Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “START Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Shuttle cryogenic supply system optimization study. Volume 5A-2: Users manual for Space shuttle orbit injection system analysis (SOPSA)

SOPSA (Shuttle Orbit Injection Propulsion System Analysis) is a computer program to aid in the preliminary design of propellant feed systems for the space shuttle orbiter main engines. The primary purpose of the program is to evaluate propellant tank ullage pressure requirements imposed by the need to accelerate propellants rapidly during the engine start sequence. These requirements can influence the system design for a given engine as well as the suitability of a given system for use with different engines. During the vehicle design phase, the SOPSA program is used to establish feed system weight variations as a function of nominal line diameter and component and line configurations. The weight data are used in conjunction with pertinent cost data to establish optimum feed system designs.

Source record↗

Lessons Learned from Shuttle Payload Verification Loads Analysis

When a system experiences a loading environment characterized by rapidly varying forces, such as a rocket launch, a transient analysis is used to analyze the response of the system. The most common transient analysis methodology is the Coupled Loads Analysis (CLA). CLAs are used by the automotive and aerospace industry to analyze cars, trucks, planes, helicopters, spacecraft, etc. The Space Shuttle program also uses the CLA methodology to assess the compatibility of the payload with the Orbiter and the flight environment. The Space Shuttle Verification Loads Analysis (VLA) was a standardized process that started between ten and thirteen months prior to launch, and included several meetings as well as analysis by both the Shuttle Program and the payload developers. Over the course of the Space Shuttle Program, many improvements were made to the process which helped to reduce cycle time and improve manifest flexibility. There were also several issues which were never properly addressed, but a work-around would be developed to keep the process flowing. The lessons learned included automation of some processes and standardization of others, early assessments, improved documentation and better coordination with all stakeholders in the process. Lessons learned also included the limitations in the current process, and what needs to be planned for in the future to avoid the same issues.

Bruno, Erica↗

Intelligent Engine Systems Work Element 1.3: Sub System Health Management

The objectives of this program were to develop health monitoring systems and physics-based fault detection models for engine sub-systems including the start, lubrication, and fuel. These models will ultimately be used to provide more effective sub-system fault identification and isolation to reduce engine maintenance costs and engine down-time. Additionally, the bearing sub-system health is addressed in this program through identification of sensing requirements, a review of available technologies and a demonstration of a demonstration of a conceptual monitoring system for a differential roller bearing. This report is divided into four sections; one for each of the subtasks. The start system subtask is documented in section 2.0, the oil system is covered in section 3.0, bearing in section 4.0, and the fuel system is presented in section 5.0.

Ashby, Malcolm↗

Recovery of sounding rocket payloads by center-of-gravity position control.

A computerized procedure has been developed to predict dynamic pressure at parachute deployment altitude. Inputs to the program are payload geometry, center-of-gravity position, velocity, and altitude at start of reentry. Payload is assumed to be trimmed, and potential and cross-flow drag theory is used to compute trim angle-of-attack and trim drag coefficient as a function of free-stream Mach number. The computations involve only simple geometric quantities and closed-form equations. Payload flight path is assumed to be vertical, and equations of motion of the payload are integrated from start of reentry to chute deployment altitude.

Mcgarvey, J. F.↗

Geochemical data synthesis and analysis

Data obtained at the Goddard Flight Center were collected for the purpose of completing analyses started at Goddard in order to maximize the scientific yield of the geochemistry program which was terminated in 1977. The major analytical task undertaken was to complete Gd analyses on a large number of samples already analyzed by mass spectrometry for other rare earth element abundances at Goddard. Gd values are important for pinning down the central part of the geochemically significant rare earth abundance pattern and are especially useful in the high precision definition of the utilitarian Eu anomaly. Isotope-dilution Gd abundances were obtained for 39 samples. The data are for 27 partition-coefficient samples, six Apollo 15 and 16 breccia samples, four terrestrial impactities, and associated rock standards.

Philpotts, J. A.↗

Simplified power supplies for ion thrusters

A program addressing less complex and potentially lower cost ion thruster systems has been started at the NASA Lewis Research Center. This paper discusses the initial development and demonstration of power supplies with an order of magnitude reduction in parts count, leading to increased reliability at lower weight, while still maintaining thrust system performance. Two new self-regulating keeper power supply circuits were developed and tested. One supply comprises 14 parts and uses an input voltage range of 18 to 36 volts, the other operates from 200 to 400 volts and requires 22 components. A new technique for controlling heater power is also demonstrated.

