Audit Report on Management Controls over the Use of Service Contracts at the Office of River Protection

The Department of Energy's (Department) Office of River Protection (ORP) is responsible for the storage, treatment, and disposal of over 53 million gallons of highly radioactive waste from over 40 years of plutonium production at the Hanford Site. Because of the diversity, complexity, and large scope of its mission, coupled with its small staff, ORP told us that it has found it necessary to engage in service contracts to obtain consulting services, technical expertise, and support staff. Federal policy generally permits contractors to perform a wide range of support service activities, including, in most situations, the drafting of Government documents subject to the review and approval of Federal employees. Federal policy issued by the Office of Management and Budget, however, prohibits contractors from drafting agency responses to Congressional inquiries and reports issued by the Office of Inspector General and Government Accountability Office (GAO) because they are so closely related to the public interest and provide the appearance of private influence. To provide a majority of its needed services, ORP issued a Blanket Purchase Agreement to Project Assistance Corporation (PAC) in 2003. Through the Blanket Purchase Agreement, ORP acquired services in the areas of project management, risk assessment, program assessment, quality assurance, safety, cost and schedule estimating, budgeting and finance, and engineering. PAC has, in turn, subcontracted with various other firms to obtain some of the services needed by ORP. From 2005 to 2008, the total annual cost for the contract with PAC had grown from $4.7 million to $9.2 million. Because of the extent of the services provided and growing costs of the contract, we conducted this review to determine whether ORP appropriately administered its contract with the Project Assistance Corporation. Our review disclosed that, in some instances, ORP had not appropriately administered all work performed under the PAC contract. Specifically, ORP allowed PAC employees to perform work that was inherently governmental and created situations where a potential conflict of interest occurred. Specifically: (1) ORP assigned PAC employees responsibility for providing information and responses to Congressional inquiries and reports issued by the GAO and the Department of Energy's Office of Inspector General (OIG); and (2) PAC employees were also allowed to perform functions that created potential conflicts of interest. ORP permitted PAC employees, for example, to develop statements of work and approve funding of work to be performed under PAC's own contract. We concluded that these problems occurred, at least in part, because ORP had not established controls necessary to effectively administer the PAC contract. Federal procurement regulations recommended that agencies provide additional management controls over contractors whose work has the potential to influence the action of government officials. ORP, however, had not implemented the controls specifically recommended in Federal policy guidance for administering contracts, including: (1) Performing conflict of interest reviews; and (2) Separating contractor and Department employees either physically or organizationally. By not effectively administering its contract with PAC, ORP increased the risk that decisions based on work performed by the contractor may not have been made in the best interests of the Department. For example, ORP increased the risk that approved work would be unnecessary or too costly. As we also recently noted in our report on 'Management Challenges at the Department of Energy' (DOE/IG-0808, December 2008), contract administration issues such as those discussed in this report remain a significant vulnerability. Continued efforts to improve this area are vitally important since the risk that contractors receive payments for unallowable costs could also increase as the Department expands its contracting activities under the American Recovery and Reinvestment Act. To its credit, however, ORP has recognized that there are weaknesses in its oversight of the PAC contract and is in the process of taking certain corrective actions. ORP indicated that it had reassigned responsibility to a Federal employee for responding to Congressional requests, GAO reviews, and OIG reports, and, planned to physically separate PAC employees from their government counterparts. While positive, those actions do not sufficiently address the issues identified in our report. Accordingly, we have made several recommendations designed to strengthen internal controls over this area.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computation Directorate 2008 Annual Report

Whether a computer is simulating the aging and performance of a nuclear weapon, the folding of a protein, or the probability of rainfall over a particular mountain range, the necessary calculations can be enormous. Our computers help researchers answer these and other complex problems, and each new generation of system hardware and software widens the realm of possibilities. Building on Livermore's historical excellence and leadership in high-performance computing, Computation added more than 331 trillion floating-point operations per second (teraFLOPS) of power to LLNL's computer room floors in 2008. In addition, Livermore's next big supercomputer, Sequoia, advanced ever closer to its 2011-2012 delivery date, as architecture plans and the procurement contract were finalized. Hyperion, an advanced technology cluster test bed that teams Livermore with 10 industry leaders, made a big splash when it was announced during Michael Dell's keynote speech at the 2008 Supercomputing Conference. The Wall Street Journal touted Hyperion as a 'bright spot amid turmoil' in the computer industry. Computation continues to measure and improve the costs of operating LLNL's high-performance computing systems by moving hardware support in-house, by measuring causes of outages to apply resources asymmetrically, and by automating most of the account and access authorization and management processes. These improvements enable more dollars to go toward fielding the best supercomputers for science, while operating them at less cost and greater responsiveness to the customers.

