Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REMEDIATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Characterization and Remediation of the Hanford 618-10 Burial Ground Vertical Pipe Units - 17121

The 618-10 Burial Ground is approximately 148 m by 143 m (485 feet by 470 feet) and consists of 12 trenches and 94 Vertical Pipe Units (VPU's). It is located approximately 8.1 km (5 miles) north of Richland, Washington in the 600 Area of the Hanford Site. The 618-10 Burial Ground received low- to high-activity waste (e.g., fission products and some plutonium-contaminated waste). Most of the waste originated at the 300 Area laboratory facilities. Lower activity radioactive material and shielded drums were disposed in trenches, while laboratory wastes with higher levels of radiation were disposed in Vertical Pipe Units (VPUs). There are different variants of VPUs. Some VPUs are simply corrugated culverts or standard pipes, 36 cm (14 in.) diameter and 3.1 m to 4.6 m (10- to 15-ft) long, buried vertically. Some VPUs are carbon steel pipes 25 to 61 cm (10 to 24 in.) in diameter and up to 4.6 m (15 ft) in length. The final design of the VPUs is 56 cm (22-in) diameter, 4.4 m (14.4 ft) long waste receptacles constructed by welding five 208 L (55-gallon) bottomless drums together end-to-end and burying them vertically, separated by approximately 3.1 m (10 feet) on center in rows approximately 7.6 m (25 feet) apart. The 618-10 Burial Ground contains approximately 94 VPUs. Historical documents indicate that shielding materials (e.g., concrete or soil) may have been added to the VPUs to reduce dose rates over the openings, and that each VPU was backfilled with sand and capped with concrete at the end of its service life. Historical documents also indicate that the VPUs were covered with approximately 0.6 m (2-ft) of soil when they were closed, and an additional 0.6 m (2-ft) of topsoil was later added for surface stabilization. In general, the process for VPU remediation was as follows: - Installed four cone penetrometers (CPTs) around the exterior of each individual VPU and sent radiation detection probes down the interior of the CPTs to get initial radiation data in order to calculate the overall curie content and create maps showing the dose rate distribution throughout the VPU. - Removed the CPTs and installed a 122 cm (48-in) diameter, 1.3 cm (0.5-in) thick steel over-casing using a vibrating hammer suspended from a crane that encompassed the VPU with some surrounding soil. - Using a Bauer BG-30 drill rig with a specifically designed augur bit and a specially designed confinement system the auger process was used to stabilize and size reduce the contents. - Once the auger reached a depth of 8.5 m (28 feet) the BG-30 drill stem was separated and additional characterization was completed by sending a radiation probe down the center of the drill stem to gather radiological data. - Once auguring and characterization was completed the waste was removed using a specially designed extended clamshell retrieval bucket and placed into individual 2.7 m x 1.5 m x 1.2 m (9-ft x 5-ft x 4-ft) metal boxes. - After the waste was placed into the metal waste boxes a low strength grout was added and the grout and waste material was mixed using a large rake device attached to an excavator. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Remediation Liquid Waste Operations Making the Workplace Safer - Lean and Human Performance Improvement Initiatives - 17244

