reactor shaft bottom could be exempted from the cast iron swarfs within a few days. The suction unit worked in such a positive way that it was decided to remove the loose refractory bricks, metallic residues, cut off wheels, etc., too. Metal parts remaining on the ground were removed by a magnet. This pragmatic approach avoided additional complex design works and the need of constructing special solutions and thus, massively saved time, cost and dose rate. The duration of planning, permission including implementation amounted to approximately 3 to 4 months. The additional work could be performed directly after the actual dismantling step.

07 ISOTOPE AND RADIATION SOURCES↗

Can we use Pictograms in a Long Term Communication System Related to a Radioactive Waste Repository? - 18301

Pictograms are often mentioned as a possible tool for sending messages about radioactive waste repositories in a far future, when the understand ability of our languages will have been lost. But they have also limits, related to the use of conventions that may fade over time. The goals of a signaling system for the long term may be (1) to alert (raise attention), (2) to inform of an underlying danger due to the existence of radioactive wastes, (3) to induce a favorable behavior (provoke or deter actions) in order not to disturb the performance of the repository. The quest for trans-cultural and trans-generational performance requires that some universal semiotic features be identified, shared by human beings of various cultures nowadays, and from far in the past to the present. Considering the typology of colors in various languages, the use of colors in ancient rock art and in children's drawings, a dedicated role may be assigned to each of the three colors, white, black and red/ocher, with a high potential for sustainable meaning: 1) red background = pay attention to this object because of the simple presence of the red color, that is to say the first color felt as color; 2) white inscription = absence of the object / action represented; 3) black inscription = presence of the object / action represented. The representation of a human body in movement inside a context is also understandable by people from various cultures. The combination of these 'semiotic primitives', used as relevant semantic features of the object and/or the experience to be represented, and 'topo-sensitive' criteria, used for pictogram production processes, would thus become a way to conceive a trans-cultural and trans-generational sign system for the signaling of radioactive danger. The choice of the stone could guarantee the durability of the support; the color could guarantee its visibility; and both could guarantee the transmission of the message. Combining these criteria could open the way to a long term communication system about radioactive waste repositories. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Robotics in Liquid Waste System - {sup 3}H Evaporator, Tank Closure and Defense Waste Processing Facility - 18525

The Savannah River Site (SRS) Liquid Waste System (LWS) safely stores and treats high-level radioactive waste. The LWS consists of 51 waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities such as the Defense Waste Processing Facility (DWPF) and Salt-stone Production Facility (SPF). At Savannah River Remediation (SRR), the liquid waste contractor, robotic technologies are needed to enter areas and spaces that are otherwise inaccessible or prohibit direct access by workers due to unsafe, unstable, or unknown physical or structural conditions; or configurations that are hard to reach or beyond reach without taking extraordinary mechanical measures. As discussed below, SRR uses robotic technologies at various LWS facilities to reduce dose to the workers as well as provide access to unreachable locations due to the presence of radiological or chemical hazards. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ion Exchange Column Thermal Modeling: Prevention of Process Effluent Boiling - 18577

