Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “START-UP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Panel Session 61: Challenges in the US DOE HLW Tank Management Program

Approximately 50 people attended this panel session which focused on the successes and challenges in DOE high-level radioactive tank waste management with special emphasis on tank waste processing and waste disposition. Panelists discussed approaches, results, and lessons learned in addressing challenges in construction, start-up, and processing of tank waste and its ultimate disposition that is critical to tank waste management at Hanford, Savannah River, and Idaho sites. Presentations proposed include: 1 - Liquid Waste Program at the Savannah River Site (James Folk, US DOE (USA)); 2 - Progress on Hanford's Tank Waste Treatment Mission (Tom Fletcher, US DOE (USA)); 3 - Idaho Tank Waste Program (Joel Case, US DOE (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) Quality Assurance Program - 20237

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous HEPA filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The SSCVS project has proceeded with the awarding of CD-3A for Long Lead Procurements followed by CD-2/3 approval for the construction of the facilities. The SSCVS project team made the decision to increase the quality oversight throughout the complete project per the Project Quality Assurance Plan (PQAP) such that it can ensure the final products meet applicable NQA-1 requirements and general quality requirements, and that the project will proceed to operations without significant delays due to post installation quality concerns. The PQAP was established prior to approval of the project at the CD-2/3 milestone. The SSCVS project has 2 major long lead procurements which commenced with the awarding of CD-3A. These procurements include the HEPA filter housing assemblies and the Exhaust Fans. There are 22 HEPA filter assemblies for the SSCVS, which are designated Safety Significant for pressure boundary confinement, per the approved PDSA. The exhaust fans also have Safety Significant components to maintain the pressure confinement boundary. NWP made the decision to install resident Quality Inspectors at the fabrication facilities to ensure the documentation for each fabricated unit meets all the QA requirements as defined in the respective contract documents. For the construction of the SSCVS Salt Reduction Building (SRB) and New Filter Building (NFB), dedicated, on-site quality inspectors have been utilized to ensure that all work being performed will comply with quality requirements and the Special Inspections as defined in IBC-2015. At each stage of inspection, hold points are placed into the work packages to ensure NWP QA personnel are present to inspect and verify the installations are in accordance with the design specifications, codes and standards. With this level of oversight, NWP anticipates that the level of quality related issues, as seen on multiple other DOE complex site projects, will be avoided and that the commissioning, start-up and hot operations will progress in a timely fashion, as all documentation will be in place and approved prior to initiation of these activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modular, Mobile Systems for the Treatment of Contaminated Water at Three Magnox Sites in the United Kingdom - 20421

Veolia Nuclear Solutions (VNS), and its mitigated entity, Veolia Nuclear Solutions Federal Services (VNSFS), are designing, overseeing the fabrication and installation, and supporting the commissioning of highly mobile and modular skid-based water treatment systems to assist in the decommissioning of three Magnox reactor sites based in the U.K. These Modular Active Effluent Treatment Plants (MAETP) will be deployed at the Chapelcross, Hinkley Point A, and Dungeness A sites to process contaminated water through the use of ion exchange systems and/or filtration units. At the time of writing, two systems have been installed and inactively commissioned, and the third system is expected to be delivered in 2020. Veolia has utilized a multi-national team of engineers, based in the UK and the US, to effectively leverage the best of Veolia expertise in the design and delivery of mobile, modular systems. The VNS team continues to refine the modular, mobile, and scalable approach to water processing system delivery, and has successfully patented the evolving technology for proprietary protection. The intent of this technology investment is to improve the functionality, mobility, and modularity, resulting in a system which can be adapted to a broad range of throughput and isotope removal requirements to achieve the most cost effective, flexible system possible for customers. Designing, fabricating, and factory-testing the modules off site followed by onsite installation, testing, start-up, and commissioning ensures expedited delivery and setup, as well as cost savings for nuclear applications. For the MAETP systems, VNS's previous nuclear site experience and ongoing Research and Development (R and D), combined with the resulting mobile/modular water processing systems developed and successfully deployed by VNS, have proven to be important inputs for the successful end-design of the systems, materials selection, system testing and commissioning. The lessons learned in the development and continued enhancement of the patented systems described in this paper will prove useful in advancing and deploying future systems for other nuclear sites, where rapid customizing and cost-effective implementation are critical factors. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System Health and Status Reporting is Used to Improve Infrastructure Systems at the Hanford Site - 20449

