Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RISK ASSESSMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Adverse Outcome Pathways and Ecological Risk Assessment: Bridging to Population-Level Effects

The viability of populations of plants and animals is a key focus for environmental regulation. Population-level responses integrate the cumulative effects of chemical stressors on individuals as those individuals interact with and are affected by their con-specifics, competitors, predators, prey, habitat and other biotic and abiotic factors. Models of population-level effects of contaminants can integrate information from lower levels of biological organization and feed that information into higher-level community and ecosystem models. As individual-level endpoints are utilized to predict population responses, this requires that biological responses at lower levels of organization be translated into a form that is useable by the population modeler. In this paper we describe how mechanistic data, as captured in adverse outcome pathways, can be translated into modeling focused on population-level risk assessments. First, we present a succinct overview of different approaches to population modeling, and discuss the types of data needed for these models. Then we discuss how toxicity data are used currently for population modeling, and provide recommendations as to how testing might be modified to better generate information to support modeling. From this we describe how different key processes measured at the level of the individual serve as the bridge between mechanistic toxicology data and predictions of population status, and provide case examples of how this linkage has been/can be achieved.

54 ENVIRONMENTAL SCIENCES↗

Risk-Assessment for Equipment Operating on the Lunar Surface

Particle-size distribution of lunar dust simulant is evaluated using scanning electron spectroscopy in order to consider approaches to evaluating risk to individual mechanical components operating on the lunar surface. Assessing component risk and risk-mitigation during actual operations will require noninvasive continuous data gathering on numerous parameters. Those data sets would best be evaluated using data-mining algorithms to assess risk, and recovery from risk, of individual mechanical components in real-time.

Richmond, R. C.↗

County-Level Climate Uncertainty for Risk Assessments: Volume 1.

This report uses the CMIP5 series of climate model simulations to produce country- level uncertainty distributions for use in socioeconomic risk assessments of climate change impacts. It provides appropriate probability distributions, by month, for 169 countries and autonomous-areas on temperature, precipitation, maximum temperature, maximum wind speed, humidity, runoff, soil moisture and evaporation for the historical period (1976-2005), and for decadal time periods to 2100. It also provides historical and future distributions for the Arctic region on ice concentration, ice thickness, age of ice, and ice ridging in 15-degree longitude arc segments from the Arctic Circle to 80 degrees latitude, plus two polar semicircular regions from 80 to 90 degrees latitude. The uncertainty is meant to describe the lack of knowledge rather than imprecision in the physical simulation because the emphasis is on unfalsified risk and its use to determine potential socioeconomic impacts. The full report is contained in 27 volumes.

54 ENVIRONMENTAL SCIENCES↗

Development of Risk Assessment Matrix for NASA Engineering and Safety Center

This paper describes a study, which had as its principal goal the development of a sufficiently detailed 5 x 5 Risk Matrix Scorecard. The purpose of this scorecard is to outline the criteria by which technical issues can be qualitatively and initially prioritized. The tool using this score card has been proposed to be one of the information resources the NASA Engineering and Safety Center (NESC) takes into consideration when making decisions with respect to incoming information on safety concerns across the entire NASA agency. The contents of this paper discuss in detail each element of the risk matrix scorecard, definitions for those elements and the rationale behind the development of those definitions. This scorecard development was performed in parallel with the tailoring of the existing Futron Corporation Integrated Risk Management Application (IRMA) software tool. IRMA was tailored to fit NESC needs for evaluating incoming safety concerns and was renamed NESC Assessment Risk Management Application (NAFMA) which is still in developmental phase.

Malone, Roy W., Jr.↗

U.S. Nuclear Operating Experience Program for Probabilistic Risk Assessment Parameter Estimations

This presentation describes the overall process of the U.S. Nuclear Regulatory Commission (NRC)operating experience (OpE) program to estimate probabilistic risk assessment parameters, the estimations of initiating event frequencies, the component unreliability, and the quality assurance and quality control activities for the OpE program. This presentation can be used for training, workshop, or knowledge transfer purpose.

99 GENERAL AND MISCELLANEOUS↗

Survey on the micro-pollutants presence in surface water system of northern Serbia and environmental and health risk assessment