The Savannah River Site treats and disposes of legacy high-level waste, which resulted from 60 years of nuclear material production, medical research, and other nuclear related work. Complex mixtures of soluble and insoluble solids occupy tanks of which the South Carolina Department of Health and Environmental Control recognizes as the single largest environmental risk state-wide. The risk is reduced through removal, treatment, and solidification of decontaminated salt waste. Presently, SRS decontaminates the soluble salt component of the waste, a solution containing actinides and cesium, via implementation of the Actinide Removal Process and the Modular Caustic Side Solvent- Extraction Unit. Caustic solvent extraction is set to increase in scale by late 2018, with startup of the newly constructed Salt Waste Processing Facility. In conjunction with Salt Waste Processing Facility startup, Savannah River Remediation has been tasked by the Department of Energy to demonstrate modular ion exchange technology. The Tank Closure Cesium Removal project aims to demonstrate the feasibility of modular ion exchange processes for future Department of Energy applications. The Tank Closure Cesium Removal system is scheduled to begin operation in mid-2018. Dissolved salt solution, or influent, will be fed through a filter and ion exchange columns in lead-lag configuration, producing effluent. The effluent is fed to a separate high-level waste tank, for future disposition at Salt-stone Production Facility. Once the demonstration project is complete, the loaded ion exchange columns will be purged, dried, and placed in interim safe storage, awaiting final disposition. The ion exchange media selected for the Tank Closure Cesium Removal system is Honeywell UOP IONSIV{sup C} R-9120. The media is a prime candidate for separation of cesium from radioactive high-level waste. UOP R-9120{sup C} is inorganic and has high capacity, selectivity, and affinity for cesium. During operation, influent is fed to the ion exchange columns, contacting UOP R-9210{sup C} packed within the media vessel. Contact initiates loading of isotopes, and given ample time the solid phase (ion exchange media) and solution achieve thermodynamic equilibrium. UOP R-9120{sup C} is a prime candidate for separation of cesium and dissolved fission products. Although the properties of UOP R-9120{sup C} are favorable for separation, the same properties lead to accumulation of a heat source in the ion exchange bed. Cesium-137 and its daughter product, barium-137 m, generate a clear majority of heat (i.e. ∼ 94%). During operation salt solution flows through each column and transports heat from the ion exchange bed. Once operation is terminated, the effluent contained within the porous bed volume becomes essentially static. In the absence of engineering controls, the heat generated may boil the effluent. Rapid vaporization of aqueous salt solution would lead to bed over pressurization. Over pressurization and an associated release of high-level waste would result in adverse impacts to human health and the environment. This paper focuses on modeling the heat transfer associated with the Tank Closure Cesium Removal system ion exchange column. The model evaluates the maximum heat generation and the associated radionuclide loadings that prevent boiling within of the media vessel, under no flow conditions. A safety significant control, maintaining loadings less than the established loading limit ensures associated impacts to human health and the environment are prevented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solid Secondary Waste Immobilization in Cementitious Waste Forms at the Hanford Site - 19081

During operations of the Hanford Tank Waste Treatment and Immobilization Plant, solid secondary wastes (SSW) will be generated. These materials include HEPA filters, granular activated carbon (GAC), and silver mordenite (AgM). The planned disposal pathway for SSW is through solidification (blending) or encapsulation in a cementitious waste form and then disposal on site at the Hanford Site's Integrated Disposal Facility. Performance assessment evaluations of SSW forms have been performed; however, limited experimental data on simulated SSW is available as input. This paper will cover efforts to fill this gap in experimental data through testing of simulated SSW materials. Two grout formulations were used in the tests: 1) Hanford grout mix 5, a mix of 25 wt% ordinary Portland cement (OPC) and 75 wt% fly ash (FA); and 2) the Cast Stone dry blend of 47 wt% blast furnace slag, 45 wt% FA, and 8 wt% OPC. The sorption (Kd) of potential contaminants (iodide, iodate, technetium) to the grouts and SSW materials was investigated in simulated grout pore water. Waste forms containing GAC and AgM were prepared using the two grout formulations and characterized using scanning electron microscopy energy dispersive X-ray spectroscopy and X-ray diffraction. Acquiring this information will further support the candidacy of cementitious waste forms to be used for disposal of SSW at Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Erosion Control Measures at Oak Ridge Reservation Landfills Oak Ridge, Tennessee - 19190

