Idaho Natural Production Monitoring and Evaluation : Annual Progress Report February 1, 2007 - January 31, 2008.

Populations of anadromous salmonids in the Snake River basin declined precipitously following the construction of hydroelectric dams in the Snake and Columbia rivers. Raymond (1988) documented a decrease in survival of emigrating steelhead trout Oncorhynchus mykiss and Chinook salmon O. tshawytscha from the Snake River following the construction of dams on the lower Snake River during the late 1960s and early 1970s. Although Raymond documented some improvements in survival through the early 1980s, anadromous populations remained depressed and declined even further during the 1990s (Petrosky et al. 2001; Good et al. 2005). The effect was disastrous for all anadromous salmonid species in the Snake River basin. Coho salmon O. kisutch were extirpated from the Snake River by 1986. Sockeye salmon O. nerka almost disappeared from the system and were declared under extreme risk of extinction by authority of the Endangered Species Act (ESA) in 1991. Chinook salmon were classified as threatened with extinction in 1992. Steelhead trout were also classified as threatened in 1997. Federal management agencies in the basin are required to mitigate for hydroelectric impacts and provide for recovery of all ESA-listed populations. In addition, the Idaho Department of Fish and Game (IDFG) has the long-term goal of preserving naturally reproducing salmon and steelhead populations and recovering them to levels that will provide a sustainable harvest (IDFG 2007). Management to achieve these goals requires an understanding of how salmonid populations function (McElhany et al. 2000) as well as regular status assessments. Key demographic parameters, such as population density, age composition, recruits per spawner, and survival rates must be estimated annually to make such assessments. These data will guide efforts to meet mitigation and recovery goals. The Idaho Natural Production Monitoring and Evaluation Project (INPMEP) was developed to provide this information to managers. The Snake River stocks of steelhead and spring/summer Chinook salmon still have significant natural reproduction and thus are the focal species for this project's investigations. The overall goal is to monitor the abundance, productivity, distribution, and stock-specific life history characteristics of naturally produced steelhead trout and Chinook salmon in Idaho (IDFG 2007). We have grouped project tasks into three objectives, as defined in our latest project proposal and most recent statement of work. The purpose of each objective involves enumerating or describing individuals within the various life stages of Snake River anadromous salmonids. By understanding the transitions between life stages and associated controlling factors, we hope to achieve a mechanistic understanding of stock-specific population dynamics. This understanding will improve mitigation and recovery efforts. Objective 1. Measure 2007 adult escapement and describe the age structure of the spawning run of naturally produced spring/summer Chinook salmon passing Lower Granite Dam. Objective 2. Monitor the juvenile production of Chinook salmon and steelhead trout for the major population groups (MPGs) within the Clearwater and Salmon subbasins. Objective 3. Evaluate life cycle survival and the freshwater productivity/production of Snake River spring/summer Chinook salmon. There are two components: update/refine a stock-recruit model and estimate aggregate smolt-to-adult survival. In this annual progress report, we present technical results for work done during 2007. Part 2 contains detailed results of INPMEP aging research and estimation of smolt-to-adult return rates for wild and naturally produced Chinook salmon (Objectives 1 and 3). Part 3 is a report on the ongoing development of a stock-recruit model for the freshwater phase of spring/summer Chinook salmon in the Snake River basin (Objective 3). Part 4 is a summary of the parr density data (Objective 2) collected in 2007 using the new site selection procedure. Data are maintained in computer databases housed at the IDFG Nampa Fisheries Research office (described in the Appendix) and are available from the first author. Other project accomplishments during 2007 (e.g., professional presentations) are also summarized in the Appendix.

13 HYDRO ENERGY↗

Temporary Restoration of Bull Trout Passage at Albeni Falls Dam, 2008 Progress Report.

