Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RECEIPTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

System Analysis Support of Consent-Based Siting Efforts - 23400

To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the Integrated Waste Management (IWM) program within the U.S. Department of Energy, Office of Nuclear Energy (DOE-NE) has been sponsoring the development and application of system analysis tools capable of analyzing various system options for the management of spent nuclear fuel (SNF) and high-level radioactive waste. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate things like the implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, and different assumed system operation start dates. Some example system analysis results have been published previously. With the passage of the consolidated appropriations acts for fiscal years 2021 and 2022, Congress provided funding and direction for the DOE to move forward with interim storage to support near-term action in managing the nation’s SNF as an important component of an IWMS. Consent-based siting is a phased, adaptive, and collaborative approach to siting facilities that focuses on the needs and concerns of people and communities. Communities participate in the siting process by working carefully through a series of phases and steps with the DOE (as the implementing organization). Each step and phase helps a community determine whether and how hosting a facility to manage SNF is aligned to the community’s goals. By its nature, a consent-based siting process must be transparent, flexible, adaptive, and responsive to community concerns. Thus, the phases and steps are intended to serve as a guide, not a prescriptive set of instructions. System analysis research analysts interface with DOE’s consent-based siting for a federal interim storage program and can perform preliminary system analyses as requested to support various aspects of the consent-based siting team’s work. This paper provides an overview of IWM program’s system analysis activities that support the ongoing consent-based siting process. The questions that decision-makers, planners, communities, and stakeholders might have during the consent-based siting process are similar to questions that have been explored by system analysts previously. Specifically, this paper discusses work that will inform consent-based siting efforts in the areas of community impacts, cost estimates, various SNF acceptance rates by potential facilities, potential consolidated interim storage facility (CISF) capacities and configurations, and the implications of a CISF on the overall waste management system. It is expected that system analysis will continue to be performed to support the consent-based siting process in the future.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The status of LILW disposal facility construction in Korea - 15158

In this paper, we discuss the experiences during the construction of the first LILW disposal facility in South Korea. In December 2005, the South Korean Government designated Gyeongju-city as a host city of Low- and Intermediate-Level Radioactive Waste (LILW) disposal site through local referendums held in regions whose local governments had applied to host disposal facility in accordance with the site selection procedures. The LILW disposal facility is being constructed in Bongil-ri, Yangbuk-myeon, Gyeongju. The official name of the disposal facility is called 'Wolsong Low and Intermediate Level Radioactive Waste Disposal Center (LILW Disposal Center)'. It can dispose of 800,000 drums of radioactive wastes in a site of 2,100,000 square meters. At the first stage, LILW repository of underground silo type with disposal capacity of 100,000 drums was completed by the end of June 2014. The Wolsong Low and Intermediate Level Radioactive Waste Disposal Center consists of surface facilities and underground facilities. The surface facilities include a receipt and inspection facility, an interim storage facility, a radioactive waste treatment building, and supporting facilities such as main control center, equipment and maintenance shop. The underground facilities consist of a construction tunnel for transport of construction equipment and materials, an operation tunnel for transport of radioactive waste, an access shaft for workers, and six silos for final disposal of radioactive waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of salt-cake removal flowsheet at SRS through incorporation of testing and in-tank waste experience - 15263

Salt-cake removal at SRS may be performed for several reasons: to provide space for evaporator operation (i.e., to precipitate more salt in the drop tank), to provide feed for salt processing (i.e. immobilize the waste), or to remove the salt for tank closure. Many different salt dissolution techniques have been employed in the 40 years that SRS has been performing salt removal, from a basic 'Add, Sit, Remove' method (water is added on top of the salt-cake and time is allowed for diffusion), to performing interstitial liquid removal, or using mixing devices to promote contact with the liquid. Lessons learned from previous salt-cake removal campaigns, in addition to testing and modeling, have led to opportunities for improvements to the overall salt-cake removal process. This includes better understanding of salt properties and behavior during dissolution; the primary concerns for salt dissolution are the release of radiolytic hydrogen and criticality prevention (post-dissolution). Recent developments in salt dissolution include the reuse of dilute supernate and a semi-continuous dissolution (SCD) process, where low volume mixing eductors are used to deliver water near the surface of the salt-cake at the same rate as the salt solution is removed and transferred to a receipt tank. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving public communication through environmental data transparency at Los Alamos National Laboratory - 15306