The Savannah River Site, a U.S. Department of Energy facility, contracted Savannah River Remediation (SRR) to manage its liquid waste project, which is a unique, high hazard nuclear waste treatment and disposal facility consisting of 51, one million gallon underground waste tanks, a solvent extraction processing unit, a vitrification facility for the highest radioactive waste, and a grout solidification and disposal facility for a decontaminated salt solution. Our Project mission is to treat the nuclear waste and close the associated storage and treatment facilities, of which, 8 of the 51 tanks have been closed to date. Over the past three years, SRR implemented a Lean Business Management System to address site inefficiencies, aging infrastructure concerns and budget constraints. The Lean philosophy started with the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health-care, and now the DOE complex. Like safety, continuous improvement is a fundamental core business value that starts at the top. The Lean Business System, led by our executive management team, drives quality, production and waste elimination by focusing on People using a structured Process that allows the workforce to identify and fix problems in their workplace. Many inefficiencies and quality related issues start with the desire to make systems fail-safe without defining the core requirements for which that process or program was created. This leads to added complexity and latent or inherent human performance issues embedded within our processes. While Lean can't fix all problems, a combination of strong nuclear safety culture, robust conduct of operations, active human performance improvement process, and a business practice of continuously looking for improvements leads to excellence across our industry and creates a culture that is worthy of promoting. Without strong management, our systems fail because no one sponsors or encourages those attributes we covet. Leadership starts at the top with our customer defining what provides 'value' to them, and filters down through to the organization and ultimately the workforce in day to day conduct of operations. It is imperative that our customer drives these desirable ideals through recognition and contractual requirements to encourage and support those behavioral traits that are critical to our ongoing success.This paper focuses on how the Lean Business Management System supports those attributes that we value: a strong nuclear safety culture; disciplined conduct of operations; and a culture of robust human performance and continuous improvement. These attributes in our daily work environment propel a safer, more consistent, more efficient workplace. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Remediation Liquid Waste Operations Lifecycle Savings through a Lean Business System at the Savannah River Site - 17245

Savannah River Remediation (SRR) was contracted by the U.S. Department of Energy (DOE) to manage its liquid waste project at the Savannah River Site. The liquid waste project is a unique, high hazard nuclear waste treatment and disposal facility consisting of 51 one million-gallon underground waste tanks, a solvent extraction processing unit, a vitrification facility for the highest radioactive waste, and a grout solidification and disposal facility for lower radioactive decontaminated salt solution. Our Project mission is to treat the nuclear waste and close the associated storage and treatment facilities, of which, 8 tanks have been closed to date. The Lean philosophy took root decades ago in the manufacturing sector and started with the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health-care, and now the DOE complex. At SRR, a Lean business management system was adopted to address site inefficiencies, aging infrastructure concerns and budget constraints. With yearly escalation and flat budgets, continuous improvement is taking on a larger role - improving the work accomplished for each dollar. This paper focuses on the program results achieved to date, including the lifecycle savings identified through the Rapid Improvement Event (RIE) process. The RIE process is a Lean tool which creates a cross-functional team to analyze, develop and implement improvements for a given process. DOE-EM has recently emphasized the value of contractor's continuous improvement programs through their implementation of Plan of Action and Milestone (POAM): Goal 2 (Increase Efficiency/Improve Performance) Reduce EM Operations Cost in FY16. POAM Goal 2 was a FY 16 effort to achieve 5% cost savings across most programs. This past year's cost savings initiatives will likely become a trend as DOE and its contractors look to do more with less. In support of our own business objectives, as well as, DOE's motivation to improve efficiencies, SRR has held over one hundred formal Lean events and dozens of 5S events that have driven improvement across the Project, including tank closure and production facilities. These improvements have significantly reduced the time required to process material and achieve the overall goal of hazard reduction and tank closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and Well Remediation Strategies for Improved Long-term Pump and Treat System Injection Well Performance - 17272