Reliable physical infrastructure systems are vital to completing the clean-up mission and the start-up and commissioning of new nuclear waste processing facilities at the Hanford Site. Key infrastructure systems at Hanford include water, sewer, and electrical utilities, roads, telecommunications/network systems, and fire systems. All of the infrastructure systems are non-nuclear, General Service systems that are being maintained under formal engineering configuration control and none are specifically credited in any documented safety analysis (DSA). Starting in calendar year 2017, the Hanford Site's infrastructure and services contractor started producing system health and status reports for a total of 15 critical infrastructure systems as means to get a better understanding of each system's health and how it could be improved to ensure better and more reliable service delivery. As the reporting, tracking, and use of the metrics has matured, the number of systems for which reports are being developed has been expanded to a total of 23. Each of the critical infrastructure systems are assigned primary and alternate design authorities that complete qualifications on each assigned system. The design authorities actively manage and maintain configuration control on each of their systems and track metrics associated with availability, maintenance (corrective and preventive), and configuration of the technical baseline. The metrics are based on the principles established in Chapter V of DOE O 420.1C, Facility Safety, [1] and have been tailored as appropriate to each of the key infrastructure systems. An overall assessment of system health is performed and documented on a routine basis (e.g., quarterly). Included in this documentation is a quantitative score for each of the metrics (i.e., availability, maintenance, configuration management) along with results of system walk-downs, description of any permanent design modifications, identification of new or emerging issues and vulnerabilities affecting the system, and an assessment by the design authority of actions necessary to improve the system health score. The overall status scores are calculated using a formula and based on a pre-determined grading scale, a color is assigned for simple presentation. The information gained from developing the reports is being used to (1) assist with making timely and better informed decisions through the use of solid technical bases that are increasing the overall reliability and capabilities of the Site's infrastructure systems as new expense and capital projects in the Reliability Projects Investment Portfolio (RPIP) are prioritized and executed; (2) feed the risk management program, and (3) integrate the technical content of Master Plans that describe the Site's needs for the system and the system's capabilities to meet those future needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Removal: Success and Partnership with T Plant - 20510

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) has safely and efficiently managed the removal of highly radioactive sludge from the 105-K West Reactor fuel storage basin (105- KW Basin) near the Columbia River. In mid-September 2019, sludge retrieval was completed after 21 storage containers were safely loaded with highly radioactive sludge and transported approximately 13 miles from the 105-KW Basin to T Plant, located in the 200 West Area on the Central Plateau of the Hanford Site. Sludge removal represents the last major source term reduction necessary before the K West Reactor and fuel storage basin can transition to closure activities in preparation for final deactivation and demolition. The technical complexity of the sludge retrieval process, coupled with the challenging physical and radiological characteristics of the waste, necessitated a methodical and deliberate approach using unique design and operational solutions to safely conduct the work. This challenge was further complicated by the need to plan and conduct the work in two separate facilities, each subject to the controls and requirements of its own nuclear facility safety basis. The project overcame these challenges through creating an integrated team that actively engaged, communicated and coordinated each phase of the project to ensure successful completion. This paper will cover how these key elements of the Sludge Removal Project led to its success: - Integrating project planning and management; - Lessons learned from design and construction; - Preparing for a successful campaign (lessons learned from testing and start-up); - Lessons learned from operating in two separate facilities, transporting sludge containers on the Hanford Site and ensuring compliance with a range of regulatory and safety basis requirements. The establishment of an integrated group spanning two facilities and multiple organizations created a team capable of overcoming the challenges necessary to successfully plan and execute the sludge retrieval mission. Sharing lessons learned from this successful project can enhance the ability of teams across the DOE complex to successfully plan and execute complex projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status of the OECD/NEA Watts Bar unit 1 benchmark and calculations of local reactor core power data of the Zero Power physics tests