99 GENERAL AND MISCELLANEOUS↗

MAJORANA Neutrinoless Double-Beta Decay DUSEL R&D

The Majorana research and development is addressing key issues and risks related to the collaboration's goal of undertaking a search for neutrinoless double-beta decay (0{nu}{beta}{beta}) in {sup 76}Ge using an array of hyper-pure Ge-diodes (HPGe). The observation of this decay would provide critical insight into our understanding of neutrinos, yielding definitive evidence that neutrinos are Majorana particles and providing information on the absolute mass of neutrinos. Achieving sensitivities to 0{nu}{beta}{beta} decay half-lives on the order of 10{sup 26} years requires ultra-low backgrounds in the 2039 keV region where a 0{nu}{beta}{beta} decay peak would be observed. The goal of our R&D program has been to demonstrate the feasibility of all components of Majorana and to provide an integrated evaluation framework, allowing for optimization of these components in terms of background, background suppression, and signal detection efficiency and acceptance. This report covers work carried out by Majorana collaboration members at the University of Washington as part of the overall Majorana collaboration activities. Specifically the Majorana group at the University of Washington was involved in moving forward on demonstrating technology for clean large-scale cryostats and mounting the HPGe crystals in low-mass holders. The UW activities included assistance in the procurement and assembly of an electroforming system for large size cryostats, and design and fabrication of prototype crystal mounting hardware.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Modeling the Office of Science Ten Year Facilities Plan: The PERI Architecture Tiger Team

The Performance Engineering Institute (PERI) originally proposed a tiger team activity as a mechanism to target significant effort optimizing key Office of Science applications, a model that was successfully realized with the assistance of two JOULE metric teams. However, the Office of Science requested a new focus beginning in 2008: assistance in forming its ten year facilities plan. To meet this request, PERI formed the Architecture Tiger Team, which is modeling the performance of key science applications on future architectures, with S3D, FLASH and GTC chosen as the first application targets. In this activity, we have measured the performance of these applications on current systems in order to understand their baseline performance and to ensure that our modeling activity focuses on the right versions and inputs of the applications. We have applied a variety of modeling techniques to anticipate the performance of these applications on a range of anticipated systems. While our initial findings predict that Office of Science applications will continue to perform well on future machines from major hardware vendors, we have also encountered several areas in which we must extend our modeling techniques in order to fulfill our mission accurately and completely. In addition, we anticipate that models of a wider range of applications will reveal critical differences between expected future systems, thus providing guidance for future Office of Science procurement decisions, and will enable DOE applications to exploit machines in future facilities fully.

97 MATHEMATICS AND COMPUTING↗

INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which were described in the March 2009 report, had adversely impacted the success of earlier Departmental projects. We concluded that consideration of these previously encountered internal control weaknesses was essential if the Department was to avoid the same or similar problems in executing the Recovery Act programs/projects. During the course of our audit we identified other internal control weakness indicators. When brought to their attention by the Office of Inspector General audit staff, program officials acted promptly to address these problems by modifying or improving their risk mitigation strategies. For instance, we found that the Office of Energy Efficiency and Renewable Energy, responsible for $16.8 billion in Recovery Act program activities, took steps to strengthen its merit review process to avoid potential conflict of interest concerns.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Office of the Chief Financial Officer Annual Report 2009

Presented is the 2009 Chief Financial Officer's Annual Report. The data included in this report has been compiled from the Budget Office, the Controller, Procurement and Property Management and the Sponsored Projects Office.

