Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Safety-Related Instrumentation and Control Upgrade Pilot Project: NUREG- 0711 Process Development, Planning and Analysis Activities, and Lessons Learned

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper presents the development execution of the HFE Program through completion of the Planning and Analysis Phase as defined by NUREG-0711 as well as HFE lessons learned.

99 GENERAL AND MISCELLANEOUS↗

Tribal Revegetation Project Final Project Report: 92-Acre Area, Area 5 Radioactive Waste Management Complex, Nevada National Security Site, Nevada

Nuwu (Southern Paiute), Newe (Western Shoshone), and Nuumu (Owens Valley Paiute) are linguistically related, Numic-speaking peoples who are part of the broader Uto-Aztecan language group. Numic peoples view the land as a holistic, living, sentient being with feelings and purpose. The land is personified with human characteristics and it needs to be experienced to be understood through “learning by doing.” Numic peoples do not support ground disturbing activities within their ancestral lands, including activities tied to the storage of low-level radioactive waste or classified materials on the NNSS, which they view as culturally inappropriate. These deep-rooted ancestral connections are the impetus for reinforcing Numic responsibility for healing disturbed areas by integrating respect and patience with consistent Tribal interaction. Tribal Ecological Knowledge (TEK) is the science of describing Tribal approaches for understanding natural resources. Numic TEK is embedded in traditional teachings learned incrementally over time though experience and it evolves through lessons learned and responses to environmental changes over millennia. Therefore, TEK can broaden and enhance Western scientific knowledge associated with revegetation, especially in highly disturbed areas. The project blended TEK with Western scientific ecological methods to create a vegetative cover within test plots on the 92-Acre Area located at the Radioactive Waste Management Complex (RWMC) located in Area 5 on the Nevada National Security Site (NNSS). The vegetated test plots were systematically created for the Department of Energy (DOE) in tandem with the existing Federal Facilities Agreement and Consent Order (FFACO) with the Nevada Department of Environmental Protection (NDEP). Three previous contractor-lead attempts at revegetation, one targeting full cover revegetation and two targeting test plot revegetation, did not achieve the anticipated results at this location. When presented to the 16 American Indian Tribal nations and affiliated groups with cultural and historical ties to the NNSS, the group appointed a Tribal Revegetation Committee (TRC) that included six expert Tribal knowledge holders to collaborate with an ethnoecologist/cultural anthropologist and two biologists. Project design, planning, seed and outplant selection, spiritual land preparation, and methodology were guided by the TRC and an ethnoecologist/cultural anthropologist from Portland State University (PSU) and biologists from Desert Research Institute (DRI). Using TEK, the TRC recommended a specific seed mixture that contained nine native plant species and three species of outplants. The revegetation effort included preparing and planting thirty 10 m × 10 m (32.8 ft × 32.8 ft) seeded plots, twelve of which also included outplants; and eight 10 m × 100 m (32.8 ft × 328 ft) plots that only received outplants, all atop a waste cell cover. The TRC and the project team creatively adapted TEK with Western scientific methods so that the planned revegetation efforts could occur within the safety and security parameters of the RWMC. Test plots were subjected to one of five soil treatments with varying combinations of straw or mulch applications, soil amendment, and/or outplant planting and one of two watering treatments (watered or unwatered). Planting was divided into two events: one in the fall season and another during the subsequent spring season based on TEK and a corresponding recommendation from the TRC. Monitoring and spiritual management was conducted by the TRC to evaluate plant progress on a monthly basis (in conjunction with the biologist and anthropologist) during each respective growing season for a period of three years after planting. This approach allowed Tribal members the opportunity to conduct traditional blessings and other culturally appropriate activities to restore balance to the land in accordance with Tribal protocols. Following TEK-guided methods, successful plant establishment from seed stock and outplants was observed in many plots. Overall, plots planted in the spring, as recommended by the TRC, showed higher rates of outplant survival and native seedling emergence than those planted in the fall. This finding is significant because it is contrary to the original guidance and previous approaches provided for planting in this region. The TRC believes the frequent co-occurrence of native seedlings near surviving outplants indicates an important symbiotic relationship understood by Tribal communities and overlooked by others. Watered outplants displayed much higher survivability than unwatered plants, even after watering was reduced after the plants were established. Soil amendments and mulch created higher densities of native plants from seed. Many native seedlings showed significant delays in germination, which is considered a normal adaptation to desert climates. Some native plants did not germinate until the third growing year, whereas others germinated during the first growing year, which demonstrates the complexity of the desert environment. Evidence of native insects, reptiles, mammals, and birds, as well as native plants that were not part of the planted species, were noted and considered culturally significant. Despite the presence of non-native plants, native outplants continued to thrive and the incidence of native plant germination from seed increased over time. These successful revegetation results where previous efforts were unsuccessful reinforce the importance of integrating regionally appropriate, TEK-guided methodology with Western science to achieve positive results and the necessity of integrating Tribal involvement in all stages of the revegetation effort. Expanded approaches coupled with Tribal knowledge and tools from Western science addressed a complex problem tied to revegetating atop a low-level radioactive waste cell. The level of Tribal participation serves as a progressive model for building collaborative relationships and addressing ecological challenges on the NNSS.