The Los Alamos National Laboratory (LANL) environmental data span a wide range of media, including air, soil, sediment, water, foodstuff, and biota as well as over 1000 analytes and time periods extending over 4 decades, resulting in over 14 million records to manage and analyze. At a time of budget cuts and rapid social and technological change, the public, regulatory and compliance agencies, and stakeholders demand accelerated data delivery and efficiency, information sharing, and transparency in the dissemination and handling of samples collected in and around LANL. Meeting these requirements, while constraining the associated costs can be challenging; however, LANL has achieved this by adopting a cloud-based database called the Environmental Information Management (EIM) system and its public database counterpart, IntellusNM (Intellus) (www.intellusnm.com). To be consistent with federal initiatives to move government computing into cloud-based services, LANL chose to partner with an existing cloud-based vendor, Locus Technologies, to implement a software-as-a-service model. As an additional cost-saving measure, local regulatory and compliance agencies collaborated with LANL to incorporate their data into EIM and Intellus database. By adopting a single platform cloud-based solution to replace 12 different pre-existing environmental data systems, LANL has streamlined environmental data processes, resulting in over $15 million cost savings through 2015. EIM, LANL's internal cloud database, provides a cradle-to-grave process for data handling. EIM supports LANL's entire data process from detailed sample planning, mobile data collection using iOS mobile devices, to automated bottle labeling, generation of chain of custody, analytical lab electronic data deliverable upload, auto data validation, sample tracking, and custom regulatory and compliance reports. EIM has functionality to assess data in various ways such as the ability to design new formatted reports, a free-form structured query language tool of the entire database, exceedance reports, calculation engine, charting, trends, and statistics. EIM also has interactive geographic information system layers and analyte concentration color contour mapping capabilities. Additionally, and of greater importance to LANL, EIM supports the ability for third-party landowners to review data before release to the public, thus ensuring transparency and confidence in LANL's stewardship of human health and the environment. Intellus, the database counterpart of EIM, is the publicly available view of the entire LANL database and requires no data feeds or transformations. Intellus allows user-friendly access to LANL's environmental data as it is collected, providing the public, scientists, remediation teams, regulators, and stakeholders within hours of receipt. Full transparency in giving the public access to environmental data information provides LANL's overall solution to environmental data management for the public. By making the data easy to obtain, search, and query for interested stakeholders, the system enables confidence in LANL's stewardship of the environment. Working together identifies key topics of improvements, develop strategies and help support innovation and substantial advances within LANL's environmental data management system. (authors)

54 ENVIRONMENTAL SCIENCES↗

Success in commissioning a key U.S. radioactive waste burial site through the technical support of Dufrane Nuclear Shielding Incorporated (DNSI) - 15476