The goal of this project is to provide temporary upstream passage of bull trout around Albeni Falls Dam on the Pend Oreille River, Idaho. Our specific objectives are to capture fish downstream of Albeni Falls Dam, tag them with combination acoustic and radio transmitters, release them upstream of Albeni Falls Dam, and determine if genetic information on tagged fish can be used to accurately establish where fish are located during the spawning season. In 2007, radio receiving stations were installed at several locations throughout the Pend Oreille River watershed to detect movements of adult bull trout; however, no bull trout were tagged during that year. In 2008, four bull trout were captured downstream of Albeni Falls Dam, implanted with transmitters, and released upstream of the dam at Priest River, Idaho. The most-likely natal tributaries of bull trout assigned using genetic analyses were Grouse Creek (N = 2); a tributary of the Pack River, Lightning Creek (N = 1); and Rattle Creek (N = 1), a tributary of Lightning Creek. All four bull trout migrated upstream from the release site in Priest River, Idaho, were detected at monitoring stations near Dover, Idaho, and were presumed to reside in Lake Pend Oreille from spring until fall 2008. The transmitter of one bull trout with a genetic assignment to Grouse Creek was found in Grouse Creek in October 2008; however, the fish was not found. The bull trout assigned to Rattle Creek was detected in the Clark Fork River downstream from Cabinet Gorge Dam (approximately 13 km from the mouth of Lightning Creek) in September but was not detected entering Lightning Creek. The remaining two bull trout were not detected in 2008 after detection at the Dover receiving stations. This report details the progress by work element in the 2008 statement of work, including data analyses of fish movements, and expands on the information reported in the quarterly Pisces status reports.

13 HYDRO ENERGY↗

Monitor and Evaluate the Genetic Characteristics of Supplemented Salmon and Steelhead, 2006-2007 Progress Report.

This progress report offers a summary of genetic monitoring and evaluation research related to artificial propagation of Chinook salmon and steelhead in the Snake River basin. Our principal goal has been to characterize the relative (and net) reproductive success of hatchery fish spawning in the wild in multiple sub-basins. We address a critical uncertainty identified in essentially all tribal, state, and federal recovery planning efforts. Beyond simple description of those patterns of differential reproductive success, we seek to understand the biotic and abiotic factors that contribute to our observations, including genetic and environmental elements, and the real time effects of hatchery reform. We adopt two fundamentally different approaches that capture processes operating at different geographic scales. Our tier 2 design monitors changes in gene frequency through time in hatchery and wild populations. These studies monitor spatial and temporal genetic change over broad river basins and sub-basins. Tier 3 studies, by contrast, are able to construct pedigrees in naturally spawning populations that include hatchery and wild fish. We can then use actual matings to infer the fitness of hatchery versus wild individuals, based on the numbers of offspring we observe in our progeny samples. We get extraordinary detail from the tier 3 studies but only for a single river system. Thus, tier 2 studies provide breadth of information, whereas tier 3 studies offer unparalleled depth of insight for single discrete systems. We exceeded our goals in almost all areas for both tier 2 and tier 3 studies, and, where we did not, we offer an explanation of why, and what future action will be taken (Lessons Learned). All subcontracts were let as expected, providing smolt trapping, tissue sampling, genotyping, and analysis. Our inter-laboratory standardization efforts with tribal, state, and federal agencies were highly successful in this period. These standardization activities have been an on-going element of this study, beginning with WDFW's forays into DNA markers in the late 1990s and continuing and becoming more formalized with the initiation of the newer genetics laboratories (CRITFC, USFWS, and IDFG). This report is intended to document success in achieving collection and genotyping goals. Data analyses, presentation, and publication are keeping pace with data collection; however, detailed results are not presented at this time. A complete and comprehensive analysis and description of results will be provided in published manuscripts and in the 2009 annual report (the culmination of the current 3-year rolling review cycle). In the first section of this report, we present accomplishments related to individual projects within this genetic monitoring program. Subsequent to the standard reporting categories, we provide a Specific Obligations section that lists accomplishments exactly as the deliverables are presented in the Pisces Statement of Work. This approach results in a small amount of redundancy, but we try to minimize obvious cases. The goal is to provide our accomplishments in a format that is easily compared to the Work-Element-driven format of Pisces, yet also provide a narrative that shows continuity with the individual studies that make up this research program.