54 ENVIRONMENTAL SCIENCES↗

Radionuclide Inventory Distribution Project Data Evaluation and Verification White Paper

Testing of nuclear explosives caused widespread contamination of surface soils on the Nevada Test Site (NTS). Atmospheric tests produced the majority of this contamination. The Radionuclide Inventory and Distribution Program (RIDP) was developed to determine distribution and total inventory of radionuclides in surface soils at the NTS to evaluate areas that may present long-term health hazards. The RIDP achieved this objective with aerial radiological surveys, soil sample results, and in situ gamma spectroscopy. This white paper presents the justification to support the use of RIDP data as a guide for future evaluation and to support closure of Soils Sub-Project sites under the purview of the Federal Facility Agreement and Consent Order. Use of the RIDP data as part of the Data Quality Objective process is expected to provide considerable cost savings and accelerate site closures. The following steps were completed: - Summarize the RIDP data set and evaluate the quality of the data. - Determine the current uses of the RIDP data and cautions associated with its use. - Provide recommendations for enhancing data use through field verification or other methods. The data quality is sufficient to utilize RIDP data during the planning process for site investigation and closure. Project planning activities may include estimating 25-millirem per industrial access year dose rate boundaries, optimizing characterization efforts, projecting final end states, and planning remedial actions. In addition, RIDP data may be used to identify specific radionuclide distributions, and augment other non-radionuclide dose rate data. Finally, the RIDP data can be used to estimate internal and external dose rates. The data quality is sufficient to utilize RIDP data during the planning process for site investigation and closure. Project planning activities may include estimating 25-millirem per industrial access year dose rate boundaries, optimizing characterization efforts, projecting final end states, and planning remedial actions. In addition, RIDP data may be used to identify specific radionuclide distributions, and augment other non-radionuclide dose rate data. Finally, the RIDP data can be used to estimate internal and external dose rates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons from the Bevatron Accelerator Demolition - 12191

The Bevatron accelerator at Lawrence Berkeley National Laboratory is the first DOE accelerator to be demolished. While there are many lessons learned from its demolition, this paper focuses on the following lessons learned that may be useful for other D and D projects: bounding project scope to ensure success, hazards mapping for focused characterization and remediation, establishing radiological evaluation criteria, and forecasting activation products. With D and D of many DOE accelerators likely to occur in the near future, these lessons learned should be considered in planning those projects. These lessons learned are likely to be applicable to other D and D projects as well. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tribal Renewable Energy Report - Final Report: Bishop Paiute Tribe Residential Solar Program. Phase 1 (DOE Award # DE-EE0006949)

The objective of the project was to provide affordable renewable energy to 22 low income reservation homeowners; provide job training to tribal members and reduce air pollution by equivalent carbon offsets. The project exceeded grant objectives installing 66kW of rooftop solar on 22 low income single family homes and providing hands-on PV rooftop solar installation training to 24 tribal individuals (four more than planned). The project was a phased installment of an on-going partnership between the Tribe and GRID that was initiated in 2013 whereby 62 rooftop solar units were installed prior to this funded effort. The reported work in this report describes the funded effort where US Department of Energy provided partial funding through grant award IE0006949 and marks the first phase of an effort matching California Solar SASH Initiative funding with DOE Office of Indian Energy Funding and brings the total for the program to 84 installed systems (running total of 271 Kw installed) and the end of the project. Tribal workforce development was a key aspect of the project and trained 24tribal members for a total 1168 cumulative on-job training hours. The solar installations and training efforts were fully completed by September of 2016 with 66.6 kW installed - 8 kW more than the original estimate stated in the grant application.

