Vadose Zone Model for B-3 Pond for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3. Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The scope of this ECF is to document the development and results of the B-3 Pond vadose zone model. The B-3 Pond model covers the main lobe of the 216-B-3 Pond System located in a topographic low east of the 200 East Area. The pond system operated from 1945 to 1997 and received effluents from the Plutonium Uranium Extraction Plant, B Plant, 284-E Powerhouse, and other 200 East Area facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for LW Crib Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Can Incineration and Vitrification Process for the Treatment of Transuranic Wastes - 20035

Technological alpha contaminated wastes are produced by the nuclear fuel cycle management industry, essentially from MOX fuel production units. These Plutonium Contaminated Materials (PCM) contain a mixture of organic, metal and mineral materials, contaminated with uranium, plutonium and americium. One treatment scenario under study is to incinerate the organic materials, melt the metallic fraction and incorporate the mineral fraction (including ashes from organics incineration) into a glass matrix without sorting or pretreatment (grinding for instance). A scale 1 pilot of this PIVIC process (Process for Incineration and Vitrification In Can) has been commissioned in 2018 at the CEA R and D vitrification facility in Marcoule site. A R and D program aiming to demonstrate the feasibility of this process is currently on going. This paper starts with a description of PIVIC process with explanation of the technologies involved. Then, main results of the first year of operation with the technological demonstration goal are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for B-3C Pond for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3. Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The scope of this ECF is to document the development and results of the B-3C Pond vadose zone model. The B-3C Pond model covers the 216-B-3C Expansion Pond of the 216-B-3 Pond System located in a topographic low east of the 200 East Area. The pond system operated from 1945 to 1997 and received effluents from the Plutonium Uranium Extraction Plant, B Plant, 284-E Powerhouse, and other 200 East Area facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the April 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the April 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained. The April 2025 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the First Quarter Fiscal Year 2025 (1QFY2025) and the Second Quarter Fiscal Year 2025 (2QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Fourth Quarter Calendar Year 2020 Tank 50 Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the Fourth Quarter Calendar Year 2020 (CY20) sample of Tank 50 salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Remediation (SRR) for the transfer of aqueous waste from Tank 50 to the Saltstone Production Facility (SPF), where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) Limits and Targets. The chemical and radionuclide contaminant results from the characterization of the Fourth Quarter CY20 sampling of Tank 50 were requested by SRR personnel via a Task Technical Request (TTR) and details of the testing are presented in the Savannah River National Laboratory (SRNL) Task Technical and Quality Assurance Plan (TTQAP). This Technical Report is part of Deliverable 2 relating to Task 1 from the SRR request. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals per Task 2 from the SRR request, will be obtained semi-annually for the 1QCY21 and 3QCY21 Tank 50 samples. However, data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals for this current 4QCY20 Tank 50 sample will be obtained and documented per the special analysis associated with the vault classification sample as described in the associated TTQAP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Excavation Volume Growth Factors at Environmental Remediation Sites - 20318

The U.S. Army Corps of Engineers (USACE) manages numerous environmental remediation projects in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, otherwise known as CERCLA. These include projects for the Formerly Utilized Sites Remedial Action Program (FUSRAP). Utilizing the CERCLA framework to address these projects requires detailed cost estimates and a significant portion of costs are associated with the volume of material to be excavated and that material's final disposition. Accordingly, understanding the expected volumes and uncertainty associated with those volumes is vital to project cost estimating. These estimates are completed at various stages of the CERCLA process, thus the project team has varying degrees of information available from which to develop these estimates depending on how far along the project is. Understanding the factors contributing to volume growth (increase in volume of material from that originally estimated) is a crucial element to determining volume and cost uncertainty. This paper presents a case study of a FUSRAP site which involves excavation and offsite disposal of contaminated soils from complex commercial, industrial, and residential properties. Original volume estimates were compared to post excavation volumes on a property by property basis. Reasons for differences are determined along with magnitude of impacts to cost estimating. For both residential and commercial property types, volume estimating factors, uncertainty considerations, and methods to account for each are discussed with emphasis on volume growth considerations. Cost estimating model input considerations are discussed with specific emphasis on accounting for volume uncertainty at the Feasibility Study (FS) phase of CERCLA. Underestimating or overestimating costs at the FS phase has repercussions under CERCLA that may impact project close out or completion schedule. Discussions presented will be helpful to both reviewers and preparers of cost estimates involving excavations. Additionally, project planners may be able to use the information to plan for volume growth contingencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adaptive Site Management Strategies for the Hanford Central Plateau Groundwater