With the -phase out- of the South Carolina based Barnwell Radioactive Waste Burial Site, and the stockpile and storage of radioactive waste and irradiated components throughout the U.S. Nuclear Industry for decades, the opening of the Texas Low-Level Radioactive Waste Disposal Compact Facility by Waste Control Specialists (WCS), is a game changer in solving this industry-wide issue. For the first time in decades, generators now have the opportunity to send their waste to a site specifically designed to permanently sequester the waste in a licensed facility that will protect public health and the environment, better than any built to date. As history has shown through the many decades of the U.S. Commercial and Federal Nuclear Industry, site operators and management have relied heavily on contractors and vendors with exceptional expertise and decades of experience to achieve success and meet their goals. The commissioning of WCS was no exception as DNSI was contracted to design, develop, build and deploy a major component required for the opening and successful operation of the WCS site. This component, being the Modular Concrete Canister (MCC), is the -work horse- of the site. With its enormous size, weight and strength, it provides many functions that meet and comply with the site performance assessment (PA) under 10 CFR Part 61, the site WAC, and Texas Low-Level Radioactive Waste Disposal Authority. Offsite contracting the production and delivery of this critical component was a major step toward success in meeting schedule and cost for the much needed opening of the Texas Compact and Federal site. In selecting a shielding vendor, WCS partnered with a U.S. Nuclear Service company with over 30 years of experience which spans the entire U.S. Commercial, Federal, and Nuclear Industry. The task given DNSI was not a simple one, it involved every aspect from start to finish of the design, production and delivery of rectangular, cylindrical and -irradiated hardware- (IH) MCCs, that could accept waste up to 100 Sv /Hr contact dose rates. The enormity of this project was quite clear and required extensive quality control, construction of batch plants, purchase of huge quantities of raw materials, setting up a production site in a neighboring city, relocation of personnel from company headquarters, and safely transporting 8,000 Tons of MCC components 75 miles one-way on West Texas highways daily. Most important of all, this was accomplished safely with no incidents, no component failures or rejects, and on schedule. The start of receipt, of -in-compact waste- and -out-of-compact waste- was conducted virtually in a 3 month period time span. To help guarantee success and quality of product, all forms had surfaces machined, heavy duty elastomer coatings were applied to concrete surfaces, only galvanized anchors were used, and the batch plant was run to strict ASME standards thus testing every 50 cubic yards of concrete poured. With significant teamwork and success from Vendors such as DNSI, WCS and the Texas Compact has evolved as one of the leading radioactive waste sites in the U.S. and the world, providing safe, secure and compliant permanent waste disposal services by using technical expertise and innovation of the highest standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Achievements and process improvements in processing transuranic waste at the TRU Waste Processing Center - 15488

Wastren Advantage, Inc., (WAI) is the DOE Prime contractor for the TRU Waste Processing Center (TWPC) located in Oak Ridge, TN. This paper highlights the TWPCs specific achievements and process improvements associated with both Contact (CH) and Remote Handled (RH), Transuranic (TRU) waste receipt processing and repackaging for disposal. The five key improvement areas and achievements include: - The TWPC installed, tested and operated successfully the Drum Venting System (DVS) to vent over-packed CH-TRU waste drums in several configurations including 55-gallon drums over-packed in 79 or 85-gallon drums. - A new Remote Drum Opener (RDO) system was designed, tested and placed in service to vent drums discovered in overpack boxes in the Box Breakdown Area and to vent overpack configurations that could not be handled in the standard DVS (e.g., 110 gallon overpacks and multiple drum configurations). - The Cask Processing Enclosure (CPE) approach to repackaging RH-TRU waste contained in concrete casks was developed and implemented - Hot Cell outage to incorporate planned equipment modifications and improvements to maintain processing rates. - To improve certification and segregation of CH-TRU from drums that meet Low Level Waste criteria for disposal at Nevada the TWPC added additional equipment/facilities for Non-Destructive Assay (NDA) and Real Time Radiography (RTR). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Legacy {sup 85}Kr Waste Form Samples - 16319

In the late 1970's, the Idaho Chemical Processing Plant conducted an R and D program on krypton encapsulation. Legacy samples composed of {sup 85}Kr incorporated in solid zeolite 5A material, and five small metal tubes containing a mixture of the zeolite combined with a glass matrix resulting from hot isostatic pressing, have been preserved. These samples were shipped to Oak Ridge National Laboratory (ORNL) in mid-FY 2014. After receipt and repackaging, the samples were examined by x-ray imaging and x-ray tomography. Two of the capsules appear to contain an amorphous mass within the capsules. An image of one capsule clearly shows the saw marks on the capsule and a quantity of loose pellet or bead-like material remaining in the capsule. An image of another capsule shows similar bead-like material within the intact capsule. One of the capsules was previously opened. The end of this capsule appears to have been cut off, and there are additional saw marks on the side of the capsule. X-ray tomography allowed the capsules to be viewed along the three axes. Of most interest was determining whether there was any residual material in the closed end of this capsule. The images confirmed the presence of residual material within this capsule. The material appears to be compacted but still retains some of the bead-like morphology. Based on the initial nondestructive assay (NDA) and the fact that there are two obviously breached samples, a plan was developed for exploratory tests that would be conducted with the breached specimens before opening the three intact capsules. Preparations are being made to determine the fraction of krypton/xenon remaining in the waste form matrix and the amount of rubidium remaining in the waste form matrix. The inner surface of the breached capsules will be examined for corrosion. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Evaluation of Alternative Waste Management System Architectures - 16338