Gruber, R. P.↗

Methods for design and evaluation of parallel computating systems (The PISCES project)

The PISCES project started in 1984 under the sponsorship of the NASA Computational Structural Mechanics (CSM) program. A PISCES 1 programming environment and parallel FORTRAN were implemented in 1984 for the DEC VAX (using UNIX processes to simulate parallel processes). This system was used for experimentation with parallel programs for scientific applications and AI (dynamic scene analysis) applications. PISCES 1 was ported to a network of Apollo workstations by N. Fitzgerald.

Pratt, Terrence W.↗

Derivation of sorting programs

Program synthesis for critical applications has become a viable alternative to program verification. Nested resolution and its extension are used to synthesize a set of sorting programs from their first order logic specifications. A set of sorting programs, such as, naive sort, merge sort, and insertion sort, were successfully synthesized starting from the same set of specifications.

Varghese, Joseph↗

Cesium and rubidium frequency standards status and performance on the GPS program

This paper is an update of the on-orbit operational performance of the frequency standards on the Block I GPS 8 to 11 Navstar satellites, the Block II GPS 13 to 21 Navstar satellites and the Block IIA GPS 22 to 40 Navstar satellites. A brief history of the frequency standards depicting improvements incorporated in the GPS Program with corresponding results will be presented. The frequency standards configurations from the start to the present, including the various Block IIA clock configurations will be discussed. Topics such as clock observations and long term trending analysis which could enhance on-orbit performance analysis will be covered.

Vanmelle, M. J.↗

The GSFC Combined Approach of ODC Stockpiling and Tribological Testing to Mitigate the Risks of ODC Elimination

In response to the elimination of production of several Ozone Depleting Chemicals (ODC's) which have been widely used in successful space flight mechanism cleaning and lubricating procedures, GSFC developed and implemented an overall philosophy of mitigating the risks to flight hardware during the transition phase to ODC-free cleaning procedures. The short term leg of the philosophy was the stockpiling of an appropriate amount of ODC solvents such that all short term GSFC missions will be able to stay with or revert to heritage cleaning and lubricating procedures in the face of life issues. The long-term leg of that philosophy was the initiation of a several tier testing program that will deliver increasing amounts of information over the next few years, starting with accelerated lubricant life tests that compare lubricant life on surfaces cleaned with ODC solvents with lubricant life on surfaces cleaned with ODC-free solvents. While tribological testing, mechanism life testing and space-flight experience will ultimately bring us into the 21st century with environmentally friendly means of cleaning long-life precision mechanism components, many satellites will be launched over the next few years before a number of important tribological questions can be answered. In order to prepare for this challenge, the Materials Engineering Branch in cooperation with the Electromechanical Branch launched an intensive review of all ongoing missions. The failure risk was determined for each long-life lubricated mechanism based on a number of parameters, including 4 comparison of flight solvents used to clean the heritage/life test hardware. Also studied was the ability of the mechanism manufacturers to stockpile ODC's based on state laws and company policies. A stockpiling strategy was constructed based on this information and subsequently implemented. This paper provides an overview of the GSFC ODC elimination risk mitigation philosophy as well as a detailed examination of the development of the ODC stockpiling plan.

Predmore, Roamer↗

The GSFC Combined Approach of ODC Stockpiling and Tribological Testing to Mitigate the Risks of ODC Elimination

In response to the elimination of production of several Ozone Depleting Chemicals (ODCs) which have been widely used in successful space flight mechanism cleaning and lubricating procedures, GSFC developed and implemented an overall philosophy of mitigating the risks to flight hardware during the transition phase to ODC-Free cleaning procedures. One leg of that philosophy is the initiation of a several tier testing program which will deliver increasing amounts of information over the next few years, starting with original surface analysis comparisons between ODC and various ODC-Free cleaning technologies. The other leg is the stockpiling of an appropriate amount of ODC solvents such that all short term GSFC missions will be able to stay with or revert to heritage cleaning and lubricating procedures in the face of life issues. While tribological testing, mechanism life testing and space-flight experience will ultimately bring us into the 21st century with environmentally friendly means of cleaning long-life precision mechanism components, many satellites will be launched over the next few years with a number of important tribological questions unanswered. In order to prepare for this challenge, the Materials Engineering Branch in cooperation with the Electromechanical Branch launched an intensive review of all ongoing missions. The failure risk was determined for each long-life mechanism based on a number of parameters, including a comparison of flight solvents used to clean the heritage/life test hardware. Also studied was the ability of the mechanism manufacturers to stockpile ODCs based on state laws and company policies. A stockpiling strategy was constructed based on this information and subsequently implemented. This paper provides an overview of the GSFC ODC elimination risk mitigation philosophy as well as a detailed examination of the development of the ODC stockpiling plan.