In June of 2012 the CH2M Hill Plateau Remediation Company completed construction of a 2,500 gallon-per-minute (gpm) pump and treat (P and T) system designed to remove technetium-99, uranium, carbon tetrachloride, trichloroethene, nitrate, and total and hexavalent chromium from incoming groundwater. The entire pump and treat system consists of the following primary components: 1) extraction wells (20+); 2) a radionuclide removal facility; 3) a biological system; 4) sludge processing; 5) vapor processing; and 6) injection wells. Overall efficiency of the 200 West P and T has been adversely impacted due to fouling in vertical injection wells where treated water is being reinjected into the subsurface. Fouling of the wells is thought to be caused by bacteria producing extracellular polymeric substances (EPS), as well as high manganese and iron in the biofilm. Due to decreased specific injectivity, all injection wells are on a maintenance schedule requiring rehabilitation. During rehabilitation, the wells are out of service affecting the overall capacity of the P and T, plus the rehabilitation process adds hundreds of thousands of dollars of cost to operate the P and T each year. Chemical and biological foulants may be coming from the P and T or are already present in the subsurface and active pumping has stimulated growth of the microbes present. Chemical and microbiological characterization efforts are in progress for the biological plant and injection well system to determine causative agents in the biofouling. P and T effluent tank samples, injection well distribution tanks, bailed samples from the fouled well, and post-rehabilitation samples were analyzed. Chemical constituents analyzed include, sulfate, phosphorus, chemical oxygen demand, total organic carbon, and iron. Microbial characterization included total heterotrophs, anaerobic heterotrophs, nitrate reducing bacteria, iron reducing bacteria and sulfate reducing bacteria. Molecular biological tools employed included 16S rRNA meta-genomes, and functional gene analysis using qPCR. Chemical analysis of the P and T effluent and injection well tanks showed the presence of ∼6.5 mg/L nitrate, 96 mg/L sulfate and phosphorus levels below 1 mg/L. Bailed samples from the injection well showed similar concentrations for each chemical, but following cleaning, TOC, total iron, manganese and other constituents were higher than prior to cleaning. These data show that bacterial nutrients and metals that may precipitate are present in the well water and are likely the causative agent in the biofouling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using ASCEM modeling and visualization to inform stakeholders of contaminant plume evolution and remediation efficacy at F-Basin Savannah river, SC - 15156

Communication with stakeholders, regulatory agencies, and the public is an essential part of implementing different remediation and monitoring activities, and developing site closure strategies at contaminated sites. Modeling of contaminant plume evolution plays a critical role in estimating the benefit, cost, and risk of particular options. At the same time, effective visualization of monitoring data and modeling results are particularly important for conveying the significance of the results and observations. In this paper, we present the results of the Advanced Simulation Capability for Environmental Management (ASCEM) project, including the discussion of the capabilities of newly developed ASCEM software package, along the its application to the F-Area Seepage Basins located in the U.S. Department of Energy Savannah River Site (SRS). ASCEM software includes state-of-the-art numerical methods for simulating complex flow and reactive transport, as well as various tool-sets such as a graphical user interface (GUI), visualization, data management, uncertainty quantification, and parameter estimation. Using this software, we have developed an advanced visualization of tritium plume migration coupled with a data management system, and simulated a three-dimensional model of flow and plume evolution on a high-performance computing platform. We evaluated the effect of engineered flow barriers on a nonreactive tritium plume, through advanced plume visualization and modeling of tritium plume migration. In addition, we developed a geochemical reaction network to describe complex geochemical processes at the site, and evaluated the impact of coupled hydrological and geochemical heterogeneity. These results are expected to support SRS's monitoring activities and operational decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applying mobile technology to data collection for environmental characterization and remediation, beyond the science - 15453

The rapid advancements of our time bring us new methods of analysis that enhance the accuracy and sensitivity of measurement, improving the science used to solve problems and meet our objectives. What is often overlooked in our industry are the technology advancements that can dramatically improve the speed, accuracy and completeness by which those data can be collected, communicated, managed and reported. In addition, in the time used to generate and collect the analytical data, the technology collects, manages and reports other process data that can be used to better manage and facilitate our business process improving efficiency and communications as well as providing the information needed to track and manage cost and schedule. Good information management practices, including the use of innovative technology solutions like mobile data collection, are the drivers for project implementation. However, experience has highlighted key success factors that will maximize the level of success and benefit realized by the project. These factors include: -A comprehensive, working knowledge of operational objectives; - Detailed, documented process and data work-flows; - Effective technology selection and/or development (right tool for the job); - Complete integration of the technology into day to day work practice accomplished through effective training and implementation planning. Once this formula is in place, and executed consistently, it can be applied to any environmental investigation and/or remediation scenario. The proof is in the calculated return on investment and captured lessons learned for each project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A paradigm shift: an introduction to structured decision making for sustainable waste management and remediation - 15649