13 HYDRO ENERGY↗

Fresh Water Generation from Aquifer-Pressured Carbon Storage: Interim Progress Report

This project is establishing the potential for using brine pressurized by Carbon Capture and Storage (CCS) operations in saline formations as the feedstock for desalination and water treatment technologies including nanofiltration (NF) and reverse osmosis (RO). The aquifer pressure resulting from the energy required to inject the carbon dioxide provides all or part of the inlet pressure for the desalination system. Residual brine would be reinjected into the formation at net volume reduction. This process provides additional storage space (capacity) in the aquifer, reduces operational risks by relieving overpressure in the aquifer, and provides a source of low-cost fresh water to offset costs or operational water needs. Computer modeling and laboratory-scale experimentation are being used to examine mineral scaling and osmotic pressure limitations for brines typical of CCS sites. Computer modeling is being used to evaluate processes in the aquifer, including the evolution of the pressure field. This progress report deals mainly with our geochemical modeling of high-salinity brines and covers the first six months of project execution (September, 2008 to March, 2009). Costs and implementation results will be presented in the annual report. The brines typical of sequestration sites can be several times more concentrated than seawater, requiring specialized modeling codes typical of those developed for nuclear waste disposal calculations. The osmotic pressure developed as the brines are concentrated is of particular concern, as are precipitates that can cause fouling of reverse osmosis membranes and other types of membranes (e.g., NF). We have now completed the development associated with tasks (1) and (2) of the work plan. We now have a contract with Perlorica, Inc., to provide support to the cost analysis and nanofiltration evaluation. We have also conducted several preliminary analyses of the pressure effect in the reservoir in order to confirm that reservoir pressure can indeed be used to drive the reverse osmosis process. Our initial conclusions from the work to date are encouraging: (1) The concept of aquifer-pressured RO to provide fresh water associated with carbon dioxide storage appears feasible. (2) Concentrated brines such as those found in Wyoming are amenable to RO treatment. We have looked at sodium chloride brines from the Nugget Formation in Sublette County. 20-25% removal with conventional methods is realistic; higher removal appears achievable with NF. The less concentrated sulfate-rich brines from the Tensleep Formation in Sublette County would support >80% removal with conventional RO. (3) Brines from other proposed sequestration sites can now be analyzed readily. An osmotic pressure curve appropriate to these brines can be used to evaluate cost and equipment specifications. (4) We have examined a range of subsurface brine compositions that is potentially pertinent to carbon sequestration and noted the principal compositional trends pertinent to evaluating the feasibility of freshwater extraction. We have proposed a general categorization for the feasibility of the process based on total dissolved solids (TDS). (5) Withdrawing pressurized brine can have a very beneficial effect on reservoir pressure and total available storage capacity. Brine must be extracted from a deeper location in the aquifer than the point of CO{sub 2} injection to prevent CO{sub 2} from migrating to the brine extraction well.

