Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SARS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

SARS-CoV-2 transmission control in California correctional facilities

LBNL provided technical assistance to the CalPROTECT project, which is a collaboration between the University of California, Berkeley and the University of California, San Francisco. The CalPORTECT team provided support and guidance to the California Department of Corrections and Rehabilitation (CDCR) and the California Correctional Health Care Services (CCHCS) in their response to the COVID-19 pandemic. The CalPROTECT team provided recommendations to mitigate the risk posed to the residents and staff who live and work in CDCR prisons through considering scientific knowledge of the virus, analyzing anonymized resident and staff level data from CCHCS, evaluation of statewide and institution-level policies, and data collection during site visits to CDCR prisons during the pandemic.

59 BASIC BIOLOGICAL SCIENCES↗

C-NR Sars-Cov-2 (Covid-19) Timeline

At the onset of the pandemic, then C-NR Group Leader, Felicia Taw, asked Roger A. Meade to compile a timeline of covid events. The following entries are announcements, statements, and email messages from the World Health Organization, the LANL homepage, LANL managers and by C Division manager and staff. Although the entries have been slightly edited and streamlined to enhance readability, they retain many of the original markings.

99 GENERAL AND MISCELLANEOUS↗

Standard Analysis Report INV-SAR-79, Revision 0 Chemical and Cement Components 2023 Inventory Estimates

This standard analysis report provides the estimates for the chemical (oxyanions and complexing agents) and cement components with a data collection cut-off date of December 31, 2023. These estimates will be included in a Performance Assessment Inventory Report developed for the U.S. Department of Energy (DOE) performance assessment (PA) for the 2026 Compliance Recertification Application (CRA).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Standard Analysis Report INV-SAR-81, Revision 0 Chemical and Cement Components 2023 Inventory Estimates for the Interim State Performance Assessment of the Waste Isolation Pilot Plant

This standard analysis report provides the estimates for the chemical (oxyanions and complexing agents) and cement components with a data collection cut-off date of December 31, 2023. These estimates will be included in a Performance Assessment Inventory Report developed for the U.S. Department of Energy (DOE) interim state repository configuration performance assessment (PA) for the 2026 Compliance Recertification Application (CRA).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Orbiting Lunar Ground Penetrating Radar SAR Feasibility

This report aims to answer the question: “Will ground penetrating radar (GPR) be able to measure lunar subsurface resources from a 10km or above orbit?” Similarly, “Could a reasonable satellite-based system achieve the radar parameters required for lunar orbital GPR?” This report is not proposing a system but exploring if one is possible.

47 OTHER INSTRUMENTATION↗

Prevalence of SARS-CoV-2 Antibodies after First 6 Months of COVID-19 Pandemic, Portugal

In September 2020, we tested 13,398 persons in Portugal for antibodies against severe acute respiratory syndrome coronavirus 2 by using a quota sample stratified by age and population density. We found a seroprevalence of 2.2%, 3–4 times larger than the official number of cases at the end of the first wave of the pandemic.

60 APPLIED LIFE SCIENCES↗