The Nuclear Fuels Storage and Transportation Planning Project (NFST), under the U.S. Department of Energy, Office of Nuclear Energy, Office of Fuel Cycle Technologies, is conducting analyses to inform future decisions regarding an integrated waste management system with a current focus on commercial spent nuclear fuel (SNF). This work builds on results from previous systems architecture studies within NFST. System-level analyses of the overall interface between at-reactor, consolidated storage, and ultimate disposition, along with the development of supporting logistic simulation tools, were initiated in 2012. This paper highlights recent results of the NFST systems architecture analysis efforts initiated in 2012. Waste management design choices are evaluated with respect to the impact on the entire system. This includes an analysis of alternative strategies for allocating receipt of SNF from reactor sites, storage options for SNF at an interim storage facility (ISF), and thermal limits restricting the transportation of canisters from an ISF to a mined geological repository (MGR). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Approach for Technetium-99 Disposal Reduces Operational Impacts - 16460

The Environmental Management Waste Management Facility (EMWMF) on the Oak Ridge Reservation began receiving and disposing waste with elevated technetium-99 (Tc-99) activities on November 11, 2013. Prior to receipt, the Tennessee Department of Environment and Conservation expressed concerns about potential releases of this highly mobile radionuclide into the environment and requested additional safeguards to minimize potential releases. Several additional requirements were negotiated to address these concerns and allow this waste lot to be safely disposed at EMWMF. Because of the 130-cm (51-inch) annual average precipitation at the landfill, the potential release of Tc-99 (above the release criterion) to surface water during the EMWMF water management activities was of the greatest concern. The EMWMF Operations staff developed an innovative approach to resolve regulator concerns regarding disposal of low-level waste containing elevated levels of Tc-99 at EMWMF. This approach minimized the spread of contamination and the generation of water that contacted the Tc-99 waste. Lessons learned and recommendations are being implemented for the next, more challenging elevated Tc-99 waste from the K-27 Building, currently scheduled for early 2016. These lessons learned are also applicable to other sites looking to minimize operational impacts from disposal of waste with elevated activities of Tc-99 or other highly mobile contaminants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternative Canister Processing Operations at an Interim Storage Facility - 16617

The US Department of Energy (DOE) is laying the groundwork for implementing interim storage of spent nuclear fuel (SNF) in response to recommendations by the Blue Ribbon Commission on America's Nuclear Future in their report to the Secretary of Energy published January 2012. These efforts include planning for a Pilot Interim Storage Facility (ISF) and a Larger ISF. In March 2014, the DOE employed the CB and I team to evaluate design alternatives for cask handling operations and storing SNF at an ISF. The report, 'Generic Design Alternatives for Dry Storage of Used Nuclear Fuel', (Alternatives Report) evaluates different aspects of an ISF, including a study on alternative approaches for processing SNF canisters such as different cask handling methods and configurations which might be used to transfer canisters from shipping casks into storage locations at an ISF. The purpose of this paper is to report on the development of alternative cask handling operations that have been evaluated for the receipt and storage of the SNF at an initial Pilot ISF and a Larger ISF. This design study is relevant for host communities considering near-term development of a Pilot ISF. DOE-sponsored system analyses indicate that a processing rate of up to 3,000 MTU/yr (approximately 230 to 300 canisters) would be needed for a single Larger ISF (less if more than one ISF were developed) to remove SNF from commercial nuclear plants in a reasonable amount of time. The study evaluated different canister processing operation methodologies in order to reduce the complexity, cost, and personnel exposure associated with processing operations at an ISF. The conclusions from this design study could help to inform the selection of future canister processing operations for an ISF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EnergySolutions' Implementation of HM-250 - 16641