14 SOLAR ENERGY↗

Solar Street Lighting: Using Renewable Energy for Safety for the Turtle Mountain Band of Chippewa

Renewable energy has grown throughout the years. It is not just something for today. With the United States power electrical grid being 100 plus years old, renewable energy is the future. There are many different types of renewable energy. Solar photovoltaic array units and wind turbines seem to be the most common community scale renewable energy systems. There are new solar and wind farms popping up in more and more places each day. It is said that installing the farms is a fast process as compared to dotting the "i's" and crossing the "t's" (paper work), which is really the most time-consuming part of the entire project. During the internship at Sandia, the Indian Energy interns attended many field visits to various tribal reservations. On these field visits, the interns were able to experience first-hand some amazing renewable energy plans and projects which have now become a reality. With each site visit, the success of tribal projects is seen where hard work and persistence pays off. It brings joy to see these tribes making their dreams a reality. It is heartwarming to hear the stories of why the tribe chose to bring renewable projects to their people. It is also very informative because the tribal hosts encourage as many questions as can be asked. The field visits are what make ideas possible and to dream of what could be pursued. Research is a big part making these goals and dreams a reality. Without the field visits and knowledge shared by the tribal staff and leaders, a relevant research topic would have been difficult to focus on. Returning for a second summer as an intern at Sandia National Laboratories' Indian Energy program, several research topics were considered. Ultimately, this research paper's focus is to incorporate renewable energy specifically to take care of Mother Nature as well as the Turtle Mountain Band of Chippewa Indian people. There have been many deaths on North Dakota Highway 281, which it is the main road of the Turtle Mountain Band of Chippewa reservation. The highway has a high volume of traffic every day, in addition to many people who frequently walk this road. There is no walking or bike path along the road; most people tend to walk the shoulders of the road. This research paper is a way to help protect these pedestrians with an idea of lighting the highway from the west end of Belcourt to one of are housing developments that is 5.34 miles to the west of town. This research paper will look at the various types of street lighting methods and provide recommendations for a suitable and economical project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The use of wholesale market purchases by Western U.S. electric utilities

Load Serving Entities (LSEs) can procure electricity from their owned generation or purchase it on bilateral or centrally organized markets. Electric utility procurement decisions have important implications for resource adequacy, which is gaining attention especially in the Western U.S. However, there is little or no research on trends of utility procurement practices, and the role that wholesale market transactions can have for resource adequacy and other applications. This paper leverages information from the U.S. Department of Energy’s Energy Information Administration, Berkeley Lab’s Resource Planning Portal, and structured interviews with regulatory and utility staff. We find that use of market transactions to meet electric energy needs has been increasing across U.S. LSEs. The reasons for this trend include a general stagnation in building owned resources, a preference towards contracting renewable energy resources to meet RPS targets, and the lower relative cost of wholesale market electricity. Among market transactions across different time scales, short-term transactions were prevalent in Western U.S. LSEs until the 2008 recession, and thereafter declined to about a quarter of total purchases. In contrast, long-term market transactions have become more prevalent and resource planning reports project the share of these transactions in the procurement mix may continue to increase. Results suggest resource adequacy obligations may drive preferences for asset ownership more than a profit incentive. We also recommend improving the planning to procurement connection by reflecting in planning assumptions the operational constraints of market transactions. These results provide insights on key issues in electric utility procurement that could improve overall market efficiency, respond to rapidly changing industry conditions, and identify practices that LSEs and regulators should consider incorporating into their long-term transmission and capacity planning processes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Storage Impacts in Resilience Hubs and Other Critical Infrastructure: An Assessment Guide for Developers and Practitioners