Predmore, Roamer↗

Equipment Failure Analysis

Tennessee Eastman uses NASTRAN to minimize lost production by pinpointing the causes of equipment failures and preventing recurrences. An example of the program's utility involves a large centrifugal fan which developed cracks during start-ups and shutdowns. This information prompted redesign of the fan. Tennessee Eastman has made extensive use of NASTRAN, both as failure analysis tool and as an aid in redesigning production hardware.

Source record↗

GUST LAT Multiwavelength Planning

Because gamma-ray astrophysics profits in powerful ways from multi-wavelength studies, the GLAST Large Area Telescope (LAT) Collaboration has started multiwavelength planning well before the scheduled 2007 launch. Many aspects of this program are of direct interest to observers using VERITAS and other atmospheric Cerenkov telescopes, whose capabilities complement those of GLAST. This talk with describe some of the current developmental concepts for GLAST LAT multiwavelength work, including release of data for transient sources, nearly-continuous monitoring of selected time-variable sources, pulsar timing, follow-on observations for source identification, coordinated blazar campaigns, and cross-calibration with other high-energy telescopes. Although few details are firm at this stage of preparation for GLAST, the LAT Collaboration looks forward to cooperation with a broad cross-section of the multiwave-length community. The GLAST Large Area Telescope is an international effort, with U.S. funding provided by the Department of Energy and NASA.

Thompson, D. J.↗

Human Rating Requirements for NASA's Constellation Program

NASA s Constellation Program (CxP) will conduct a series of human space expeditions of increasing scope, starting with missions supporting the International Space Station and expanding to encompass the Moon and Mars. Although human-rating is an integral part of all CxP activities throughout their life cycle, NASA Procedural Requirements document NPR 8705.2B, Human-Rating Requirements (HRR) for Space Flight Systems, defines the additional processes, procedures, and requirements necessary to produce human-rated space systems that protect the safety of crew members and passengers on these NASA missions. In order to be in compliance with 8705.2B the CxP must show appropriate implementation or progression toward the HRR, or justification for an exception. Compliance includes an explanation of how the CxP intends to meet the HRR, analyses to be performed to determine implementation; and a matrix to trace the HRR to CxP requirements. The HRR requires the CxP to establish a human system integration team (HSIT), consisting of astronauts, mission operations personnel, training personnel, ground processing personnel, human factors personnel, and human engineering experts, with clearly defined authority, responsibility, and accountability to lead the human-system integration. For example, per the HRR the HSIT is involved in the evaluation of crew workload, human-in-the-loop usability evaluations, determining associated criteria, and in assessment of how these activities influenced system design. In essence, the HSIT is invaluable in CxP s ability to meet the three fundamental tenets of human rating: the process of designing, evaluating, and assuring that the total system can safely conduct the required human missions; the incorporation of design features and capabilities that accommodate human interaction with the system to enhance overall safety and mission success; and the incorporation of design features and capabilities to enable safe recovery of the crew from hazardous situations.

Berdich, Debbie↗

Developing Ultra Reliable Life Support for the Moon and Mars

Recycling life support systems can achieve ultra reliability by using spares to replace failed components. The added mass for spares is approximately equal to the original system mass, provided the original system reliability is not very low. Acceptable reliability can be achieved for the space shuttle and space station by preventive maintenance and by replacing failed units, However, this maintenance and repair depends on a logistics supply chain that provides the needed spares. The Mars mission must take all the needed spares at launch. The Mars mission also must achieve ultra reliability, a very low failure rate per hour, since it requires years rather than weeks and cannot be cut short if a failure occurs. Also, the Mars mission has a much higher mass launch cost per kilogram than shuttle or station. Achieving ultra reliable space life support with acceptable mass will require a well-planned and extensive development effort. Analysis must define the reliability requirement and allocate it to subsystems and components. Technologies, components, and materials must be designed and selected for high reliability. Extensive testing is needed to ascertain very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The systems must be designed, produced, integrated, and tested without impairing system reliability. Maintenance and failed unit replacement should not introduce any additional probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass must start soon if it is to produce timely results for the moon and Mars.