The paper aims to provide an update on the status of the Organization for Economic Cooperation and Development (OECD) / the Nuclear Energy Agency (NEA) Tennessee Valley Authority (TVA) Watts Bar 1 (WB1) Multi-Physics Multi-Cycle depletion benchmark and the results associated with Exercise 1. The benchmark relies on the set of benchmark progression problems developed by the Department of Energy (DOE) Consortium for the Advanced Simulation of Light Water Reactors (CASL) for the Virtual Environment for Reactor (VERA), which are based on real plant design and operational data. The OECD/NEA TVA WB1 benchmark is designed for validation of both traditional and novel high-fidelity multi-physics codes to analyze Pressurized Water Reactors (PWR) depletion cycles. The activities are conducted under the Expert Group on Reactor Systems Multi-Physics (EGMUP) at NEA/OECD. In this work, we analyze Exercise 1 of the benchmark: stand-alone Three-Dimensional (3D) neutronics at Start-up Zero Power Physics Test (ZPPT) at Hot Zero Power Conditions (HZP) and the resulting power maps. The code used to model the exercise is the continuous energy Monte Carlo code Serpent 2.1.31 along with the nuclear data library ENDF/B-VII.1. Serpent results are compared with the high-fidelity deterministic code MPACT, which is part of VERA. The paper presents three selected results from power calculations required output. The results compared are the normalized axially integrated radial core power maps, the normalized axial averaged core power shapes, and the normalized core hottest and coldest assemblies radial power maps. The Root Mean Square Deviation (RMSD) between Serpent and MPACT is 0.51 % for the axially integrated radial core power map, 1.41 % for the axial averaged core power shape, 2.42 % for the hottest assembly axial power shape, 0.88 % for the coldest assembly axial integrated hottest assembly radial pin power map, and 0.17 % for the axially integrated coldest assembly radial pin power map. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

GeoBridge: Connecting Communities to Geothermal Information and Opportunities: Preprint

The geothermal community is well established with long-standing events, organizations, and tools that are known across the geothermal community. But many of these tools and resources are located behind pay walls, require memberships, or are otherwise difficult to find, especially for people looking to join the geothermal community. These barriers to access can prevent outsiders from discovering valuable geothermal resources, limiting the geothermal community's potential for collaboration with other communities, such as clean energy entrepreneurs looking to expand into geothermal energy. The Department of Energy's (DOE) GeoBridge serves to bring these communities together by acting as a single, publicly accessible, searchable portal that facilitates easy access to available geothermal knowledge and information. It works to expand and diversify the pool of geothermal stakeholders by providing in-roads to geothermal information and community resources. It helps build a stronger geothermal community; one inclusive of individuals and groups from a variety of different backgrounds, including potential investors and start-up companies looking to accelerate innovation in geothermal technologies. By linking communities to geothermal information, analysis and expertise, GeoBridge serves as a launch point, directing interested parties to existing data and tools, events, educational resources, STEM programs, permitting and regulatory information, and other resources that can be used to evaluate, promote, and discover geothermal opportunities.

access↗

GeoBridge: Connecting Communities to Geothermal Information and Opportunities

The geothermal community is well established with long-standing events, organizations, and tools that are known across the geothermal community. But many of these tools and resources are located behind pay walls, require memberships, or are otherwise difficult to find, especially for people looking to join the geothermal community. These barriers to access can prevent outsiders from discovering valuable geothermal resources, limiting the geothermal community's potential for collaboration with other communities, such as clean energy entrepreneurs looking to expand into geothermal energy. The Department of Energy's (DOE) GeoBridge serves to bring these communities together by acting as a single, publicly accessible, searchable portal that facilitates easy access to available geothermal knowledge and information. It works to expand and diversify the pool of geothermal stakeholders by providing in-roads to geothermal information and community resources. It helps build a stronger geothermal community; one inclusive of individuals and groups from a variety of different backgrounds, including potential investors and start-up companies looking to accelerate innovation in geothermal technologies. By linking communities to geothermal information, analysis and expertise, GeoBridge serves as a launch point, directing interested parties to existing data and tools, events, educational resources, STEM programs, permitting and regulatory information, and other resources that can be used to evaluate, promote, and discover geothermal opportunities.

access↗

Reactors Section Presentation - INL, HPS Society 2025

The ongoing Nuclear Renaissance includes many next generation reactor designs and testing, this means translates to increased demand for Health Physicists. These opportunities are not limited to just reactors but the entire fuel cycle from mining and extraction from existing tailings, R&D support efforts at new start-up companies, to shielding modeling and design, to Recycling and Reprocessing, and eventually Decommissioning.