Battery energy storage systems (BESS) deployed behind the meter at resilience hubs and other critical infrastructure can provide economic and operational value during normal operations—such as lower and more predictable energy costs—as well as resilience and security benefits during power disruptions by maintaining essential services. However, existing evaluation approaches tend to focus narrowly on engineering performance or rely on broad socio-economic frameworks that are not well suited to behind-the-meter storage. As a result, developers, utilities, and funders often lack consistent methods for defining success, quantifying benefits, and comparing outcomes across projects. This report presents a practitioner-oriented impact assessment framework for evaluating behind-the-meter BESS at resilience hubs and critical infrastructure facilities. The framework is organized into five iterative components—developing an action plan, defining project goals, identifying metrics, collecting data and measuring outcomes, and reporting and using results—and includes a structured metric architecture spanning six impact categories. Designed for real-world constraints such as limited staffing and uneven data availability, the framework was developed, applied, and refined through real projects, and is illustrated with case studies across diverse deployment contexts.

Impact Assessment↗

Mechanical Comparison of Short Models of Nb$_3$ Sn Low-$\beta$ Quadrupole for the Hi-Lumi LHC

MQXF is the Nb 3 Sn Low-β quadrupole magnet that the HL-LHC project is planning to install in the LHC interaction regions in 2026 to increase the LHC integrated luminosity. The magnet will be fabricated in two different lengths: 4.2 m for MQXFA, built in the US by the Accelerator Upgrade Project (AUP), and 7.15 m for MQXFB, fabricated by CERN. In order to qualify the magnet design and characterize its performance with different conductors, cable geometries and pre-load configurations, five short model magnets, called MQXFS, were fabricated, assembled and tested. We compare the mechanical behavior of short model magnets using experimental data and new numerical models that take into account the measured coil sizes as a function of position.

43 PARTICLE ACCELERATORS↗

Fuel Pond Sludge - Lessons Learned from Initial De-sludging of Sellafield's Pile Fuel Storage Pond - 12066

The Pile Fuel Storage Pond (PFSP) at Sellafield was built and commissioned between the late 1940's and early 1950's as a storage and cooling facility for irradiated fuel and isotopes from the two Windscale Pile reactors. The pond was linked via submerged water ducts to each reactor, where fuel and isotopes were discharged into skips for transfer along the duct to the pond. In the pond the fuel was cooled then de-canned underwater prior to export for reprocessing. The plant operated successfully until it was taken out of operation in 1962 when the First Magnox Fuel Storage Pond took over fuel storage and de-canning operations on the site. The pond was then used for storage of miscellaneous Intermediate Level Waste (ILW) and fuel from the UK's Nuclear Programme for which no defined disposal route was available. By the mid 1970's the import of waste ceased and the plant, with its inventory, was placed into a passive care and maintenance regime. By the mid 1990s, driven by the age of the facility and concern over the potential challenge to dispose of the various wastes and fuels being stored, the plant operator initiated a programme of work to remediate the facility. This programme is split into a number of key phases targeted at sustained reduction in the hazard associated with the pond, these include: - Pond Preparation: Before any remediation work could start the condition of the pond had to be transformed from a passive store to a plant capable of complex retrieval operations. This work included plant and equipment upgrades, removal of redundant structures and the provision of a effluent treatment plant for removing particulate and dissolved activity from the pond water. - Canned Fuel Retrieval: Removal of canned fuel, including oxide and carbide fuels, is the highest priority within the programme. Handling and export equipment required to remove the canned fuel from the pond has been provided and treatment routes developed utilising existing site facilities to allow the fuel to be reprocessed or conditioned for long term storage. - Sludge Retrieval: In excess of 300 m{sup 3} of sludge has accumulated in the pond over many years and is made up of debris arising from fuel and metallic corrosion, wind blown debris and bio-organic materials. The Sludge Retrieval Project has provided the equipment necessary to retrieve the sludge, including skip washer and tipper machines for clearing sludge from the pond skips, equipment for clearing sludge from the pond floor and bays, along with an 'in pond' corral for interim storage of retrieved sludge. Two further projects are providing new plant processing routes, which will initially store and eventually passivate the sludge. - Metal Fuel Retrieval: Metal Fuel from early Windscale Pile operations and various other sources is stored within the pond; the fuel varies considerably in both form and condition. A retrieval project is planned which will provide fuel handling, conditioning, sentencing and export equipment required to remove the metal fuel from the pond for export to on site facilities for interim storage and disposal. - Solid Waste Retrieval: A final retrieval project will provide methods for handling, retrieval, packaging and export of the remaining solid Intermediate Level Waste within the pond. This includes residual metal fuel pieces, fuel cladding (Magnox, aluminium and zircaloy), isotope cartridges, reactor furniture, and miscellaneous activated and contaminated items. Each of the waste streams requires conditioning to allow it to be and disposed of via one of the site treatment plants. - Pond Dewatering and Dismantling: Delivery of the above projects will allow operations to progressively remove the radiological inventory, thereby reducing the hazard/risk posed by the plant. This will then allow subsequent dewatering of the pond and dismantling of the structure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EVI-LOCATE User Manual