This presentation discusses the various changes at EnergySolutions' radioactive material disposal and processing facilities to implement the recent changes in Department of Transportation (DOT) with respect to the receipt and return to service of conveyances and packages used to transport radioactive material. Effective July 13, 2015, the DOT has revised 49 CFR 173.443(c) in an effort to prevent inadvertent diversion of conveyances and bulk packages into general commerce that had previously been used to transport radioactive material. Previous to this change, conveyances, such as, trailers, rail cars, gondolas and bulk packages, such as, sea-lands and inter-modals that were received at radioactive material management facilities could be released back to the customer as 'Return to Service' (RTS) in accordance with the contamination and dose limits specified in 49 CFR 173.443(c). At the point of release, these conveyances or packages were not required to be dedicated exclusively for subsequent radioactive material shipments. The DOT revised this regulation to implement additional controls that require any conveyance or package that was transported as Class 7 (radioactive) materials exclusive use shipment to be dedicated to subsequent radioactive material shipments. If these conveyances or packages are not use for Class 7 (radioactive) use, then they must be released for unrestricted use in accordance with the DOT and the respective radioactive material license or other regulatory authority. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chute Silo ILW Project Berkeley - 16649

Magnox, a Tier 1 Site Licensed Company (SLC), is the management and operations contractor responsible for the decommissioning of twelve of the Nuclear Decommissioning Authority's (NDA) nuclear sites in the UK. Aquila Nuclear Engineering is a specialist Tier 3, turnkey engineering company based in the UK, delivering mission critical engineering solutions to Europe's nuclear and nuclear medicine industries. Berkeley Nuclear Power Station, Berkeley, England started generating electricity in 1962, ceasing operation 27 years later in 1989. The Chute Silo ILW Project at this Reactor Site had been set up to retrieve irradiated control rods and charge chutes disposed of within a subterranean vault (silo). The project involved in-silo size reduction of waste in to 30-35 waste baskets. The waste basket was then to be retrieved via a pintle grab and hoist mechanism in to a Transfer Flask (through a silo and a Transfer Flask gamma gate). The Transfer Flask was then to transit along existing crane rails, out of the silo building and over the top of an Import/Export Facility. A Ductile Cast Iron Container (DCIC) was to be imported into Import/Export Facility and inspected/prepared to receipt the waste basket from the Transfer Flask. Once filled, the DCIC was then to be sealed and exported to an on-site storage facility. Due to an issue with the Magnox Tier 2 Framework holder in delivering a cost effective and viable solution for their Chute Silo ILW Retrieval Project, Magnox took the ground breaking decision to 'self-perform'. This involved dividing the larger project into several smaller packages. Two of these packages - for the shielded Transfer Flask and the Import/Export facility - were put out for competitive tendering directly to the Tier 3 Supply Chain. The work completed by the Tier 2 Company was shared with the Tier 3's, but Magnox expressly requested the Tier 2 proposals were scrutinised and that far more cost effective, robust and simpler solutions were provided for within the Tier 3 Tenders. Aquila won both work packages and delivered them with significant and demonstrable cost savings, on time and under budget. This was achieved by the collaborative arrangements between Aquila and Magnox, the methodologies of both company's project teams and the innovation and 'fitness for purpose' of Aquila's design pragmatism. The original Tier 2 Framework holder's price to Magnox for the Chute Silo ILW Project was between UK Pounds 2-3 M. Aquila delivered the equivalent scope for under UK Pounds 1 M. Aquila's original programme was maintained despite the award of additional scope and (Magnox) delays on site. Aquila came under the original target price for each discrete phase of the project. The above was achieved because of: - the collaborative arrangements between Aquila and Magnox; - the methodologies of both company's project teams; - the design features put forward by Aquila (welcomed and adopted by Magnox). In 2014 Aquila Nuclear Engineering received formal recognition of its achievements on this project by winning an NDA Supply Chain Award for 'Best example of supplier 'going the extra mile''. Points highlighted in the award were: - improved customer focus, leading to stronger relationships - encouraging challenge and innovation - continuous suggestions for improvement - UK Pounds 1 million savings and three months programme reduction.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering Design of the Geological Disposal Facility for the UK - 18074