transport of contaminants and human health risk assessment. Most often these modeling activities are carried out in a conservative fashion, usually beyond even the conservatism that is built into the associated regulations and guidance. Decisions are aimed primarily at compliance with regulatory objectives, rather than optimization. This leads to unnecessarily costly remediation and under-utilization of the nation's relatively few radioactive waste disposal facilities. Risk assessment decisions under CERCLA and RCRA might seem to perform better, but if anything this is because the focus is on shorter-term decision-making because long term fate and transport modeling is not considered necessary in most cases. However, some more complex contamination problems suffer from the same basic issues as radioactive waste disposal in terms of the need for complex fate and transport modeling and subsequent risk assessment. At least CERCLA addresses optimization in the feasibility study, but it does not address how to perform that optimization in the face of uncertainty or stakeholders who have different competing objectives. Other environmental issues that fall outside the realm of DOE Orders, NRC regulations, and regulations such as CERCLA and RCRA, have found a different path towards effective decision-making. This includes land reuse and watershed management decisions, for which there is a focus on sustainability and on stakeholder involvement throughout the decision making process. EPA is using 'structured decision analysis' to achieve the primary goal of maximizing societal welfare. These same tools and approaches can be brought into environmental and waste management decisions that need to be made by DOE. Structured decision analysis provides a formal process for capturing not only the science side of the problem, but also the costs and value judgments of the stakeholders, to reach an optimal solution. But this approach requires a paradigm shift within the DOE and NRC environmental and waste management programs. That is, it requires a willingness to engage a new approach that will provide a path towards effective optimization in the decision-making process for the complex environmental problems faced by DOE and NRC. Because of the current nature of problem solving for these types of problems, which involves many layers of conservatism, this structured decision analysis path towards optimization will also realize substantial cost savings for these programs, while maintaining or improving defensibility and transparency in the decision making process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Study of an unrefined humate solution as a possible remediation method for groundwater contamination - 15698

Savannah River Site (SRS) was one of the major nuclear processing facilities in the U.S. where plutonium was produced during the Cold War. Approximately 1.8 billion gallons of low level acidic waste solution containing radionuclides and dissolved metals were discharged to a series of unlined seepage basins at the F/H Area. Uranium is a key contaminant of concern in the basin's groundwater. It is migrating into the groundwater creating an acidic plume with a pH between 3-5.5. Groundwater Actions: The pump-and-treat water treatment unit was designed and built in 1997 to remove metals and radionuclides. In 2004 a hybrid funnel-and-gate system was constructed to create a treatment zone in which the acidic nature of the contaminated sediments could be reversed. Huma-K is an organic fertilizer that comes from the alkaline extraction of leonardite (a low-rank coal). Huma-K has a high content of humic substances which consist of complex organic compounds formed by the decomposition of plant and animal tissue. The objective of this study is to determine if a low cost unrefined humate solution (Huma-K) can be used to facilitate uranium adsorption to control its mobility in acidic groundwater. This study can assist in evaluating whether Huma-K can be used as an in situ amendment for the remediation of groundwater contaminated with uranium. Sediments from FAW-1 70-90 ft were used in this experiment. Sediments were disaggregated and sieved to a particle size of . 2 mm. Concentrations in the range 10-500 ppm were tested. Once all the components were added, pH was adjusted to 4. Samples were vortex mixed and placed on a shaker table at 100 RPM for a period of 24 hours in order to reach the adsorption equilibrium. Once the adsorption equilibrate was reached, samples were centrifuged at 2700 RPM to separate the liquid and the solid phase. The liquid fraction was analyzed using a Thermo Scientific Genesys 10S UV-Vis spectrophotometer. The same experimental design was used as explained above. A known concentration of Huma-K was used to study the pH effect on the sorption process. pH values were measured at the beginning and at the end of the experiment. Spectra of Huma-K show a featureless character. Absorbance of light increases as the wavelength is decreased. Measurements were done at 254 nm due to the presence of aromatic rings. Apparently there are two sorption processes. The first one follows the same trend as the Langmuir isotherm up to 250 ppm. The second sorption process occurs after all the binding sites in the sediments have been occupied. Precipitation decreases as the pH is increased. Based on the sorption isotherm, humic substances apparently bind first to the binding sites of the sediments particles. Once all the binding sites have been occupied, other sorption processes may start to dominate. Sorption is affected by pH. Higher sorption is seen at low pH values. Increased precipitation at low pH values is probably due to the neutralization of surface charges of humic molecules making them agglomerate.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of the Uranium-Bearing Products of the Ammonia Injection Remediation Method - 15707