URS-CH2M Oak Ridge LLC (UCOR) manages the cleanup of the 2,200-acre East Tennessee Technology Park (ETTP) for its client, the U.S. Department of Energy (DOE), in Oak Ridge, Tennessee. The ETTP was contaminated with radioactive, hazardous and industrial wastes generated by more than 40 years of national defense and energy missions. In disposing of low-level radioactive and other wastes from demolition activities, the UCOR approach relies on the availability of onsite facilities to streamline disposal, reduce costs and enhance cleanup schedules while confining shipments and related hazards onsite. The sanitary/industrial waste facility, known as the Oak Ridge Reservation Landfill Facility (ORRLF) is a solid waste operation that receives and disposes of sanitary/industrial, construction/demolition and classified, special waste; and spoil materials types of waste generated at the U.S. Department of Energy (DOE) Oak Ridge facilities. ETTP is the primary generator; however, the landfill accepts waste from Y-12 National Security Complex (Y-12), Oak Ridge National Laboratory and other DOE prime contractors in the Oak Ridge area. ORRLF's mission is to receive nonhazardous, non-radioactive, and non-Resource Conservation and Recovery Act of 1976 (RCRA)-regulated solid wastes. Approved operations include receiving, compacting, and covering wastes; leachate management, site drainage; erosion control and prevention, inspections, maintenance and recording keeping. The Oak Ridge Reservation has three separate State of Tennessee-permitted active landfills (Landfill IV, Landfill V, and Landfill VII) that meet different disposal needs -- classified industrial waste, industrial waste that includes office trash and cafeteria waste, and construction and demolition debris,. As with a typical landfill, strategic waste placement and covering involves moving a lot of soil, usually resulting in large areas of exposed land. After increased sediment was noted in streams following heavy rains, a concerted erosion prevention and sediment control effort began in 2017. While not uncommon for landfills, the ORRLF staff knew they could do better in controlling sediment. In response, the ORRLF staff developed an approach of aggressive revegetation, ditch improvements and other erosion controls. Staff developed a list of all the areas that needed the most attention and requested resources. UCOR management arranged funding for needed improvements. The oldest of the three landfills is Industrial Landfill IV, which opened in 1989 and has an expected remaining 60 years of life. Therefore, how the landfills are maintained/managed today directly affects the compliance posture, the capacity, and the infrastructure in the future. A systematic, aggressive and multi-pronged approach was taken to address the major concerns first, then continue with longer-term, and/or lower priority projects. Buy-in was obtained from both craft and supervision, resulting in approaches like 'Ditch of the Month'. In addition, management support at the highest levels has provided resources and recognition that further fuels progress. After working on the site for the past year, what used to be exposed brown hills looks more like a golf course now. Now that the grass is established and other erosion controls are in place, the amount of sediment leaving the site has been reduced, and the appearance of the landfills is improved. Vegetation dissipates the kinetic energy from rain droplets while the root system helps hold the soil in place, and wire-reinforced silt fences and straw wattles have greatly improved erosion control. Improved ditches reduce the runoff velocities allowing sediments to fall out of suspension in the stormwater before they reach the receiving waters, and structures are in place to let finer sediment settle in ponds rather than going downstream. In addition, the project has added more stone to roadways to minimize tracking dirt down the road as an average of 20 to 40 trucks per day enter and leave the site. Ongoing landfill erosion and sediment control must be funded and maintained continually. The lack of attention to either resource will negatively affect the condition of the landfill fairly quickly. Constant compliance commitment is necessary to ensure protection to the environment, the operator/workers and the public. Operations must include sediment control, pond maintenance and clean out, road maintenance and construction, erosion prevention, seeps repair, leachate management, landfill expansion, mowing and grounds upkeep and much more. Knowledgeable/experience staff is also crucial. Knowing how to build lifts, create leachate drainage windows, respond to high rains events, compact waste will impact operations today and future operations into the closure / post closure periods. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

R and DE Robotic Sensor Intern Team: Sensor Suite Mock Up Testing

Assess sensor suite performance: - Mounted on crawler typical to what would be used in tunnel; - In test bed simulating the tunnel environment. The SuperDroid fiber tethered LT-F crawler is a general-purpose surveillance robot that our team has refurbished as a testing platform for the sensor suite. This crawler was selected because its dimensions are similar to the actual crawler that will be deployed in the field. Crawler preparation included: - Communicating with vendor to resolve software and platform issues; - Configuring a laptop with the crawler control software; - Reconfiguration of communication protocol between computer and crawler; - Resolution of control board checksum errors; - Installation of a mounting fixture on the base; - In progress: addition of lighting needed for total darkness. A solution for hosting the selected sensors onto a single unit that could function standalone or be mounted on the crawler was needed. Sensor mount requirements included: - Host Lidar, panospheric cameras and IMU sensors; - Cable management for rotating Lidar; - House on-board crawler computer; - Method for affixing to crawler; - Robust and vibration proof. The Lidar sensor required a sturdy mount that ensured the axis of rotation be centered with the LiDAR's desired laser path and included a slender profile in order to not block the scanning FOV. The mounting plate holds two 180-degree cameras on either side and the servo on the center. The servo mount is located so the axis of rotation is in the center of the plate. The mount features a set of guides that hold the wires and ensure they wrap around the spool area properly. The sensor box design features thick walls for added strength, holes for mounting the sensor suite to the crawler, notches on the bottom for the different components and holes for cable routing and management. The sensor mounts were designed using CREO and printed in the R and DE Additive Manufacturing Lab. To test the performance of the sensor suite for our application it was desired to design and build a test bed simulating the H-Canyon tunnel environment. Requirements included: - Dimensions similar to the tunnel; - Wall surfaces simulating the eroded tunnel walls; - Complete darkness; - Even and uneven crawler path; - Ability to change the tunnel width to simulate erosion. The HCAEX tunnel changes in height and includes several bends ranging from approximately 30 to 80 degrees, for that reason a test bed capable of easily being changed was needed. The final design includes two sections that can be connected to provide a 16' tunnel or placed at an angle to create a tunnel bend. The test bed features caster wheels for easy movement and has a sliding inner wall that enables tunnel width to be controlled. In order to simulate the tunnel walls without adding a lot of weight to the test bed, sheets of faux stone are to be used on the inner walls. To create a completely dark tunnel, 100% black-out film will be draped over the tunnel structure. Carpet remnants in the lab will enable folds to be introduced in the floor to generate uneven surface data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field-Scale Lysimeter Studies of Glass and Cementitious Waste Forms at the Hanford Site - 20392