99 GENERAL AND MISCELLANEOUS↗

Thinking Globally: How ISO 50001 - Energy Management can make industrial energy efficiency standard practice

Industry utilizes very complex systems, consisting of equipment and their human interface, which are organized to meet the production needs of the business. Effective and sustainable energy efficiency programs in an industrial setting require a systems approach to optimize the integrated whole while meeting primary business requirements. Companies that treat energy as a manageable resource and integrate their energy program into their management practices have an organizational context to continually seek opportunities for optimizing their energy use. The purpose of an energy management system standard is to provide guidance for industrial and commercial facilities to integrate energy efficiency into their management practices, including fine-tuning production processes and improving the energy efficiency of industrial systems. The International Organization for Standardization (ISO) has identified energy management as one of its top five priorities for standards development. The new ISO 50001 will establish an international framework for industrial, commercial, or institutional facilities, or entire companies, to manage their energy, including procurement and use. This standard is expected to achieve major, long-term increases in energy efficiency (20percent or more) in industrial, commercial, and institutional facilities and to reduce greenhouse gas (GHG) emissions worldwide.This paper describes the impetus for the international standard, its purpose, scope and significance, and development progress to date. A comparative overview of existing energy management standards is provided, as well as a discussion of capacity-building needs for skilled individuals to assist organizations in adopting the standard. Finally, opportunities and challenges are presented for implementing ISO 50001 in emerging economies and developing countries.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Heavy-duty diesel engine NO{sub x} reduction with nitrogen-enriched combustion air. Final CRADA report.

The concept of engine emissions control by modifying intake combustion gas composition from that of ambient air using gas separation membranes has been developed during several programs undertaken at Argonne. These have led to the current program which is targeted at heavy-duty diesel truck engines. The specific objective is reduction of NO{sub x} emissions by the target engine to meet anticipated 2007 standards while extracting a maximum of 5 percent power loss and allowing implementation within commercial constraints of size, weight, and cost. This report includes a brief review of related past programs, describes work completed to date during the current program, and presents interim conclusions. Following a work schedule adjustment in August 2002 to accommodate problems in module procurement and data analysis, activities are now on schedule and planned work is expected to be completed in September, 2004. Currently, we believe that the stated program requirements for the target engine can be met, based upon extrapolation of the work completed. Planned project work is designed to experimentally confirm these projections and result in a specification for a module package that will meet program objectives.

33 ADVANCED PROPULSION SYSTEMS↗

Calculators for Estimating Greenhouse Gas Emissions from Public Transit Agency Vehicle Fleet Operations

This paper reviews calculation tools available for quantifying the greenhouse gas emissions associated with different types of public transit service, and their usefulness in helping a transit agency to reduce its carbon footprint through informed vehicle and fuel procurement decisions. Available calculators fall into two categories: registry/inventory based calculators most suitable for standardized voluntary reporting, carbon trading, and regulatory compliance; and multi-modal life cycle analysis calculators that seek comprehensive coverage of all direct and indirect emissions. Despite significant progress in calculator development, no single calculator as yet contains all of the information needed by transit agencies to develop a truly comprehensive, life cycle analysis-based accounting of the emissions produced by its vehicle fleet operations, and for a wide range of vehicle/fuel technology options.

54 ENVIRONMENTAL SCIENCES↗

Solar PV Manufacturing Cost Model Group: Installed Solar PV System Prices (Presentation)

EERE's Solar Energy Technologies Program is charged with leading the Secretary's SunShot Initiative to reduce the cost of electricity from solar by 75% to be cost competitive with conventional energy sources without subsidy by the end of the decade. As part of this Initiative, the program has funded the National Renewable Energy Laboratory (NREL) to develop module manufacturing and solar PVsystem installation cost models to ensure that the program's cost reduction targets are carefully aligned with current and near term industry costs. The NREL cost analysis team has leveraged the laboratories' extensive experience in the areas of project finance and deployment, as well as industry partnerships, to develop cost models that mirror the project cost analysis tools used by projectmanagers at leading U.S. installers. The cost models are constructed through a 'bottoms-up' assessment of each major cost element, beginning with the system's bill of materials, labor requirements (type and hours) by component, site-specific charges, and soft costs. In addition to the relevant engineering, procurement, and construction costs, the models also consider all relevant costs to aninstaller, including labor burdens and overhead rates, supply chain costs, and overhead and materials inventory costs, and assume market-specific profits.