This paper discusses plans for implementing UK government policy for the safe geological disposal of higher activity radioactive waste. In order to progress the programme for geological disposal in the absence of a specific site, RWM has developed generic, illustrative disposal system designs for three host geological environments. These geological environments are typical of those being considered in other countries and have been chosen because they represent the range that may need to be addressed when developing the Geological Disposal Facility (GDF) for the UK. This paper provides an overview of the updated 2016 design of the UK geological disposal facility and describes the processes of construction, transport, waste package receipt, handling and emplacement and the design characteristics that the disposal facility will need to include for the waste inventory. The paper provides examples of the approach to ensure confidence in safety over the GDF life cycle and discusses the challenges in the design, construction and operation of a nationally significant infrastructure project with a scheduled waste disposal of more than 150 years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Full-Scale Vessel Testing for the Hanford Waste Treatment and Immobilization Plant - 18333

Concerns over the mixing performance of the planned pulse jet mixed (PJM) vessels for high-solids applications in the Hanford Waste Treatment and Immobilization Plant (WTP) Pretreatment (PT) Facility, led to the development of a standard high-solids vessel (SHSV) design and full-scale vessel testing program. The SHSV is intended as a potential replacement for several high-level waste feed receipt and lag storage vessels (High-Level Waste Facility lag storage and feed blending process), ultrafiltration feed preparation vessels (ultrafiltration process system), and plant wash vessels (plant wash and disposal system). The SHSV concept uses multiple smaller vessels (60 500 L - 79 500 L nominal batch size) to replace larger vessels, providing redundancy, improved mixing (PJM design and spargers), monitoring (multi-level bubblers), reduced material at risk, and improved structural features. The SHSV also requires qualification of a single vessel design for high solids Newtonian and non-Newtonian slurry processing, rather than having to qualify earlier multiple vessel designs. An Integrated Technical Team consisting of the U.S. Department of Energy, Bechtel National, Inc., and independent experts was established to accelerate and provide oversight and direction of the test program and SHSV qualification. Qualification of the SHSV for mixing has now been achieved through a comprehensive full-scale vessel testing program conducted in 2017 with a prototypic SHSV under a set of most adverse design conditions, in conjunction with additional engineering analyses. This paper will present an overview of the SHSV, results from the three-phase full-scale vessel test and qualification program completed in September 2017, and the management program to achieve resolution of the PJM mixing technical issue. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Discovering Challenges and Opportunities During Sludge Removal in Savannah River Site's Tank 15 - 18415

Tank 15 is one of 43 active underground waste storage tanks in the Liquid Waste System at SRS. After receiving and storing waste containing insoluble solids (sludge), receipts stopped, and the free supernate evaporated beginning in the 1980's. Tank 15 remained a dry sludge tank for almost 30 years. In 2015, the Tank 15 sludge was rehydrated as the first step of waste removal. Submersible Mixer Pumps (SMPs) were then installed in four risers, as well as other equipment upgrades, to facilitate sludge solids removal. SMPs were successfully used in prior waste removal campaigns, but this was the first deployment of four in a tank. Automated controls were also added to better monitor and protect the SMPs during operation in the more challenging H-area sludge. Waste removal plans consisted of multiple campaigns where sludge was suspended, transferred to Tank 13 and supernate decanted back to Tank 15 for reuse after allowing solids to settle. During the first campaign, sludge solids did not settle at an adequate rate to support the operating plan, and flammability evaluations were impacted. The SMPs also experienced operational challenges. New control logic for the SMPs was useful for early identification of issues; however, some equipment failures still occurred. These challenges were overcome using a combination of additional analyses, operating plan and procedure changes, and tank mapping techniques resulting in the successful removal of the bulk of the sludge from Tank 15. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vitrification Process for Idaho HLW Calcine - 18433