The Hanford site Integrated Disposal Facility (IDF) will receive waste forms from vitrification activities at the Hanford Waste Treatment and Immobilization Plant (WTP). The waste form inventory to be disposed of at the IDF will consist of vitrified low-activity waste (LAW) in glass forms and solidified (or encapsulated) secondary wastes in cementitious forms. The IDF is a near-surface burial facility located near Hanford's Waste Treatment and Immobilization Plant in the 200 East Area of the site's Central Plateau. An extensive set of laboratory experimental data has been collected to support IDF performance assessment calculations of the eventual degradation of waste forms and mobility of contaminants. This paper describes the start of a field experiment to generate waste-form performance data on a larger scale (tens of centimeters), over a longer duration (five years or more), and under field conditions representative of the IDF. Results from this study are expected to improve model descriptions of contaminant mobility, reduce uncertainties about the representativeness of laboratory results in the IDF performance assessment, improve stakeholder confidence in the safe disposal of treated waste at the IDF, and facilitate the adoption of informed facility designs with the potential to reduce operational costs. A lysimeter test facility near Hanford's 200 West Area has been repurposed to carry out long-term assessments of waste forms buried in sediments excavated from the IDF. The waste forms are buried in large drainage lysimeters, open caissons that are two meters in diameter and three meters deep. Waste forms are buried in up to six locations in each lysimeter. Samplers collect pore water and drainage water beneath the waste forms and air from the pore space adjacent to waste forms. Sensors measure temperature, soil water content, soil water tension, and drainage flux. One lysimeter containing cementitious waste forms and one containing glass waste forms have been completed, along with a control lysimeter (without waste forms). The cementitious waste forms are Cast Stone grout formulations using a liquid secondary waste simulant and a generic Hanford high-salt simulant, as well as a hydrated lime-based grout formulation using a liquid secondary waste simulant. Technetium-99 and iodine-127 were added as tracers to monitor contaminant mobility. Glass waste forms were fabricated in two formulations (LAWA44 and ORLEC28), with rhenium and molybdenum tracers to monitor waste form degradation. The predicted performance of the waste forms in the lysimeters was modeled prior to installation to determine waste form size, tracer concentration/activity, and locations of sensors and samplers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On Temperature Limits for the Outer Surface of a Container in a Disposal Facility - 20313

The temperature in a disposal facility for high-level radioactive waste (HLRW) is an issue for safety. When the recommencement of the search for and selection of a site for a disposal facility for HLRW in Germany was stipulated by the Site Selection Act (StandAG 2017) in 2017, a precautionary temperature limit of 100 deg. C on the outer surface of the containers with high-level radioactive waste in the disposal facility section was set. This precautionary temperature limit shall be applied in preliminary safety analyses provided that the 'maximum physically possible temperatures' in the respective host rocks have not yet been determined due to pending research. Therefore, this issue is addressed and discussed in this paper, contributing to 'pending research' by a review of the literature. This paper briefly discusses a few examples of thermohydraulic, mechanical, chemical and biological processes in a disposal facility, because temperature limits are derived based on safety impacts regarding THMCB-processes. The temperature-dependent processes have been extracted from databases for features, events and processes (FEP-databases). Furthermore, it is discussed if the feasibility to retrieve and recover HLRW is hampered at high temperatures. A design temperature concerning single components of a disposal facility for the preservation of their features can be derived when a safety concept is established. However, the interactions of all relevant processes in a disposal concept must be considered to determine a specific temperature limit for the outer surface of the containers. Therefore, applicable temperature limits may vary for particular safety and disposal concepts in the following host rocks: rock salt, clay stone and crystalline rock. Technical solutions for retrieval and design options for recovery seem to be viable up to temperatures of 200 deg. C with different, sometimes severe, downsides according to expert judgement. Temperature limits regarding the outer surface of the containers can be derived specifically for each safety concept and design of the disposal facility in a host rock. General temperature limits without reference to specific safety concepts or the particular design of the disposal facility may narrow down the possibilities for optimisation of the disposal facility and could adversely affect the site selection process in finding the best suitable site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Code of Radiation Damage by Gamma - Paper 62