One of the longest stages in the deployment of electric vehicle supply equipment (EVSE) is the initial planning of the infrastructure itself. Engineers and fleet experts from the National Renewable Energy Laboratory (NREL) have supported dozens of charging infrastructure site plans over the past couple decades, including the generation of site schematics, determinations of electric capacity, and estimates for likely costs. As the market for electric vehicles (EVs) has matured, this approach should no longer require a time and personnel intensive process. In order to shorten the time taken to develop site plans and cost estimates, NREL developed a tool that fleet managers, facility managers, electricians, EVSE installers, and members of the public can use to develop initial schematics and ballpark pricing for charging station installations. The Electric Vehicle Infrastructure - Locally Optimized Charger Assessment Tool and Estimator (EVI-LOCATE) provides a structured and consistent way for users to enter information about their planned EVSE project in a relatively simple web-based format. EVI-LOCATE then calculates electrical equipment capacity, wiring runs, and project costs. It produces a site diagram optimized around surface characteristics with differential trenching costs for softscape such as grass compared to hardscape such as asphalt that can be adjusted by users in the tool. It also stores the resulting site plans and costs in a dashboard for access at a later date, including plan revisions if necessary. This document guides users through the EVI-LOCATE screens and associated questions. It contains tip text boxes throughout on how best to interface with the tool and find additional information or context. The appendices contain the assumptions and calculations underpinning the tool. Much of the information for EVI-LOCATE was gathered through industry engagements with EVSE installers, invoices from completed EVSE installations, Gordian's RS Means construction data, and the General Services Administration blanket purchase agreement for EVSE. For a visual tutorial of the tool, users can watch EVI-LOCATE Step-by-Step Video. The tool itself is available at https://evi-locate.nrel.gov.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

US Veteran Gets a Facelift

Idaho National Laboratory's Advanced Test Reactor (ATR) has received replacement instrumentation and control systems - the process distributed control system (DCS) and the console display system (CDS), which included a replacement annunciator subsystem. The new systems offer the latest software and technology advancements, ensuring the availability of the reactor for future energy research. ATR, a pressurized, light water moderated 250 MW materials test reactor, became operational in 1965. In the early 1990s, after nearly thirty years of analogue/pneumatic controls, the laboratory upgraded ATR to digital-based instrumentation and control systems. By 2007, the equipment and technology used in these digital systems were reaching the end of their lifecycle. The systems component failure rates were on a rise, while vendor support and parts availability were declining. With current projections and plans for operating ATR into 2040, modernization of the reactor's infrastructure is necessary to maintain reliability and efficiency. As a result, the Idaho National Laboratory and the U.S. Department of Energy (DOE) invested more than $13 million in a four-year project to replace ATR's instrumentation and control systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Pilgrim Hot Springs Building Dimensions and Energy Modeling

This dataset was created to model the anticipated heating load of a geothermal project in development for the historical site of Pilgrim Hot Springs, and adds to the history of geothermal studies at the site. Models include an historical building (Nun's Quarters), existing modern buildings (Caretaker's Cabin, Igloo, Visitor's Cabin, Staff Shower Hut), and planned building projects (Changing Room, Greenhouse). Modeling results were used to determine feasible geothermal system typologies. The previous study linked below ("Village of Solomon Development of Energy Efficiency Building Standards for New Construction") feeds in to this project. The dataset includes DWG drawings and AKwarm energy models (.hm2) of a subset of existing buildings at the site of Pilgrim Hot Springs. All buildings were modeled in their current state, and some were additionally modeled with improvements to the building envelope. Energy modeling results exported from AKwarm include .htm and .png images.