Highlights: • First survey on the occurrence of 940 substances in the middle part of the Danube Basin. • Micro-pollutants from canals water had higher abundance of contaminants that from river. • High level of sterols indicated dominant effect of untreated domestic wastewater. • Correlations among the groups of micro-pollutants indicated their common origin. • Ecological risk suggesting a potential for adverse effects on fish. This study demonstrates the occurrence of 940 organic micro-pollutants in surface water of four rivers, one irrigation canal system, and two lakes in Vojvodina Province, the northern part of Serbia, summing in total eighteen samples. The number of detected chemicals ranged from 22 to 84, with 127 micro-pollutants detected at least once, representing 13% of the studied substances. The targeted compounds include n-alkanes, sterols, polycyclic aromatic hydrocarbons (PAHs), organochlorine pesticides polychlorinated biphenyls, pesticides, pharmaceutical active compounds, industrial chemicals, plasticizers, etc. Among the analysed compounds, sterols were the most dominant with maximum quantified concentrations. The substances which were quantified with frequency over 50% were two PAHs (2-methylnaphthalene, benzo(ghi)perylene), five sterols (cholesterol, cholestanol, stigmasterol, fucosterol, beta-sitosterol), three pharmaceuticals and personal care products (L-menthol, diethyltoluamide, caffeine), and ten household chemicals (4-tert-octylphenol, dimethyl phthalate, methyl palmitate, phenylethyl alcohol, 1-nonanol, alpha-terpineol, 2-phenoxy-ethanol, methyl myristate, acetophenone, and 2-ethyl-1-hexanol). The list of priority substances under the European Union Directive 2013/39/EU includes 49 priority substances (PSs) out of which 34 were analysed. Among these, eleven PSs were quantified, and only two compounds (fluoranthene and benzo (a) pyrene) exceeded EU Environmental Quality Standards targeted values. The obtained results were compared with the previously published data that dealt with the same targeted number of micro-pollutants in sediment samples. This revealed connections between the same sampling locations. Environmental risk assessment showed the existence of potential ecological risk as 72% of the obtained values for the ecological hazard index (HI) at investigated locations were higher that the targeted value (HI > 1). Estimated values for hazard quotient (HQ) and hazard index (HI) for non-carcinogenic risk were lower than the targeted value, indicating no non-carcinogenic risk through dermal contact and non-intentional ingestion of water. Estimated values for cancer risk were all below 1 × 10{sup −6}, which is not considered to pose significant human health risk.

54 ENVIRONMENTAL SCIENCES↗

Dynamic Positioning System (DPS) Risk Analysis Using Probabilistic Risk Assessment (PRA)

The National Aeronautics and Space Administration (NASA) Safety & Mission Assurance (S&MA) directorate at the Johnson Space Center (JSC) has applied its knowledge and experience with Probabilistic Risk Assessment (PRA) to projects in industries ranging from spacecraft to nuclear power plants. PRA is a comprehensive and structured process for analyzing risk in complex engineered systems and/or processes. The PRA process enables the user to identify potential risk contributors such as, hardware and software failure, human error, and external events. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. This paper provides an overview of the PRA process and demonstrates how this process was applied in estimating the probability that a Mobile Offshore Drilling Unit (MODU) operating in the Gulf of Mexico and equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. The PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.

Thigpen, Eric B.↗

Dynamic Positioning System (DPS) Risk Analysis Using Probabilistic Risk Assessment (PRA)

The National Aeronautics and Space Administration (NASA) Safety & Mission Assurance (S&MA) directorate at the Johnson Space Center (JSC) has applied its knowledge and experience with Probabilistic Risk Assessment (PRA) to projects in industries ranging from spacecraft to nuclear power plants. PRA is a comprehensive and structured process for analyzing risk in complex engineered systems and/or processes. The PRA process enables the user to identify potential risk contributors such as, hardware and software failure, human error, and external events. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. This paper provides an overview of the PRA process and demonstrates how this process was applied in estimating the probability that a Mobile Offshore Drilling Unit (MODU) operating in the Gulf of Mexico and equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. The PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.

Thigpen, Eric B.↗

Hydrogen Plus Other Alternative Fuels Risk Assessment Models (HyRAM+) Technical Reference Manual (V.6.0)

The HyRAM+ software is an open-source toolkit that provides publicly available models and default input values to enable straightforward and consistent safety assessments for hydrogen and other alternative fuel systems, such as natural gas and propane. The HyRAM+ quantitative risk assessment calculation incorporates annual likelihood of leaks or failures for both compressed gaseous and liquefied flammable fuels, as well as probabilistic models for the effects of heat flux and overpressure. HyRAM

08 HYDROGEN↗

Preliminary risk assessment for the Black Brant XII

In order to provide the scientific community, as well as NASA management, with a preview of typical safety restrictions for the proposed Black Brant XII sounding rocket, a risk assessment for a typical payload has been performed. This paper details the considerations which ensure minimal risk for projects managed by Wallops Flight Facility and the safety criteria required to conduct an operation. Specifically, three launch scenarios for the Black Brant XII have been considered. The first case assumes a test launch from Wallops, and the other two cases analyze typical scientific missions from Poker Flat Research Range.