In recent years, the study of radiation damage of materials has seen a thrust because of the expectation of the high rate of radiation damage in fusion reactors, accelerator driven sub critical systems and damage of a control system of space vehicles by the high energy neutrons and gamma showers. Embrittlement of reactor vessels, corrosion of steel and swelling of fuel rods are the well known empirical examples of severe radiation damage. It is also realized that damage by high energy gammas is in no way insignificant, and it is equivalent to the damage by the neutrons. Secondly, value addition of certain materials like enhancement of electrical resistance, mechanical strength, color enhancement of precious stones on irradiation by neutrons and gammas and polymerization in the presence of gamma radiation add to the necessity of a Monte Carlo (MC) code of radiation damage in a wide range of energy. The JAIPU code, for the study of radiation damage by neutrons up to 10 MeV energy, incorporates features like development of secondary atomic cascade and PKA energy corrected for the ionization lose and production of Frenkel pair. MC estimation of both the primary and secondary displacements has been compared with the Frenkel pairs calculated using the NRT model. In the present work, JAIPU code is extended for irradiation of materials by high energy gammas. Here cascade generated by the incident gamma produces electrons by way of photo-electric, Compton and pair production until it is absorbed. The recoiled Frenkel pairs produced in electron + atom collision have been considered for the purpose of atomic cascade. Standard cross section libraries for gamma and electron interaction are used while for atom + atom collision we have made use of the IOTA code. In addition, in the code, the lattice structure of the irradiated material is simulated to know the positions of the photon interactions with atoms and the energy of electron it adds an extra feature of the position and size of the voids and the clusters produced on irradiation. The code has the possibility of calculation of 'absorbed radiation dose' and 'KERMA' and the interatomic distances of the displaced atoms. It may be pointed out that the code uses only the MC simulation of the number of displacements unlike several other approaches where the NRT model with PKA energy is used for gross estimation of the number of the displaced atoms. Thus, the code keeps an account of the positions of displaced atoms for the in-depth modification of the irradiated material. 1 MeV gamma seems to damage Fe up to several millimeters of its depth and this is mostly by the recoiled Compton electrons than photo electrons. The code is in the developmental stage and it has the capability of applications in the developing field of Radiology besides the shielding and other studies of radiation damage. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Toward inclusive observables with staggered quarks: the smeared $R$~ratio

Inclusive hadronic observables are ubiquitous in particle and nuclear physics. Computation of these observables using lattice QCD is challenging due the presence of a difficult inverse problem. As a stepping stone to more complicated observables, we report on progress to compute the smeared $R$~ratio with staggered quarks using the spectral reconstruction algorithm of Hansen, Lupo, and Tantalo. We compare staggered-quark results on two ensembles to domain-wall results on a single ensemble and to the Bernecker-Meyer parameterization. This work utilizes two ensembles generated by the MILC collaboration using highly improved staggered quarks and one ensemble generated by the RBC/UKQCD collaboration using domain-wall quarks. Possible strategies for controlling opposite-parity effects associated with staggered quarks are discussed.

Blum, Thomas↗

Element 74, the Wolfram Versus Tungsten Controversy

Two and a quarter centuries ago, a heavy mineral ore was found which was thought to contain a new chemical element called heavy stone (or tungsten in Swedish). A few years later, the metal was separated from its oxide and the new element (Z=74) was called wolfram. Over the years since that time, both the names wolfram and tungsten were attached to this element in various countries. Sixty years ago, IUPAC chose wolfram as the official name for the element. A few years later, under pressure from the press in the USA, the alternative name tungsten was also allowed by IUPAC. Now the original, official name 'wolfram' has been deleted by IUPAC as one of the two alternate names for the element. The history of this controversy is described here.

36 MATERIALS SCIENCE↗