02 PETROLEUM↗

DOE Annual Progress Report: Water Needs and Constraints for Hydrogen Pathways

Water is a critical feedstock in the production of hydrogen. In fact, water and many of the energy transformations upon which society depends are inextricably linked. Approximately 39% of freshwater withdrawals are used for cooling of power plants, and another 8% are used in industry and mining (including oil and gas extraction and refining). Major changes in the energy infrastructure (as envisioned in a transformation to a hydrogen economy) will necessarily result in changes to the water infrastructure. Depending on the manner in which a hydrogen economy evolves, these changes could be large or small, detrimental or benign. Water is used as a chemical feedstock for hydrogen production and as a coolant for the production process. Process and cooling water must meet minimum quality specifications (limits on mineral and organic contaminants) at both the inlet to the process and at the point of discharge. If these specifications are not met, then the water must be treated, which involves extra expenditure on equipment and energy. There are multiple options for water treatment and cooling systems, each of which has a different profile of equipment cost and operational requirements. The engineering decisions that are made when building out the hydrogen infrastructure will play an important role in the cost of producing hydrogen, and those decisions will be influenced by the regional and national policies that help to manage water resources. In order to evaluate the impacts of water on hydrogen production and of a hydrogen economy on water resources, this project takes a narrowly-scoped lifecycle analysis approach. We begin with a process model of hydrogen production and calculate the process water, cooling, electricity and energy feedstock demands. We expand beyond the production process itself by analyzing the details of the cooling system and water treatment system. At a regional scale, we also consider the water use associated with the electricity and fuel that feed hydrogen production and distribution. The narrow scope of the lifecycle analysis enables economic optimization at the plant level with respect to cooling and water treatment technologies. As water withdrawal and disposal costs increase, more expensive, but more water-efficient technologies become more attractive. Some of the benefits of these technologies are offset by their increased energy usage. We use the H2A hydrogen production model to determine the overall cost of hydrogen under a range of water cost and technology scenarios. At the regional level, we are planning on following the hydrogen roll-out scenarios envisioned by Greene and Leiby (2008) to determine the impact of hydrogen market penetration on various watersheds. The economics of various water technologies will eventually be incorporated into the temporal and geographic Macro System Model via a water module that automates the spreadsheet models described. At the time of this progress report, the major achievement for FY2009 has been the completion of the framework and analytical results of the economic optimization of water technology for hydrogen production. This accomplishment required the collection of cost and performance data for multiple cooling and water treatment technologies, as well as the integration of a water and energy balance model with the H2A framework. 22 (twenty-two) different combinations of production method (SMR, electrolysis), scale (centralized, forecourt), cooling (evaporative tower, dry) and water treatment (reverse osmosis, ion exchange) were evaluated. The following data were collected: water withdrawal, water discharge, electricity consumption, equipment footprint, equipment cost, installation cost, annual equipment and material costs and annual labor costs. These data, when consolidated, fit into a small number of input cells in H2A. Items such as capital cost end up as line-items for which there is space in the existing H2A spreadsheets. Items such as electricity use are added to the values that already exist in H2A. Table 1 lists eight potential technology combinations for cooling and water treatment associated with centralized SMR hydrogen production. When water costs are very low, the most economical system is described by row B, however, as water purchase and discharge prices rise, systems with higher water efficiency prevail. Tables 2a, 2b and 2c show the price of hydrogen production as a function of water purchase and discharge price. In table 2a, the technology is fixed. In table 2b, the price is the lowest of the eight available water technology options. Table 2c identifies the chosen technology for the economic conditions. This analysis has shown that at current prices, water is not expected to have a major impact on hydrogen deployment. In previous years work, it was show, qualitatively, that acquisition of water rights (permitting) can present a major issue for any new water user, particularly in highly water stressed areas.

13 HYDRO ENERGY↗

Lake Roosevelt White Sturgeon Recovery Project : Annual Progress Report, January 2003 – March 2004.

This report summarizes catch data collected from white sturgeon Acipenser transmontanus in Lake Roosevelt during limited setlining and gill netting activities in the fall of 2003, and documents progress toward development of a U.S. white sturgeon conservation aquaculture program for Lake Roosevelt. From 27-30 October, 42 overnight small mesh gill net sets were made between Marcus and Northport, WA for a total catch of 15 juvenile white sturgeon (275-488 mm FL). All sturgeon captured were of Canadian hatchery origin. These fish had been previously released as sub-yearlings into the Canadian portion (Keenleyside Reach) of the Transboundary Reach of the Columbia River during 2002 and 2003. Most sturgeon (n=14) were caught in the most upstream area sampled (Northport) in low velocity eddy areas. Five fish exhibited pectoral fin deformities (curled or stunted). Growth rates were less than for juvenile sturgeon captured in the Keenleyside Reach but condition factor was similar. Condition factor was also similar to that observed in juvenile sturgeon (ages 1-8) captured in the unimpounded Columbia River below Bonneville Dam between 1987-92. From 10-14 November, 28 overnight setline sets were made in the Roosevelt Reach between the confluence of the Spokane River and Marcus Island for a total catch of 17 white sturgeon (94-213 cm FL). Catch was greatest in the most upstream areas sampled, a distribution similar to that observed during a WDFW setline survey in Lake Roosevelt in 1998. The mean W{sub r} index of 110% for fish captured this year was higher than the mean W{sub r} of 91% for fish captured in 1998. Excellent fish condition hindered surgical examination of gonads as lipid deposits made the ventral body wall very thick and difficult to penetrate with available otoscope specula. Acoustic tags (Vemco model V16 coded pingers, 69 kHz, 48-month life expectancy) were internally applied to 15 fish for subsequent telemetry investigations of seasonal and reproductively motivated movements. In August 2003, three Vemco VR2 fixed station acoustic receivers, supplied by the UCWSRI Transboundary Telemetry Project, were deployed in the vicinities of Kettle Falls Bridge, Marcus Island, and Northport, WA. Data downloaded from these receivers through December 2003 confirmed the findings of a previous telemetry study that the Marcus area is an important overwintering habitat for white sturgeon. On 18 February 2004, juvenile white sturgeon (n=2,000) were transported from Kootenay Sturgeon Hatchery in British Columbia to WDFW Columbia Basin Hatchery (CBH) in Moses Lake, WA. Fish were reared at CBH to approximately 30 g and individually outfitted with PIT tags and scute marked. On 11 May 2004, fish were released into Lake Roosevelt in the vicinities of Kettle Falls Bridge, North Gorge, and Northport.