Underwood, B. E.↗

Risk Assessment for Titanium Pressure Vessels Operating Inside the ARES I's Liquid Hydrogen Tank Environment

Titanium alloy (Ti-6-4) is currently being proposed for the manufacturing of pressure vessels (PV) for storage of compressed helium gas, which are mounted inside the ARES I's liquid hydrogen (LH2) tank. At cryogenic temperature, titanium alloys usually have the highest strength-to-weight ratio property and have been considered as the metallic materials of choice for lightweight PV operating in LH2 environment. Titanium PV s are also considered as heritage hardware because they have been used by NASA for the Saturn IV-B rocket s LH2 tank in the mid 1960 s. However, hydrogen embrittlement is possible if Ti-6-4 alloy is exposed to gaseous hydrogen at certain pressure and temperature during the LH2 tank filling and draining operations on the launch pad, and during the J2X engine burn period for the ARES I s upper stage. Additionally, the fracture toughness and ductility properties of Ti-6-4 are significantly decreased at cryogenic temperature. These factors do not necessary preclude the use of titanium PV in hydrogen or at cryogenic applications; however, their synergistic effects and the material damage tolerance must be accounted for in the mission life assessment for PV s, which are considered as fracture critical hardware. In this paper, an overview of the risk assessment for Ti-6-4 alloy, strategy to control hydrogen embrittlement and brief metallic material trade study for PV operating in LH2 tank will be presented.

Lee, Jonathan A.↗

County-Level Climate Uncertainty for Risk Assessments: Volume 8 Appendix G - Historical Precipitation.

This report uses the CMIP5 series of climate model simulations to produce country- level uncertainty distributions for use in socioeconomic risk assessments of climate change impacts. It provides appropriate probability distributions, by month, for 169 countries and autonomous-areas on temperature, precipitation, maximum temperature, maximum wind speed, humidity, runoff, soil moisture and evaporation for the historical period (1976-2005), and for decadal time periods to 2100. It also provides historical and future distributions for the Arctic region on ice concentration, ice thickness, age of ice, and ice ridging in 15-degree longitude arc segments from the Arctic Circle to 80 degrees latitude, plus two polar semicircular regions from 80 to 90 degrees latitude. The uncertainty is meant to describe the lack of knowledge rather than imprecision in the physical simulation because the emphasis is on unfalsified risk and its use to determine potential socioeconomic impacts. The full report is contained in 27 volumes.

54 ENVIRONMENTAL SCIENCES↗

County-Level Climate Uncertainty for Risk Assessments: Volume 10 Appendix I - Historical Evaporation.

This report uses the CMIP5 series of climate model simulations to produce country- level uncertainty distributions for use in socioeconomic risk assessments of climate change impacts. It provides appropriate probability distributions, by month, for 169 countries and autonomous-areas on temperature, precipitation, maximum temperature, maximum wind speed, humidity, runoff, soil moisture and evaporation for the historical period (1976-2005), and for decadal time periods to 2100. It also provides historical and future distributions for the Arctic region on ice concentration, ice thickness, age of ice, and ice ridging in 15-degree longitude arc segments from the Arctic Circle to 80 degrees latitude, plus two polar semicircular regions from 80 to 90 degrees latitude. The uncertainty is meant to describe the lack of knowledge rather than imprecision in the physical simulation because the emphasis is on unfalsified risk and its use to determine potential socioeconomic impacts. The full report is contained in 27 volumes.

54 ENVIRONMENTAL SCIENCES↗

County-Level Climate Uncertainty for Risk Assessments: Volume 9 Appendix H - Forecast Precipitation

This report uses the CMIP5 series of climate model simulations to produce country- level uncertainty distributions for use in socioeconomic risk assessments of climate change impacts. It provides appropriate probability distributions, by month, for 169 countries and autonomous-areas on temperature, precipitation, maximum temperature, maximum wind speed, humidity, runoff, soil moisture and evaporation for the historical period (1976-2005), and for decadal time periods to 2100. It also provides historical and future distributions for the Arctic region on ice concentration, ice thickness, age of ice, and ice ridging in 15-degree longitude arc segments from the Arctic Circle to 80 degrees latitude, plus two polar semicircular regions from 80 to 90 degrees latitude. The uncertainty is meant to describe the lack of knowledge rather than imprecision in the physical simulation because the emphasis is on unfalsified risk and its use to determine potential socioeconomic impacts. The full report is contained in 27 volumes.

54 ENVIRONMENTAL SCIENCES↗

County-Level Climate Uncertainty for Risk Assessments: Volume 11, Appendix J - Forecast Evaporation

This report uses the CMIP5 series of climate model simulations to produce country- level uncertainty distributions for use in socioeconomic risk assessments of climate change impacts. It provides appropriate probability distributions, by month, for 169 countries and autonomous-areas on temperature, precipitation, maximum temperature, maximum wind speed, humidity, runoff, soil moisture and evaporation for the historical period (1976-2005), and for decadal time periods to 2100. It also provides historical and future distributions for the Arctic region on ice concentration, ice thickness, age of ice, and ice ridging in 15-degree longitude arc segments from the Arctic Circle to 80 degrees latitude, plus two polar semicircular regions from 80 to 90 degrees latitude. The uncertainty is meant to describe the lack of knowledge rather than imprecision in the physical simulation because the emphasis is on unfalsified risk and its use to determine potential socioeconomic impacts. The full report is contained in 27 volumes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