14 SOLAR ENERGY↗

CURRENT STATUS OF INSERTION DEVICE DEVELOPMENT AT THE NSLS-II AND ITS FUTURE PLANS

National Synchrotron Light Source-II (NSLS-II) project is currently under construction. Procurement of various insertion devices (IDs) has begun. This ring assumes a very high beam stability requirement which imposes tighter field specifications on insertion devices (IDs) compared to the rings of previous generation. The state of the art ID Magnetic Measurement Facility is being set up in order to be able to certify the stringent requirements on the magnetic field of NSLS-II IDs. The IDs in the project baseline scope include six 3.5m long damping wigglers (DWs) with 100mm period length and 15mm pole gap, two 2.0m Elliptically Polarizing Undulator (EPU) with 49mm period and 11.5mm minimum magnetic gap, two 3.0m long 20mm period and one 1.5m long 21mm period IVU, which the minimum gap of these is 5mm and 5.5mm, respectively. Recently a special device for inelastic X-ray scattering (IXS) beamline has been added to the collection of baseline devices. Three pole wigglers with a 28mm magnetic gap and a peak field over 1 Tesla will be utilized to accommodate the users of the type of radiation which is currently produced with bending magnets at the NSLS.

43 PARTICLE ACCELERATORS↗

Principal Physics Developments Evaluated in the ITER Design Review

As part of the ITER Design Review and in response to the issues identified by the Science and Technology Advisory Committee, the ITER physics requirements were reviewed and as appropriate updated. The focus of this paper will be on recent work affecting the ITER design with special emphasis on topics affecting near-term procurement arrangements. This paper will describe results on: design sensitivity studies, poloidal field coil requirements, vertical stability, effect of toroidal field ripple on thermal confinement, material choice and heat load requirements for plasma-facing components, edge localized modes control, resistive wall mode control, disruptions and disruption mitigation.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Los Alamos National Laboratory DOE M441.1-1 implementation

Loss of containment of nuclear material stored in containers such as food-pack cans, paint cans, or taped slip lid cans has generated concern about packaging requirements for interim storage of nuclear materials in working facilities such as the plutonium facility at Los Alamos National Laboratory (LANL). The Department of Energy (DOE) issued DOE M 441.1-1, Nuclear Materials Packaging Manual on March 7, 2008 in response to the Defense Nuclear Facilities Safety Board Recommendation 2005-1. The Manual directs DOE facilities to follow detailed packaging requirements to protect workers from exposure to nuclear materials stored outside of approved engineered-contamination barriers. Los Alamos National Laboratory has identified the activities that will be performed to bring LANL into compliance with DOE M 441.1-1. These include design, qualification and procurement of new containers, repackaging based on a risk-ranking methodology, surveillance and maintenance of containers, and database requirements. The primary purpose is to replace the out-dated nuclear material storage containers with more robust containers that meet present day safety and quality standards. The repackaging campaign is supported by an integrated risk reduction methodology to prioritize the limited resources to the highest risk containers. This methodology is systematically revised and updated based on the collection of package integrity data. A set of seven nested packages with built-in filters have been designed. These range in size from 1 qt. to 10 gallon. Progress of the testing to meet Manual requirements will be given. Due to the number of packages at LANL, repackaging to achieve full compliance will take five to seven years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ITER's Tokamak Cooling Water System and the the Use of ASME Codes to Comply with French Regulations of Nuclear Pressure Equipment