AKwarm↗

Delivery of a Solar-Powered Forward Osmosis Seawater Desalination Plant: Trevi’s 500 m3/day Zero-Carbon FO Seawater Desalination Plant at NELHA

This paper presents an account of Trevi’s delivery of a 500 m3/day solar powered forward osmosis (FO) seawater desalination plant at the Ocean Science and Technology Park of the Natural Energy Laboratory of Hawaii Authority (NELHA). The project aimed to demonstrate the viability of solar thermal-powered desalination for agricultural applications through the integration of a 2MW micro-dish solar thermal array with a state-of-the-art FO system. Highlighted in the paper are the three distinct project phases; Planning and Design, System Construction, Installation & Testing followed finally by System Operation and Optimization. Results and decisions which led to the final plant design will be shared, highlighting how Trevi Systems succeeded in producing a zero-carbon FO seawater desalination plant with a projected Levelized Cost of Water (LCOW) estimate competitive with existing carbon-intensive RO technologies (based on some assumptions and the cost of heat which is required for FO.

14 SOLAR ENERGY↗

Light-Duty Fuel Cell Electric Vehicle Validation Data (Final Report)

Since 2005, Mercedes-Benz Research & Development North America (MBRDNA) participated in the DOE’s Technology Validation Programs to help accelerate the market introduction of fuel cell vehicles. Under the U.S. Department of Energy (DOE) contract DE-EE0005971, which ran from 2013 - 2019, MBRDNA collaborated with the DOE to evaluate overall vehicle degradation effects of fuel cell vehicles, as well as evaluate the generational improvements from one vehicle generation to another. The goal was to achieve a mileage target of 10,000-12,000 miles per vehicle per year and 750 to 1,000 operating hour accumulation per fuel cell stack. The MBRDNA Project Team (Project Team) leased a total of 69 fuel cell vehicles to regular Mercedes-Benz customers through select dealerships in Northern and Southern California. Of these 69 vehicles, a minimum of 20 active vehicles were chosen to participate in this project based on customer driving habits, average daily miles, and geographic conditions. These vehicles were equipped with a data acquisition system that automatically collected statistically relevant data for submission to the National Renewable Energy Laboratory, which monitors the progress of fuel cell vehicle technology for the DOE. As customer operation of GEN II vehicles ended in Q4 2017, a decision was made to focus GEN III vehicle operation in Europe and Japan only, and not to deploy the vehicle in the United States. Despite the intention to include three GEN III vehicles in durability runs in Southern California for purposes of data collection for this project, the plan could not be realized given the decision not to deploy GEN III vehicles in the U.S. market at this time. In total, over 1.3 million miles and 60,000 operational hours of fuel cell system and powertrain operation were submitted to DOE under this project. The data provided revealed insights into real-world customer operation and system durability of fuel cell vehicles, enabling the DOE to observe the technology maturity and readiness of fuel cell vehicles outside of the controlled corporate research and development environment. Mercedes-Benz Research and Development North America (MBRDNA) has been promoting fuel cell technology in the U.S. since 2000. Over this time, it has been a pleasure to work in conjunction with the Department of Energy (DOE) on two separate projects surrounding fuel cell vehicle and market readiness. MBRDNA looks forward to future opportunities to collaborate in the interest of helping to further a sustainable transportation future.

08 HYDROGEN↗

In-Conduit Hydropower for Public Water Supply Systems: Development Challenges and Costs

Conduit hydropower leverages existing water infrastructure to provide energy solutions, though deployment has been slow. A 2022 US Department of Energy (DOE)–funded report led by Oak Ridge National Laboratory (ORNL) summarizes a reconnaissance-level study of hydropower potential at national conduits (Kao et al., 2022). The report includes power and energy estimates across three major sectors of conduit hydropower potential: municipal, agricultural, and industrial. Water resources include public water supply systems (municipal and industrial), irrigation canal systems (agricultural), thermoelectric cooling systems (industrial), and wastewater systems (municipal and industrial). In total, 1.41 GW of power potential was estimated nationwide. Subsequently, DOE has funded ORNL through the Conduit Hydropower Engineering, Evaluation, and Technology Acceleration project (CHEETA) to improve deployment potential for conduit hydropower. Work thus far has focused on “in-conduit” hydropower (ICH)—or “in-pipe” hydropower—for public water supply systems, though the project is planning to cover conduit hydropower more broadly. The timeline of ORNL’s conduit hydropower related research and development (R&D) is shown in Figure 1. The results of CHEETA should benefit the hydropower industry by providing insights into costs, barriers, and other considerations that impact project development. The hydropower industry and municipal/industrial conduit stakeholders will use the output to inform development decisions and advance low-impact hydropower growth in the US.