Commissioned in 1943, the Hanford Site is the home of the world's first full-scale nuclear production facility. After more than 40 years of processing, improper discharge and failed storage tanks have resulted in the contamination of the Hanford vadose zone with radiologically contaminated waste. Remediation methods considered for the area include sequestration of the mobile uranium by injection of ammonia (NH{sub 3}) gas. Injection of this reactive gas increases the pore water pH, promoting the dissolution of soil minerals; a subsequent re-establishment of natural conditions is believed to result in the recrystallization of those soil minerals and the co-precipitation of uranium phases. Characterization of the precipitates formed when the ammonia (NH{sub 3}) injection method, proposed for the Hanford vadose zone, is applied to synthetic pore water on a laboratory scale. This involves: Identification of the uranium-bearing phases; A study of the effect of pore water constitution on the phases produced. Synthetic pore water solutions were prepared to mimic selected constituents of the pore water from the Hanford 200 Area: Varying constituent concentrations; Observations led to modifications to increase relative uranium content: 200 ppm → 500 ppm U; Substituted sodium silicate for silicic acid. Dried samples were analyzed by SEM-EDS and powder X-ray diffraction (XRD). A suspension in ethanol was prepared and analyzed by Transmission Electron Microscope (TEM) with Selective Area Electron Diffraction (SAED). Studied and applied geochemical modeling software (Visual Minteq and Geo-chemist's Workbench) for speciation and prediction of potential species formed. Discussion/Conclusions: - SEM-EDS Analysis: Scanning electron microscopy revealed areas of high average atomic weight which would be confirmed to be uranium-rich by energy dispersive spectroscopy analysis. The samples prepared with a more than two-fold increase in uranium concentration did not show the crystal-like forms spotted in the lower [U] samples. The samples prepared with silicic acid substituted in showed little to no uranium precipitation [not shown]. - Diffraction Analysis: Powder XRD analysis of the low [U] samples confirmed the presence of repeating crystalline patterns in the precipitate samples. Nitratine (NaNO{sub 3}) showed a massive presence, potentially obscuring significant peaks in the low [U] samples. Though it was not predicted, there was a tentative match for cejkaite (Na{sub 4}(UO{sub 2})(CO{sub 3}){sub 3}). Elevated uranium samples showed none of the needle-like crystalline shapes [diffraction data pending]. TEM - SAED confirmed the presence of a polycrystalline phase. Data analysis is complex but a comparison of average d-spacings with those of reference minerals could further support a match with cejkaite. - Geochemical Modeling: The system conditions were input into geochemical modeling software to predict the forms present throughout the reaction process. The model was used to demonstrate that the pH of the system could be increased using [NH{sub 4}{sup +}] in solution to better represent the system. Using the [NH{sub 4}{sup +}] increase, the changes in significant species with increasing pH were observed. Future Work: Repeat samples will be prepared and analyzed to bolster any potential identification. Promising samples will be submitted to the PNNL's EMSL facility, which is better equipped to perform the required analyses. An expanded study on the impact of carbonate (CO{sub 3}{sup 2-}) on the phases produced.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of a Hydroxyapatite Permeable Reactive Barrier to Remediate Uranium at the Old Rifle Site, Colorado - 16193

We have performed an initial evaluation and testing program to assess the effectiveness of a hydroxyapatite (Ca{sub 10}(PO{sub 4}){sub 6}(OH){sub 2}) permeable reactive barrier and source area treatment to decrease uranium mobility at the Department of Energy (DOE) former Old Rifle uranium mill processing site in Rifle, western Colorado. Uranium ore was processed at the site from the 1940's to the 1970's. The mill facilities at the site as well as the uranium mill tailings previously stored there have all been removed. Groundwater in the alluvial aquifer beneath the site still contains elevated concentrations of uranium and is currently used for field tests to study uranium behavior in groundwater and investigate potential uranium remediation technologies. The technology investigated in this work is based on in situ formation of apatite in sediment to create a subsurface apatite PRB and also for source area treatment. The process is based on injecting a solution containing calcium citrate and sodium into the subsurface for constructing the PRB within the uranium plume. As the indigenous sediment micro-organisms biodegrade the injected citrate, the calcium is released and reacts with the phosphate to form hydroxyapatite (precipitate). This paper reports on proof-of-principle column tests with Old Rifle sediment and synthetic groundwater. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Individuals Who Build Solutions Across Boundaries for Environmental Remediation and Nuclear Waste Disposal - 16204