13 HYDRO ENERGY↗

White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; Annual Progress Report, April 2007 - March 2008.

We report on our progress from April 2007 through March 2008 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), Columbia River Inter-Tribal Fish Commission (CRITFC; Report C), and Montana State University (MSU; Report D). This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

13 HYDRO ENERGY↗

Simulation of Seismic Waves from Underground Explosions in Geologic Media: FY2009 Progress Report

This report summarizes work done after one year on project LL09-Sim-NDD-02 entitled 'Exploratory Research: Advanced Simulation of Low Yield Underground Nuclear Explosions To Improve Seismic Yield Estimation and Source Identification'. Work on this effort proceeded in two thrusts: (1) parametric studies of underground explosion generated motions with GEODYN; and (2) coupling of GEODYN to WPP. GEODYN is a code for modeling hydrodynamic (shock-wave) motions in a wide variety of materials, including earth materials. WPP is an anelastic finite difference code for modeling seismic motions. The sensitivity of seismic motions to emplacement conditions was investigated with a series of parametric studies of low-yield (0.2-4 kiloton) chemical high-explosive shots at a range of burial depths in four canonical geologic media (granite, limestone, tuff and alluvium). Results indicate that the material has a strong impact on the seismic motions consistent with previous reports. Motions computed with GEODYN in realistically complex material models are very consistent with reported motions from nuclear tests by Perret and Bass (1975). The amplitude, frequency content and cavity size resulting from explosions are all strongly sensitive to the material strength. Explosions in high-strength (granite) resulted in the highest amplitude, shortest duration pulse and smallest cavities, whereas explosions in low-strength material (alluvium) resulted in the lowest amplitudes, longest duration pulse and larger cavities. The corner frequencies of P-wave motions at take-off angles corresponding to propagation to teleseismic distances show corresponding behavior, with high-strength materials having the highest corner frequency and low-strength materials having low corner frequency. Gravity has an important effect on the cavity size and outgoing motions due work done against lithostatic stress. In fact without gravity the cavity radius and elastic motions are largely insensitive to depth of burial. We investigated the effects of depth of burial for a given yield and material model in the presence of gravity and found that the cavity radius is slightly smaller for deeper shots and the resulting motions have shorter duration and higher corner frequency compared to shallower shots. On the second thrust, progress has been made on one-way coupling of GEODYN to WPP. Early in the project we demonstrated this capability from one-dimensional (1D) GEODYN calculations. We have now completed the capability to pass motions computed in 2D or 3D with GEODYN to WPP and propagated (in 3D) to large distances.