Health Physics↗

Development of Biological and Electrochemical Technologies for the Clean Extraction of Copper and Critical Materials from Low Grade Ores

As we transition toward renewable energy resources and electrification, there will be an increasing demand for critical materials, including copper. While copper is currently mined in the US, processing capacity is not sufficient, and intermediate mining products are shipped to Asia for further processing. The goal of this research was to develop a transformative hydrometallurgical process for the production of copper from low-grade ores that would eliminate the need for smelting and would increase the domestic processing capacity in the US, The project initially focused on the electrochemical reduction of copper concentrate using vanadium, followed by the biological oxidation to produce a stream compatible with existing solvent extraction and electrowinning operations. We discovered an efficient electrochemical process that could produce copper salts from concentrate without the need for biological oxidation, and this technology has been licensed and spun-off into a start-up company. The microbes involved in the current state-of-the-art bioleaching processes were genetically modified to introduced a number of new traits, including increased sulfur oxidation, salt-tolerance, and binding of other critical metals such as cobalt, molybdenum, rhenium, and the rare earth elements. The project was extended to also explore the electrochemical oxidation of copper concentrate using cerium which would potentially eliminate production of hydrogen sulfide that occurs with the reductive leaching process. This technology was found to have slower kinetics, however could it still be developed as an alternative process for domestic copper production and has been found to be applicable to other critical minerals.

42 ENGINEERING↗

Initial steady-state core simulation capability or thermal and pool-type molten salt reactors, coupling reactor physics, thermal-hydraulics, and evolving chemistry

This report presents the development and validation of an initial steady-state multiphysics capability for molten salt reactors (MSRs) under the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program in Fiscal Year 2025. The framework integrates neutronics, thermal-hydraulics, species transport, and thermochemistry to capture the coupled dynamics of liquid-fueled systems. Implementation and testing were performed on two representative designs: the Molten Salt Reactor Experiment (MSRE), a thermal-spectrum, channeled-flow reactor, and the Lotus Molten Salt Reactor (L-MSR), a fast-spectrum, pool-type reactor. The modeling suite employs Griffin for reactor physics and depletion, Pronghorn and SAM for thermal-hydraulics, Thermochimica for chemistry, and Saline for thermophysical properties, with benchmarking and validation carried out against historical MSRE data, experimental flow-loop measurements, and reference depletion calculations from Monte Carlo codes. The framework demonstrated the ability to reproduce key reactor behaviors including temperature feedback, reactivity losses, delayed neutron precursor transport, xenon poisoning, and redox potential evolution. The results confirm the feasibility and accuracy of the coupled models in predicting steady-state and selected transient MSR behaviors. This latter ones are used in this report as a proxy indicating that the steady-state models from which the transient starts are accurate. For MSRE, validation showed good agreement with pump start-up and natural circulation tests, while for the L-MSR, benchmarking confirmed hydraulic calibration and consistency of neutronics–thermal coupling. The tools also provided new insights into species transport, noble metal deposition, and salt solidification dynamics. On the Xenon transport front, the code is validated against the steady state Xenon poisoining measurement and showed good agreement with the experimental value. Identified areas for future work include advanced void transport modeling, three-dimensional simulations, improved alloy corrosion models, and tighter integration with high-fidelity Monte Carlo codes. These developments provide a foundation for high-fidelity MSR simulations that can support reactor design optimization, safety assessments, and long-term operational strategies.

42 - ENGINEERING↗

Dynamic Instructions for Lock-out Tag-out

Lock-out tag-out (LOTO) instructions protect personnel from unex-pected re-energization or start-up of equipment that is under maintenance. Even though there is rigorous training associated with LOTO activities, incidents still occur. Idaho National Laboratory is researching and developing dynamic LOTO instructions, which supports automatic place keeping, personnel working on mul-tiple instructions, and multiple work groups completing the same instructions. Researchers identified user needs through subject matter expert interviews, ob-servations, and classroom training. Failing to identify potential hazards during LOTO can cause injury or death to personnel. Dynamic instructions help to guide the user seamlessly through the instructions. Combining planning and record keeping may lead to clearer, more applicable instructions which addresses the reason for compliance issues with current paper-based procedures.

99 - GENERAL AND MISCELLANEOUS↗

ECAR-8823 Rev 0 Structural Evaluation of the MARVEL Support Frame in Dry Critical Configuration

The purpose of this ECAR is to structurally evaluate the MARVEL reactor support frame during the dry critical (DryCrit) start-up testing. The ECAR includes evaluation of the DryCrit configuration for tip-over of the frame during a seismic event, floor loading of the frame on the MFC-720 (TREAT) operating floor, stress analysis of the adapter ring, and stress analysis of the frame itself for gravity and seismic loads.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Spatially resolved degradation during startup and shutdown in polymer electrolyte membrane fuel cell operation