13 HYDRO ENERGY↗

WRPS MEETING THE CHALLENGE OF TANK WASTE

Washington River Protection Solutions (WRPS) is the Hanford tank operations contractor, charged with managing one of the most challenging environmental cleanup projects in the nation. The U.S. Department of Energy hired WRPS to manage 56 million gallons of high-level radioactive waste stored in 177 underground tanks. The waste is the legacy of 45 years of plutonium production for the U. S. nuclear arsenal. WRPS mission is three-fold: safely manage the waste until it can be processed and immobilized; develop the tools and techniques to retrieve the waste from the tanks, and build the infrastructure needed to deliver the waste to the Waste Treatment Plant (WTP) when it begins operating. WTP will 'vitrify' the waste by mixing it with silica and other materials and heating it in an electric melter. Vitrification turns the waste into a sturdy glass that will isolate the radioactivity from the environment. It will take more than 20 years to process all the tank waste. The tank waste is a complex highly radioactive mixture of liquid, sludge and solids. The radioactivity, chemical composition of the waste and the limited access to the underground storage tanks makes retrieval a challenge. Waste is being retrieved from aging single-shell tanks and transferred to newer, safer double-shell tanks. WRPS is using a new technology known as enhanced-reach sluicing to remove waste. A high-pressure stream of liquid is sprayed at 100 gallons per minute through a telescoping arm onto a hard waste layer several inches thick covering the waste. The waste is broken up, moved to a central pump suction and removed from the tank. The innovative Mobile Arm Retrieval System (MARS) is also being used to retrieve waste. MARS is a remotely operated, telescoping arm installed on a mast in the center of the tank. It uses multiple technologies to scrape, scour and rake the waste toward a pump for removal. The American Reinvestment and Recovery Act (ARRA) provided nearly $326 million over two-and-a-half years to modernize the infrastructure in Hanford's tank farms. WRPS issued 850 subcontracts totaling more than $152 million with nearly 76 percent of that total awarded to small businesses. WRPS used the funding to upgrade tank farm infrastructure, develop technologies to retrieve and consolidate tank waste and extend the life of two critical operating facilities needed to feed waste to the WTP. The 222-S Laboratory analyzes waste to support waste retrievals and transfers. The laboratory was upgraded to support future WTP operations with a new computer system, new analytical equipment, a new office building and a new climate-controlled warehouse. The 242-A Evaporator was upgraded with a control-room simulator for operator training and several upgrades to aging equipment. The facility is used to remove liquid from the tank waste, creating additional storage space, necessary for continued waste retrievals and WTP operation. The One System Integrated Project Team is ajoint effort ofWRPS and Bechtel National to identify and resolve common issues associated with commissioning, feeding and operating the Waste Treatment Plant. Two new facilities are being designed to support WTP hot commlsslomng. The Interim Hanford Storage project is planned to store canisters of immobilized high-level radioactive waste glass produced by the vitrification plant. The facility will use open racks to store the 15-foot long, two-foot diameter canisters of waste, which require remote handling. The Secondary Liquid Waste Treatment Project is a major upgrade to the existing Effluent Treatment Facility at Hanford so it can treat about 10 million gallons of liquid radioactive and hazardous effluent a year from the vitrification plant. The One System approach brings the staff of both companies together to identify and resolve WTP safety issues. A questioning attitude is encouraged and an open forum is maintained for employees to raise issues. WRPS is completing its mission safely with record-setting safety performance. Since WRPS took over the Hanford Tank Operations Contract in October 2008, the recordable injury rate has decreased 43 percent, while the lost work-days rate decreased by 30 percent. The company recently surpassed three million hours worked without a lost workday accident.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