58 GEOSCIENCES↗

SciDAC's Earth System Grid Center for Enabling Technologies Semi-Annual Progress Report for the Period April 1, 2009 through September 30, 2009

This report summarizes work carried out by the ESG-CET during the period April 1, 2009 through September 30, 2009. It includes discussion of highlights, overall progress, period goals, collaborations, papers, and presentations. To learn more about our project, and to find previous reports, please visit the Earth System Grid Center for Enabling Technologies (ESG-CET) website. This report will be forwarded to the DOE SciDAC program management, the Office of Biological and Environmental Research (OBER) program management, national and international collaborators and stakeholders (e.g., the Community Climate System Model (CCSM), the Intergovernmental Panel on Climate Change (IPCC) 5th Assessment Report (AR5), the Climate Science Computational End Station (CCES), the SciDAC II: A Scalable and Extensible Earth System Model for Climate Change Science, the North American Regional Climate Change Assessment Program (NARCCAP), and other wide-ranging climate model evaluation activities). During this semi-annual reporting period, the ESG-CET team continued its efforts to complete software components needed for the ESG Gateway and Data Node. These components include: Data Versioning, Data Replication, DataMover-Lite (DML) and Bulk Data Mover (BDM), Metrics, Product Services, and Security, all joining together to form ESG-CET's first beta release. The launch of the beta release is scheduled for late October with the installation of ESG Gateways at NCAR and LLNL/PCMDI. Using the developed ESG Data Publisher, the ESG II CMIP3 (IPCC AR4) data holdings - approximately 35 TB - will be among the first datasets to be published into the new ESG enterprise system. In addition, the NCAR's ESG II data holdings will also be published into the new system - approximately 200 TB. This period also saw the testing of the ESG Data Node at various collaboration sites, including: the British Atmospheric Data Center (BADC), the Max-Planck-Institute for Meteorology, the University of Tokyo Center for Climate System Research, and the Australian National University. This period, a total of 14 national and international sites installed an ESG Data Node for testing. During this period, we also continued to provide production-level services to the community, providing researchers worldwide with access to CMIP3 (IPCC AR4), CCES, and CCSM, Parallel Climate Model (PCM), Parallel Ocean Program (POP), and Cloud Feedback Model Intercomparison Project (CFMIP), and NARCCAP data.

54 ENVIRONMENTAL SCIENCES↗

Fission-Fusion Neutron Source Progress Report July 31, 2009

In this report the authors describe progress in evaluating the feasibility of a novel concept for producing intense pulses of 14 MeV neutrons using the DT fusion reaction. In this new scheme the heating of the DT is accomplished using fission fragments rather than ion beams as in conventional magnet fusion schemes or lasers in ICF schemes. This has the great advantage that there is no need for any large auxiliary power source. The scheme does require large magnetic fields, but generating these fields, e.g. with superconducting magnets, requires only a modest power source. As a source of fission fragments they propose using a dusty reactor concept introduced some time ago by one of us (RC). The version of the dusty reactor that they propose using for our neutron source would operate as a thermal neutron reactor and use highly enriched uranium in the form of micron sized pellets of UC. Our scheme for using the fission fragments to produce intense pulses of 14 MeV neutrons is based on the fission fragment rocket idea. In the fission fragment rocket scheme it was contemplated that the fission fragments produced in a low density reactor core would then be guided out of the reactor by large magnetic fields. A simple version of this idea would be to use the fission fragments escaping from one side of a tandem magnet mirror to heat DT gas confined in the adjacent magnetic trap.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Fission-Fusion Neutron Source Progress Report Sept 30, 2009

In this report the authors describe the progress made in FY09 in evaluating the feasibility of a new concept for using the DT fusion reaction to produce intense pulses of 14 MeV neutrons. In this new scheme the heating of the DT is accomplished using fission fragments rather than ion beams as in conventional magnet confinement fusion schemes or lasers in inertial confinement schemes. As a source of fission fragments they propose using a dust reactor concept introduced some time ago by one of us (RC). An attractive feature of this approach is that there is no need for a large auxiliary power source to heat the DT plasma to the point where self-sustaining fusion become possible. Their scheme does require pulsed magnetic fields, but generating these fields requires only a modest power source. The dust reactor that they propose using for their neutron source would use micron-sized UC pellets suspended in a vacuum as the reactor fuel. Surrounding the fuel with a moderator such as heavy water (D{sub 2}O) would allow the reactor to operate as a thermal reactor and require only modest amounts of HEU. The scheme for using fission fragments to generate intense pulses of 14 MeV neutrons is based on the fission fragment rocket idea. In the fission fragment rocket scheme it was contemplated that the fission fragments produced in a low density reactor core could be guided out of the reactor by large magnetic fields used to form a 'rocket exhaust'. Their adaptation of this idea for the purposes of making a neutron source involves using the fission fragments escaping from one side of a tandem magnet mirror to heat DT gas confined in the adjacent magnetic trap.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SciDAC's Earth System Grid Center for Enabling Technologies Semi-Annual Progress Report for the Period October 1, 2009 through March 31, 2010