Adaptive site management (ASM) is a systematic and iterative management approach that can be used to expedite the remediation of large and/or complex sites. ASM is defined as a formal and systematic project or site management approach centered on rigorous site planning and a firm understanding of site conditions and uncertainties, using science and technology to routinely re-evaluate and prioritize site remedial actions and characterization activities. The goal of the approach is to create a framework of structured and continuous planning, implementation, and assessment processes that accommodates new information and changing site conditions to develop effective and efficient cleanup approaches that achieves the required outcome(s) while optimizing costs, cleanup timeframe, and performance. Central to ASM is an evolving conceptual site model (CSM). Over time, incremental reductions in uncertainty associated with the CSM will occur, while supporting continued progress toward site cleanup and closure through remedy optimization and evaluation. ASM has the potential to expedite cleanup for the Central Plateau area at Hanford through a planned and systematic approach for reducing uncertainty with targeted characterization activities, while continuing remediation activities that advance cleanup for key risk-driving contaminants. A core component of cleanup within the Central Plateau is the 200 West Pump-and-Treat (P&T) system. Even with an active P&T remedy, uncertainty exists with respect to plume distributions, total mass in the aquifer, and currently known continuing sources. Additional uncertainty is associated with multiple contaminant source locations in the vadose zone, which have the potential to create new groundwater plumes in the absence of any source control measures, although not all contaminant fluxes to groundwater will result in contaminant concentrations above cleanup levels. Collectively, these uncertainties need to be addressed in the CSM to support effective and efficient site progress toward cleanup goal(s). Other nontechnical factors that may warrant an ASM approach at the Hanford Central Plateau are associated with the formation of operable units (OUs) used to manage cleanup. With the exception of the 200-ZP-1 OU, the three remaining groundwater OUs only have interim action records of decision. Nine vadose zone source area OUs are also in the early stages of the remedial investigation and feasibility study process, with pending characterization and technology identification activities. A set of proposed site objectives for the Central Plateau are provided in this document as an initial consideration/example and basis for discussion for ASM implementation. These example site objectives were selected with the goal of maintaining protectiveness at the Columbia River through confinement of contaminant plumes within an administratively controlled area below existing surface waste sites and waste disposal facilities. Although site decision makers and regulators need to provide concurrence, these site objectives are used in this document to describe the elements of an ASM approach, including selection of interim objectives and a long-term adaptive management plan. Interim objectives are also defined to yield measurable incremental progress toward the overall site goals. This document identifies initial technical considerations for developing an ASM framework for the Central Plateau cleanup decisions. These considerations are intended to facilitate more specific decisions, such as objectives, near- and long-term actions, and performance metrics, to develop an overall approach that maintains protectiveness but recognizes the uncertainty, long timeframe, and technical challenges that need to be considered in selecting, implementing, and managing remediation at the Hanford Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Desorption and Co–Dissolution of Uranium–Bearing Solids During Alkalinity–Enhanced Flushing of Contaminated Sediments

Elevated uranium concentrations in groundwater remain a persistent challenge at contaminated sites. Several sites rely on natural flushing of uranium as a remediation strategy. Uncertainties in conceptual models can cause remediation strategies to underestimate timeframes required to reach remediation goals. In this study, laboratory experiments were conducted to investigate uranium flushing of sediments from a site with persistent groundwater contamination. Six columns were used to simulate alkalinity-enhanced flushing of uranium from sediments, by switching influent alkalinity after ~12 pore volumes. About 20% to 31% of sediment uranium was consistently flushed from the sediments. K d values varied greatly (5.3 to 117 L/kg) but were consistently lower (20% to 50%) during influents with elevated alkalinity. The mass of uranium recovered from the columns also was consistently higher (5% to 80%) during alkalinity-enhanced flushing periods. However, column experiments with sequentially increasing alkalinity showed diminishing returns in uranium elution at higher carbonate concentrations. The loss of flushing efficiency is attributed to significant calcite precipitation at higher alkalinities. Furthermore, the results show that alkalinity-enhanced flushing of uranium could be employed as a viable remediation scheme if calcite precipitation could be minimized in a field application.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removable, Sequestration Coatings for Mitigating Hazardous Contaminants Related to Deactivation and Decommissioning Activities