This paper profiles individuals who shifted from developing solutions primarily from within one organization to across multiple organizations for decisions requiring input from multiple parties. These individuals are engineers and scientists who work as government employees or government contractors. This paper contains six areas of discussion: 1. Why individuals build solutions across organizational boundaries, 2. The results they achieve, 3. Supporting skills and personal characteristics, 4. Means to build solutions across boundaries, 5. How they enlist others to participate, and 6. The importance of a catalyst. This paper is based on three sources of information. The primary source are interviews with nine engineers and scientists with direct experience building solutions across organizational boundaries in the fields of environmental remediation or nuclear energy/waste management and disposal. The second source are selected research studies. The third source is the author's experience both as a government employee and a consultant. The author's hope is that this paper will strengthen people's desire and ability to engage multiple parties in decisions requiring their input. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low-Altitude Unmanned Aerial Vehicles as a Tool for the Remediation of Radiologically Contaminated Environments - 16257

Following the events at the Fukushima Daiichi Nuclear Power Plant (FDNPP) in March 2011, significant quantities of radioactive material were released into the local Japanese as well as the wider global environment. At the fifth anniversary of the incident, much work and expense is still being dedicated to the remediation of a large area of eastern Japan, contaminated primarily with radio-caesium. Due to the complex topography of the geographical area of Japan effected, it is important to understand contaminant evolution/migration at the greatest possible resolution - previous methods have lacked this. An increase in the spatial resolution of radiation mapping over other previous methods has been achieved through the deployment of an unmanned aerial vehicle (UAV). The platform used during this work combined a low-altitude multi-rotor UAV with a lightweight radiation mapping system to achieve sub-meter resolution. Using this system it was possible to measure the distribution of radionuclide contamination at a number of sites within the Fukushima Prefecture region of Japan. Unlike ground-based surveys conducted on foot by humans that attain a comparable resolution, such a system eliminates the potentially significant dose that would otherwise be received, as well as the influence of shielding on results. In addition to providing a rapid and high resolution response to radiological incidents, such monitoring technology has the potential to be a powerful tool in post-operational clean-out (POCO) at nuclear sites undergoing decommissioning worldwide. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilization and Application of Kurion Mobile Processing System in Remediation of Radioactively Contaminated Water - 16370

Kurion{sup R} Mobile Processing Systems (KMPS) were deployed in Fukushima as first-of-a- kind at-tank isotope removal systems to remediate Sr from reverse osmosis concentrated salt water. The systems were successful in their efforts and achieved their decontamination and availability goals. The use of KMPS has been considered for other applications where a modular system is of benefit. The use of different Kurion Ion Specific Media (ISM) allows for precision removal of hazardous ions from a variety of waste streams. This paper describes a range of projects in which KMPS modularity will benefit the nuclear industry. The KMPS is a flexible system that can be deployed quickly and efficiently. One treatment system option being considered is the utilization of a KMPS for the removal of contamination from groundwater. Similar to its use in Japan, the KMPS can be sent to remote locations for the direct treatment of ground water. In particular, there are several sites across the world where uranium contamination is a problem. Uranium treatability testing was performed on collected groundwater samples from a radiologically contaminated site. The tests were used to help provide designs for KMPS modifications. These designs included the addition of chemical treatment module for the control of pH and other chemistry, the addition of an ultraviolet module for the destruction of biological material, among others. The tests determined the loading capacities of uranium capture resins (UCR) and media (UCM) for this specific waste stream. Based on uranium loading capacities of 37.3 mg/L (end of test C/C{sub 0} = 0.5) and 54.6 mg/L (extrapolated to C/C{sub 0} = 0.98), and the longevity of the resin (45,911 BV for C/C{sub 0} = 0.5, and 80,556 BV for C/C{sub 0} = 0.98) UCR-1 was selected as the media/resin to be proposed for a uranium treatment system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The 'Site of Things': Remediation in the Information Age - 18088