This report summarizes work carried out by the ESG-CET during the period October 1, 2009 through March 31, 2009. It includes discussion of highlights, overall progress, period goals, collaborations, papers, and presentations. To learn more about our project, and to find previous reports, please visit the Earth System Grid Center for Enabling Technologies (ESG-CET) website. This report will be forwarded to the DOE SciDAC program management, the Office of Biological and Environmental Research (OBER) program management, national and international collaborators and stakeholders (e.g., the Community Climate System Model (CCSM), the Intergovernmental Panel on Climate Change (IPCC) 5th Assessment Report (AR5), the Climate Science Computational End Station (CCES), the SciDAC II: A Scalable and Extensible Earth System Model for Climate Change Science, the North American Regional Climate Change Assessment Program (NARCCAP), and other wide-ranging climate model evaluation activities).

99 GENERAL AND MISCELLANEOUS↗

Heavy quarkonium: progress, puzzles, and opportunities

A golden age for heavy quarkonium physics dawned a decade ago, initiated by the confluence of exciting advances in quantum chromodynamics (QCD) and an explosion of related experimental activity. The early years of this period were chronicled in the Quarkonium Working Group (QWG) CERN Yellow Report (YR) in 2004, which presented a comprehensive review of the status of the field at that time and provided specific recommendations for further progress. However, the broad spectrum of subsequent breakthroughs, surprises, and continuing puzzles could only be partially anticipated. Since the release of the YR, the BESII program concluded only to give birth to BESIII; the $B$-factories and CLEO-c flourished; quarkonium production and polarization measurements at HERA and the Tevatron matured; and heavy-ion collisions at RHIC have opened a window on the deconfinement regime. All these experiments leave legacies of quality, precision, and unsolved mysteries for quarkonium physics, and therefore beg for continuing investigations. The plethora of newly-found quarkonium-like states unleashed a flood of theoretical investigations into new forms of matter such as quark-gluon hybrids, mesonic molecules, and tetraquarks. Measurements of the spectroscopy, decays, production, and in-medium behavior of c{bar c}, b{bar b}, and b{bar c} bound states have been shown to validate some theoretical approaches to QCD and highlight lack of quantitative success for others. The intriguing details of quarkonium suppression in heavy-ion collisions that have emerged from RHIC have elevated the importance of separating hot- and cold-nuclear-matter effects in quark-gluon plasma studies. This review systematically addresses all these matters and concludes by prioritizing directions for ongoing and future efforts.

43 PARTICLE ACCELERATORS↗

Progress Update: M Area Closure

A progress update of the Recovery Act at work at the Savannah River Site. The celebration of the first area cleanup completion with the help of the Recovery Act.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Update: Stack Project Complete

Progress update from the Savannah River Site. The 75 foot 293 F Stack, built for plutonium production, was cut down to size in order to prevent injury or release of toxic material if the structure were to collapse due to harsh weather.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY2011 Annual Progress Report: Advanced Combustion Engine Research and Development (Book)

Annual Progress Report for the Advanced Combustion Engine Research and Development (R&D) subprogram supporting the mission of the Vehicle Technologies Program by removing the critical technical barriers to commercialization of advanced internal combustion engines (ICEs) for passenger and commercial vehicles that meet future federal emissions regulations.

combustion engine, ICE, emission control↗

FY2011 Annual Progress Report: Propulsion Materials

Annual Progress Report for Propulsion Materials focusing on enabling and innovative materials technologies that are critical in improving the efficiency of advanced engines by providing enabling materials support for combustion, hybrid, and power electronics development.

COMMERCIALIZATION↗