This project is a collaborative effort between InnoSense LLC (ISL) and Oak Ridge National Laboratory (ORNL) aimed at mitigating the mercury (Hg) contamination problem at the Y-12 National Security Complex (NSC). The report summarizes the research and technology development work of the Phase IIB Project, led by Dr. Uma Sampathkumaran at ISL for the period of July 31, 2017–October 31, 2021. The Y-12 site cleanup includes technologies for safe and cost-effective facility demolition, soil remediation, and on-site treatment and disposal of mercury bearing wastes. One of the technology demonstration goals was a reactive strippable coating for targeted pre-demolition and de-contamination to limit Hg mobilization and the volume of debris requiring treatment for disposal. Toward this, ISL has developed a water-based reactive strippable coating (Trap & See-Hg™) to sequester elemental Hg(0) and mercuric Hg(II) species in the coating. The coating provides multiple benefits including (1) Hg vapor suppression, (2) sealing in the hazardous contaminants, (3) visually locating the contaminant through color changes, and (4) remediating the contaminated surfaces upon coating removal. Through collaboration between ORNL and ISL in Phase II work, the team successfully demonstrated the Trap & See-Hg technology to (1) visually locate the presence of Hg on concrete, soil and drywall surfaces, (2) effectively sequester all mercury species (elemental, soluble and insoluble Hg) from lab-generated and ex-situ soil and brick/rubble samples collected from the Y 12 site with 80 to 95% efficiency to capture/reduce Hg vapor concentration, (3) be applied by manual and robotic spray applicators and cure at room ambient, (4) remain a cohesive and peelable coating upon drying, and (5) sequester Hg0 from walls in the alpha-2 building basement at Y-12 during a small scale in-situ field trial. In Phase IIB, ISL’s effort was focused on refining the coating formulations with additives containing passive and reactive sorbents, colorimetric indicator, and thixotropic agents to achieve the desired performance. The paints were then evaluated at ORNL for applicability to metal and concrete surfaces of different sizes and shapes, and soil rubble, Hg-sorption capacity and achieving sag-free coating on surfaces when applied by a manual spray applicator. Ambient cure of the coating resulted in a dry thickness of 16–20 mil. The coatings were removed from smooth or rough surfaces with low to moderate force. Both lab-generated Hg-contaminated samples and soil and brick/rubble samples containing a range of Hg concentrations (collected from the Y-12 site by UCOR) were used in this project. Optimized formulations were applied to these samples and evaluated for ability to suppress Hg vapors, sequester Hg 0 and Hg(II) species and color mapping of mercury species on the test surface. The ORNL team initially identified three to four potential sites at Y-12 and ORNL for potential demonstration. However, the pandemic closed any possible avenues for on-site demonstration of the robotic spray applicator. The metal and concrete samples with low to high Hg content provided by UCOR from an ongoing demolition were subsequently used for ex-situ sample characterization and analysis at ORNL over a period of 25 days. The coatings suppressed Hg vapors with an efficiency of 95–99% from heavily contaminated metal and 60% from concrete substrate. Analysis of total Hg in the peeled paints indicates sorption capacities ranging from 12 µg Hg/g of paint from concrete to 1.2 mg Hg/g of paint from the metal substrates while peeled paints from soil samples could capture a total Hg from 2.3 mg Hg/g to 66 mg/g paint. Toxicity characteristic leaching procedure (TCLP) tests recovered total mercury leached at 0.15±0.0008 µg/L for concrete to 126.81±0.67 µg/L and 377.25±5.67 µg/L for the two metal substrates, to allow for informed decisions on downstream disposal considerations. Together, this Phase IIB demonstrated the potential value of the Trap & See-Hg for Hg uptake, vapor suppression, and color mapping, and may thus be used to enhance worker safety during site cleanup, facility demolition, and downstream waste disposal at Y-12 NSC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the October 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the October 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TAR GETS that were established at the time the SWPF DSS sample was obtained. 1 The October 2025 Semiannual sample of the SWPF DSS is a composite from one month of SWPF processing during the Third Quarter Fiscal Year 2025 (3QFY2025) and two months of SWPF processing during the Fourth Quarter Fiscal Year 2025 (4QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear waste Educator's workshop: What and how do we teach about nuclear waste?