More than just a payload, machines now haul data as well. Wood Environment and Infrastructure's maiden voyage into civil engineering automation at the Port Granby Project Long-Term Waste Management Facility demonstrated enormous potential for the remediation industry. The Port Granby Project will relocate approximately 450,000 cubic meters of historic low-level radioactive waste and marginally contaminated soils, located at an existing waste management facility on the shoreline of Lake Ontario, to a new, engineered aboveground mound to be built about a kilometer north of the current site. Sounds simple, right? Just move a bunch of dirt up the road? Hardly, this is marginally contaminated soil situated near Lake Ontario in a beautiful little village an hour east of Toronto. We must relocate safely, meaning limiting the number of staff in the field and efficiently to deliver according to our agreed upon budget and schedule. As if that wasn't enough we were asked to keep track of where each truckload of dirt was excavated from (with a high degree of accuracy), where it was placed in the new engineered disposal facility, how much it weighed and the amount of radioactivity in each load... a virtual chain of custody for each load. Presented is an overview of the Information Technology that supports the Port Granby Project and how the Data Management System (DMS) is being leveraged to make the project safer, more effective and efficient. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In Situ Monitoring of Groundwater Contamination for Sustainable Remediation Using the Kalman Filter - 18423

Groundwater monitoring is critical for nuclear-related facilities as well as radioactively contaminated sites. Recent advances in sensing, data analytics and simulation capabilities provide substantial opportunities to improve and change current monitoring procedures. In particular, we need a paradigm shift from contaminant-only or compliance-only monitoring programs to comprehensive monitoring, i.e., including other ancillary environmental variables for a holistic understanding of the groundwater systems and plume behaviors. Such new approaches are needed for the effective implementation of sustainable remediation (enhanced and natural attenuation), and they have great potential for cost reduction in site monitoring. This paper reviews recent developments for improving long-term monitoring, with focus on the effective use of in situ sensors, data analytics and simulation capabilities. In particular, we highlight a recent application of the Kalman filter algorithm to estimate contaminant concentrations continuously in real time, based on in-situ measured water quality parameters (e.g. electrical conductance and pH) and sparse groundwater sampling. The results show that we can reduce the groundwater sampling frequency significantly, while capturing the dynamics of short- and long-term contaminant concentration changes. Such advanced and integrated monitoring systems will be beneficial for local residents (e.g., to ensure the safety by detecting adverse events early, enabling a swift response) as well as for site operators (e.g., to gain/improve public acceptance, to be better prepared for litigations and false claims, and to reduce overall monitoring cost). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Laboratory and Field Investigations of In-Situ Remediation of Cr(VI) in the LANL Regional Aquifer - 18683

Two biogeochemical in-situ remediation strategies are currently being evaluated to help manage a Cr(VI) plume present in deep groundwater beneath Los Alamos National Laboratory. The first is the addition of a chemical reductant, sodium dithionite, and the second is the use of a bio-stimulant, molasses. This paper summarizes the results to date of laboratory and field investigations of the effectiveness of these two amendments in the Los Alamos aquifer. A semi-empirical model based on the results of laboratory batch and column experiments has been developed to describe dithionite reactions and subsequent cation exchange processes in the aquifer. The model is being used to predict the effective 'reach' of dithionite in field deployments, and so far the predictions of the model are consistent with observations in a field push-pull test involving dithionite. Contrary to what has been frequently assumed, the laboratory data suggest that the resulting Cr(VI) reduction capacity depends more strongly on the amount of dithionite consumed than on the amount of iron reduced during the treatment, and an empirical approach is being used to predict reduction capacity generated in the field test. Laboratory experiments have demonstrated a robust ability of molasses to promote biomass growth that imparts significant Cr(VI) reduction capacity to sediments. Molasses has been deployed in a field push-drift test (no active pumping) in a well in which the aquifer Darcy velocity is known to be high. To date, the molasses has not drifted out of the injection well, so it has not been possible to make comparisons with laboratory experiments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Climatic Controls on Residual Contaminants Under Sustainable Remediation - 18699