Jones, Harry W.↗

Geolab 2010: Desert Rats Field Demonstration

In 2010, Desert Research and Technology Studies (Desert RATS), NASA's annual field exercise designed to test spacesuit and rover technologies, will include a first generation lunar habitat facility, the Habitat Demonstration Unit (HDU). The habitat will participate in joint operations in northern Arizona with the Lunar Electric Rover (LER) and will be used as a multi-use laboratory and working space. A Geology Laboratory or GeoLab is included in the HDU design. Historically, science participation in Desert RATS exercises has supported the technology demonstrations with geological traverse activities that are consistent with preliminary concepts for lunar surface science Extravehicular Activities (EVAs). Next year s HDU demonstration is a starting point to guide the development of requirements for the Lunar Surface Systems Program and test initial operational concepts for an early lunar excursion habitat that would follow geological traverses along with the LER. For the GeoLab, these objectives are specifically applied to support future geological surface science activities. The goal of our GeoLab is to enhance geological science returns with the infrastructure that supports preliminary examination, early analytical characterization of key samples, and high-grading lunar samples for return to Earth [1, 2] . Figure 1: Inside view schematic of the GeoLab a 1/8 section of the HDU, including a glovebox for handling and examining geological samples. Other outfitting facilities are not depicted in this figure. GeoLab Description: The centerpiece of the GeoLab is a glovebox, allowing for samples to be brought into the habitat in a protected environment for preliminary examination (see Fig. 1). The glovebox will be attached to the habitat bulkhead and contain three sample pass-through antechambers that would allow direct transfer of samples from outside the HDU to inside the glovebox. We will evaluate the need for redundant chambers, and other uses for the glovebox antechambers, such as a staging area for additional tools or samples. The sides of the glovebox are designed with instrument ports and additional smaller ports for cable pass-through, imagery feeds and environmental monitoring. This first glovebox version will be equipped with basic tools for manipulating, viewing, and early analysis of samples. The GeoLab was also designed for testing additional analytical instruments in a field setting.

Evans, Cindy A.↗

Geolab in NASA's First Generation Pressurized Excursion Module: Operational Concepts

We are building a prototype laboratory for preliminary examination of geological samples to be integrated into a first generation Habitat Demonstration Unit-1/Pressurized Excursion Module (HDU1-PEM) in 2010. The laboratory GeoLab will be equipped with a glovebox for handling samples, and a suite of instruments for collecting preliminary data to help characterize those samples. The GeoLab and the HDU1-PEM will be tested for the first time as part of the 2010 Desert Research and Technology Studies (DRATS), NASAs annual field exercise designed to test analog mission technologies. The HDU1-PEM and GeoLab will participate in joint operations in northern Arizona with two Lunar Electric Rovers (LER) and the DRATS science team. Historically, science participation in DRATS exercises has supported the technology demonstrations with geological traverse activities that are consistent with preliminary concepts for lunar surface science Extravehicular Activities (EVAs). Next years HDU1-PEM demonstration is a starting point to guide the development of requirements for the Lunar Surface Systems Program and test initial operational concepts for an early lunar excursion habitat that would follow geological traverses along with the LER. For the GeoLab, these objectives are specifically applied to enable future geological surface science activities. The goal of our GeoLab is to enhance geological science returns with the infrastructure that supports preliminary examination, early analytical characterization of key samples, insight into special considerations for curation, and data for prioritization of lunar samples for return to Earth.

Evans, C. A.↗

Ultra Reliable Closed Loop Life Support for Long Space Missions

Spacecraft human life support systems can achieve ultra reliability by providing sufficient spares to replace all failed components. The additional mass of spares for ultra reliability is approximately equal to the original system mass, provided that the original system reliability is not too low. Acceptable reliability can be achieved for the Space Shuttle and Space Station by preventive maintenance and by replacing failed units. However, on-demand maintenance and repair requires a logistics supply chain in place to provide the needed spares. In contrast, a Mars or other long space mission must take along all the needed spares, since resupply is not possible. Long missions must achieve ultra reliability, a very low failure rate per hour, since they will take years rather than weeks and cannot be cut short if a failure occurs. Also, distant missions have a much higher mass launch cost per kilogram than near-Earth missions. Achieving ultra reliable spacecraft life support systems with acceptable mass will require a well-planned and extensive development effort. Analysis must determine the reliability requirement and allocate it to subsystems and components. Ultra reliability requires reducing the intrinsic failure causes, providing spares to replace failed components and having "graceful" failure modes. Technologies, components, and materials must be selected and designed for high reliability. Long duration testing is needed to confirm very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The system must be designed, developed, integrated, and tested with system reliability in mind. Maintenance and reparability of failed units must not add to the probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass should start soon since it must be a long term effort.

Jones, Harry W.↗