A workshop was held at the Massachusetts Institute of Technology (MIT) on July 25th and 26th, 2022. The objective was to develop a blueprint for educating next-generation engineers and scientists about nuclear waste management and disposal, which requires knowledge from diverse disciplines, including nuclear, chemical, civil, environmental, and geological science and engineering. The 49 participants included university professors, researchers, industry experts, and government officials from different areas. First, we have developed a list of key fundamental knowledge on waste management and disposal across the nuclear fuel cycle. In addition, we discussed strategies on how to teach students with diverse backgrounds through innovative teaching strategies as well as how to attract students into this area. Through the workshop, we identified the critical needs to (1) develop community resources for nuclear waste education; (2) synthesize historical perspectives, including past contamination and the management of general hazardous waste; (3) emphasize a complete life-cycle perspective, including proper waste management as the key component for energy sustainability; (4) teach students how to communicate about the key facts and risks to technical and non-technical audiences; and (5) accelerate the use of the state-of-art-technologies to attract and retain a young workforce. Furthermore, we aim to build a diverse, inclusive community that supports students in developing their own narratives about nuclear waste, particularly in recognizing that antagonistic views have been important to improving safety and protecting public health and the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status Update on TRAC: A DOE-EM Tool for Tracking Groundwater Cleanup and Progress Toward Site Closure - 20245

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) uses a customized, web-based mapping tool called TRAC (Tracking Restoration and Closure) to communicate information on plume sizes, remedial approaches, regulatory drivers, exit strategies, and long-term stewardship requirements at all sites within the DOE-EM complex. The web-based GIS story maps provide robust geospatial visualization of plumes at DOE sites using an intuitive interface that allows users to explore the plume maps, explanatory text, photographs, and video. This collection of story maps not only communicates information for each individual site, but also summarizes pertinent metrics on cleanup and remaining contaminants across all EM sites. This paper describes a new design within TRAC for communicating metrics on plume status, regulatory cleanup progress, and technology implementation. A principal benefit of TRAC is the ability to view individual pieces of data at a time, permitting targeted questions to be addressed, such as the status of regulatory decisions, site cleanup priorities, and site closure needs for each site within the DOE-EM complex. TRAC manages communication and supports decision-making through knowledge access, data and information transparency and traceability, and inclusive participation. It serves as a common resource that provides consistent information for DOE managers, site personnel, regulators and stakeholders. Because long-term stewardship of legacy waste sites requires ongoing coordination and communication among DOE, regulators, and stakeholders, TRAC can also be used to help transition EM sites to the Office of Legacy Management at site closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using Multiple Geophysical Methods to Refine a Stratigraphic Conceptual Site Model at a Nuclear Waste Site

At contaminated sites, there is a critical reliance on conceptual site models of which a key component is the geologic framework model (GFM), which is used to build predictive fate and transport modeling in support of remediation goals. Here, we detail an ongoing study at a nuclear waste site (Hanford Site, Washington, USA) where surface geophysical methods were used to complement existing borehole information and to help site new boreholes to update and refine the GFM. Ground-based electrical resistivity tomography (ERT), time-domain electromagnetics (TEM), and seismic data was acquired on the Hanford Site’s Central Plateau, where the presence of a hydraulically transmissive subsurface feature, or paleochannel, was suspected but uncertain based on contaminant concentrations at sparsely located boreholes. To assess and compare ERT, TEM, and seismic geophysical datasets, co-located data was acquired in an area where the existing GFM was more certain. Surrounding the suspected paleochannel, ERT and seismic refraction tomography showed similar subsurface structures consistent with a channelized feature. While TEM interpretation was limited in the suspected paleochannel area due to a thick resistive top layer and high electromagnetic noise, TEM showed greater utility in a different area where these factors were less prevalent. Based on the results of quasi-3D ERT inversions, we propose updates to the GFM, including identifying a paleochannel. Further, we evaluate the utility of geophysical methods and examine lessons learned that will be used as a basis for continued characterization efforts to support site management decisions and implementation efforts.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment the leaching characteristics and long-term leaching behavior of some radionuclides from synthesized zeolite cement matrix