We investigate the impact of climate change on residual contaminants in soil and groundwater under sustainable remediation. We illustrate seven climate change scenarios which mimic shifts in the precipitation regime as well as the failure of the source-zone cap. We evaluate different performance metrics including contaminant concentrations at multiple wells and export to a creek. The approach is demonstrated by simulating the tritium plume migration at the Savannah River Site F-Area, USA. The cap integrity is critical not only to reduce the well concentrations and export but also to reduce the uncertainty associated with the climatic variability. Sampling or in situ monitoring near the source zone is important for the early detection of plume mobility changes. Realistic hydrological models are necessary to evaluate the trade-offs (mobility vs dilution)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantitative Risk Management - Risk Informed Decision Making on High-Risk Waste Remediation Projects - 19022

For every $1 billion invested in projects, $97 million is wasted due to poor project performance. That means 9.7% of money spent on projects is wasted due to poor risk and uncertainty management. High-risk projects, similar to those in waste remediation, have the most to lose. A solid quantitative risk management program is one of the keys to increasing the likelihood that a project will succeed. A quantitative risk program solves two major problems that challenge the effective management of risk and uncertainty: 1. Risks arise at all levels of an organization; however, not all organizational levels have an effective way to identify and resolve them. This can lead to risks that, even if identified, are not reported. 2. Decision-makers are often forced to operate solely on intuition when implementing mitigation strategies, not fully understanding the effects that certain decisions have on the program's cost and schedule. A quantitative risk program uses a risk register and builds it into the project/program integrated schedule to assess the impact of these risks, typically at the 80% confidence contingency level for specific milestones and/or project completion. Implementing a quantitative risk program drives a forward-thinking, proactive mentality to problem solving into all levels of the organization. A healthy risk program for regular reporting and communication ensures that all members of an organization are thinking about risks and using their communication channels to resolve them. It gives a method of communication and incentive for all levels in the organization and helps to ensure that risks will be reported and resolved. Pacific Northwest National Laboratory (PNNL) has developed tools and methods that provide a level of realism for analyzing different scenarios and estimating contingency that does not exist in the standard industry risk tool kit. These tools and methods provide decision-makers with actionable, quantitatively based information to guide their decision making. The first tool is a probabilistic branching risk model for mitigation strategies. Current quantitative risk analysis tools in the industry simulate two cases: fully mitigated and un-mitigated. In the fully mitigated case, the user assumes that every planned mitigation activity is successful. In the un-mitigated case, the user assumes that none are successful. The truth lies between these two extremes. The PNNL team has developed a probabilistic risk model for mitigation scenarios that includes a probability that a mitigation activity will succeed and a probability that a mitigation action will be funded. These probabilities are elicited from subject matter experts and ensure that the contingency calculations at the specified confidence are approaching reality. The second tool developed at PNNL is the Risk Box, which is a tool that integrates with different scenarios in the risk register. For example, say the user is faced with two different and mutually exclusive mitigation actions to reduce a risk. The Risk Box methodology performs the contingency calculations and then displays them on a time-phased graph that shows how each scenario reduces the risk contingency needed on the project/program. This graph then provides quantitative information to show decision-makers which mitigation action provides the greatest reduction (cost and schedule) in risk contingency for the program. Implementing these and other tools within a structured risk program increases the likelihood that a project will come in on schedule and budget, ensures that all personnel are proactively thinking about problems and resolutions, creates communication channels for all members to submit and resolve potential problems, produces a prioritized list of risk rankings to focus leadership on issues that may cause the biggest problems, and implements processes that drive updates to the risk program as the risk profile changes. PNNL has been developing these methods and using them on projects for over 20 years. They have been successfully applied on waste management projects, high-tech research and development projects, and construction projects, and they continue to be used on a number of U.S. Department of Energy projects today. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