Polymer electrolyte membrane fuel cells have durability limitations associated with the startup and shutdown of the fuel cell, which is critical for real-world vehicle commercialization. During startup or shutdown, there exists an active region (hydrogen/air) and a passive region (air/air) between the cell inlet and outlet. Internal currents are generated in the passive region causing high-potential excursion in the cathode leading to accelerated carbon corrosion. In this study, a segmented cathode hardware is used to evaluate the effect of platinum loading on both cathode and anode, and carbon support material on degradation due to repeated series of startups or shutdowns. Here, in situ losses in the performance and electrochemical surface area were measured spatially, and ex situ analysis of the catalyst layer thickness and platinum particle size was performed to understand the effect of startup or shutdown on different membrane electrode assembly materials. Startup degrades the region near anode outlet more, while shutdown degrades the region near anode inlet more compared to the rest of the electrode. While various system mitigation strategies have been reported in the literature to limit this degradation, one materials mitigation strategy is to limit the anode's ability to reduce oxygen to water through increasing the ratio of platinum loading in the cathode to the anode, or by using a bi-functional catalyst.

25 ENERGY STORAGE↗

Understanding the electromagnetic topology during the ohmic breakdown in tokamaks considering self-generated electric fields

We report that the physical mechanisms of the ohmic breakdown in a tokamak have been understood based on the classical Townsend avalanche theory. However, a new systematic theory (Yoo et al 2018 Nat. Commun.9 3523) recently demonstrated that electron avalanches during the ohmic breakdown are completely different from the Townsend avalanche due to strong self-generated electric fields. In this study, we elucidate the multi-dimensional effects of the self-generated electric field on plasma dynamics during the ohmic breakdown. We also propose a novel electromagnetic topology analysis method that can easily predict the overall plasma behavior and where the main plasma is generated. The topology analysis method is validated by a state-of-art particle simulation for various magnetic configurations. New physical insights into the complex electromagnetic topology would facilitate designing more reliable and optimized ohmic breakdown scenarios in future tokamaks, such as ITER and beyond.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A Station-hybrid HVDC System Structure and Control Strategies for Cross-seam Power Transmission

Cross-seam high voltage DC (HVDC) transmission in the United States can provide an efficient and flexible bulk power delivery highway between the interconnections. Recent studies have shown significant economic benefits of cross-seam HVDC transmission systems by taking the advantages of load diversity, frequency response, renewable energy diversity, and energy arbitrage in the different interconnections. This paper introduces a station-hybrid system scheme for cross-seam interconnections. Here, the proposed station-hybrid system combines the advantages of line commutated converter (LCC) and voltage source converter (VSC) technologies, thus enabling reliable and flexible bidirectional power flows across the interconnections. Control strategies of the station-hybrid system are investigated with a focus on power flow reversal control under normal operation conditions and grid support control under emergency conditions. The feasibility and effectiveness of the proposed station-hybrid system and corresponding control strategies are verified by simulations in PSCAD/EMTDC.

Station-hybrid system↗

Reduced Model for Direct Induction Startup Scenario Development on MAST-U and NSTX-U

A reduced semi-empirical model using time-dependent axisymmetric vacuum field calculations is used to develop the prefill and feed-forward coil current targets required for reliable direct induction (DI) startup on the new MA-class spherical tokamaks, MAST-U and NSTX-U. The calculations are constrained by operational limits unique to each device, such as the geometry of the conductive elements and active coils, power supply specifications and coil heating and stress limits. The calculations are also constrained by semi-empirical models for sufficient breakdown, current drive, equilibrium and stability of the plasma developed from a shared database. A large database of DI startup on NSTX and NSTX-U is leveraged to quantify the requirements for achieving a reliable breakdown (Ip ~ 20 kA). It is observed that without pre-ionization, STs access the large E/P regime at modest loop voltage (Vloop) where the electrons in the weakly ionized plasma are continually accelerating along the open field lines. This ensures a rapid (order millisecond) breakdown of the neutral gas, even without pre-ionization or high-quality field nulls. The timescale of the initial increase in Ip on NSTX is reproduced in the reduced model provided a mechanism for impeding the applied electric field is included. Most discharges that fail in the startup phase are due to an inconsistency in the evolution of the plasma current (Ip) and equilibrium field or loss of vertical stability during the burn-through phase. The requirements for the self-consistent evolution of the fields in the weakly and full-ionized plasma states are derived from demonstrated DI startup on NSTX, NSTX-U and MAST. The predictive calculations completed for MAST-U and NSTX-U illustrate that the maximum Ip ramp rate (dIp/dt) in the early startup phase is limited by the voltage limits on the poloidal field coils on MAST-U and passive vertical stability on NSTX-U.

Direct induction↗