Highlights: • Synthesis and characterization of zeolite cement synthesized from fly ash • Leaching tests were used to assess the release rate of {sup 85}Sr and {sup 60}Co radionuclides. • Simple mathematical models were used to detect leaching mechanisms. • Long-term leaching behavior of {sup 85}Sr and {sup 60}Co from cementitious matrix was assessed. The development of cementitious materials remains a vital goal to produce valuable products with good mechanical, physical and chemical properties suitable for the safe disposal of concentrated radionuclides resulted from the treatment of contaminated solutions. In this paper, zeolite cement with good properties was laboratory synthesized from industrial by-products fly ash and characterized using various characterization techniques. The leaching characteristics of strontium and cobalt radionuclides from the synthesized zeolite cement were scrutinized conforming with the standard leaching methodology of International Atomic Energy Authority (IAEA). A mechanical strength assessment was executed to characterize the extent of immobilization process of the solidified matrices. The cumulative leaching fraction (φ) of the two studied radionuclides was found to be less than 5% in all examined conditions, which implies the applicability of the IAEA-recommended methodology for estimating the diffusion coefficient. The experimental leaching data were regressed nonlinearly to various mathematical kinetic models to assess the controlling leaching mechanism and to determine the leaching parameters. The regression results indicated that strontium ({sup 85}Sr) and cobalt ({sup 60}Co) leaching resulted from two succeeding mechanisms: as first order kinetic reaction, and then diffusion. The calculated values of leachability indices signify that the performance of each of the studied matrices is within an acceptable range. A simplified mathematical model, rooted in the first order reaction and diffusion mechanisms, was simulated to predict the radionuclides leaching rates from zeolite cement matrices. By comparing the synthesized zeolite cement with other cementitious materials, it can be concluded that the synthesized material can be classified as an efficient material suitable to immobilize {sup 85}Sr and {sup 60}Co from radioactive wastes. The acquired findings demonstrated that the studied immobilized waste matrices have acceptable mechanical effectiveness.

36 MATERIALS SCIENCE↗

Guidance for Monitoring Passive Groundwater Remedies Over Extended Time Scales

Passive remediation can be appropriate where natural processes and actions such as institutional controls mitigate exposure to contaminated groundwater, achieving remedial action objectives and protectiveness of human health and the environment. Monitored natural attenuation (MNA) is a prevalent passive remediation strategy supported by a regulatory framework and monitoring design guidance. However, long-term passive remedies are usually selected in combination with at least one active remedy, such as source removal, in situ treatment, or pump-and-treat, functioning as a complementary method for achieving remediation objectives and meeting the applicable statutory and regulatory requirements. However, MNA and existing monitoring guidance primarily target situations where the remedial action objectives are met within a few decades. When time scales for passive remediation extend to many decades (50 years or more), a corresponding change in monitoring strategy is needed to adapt to the extended time scale. This document provides guidance for implementing an extended-scale monitoring (ESM) approach appropriate for long-duration passive remediation. Extended-scale is defined in this document with respect to time (i.e., a long duration of remediation) and a large enough physical scale such that downstream receptors will not be impacted within the remediation timeframe. ESM applies to slow-moving groundwater contaminant plumes and emphasizes monitoring primarily for potential exposure pathways. For this approach, the primary monitoring objective is to demonstrate that the plume diminishes before reaching the receptor zone or point of compliance and/or a receptor does not receive concentrations above the compliance limit. While the overall objectives of protecting human health and the environment are the same as for plumes where remediation can occur over a shorter time period, the time scales between decisions are longer and the dynamics of plume evolution are slower. To this end, a scenario-based strategy is described for different plume and source conditions, defining a containment and receptor zones. The containment zone is the area where the risk of exposure to groundwater contamination can be mitigated (e.g., through institutional controls) during the remediation time period. The receptor zone is defined as the area where exposure to groundwater contamination cannot be mitigated and compliance concentration standards must be met. Within the containment zone, slow plume migration may occur, leading to concentrations that exceed compliance standards. However, where distance to the receptor zone is large relative to plume migration and attenuation rate, this approach can be protective of the receptor zone. Selection of a long-duration passive remedy needs to be based on sufficient understanding of contaminant sources, hydrogeology, and contaminant plumes. A strong technical basis, supported by predictive analysis, is recommended to substantiate that contamination is expected to stay within the containment zone during the active remediation and attainment phase of the remedy, and diminish to meet compliance standards within the extended timeframe prior to reaching the receptor zone (e.g., many decades or even centuries). The ESM approach is based on verification of plume behavior and not on detailed plume dynamics. Monitoring is conducted to confirm expected behavior with an emphasis on exposure pathways to verify that plumes remain contained in areas where the protectiveness objectives can be met. ESM should not be adopted if there is significant risk of the plume extending beyond the containment zone. Given the slow movement within the containment zone, less frequent sampling is required relative to approaches used for conventional-scale remediation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of electrostatic precipitator (ESP) technology to remove elemental mercury vapor, HG(0)