The majority of the liquid wastes produced from reprocessing of several types of spent nuclear fuel at the Department of energy's (DOE) Idaho site have been volume reduced by calcination. The resulting ∼155,600 ft{sup 3} of calcined waste is stored in 43 shielded stainless steel bins, which have a 500-year design life. The calcined material is both a high-level waste and a RCRA hazardous waste, which complicates treatment and disposal options. In addition to a potential direct disposal option, treatment options that have been considered include steam reforming, hot isostatic pressing (HIP), and vitrification. This paper describes testing and evaluation of a vitrification option for the calcine. Vitrification to produce a borosilicate glass has the advantage that it is the only treatment that provides a waste form that meets the current HLW repository waste acceptance criteria. It is therefore the lowest risk option in terms of regulatory and legislative concerns. The present work addressed several key questions: (i) Calcine waste loadings in glass, which determine the number of HLW canisters produced and the required glass production rate (throughput) for the system design; (ii) Melt rate per unit glass pool surface area of the melter, which determines the sizing of the vitrification system; and (iii) The ability to meet waste form acceptance requirements (PCT and TCLP) while achieving reasonable waste loadings. These are issues of fundamental importance to the sizing estimates for the unit operations and overall flow-sheet and they, therefore, directly impact the cost and schedule estimates. Fully compliant, high-waste-loading glasses were developed for two of the four Idaho calcine wastes. The results demonstrate that waste loadings of 35 wt% waste oxides are achievable for the two alumina calcines and about 30 wt% is achievable for the two zirconia calcines. Testing of these formulations in a joule-heated ceramic melter showed glass production rates of over 5000 kg/(m2/d) for the Alumina calcine and over 8500 kg/(m{sup 2}/d) for the Zirconium-Na Blend calcine. These extremely high production rates translate directly into smaller system size and shorter mission duration and, therefore, reduced costs. Based on these results, a preliminary design for the full-scale vitrification system was developed. The system consists of waste receipt, vitrification, off-gas treatment, and canister sealing and decontamination equipment. The calcine is blended with the appropriate glass forming chemicals (or glass frit) and fed to the melter as a solid stream. The melter has a glass pool surface area of about 2.5 m{sup 2} and is equipped with a bubbling system to increase processing rates. Glass production rates of about 6 metric tons per day are projected. The vitrification system would be installed into the existing Idaho Waste Treatment Unit Facility (IWTU) so that no new facilities are required to house the treatment system, thus greatly reducing overall cost, duration, and risk. The system would be designed to treat all of the calcine waste within a period of 12 years at an operating efficiency of 80%, producing a total of about 8500 canisters each weighing two metric tons. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Development of the R79: A new Type B and IP-1-2-3 Transportation Cask for Historic Waste - 18570

In October 2014, Robatel began the design and development of a new Type B and IP-1-2-3 transportation cask, the R79. This cask is designed to transport 'historical' waste from nuclear power plants, nuclear research labs, and nuclear medical isotope production facilities. This 'historical' waste may consist of activated and/or contaminated components including irradiated metal from decommissioning activities, fuel assembly containers, consumables, dried residues, etc. It may also include dewatered ion exchange resins, dried concentrates (salt, metal oxide, sludge, etc.), and hydrogenous materials. The main isotopes in this waste are Co-60 and Cs-137. The cask is not designed to transport fissile material but a trace quantity of up to 22.5 g is allowed. For ease of loading and unloading, the cask is designed to handle waste prepackaged into standard drums. With a loading capacity of 300 kg (661 lb) and a volume of 350 L (12.3 ft{sup 3}), the R79 cask is well suited to carry small to medium-sized waste shipments. The cask body is constructed of 304L stainless steel, its impact limiters are filled with Robatel's FENOSOL{sup TM} foam, and the shielding material includes Robatel's PNT7{sup TM} compound for its thermal and neutron absorbing properties. The cask is loaded in a dry environment and is designed for road transportation. Some novel features were integrated into the design of this cask. With its impact limiters installed, the cask may be treated as a Type B container. Depending on the result of the gas generation analysis, the cask can be treated as either Type B(U) (no limit of the transport duration) or Type B(M) (transport duration limited to 2 weeks). With the impact limiters removed, the R79 cask functions as an industrial-type package (either IP-1, IP-2, or IP-3 depending on the content classification). This can be advantageous for a number of reasons. First, it takes less time for loading and unloading operations when the impact limiters are not installed. Secondly and more importantly, three industrial-type packages can be transported on the same conveyance compared to two Type B packages. These options allow the shipper more flexibility: if the content meets the lower radiation limits for an industrial type package, more waste can be transported on one shipment. If the content must be classified as Type B, the user only must install the impact limiters prior to shipment. The design and development of this cask was performed in 2015, with the first drop testing beginning in July 2015. The complete design documents were first submitted September 2015. Robatel completed the foam for the impact limiters in October 2016, with the completed impact limiters finished in March 2017. The end of manufacturing, delivery of the cask to our customer, and receipt of the regulatory certificate of approval is scheduled before the end of 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

National Plan for the Disposal of Existing and Future TRU Wastes - 18616

Now that the Waste Isolation Pilot Plant (WIPP) has re-opened, after being down for three years due to an accident the DOE National TRU Program has re-developed a plan for the disposal of existing and future TRU wastes. The National TRU Waste Management Plan (NTWMP) is an integrated plan to address the needs of DOE sites across the DOE Weapons Complex that create and store TRU waste, and is centered on the capability of WIPP to receive and dispose of TRU waste. The WIPP capability is planned as a weekly shipping rate and is defined by emplacement and receipt rate capabilities since WIPP is not permitted for long-term storage. And, shipping rates may be constrained by new WIPP Waste Acceptance Criteria (WAC) and future plans for repository configurations and disposal package capabilities over the next 30 years. Since WIPP is the only disposal system available to the DOE for TRU waste disposal, DOE has a newly projected life-cycle need for WIPP to remain open and available up to 2050. It is projected that the need for WIPP will continue up to the year 2050 for the disposition of the remaining legacy TRU inventories and for the disposal of TRU waste continuing to be generated at DOE's National Laboratories. In addition, there are several other potential new waste streams in which WIPP is being considered an alternative solution for their disposition. The NTWMP has been updated to reflect the short-term and long-term plans for TRU waste disposal at WIPP. The short-term plan is used by DOE for budget projection and integration purposes to facilitate and inform budget planning, both in DOE's Environmental Management (EM) and National Nuclear Security Administration (NNSA) organizations. Most legacy TRU waste (generated in the past and stored at DOE sites today) is owned and managed by EM. And, EM submits integrated budget requests for DOE sites, including the integration of resources for TRU waste management. NNSA and DOE's Office of Science (OS) funds TRU waste management as part of their mission funding and NNSA should eventually be the primary user of the WIPP resources as EM's legacy TRU waste is cleaned-up. Prior to the unexpected shutdown of WIPP in 2014, there was a small back-log of waste certified for WIPP disposal and shipments of TRU waste to WIPP were 'just-in-time' as waste was certified. After three years of WIPP being down, DOE sites have built significant back-logs of TRU waste to be certified for WIPP. That back-log built up to over 25,000 containers of TRU waste during that three-year period (Table 1). The backlog included both Contact-Handled (CH) TRU waste and Remote-Handled (RH) TRU waste, and even though WIPP re-opened in April of 2017, it is only open for TRU waste containers that can be stacked on disposal room floors. Plans for changing RH waste disposal packages and methods are in-the-works, but are not yet mature enough for significant planning. In addition, the WIPP underground facilities are now partially contaminated with radioactive particulate, which significantly reduces the WIPP operational efficiencies as compared to 2014. With a large back-log of waste ready for WIPP disposal and limited throughput for WIPP disposal rates, the focus of the NTWMP is to prioritize the selection of TRU wastes from the various sites based on WIPP waste emplacement rates and shipping rates to WIPP. Some TRU waste sites have a significant need to be top priority for shipments to WIPP, and that must be balanced with the need for all TRU waste sites to have some shipments to deplete their back-log of TRU wastes. Storage and management of TRU waste is very costly for DOE and many of those resources could be used to optimize the overall disposition of TRU waste and save DOE significant funding. In addition, the plan will show the possible transition of TRU Waste Management from primarily being an EM function to being an NNSA function in the coming years. As legacy TRU waste inventories are removed, and as NNSA mission-related TRU waste inventories are produced, DOE will be faced with deciding where the primary responsibility for TRU waste management should reside. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