The presence of mercury vapor or other forms of mercury presents issues with worker safety, decommissioning facilities, and environmental impacts. As such, it is desired to develop a strategy to either remove or reduce mercury levels in Oak Ridge’s Y-12 Complex facilities. A testing methodology was developed to evaluate electrostatic precipitator technology for removal of mercury vapor. This methodology involved supplying mercury vapor-containing air to the ESP device by flowing air through a column containing alternating layers of sand and liquid mercury droplets. Initial attempts at quantifying the efficacy of the ESP device in removing mercury vapor were plagued with difficulties in controlling the flow of mercury into the ESP device due to poor performance of the generator column and the contamination of these experiments with mercury from an unknown source. These issues were resolved by creating a new generator column with slower air velocity and higher surface area of liquid mercury, along with moving the air intake for the ESP device to outside of the chemical hood in which testing took place. This resulted in a steady, quantified flow of mercury vapor from the generator column and no observation of unintended mercury sources. A final test of the ESP device under these controlled conditions showed that for a certain amount of time (on the order of 20-30 minutes) mercury concentrations were reduced by approximately 33 - 67% of the inlet concentration. However, episodic releases or pulses of mercury observed only at the outlet indicated that the mercury accumulated in the ESP device is periodically expelled. As a result, it was not deemed to be an efficient strategy for the removal of elemental mercury vapor.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Soil Sampling Results for Closure of a Portion of Solid Waste Management Unit #16

The U.S. Department of Energy/National Nuclear Security Administration (DOE/ NNSA) and National Technology & Engineering Solutions of Sandia, LLC (NTESS), the management and operating contractor for Sandia National Laboratories/California (SNL/CA), has prepared this soil sampling results report for closure of a portion of Solid Waste Management Unit (SWMU) #16. The entire network of SNL/CA sanitary sewer lines, including building laterals, was identified as SWMU #16 under a Resource Conservation and Recovery Act (RCRA) Facility Assessment conducted for SNL/CA in April 1991 (DOE 1992). Along with the previous SWMU #16 investigation results (SNL/CA 2019), the results of this investigation are intended to support closure decisions by the San Francisco Bay Regional Water Quality Control Board (RWQCB), as discussed below. SNL/CA personnel completed upgrading its sanitary sewer discharge network in 2019. These upgrades included installing new sections of underground lines and decommissioning certain sections of the old piping system by capping in place. To date, several sections of the sewer line have been abandoned-in-place by capping as new sewer lines were installed or flow was rerouted to other existing lines. To formally close these abandoned sections of the sewer line, the RWQCB required that SNL/CA personnel collect soil samples to be analyzed for contaminants potentially released from the sewer lines. SNL/CA personnel hired Weiss Associates (Weiss) of Emeryville, California to prepare a sampling and analysis plan, implement the sampling plan and report the results of the investigation under Purchase Order #2166257. The Sampling and Analysis Plan for Partial Closure of Solid Waste Management Unit #16 (SAP) was submitted to the RWQCB on August 14, 2020 by Weiss on behalf of SNL/CA. The RWQCB approved the SAP on September 30, 2020 after Weiss updated the method detection limit and reporting limits for total polychlorinated biphenyls (PCBs) and individual aroclors. Soil sampling was conducted in accordance with the SAP except that fewer locations were sampled due to site constraints, as discussed below. This report presents the results of the sampling effort and documents all associated field activities including borehole clearing, soil sample collection, storage and transportation to the analytical laboratories, borehole backfilling and surface restoration, and storage of investigation-derived waste (IDW) for future profiling and disposal by SNL/CA waste management personnel.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