During inductive plasma operation of ITER, fusion power will reach 500 MW with an energy multiplication factor of 10. The heat will be transferred by the Tokamak Cooling Water System (TCWS) to the environment using the secondary cooling system. Plasma operations are inherently safe even under the most severe postulated accident condition a large, in-vessel break that results in a loss-of-coolant accident. A functioning cooling water system is not required to ensure safe shutdown. Even though ITER is inherently safe, TCWS equipment (e.g., heat exchangers, piping, pressurizers) are classified as safety important components. This is because the water is predicted to contain low-levels of radionuclides (e.g., activated corrosion products, tritium) with activity levels high enough to require the design of components to be in accordance with French regulations for nuclear pressure equipment, i.e., the French Order dated 12 December 2005 (ESPN). ESPN has extended the practical application of the methodology established by the Pressure Equipment Directive (97/23/EC) to nuclear pressure equipment, under French Decree 99-1046 dated 13 December 1999, and Order dated 21 December 1999 (ESP). ASME codes and supplementary analyses (e.g., Failure Modes and Effects Analysis) will be used to demonstrate that the TCWS equipment meets these essential safety requirements. TCWS is being designed to provide not only cooling, with a capacity of approximately 1 GW energy removal, but also elevated temperature baking of first-wall/blanket, vacuum vessel, and divertor. Additional TCWS functions include chemical control of water, draining and drying for maintenance, and facilitation of leak detection/localization. The TCWS interfaces with the majority of ITER systems, including the secondary cooling system. U.S. ITER is responsible for design, engineering, and procurement of the TCWS with industry support from an Engineering Services Organization (ESO) (AREVA Federal Services, with support from Northrop Grumman, and OneCIS). ITER International Organization (ITER-IO) is responsible for design oversight and equipment installation in Cadarache, France. TCWS equipment will be fabricated using ASME design codes with quality assurance and oversight by an Agreed Notified Body (approved by the French regulator) that will ensure regulatory compliance. This paper describes the TCWS design and how U.S. ITER and fabricators will use ASME codes to comply with EU Directives and French Orders and Decrees.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Acceptance Performance Test Guideline for Utility Scale Parabolic Trough and Other CSP Solar Thermal Systems: Preprint

Prior to commercial operation, large solar systems in utility-size power plants need to pass a performance acceptance test conducted by the engineering, procurement, and construction (EPC) contractor or owners. In lieu of the present absence of ASME or other international test codes developed for this purpose, the National Renewable Energy Laboratory has undertaken the development of interimguidelines to provide recommendations for test procedures that can yield results of a high level of accuracy consistent with good engineering knowledge and practice. Progress on interim guidelines was presented at SolarPACES 2010. Significant additions and modifications were made to the guidelines since that time, resulting in a final report published by NREL in April 2011. This paper summarizesthose changes, which emphasize criteria for assuring thermal equilibrium and steady state conditions within the solar field.

14 SOLAR ENERGY↗

Nexus of technologies : international safeguards, physical protection and arms control.

New technologies have been, and are continuing to be, developed for Safeguards, Arms Control, and Physical Protection. Application spaces and technical requirements are evolving - Overlaps are developing. Lessons learned from IAEA's extensive experience could benefit other communities. Technologies developed for other applications may benefit Safeguards - Inherent cost benefits and improvements in procurement security processes.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

The future of IAEA safeguards: challenges and responses

For nearly two decades, the International Atomic Energy Agency (lAEA) has been transforming its safeguards system to address the challenges posed by undeclared nuclear programs, the associated revelation of an extensive non-State nuclear procurement network and other issues, including past limits to its verification mandate and the burden of noncompliance issues. Implementing the new measures, including those in the Additional Protocol, and integrating new and old safeguards measures, remains a work in progress. Implementation is complicated by factors including the limited teclmological tools that are available to address such issues as safeguarding bulk handling facilities, detection of undeclared facilities/activities, especially related to enrichment, etc. As this process continues, new challenges are arising, including the demands of expanding nuclear power production worldwide, so-called safeguards by design for a new generation of facilities, the possible IAEA role in a fissile material cutoff treaty and other elements of the arms control and disarmament agenda, the possible role in 'rollback' cases, etc. There is no doubt safeguards will need to evolve in the future, as they have over the last decades. In order for the evolutionary path to proceed, there will inter alia be a need to identify technological gaps, especially with respect to undeclared facilities, and ensure they are filled by adapting old safeguards technologies, by developing and introducing new and novel safeguards teclmologies and/or by developing new procedures and protocols. Safeguards will also need to respond to anticipated emerging threats and to future, unanticipated threats. This will require strategic planning and cooperation among Member States and with the Agency. This paper will address challenges to IAEA safeguards and the technological possibilities and R&D strategies needed to meet those challenges in the context of the forty-year evolution of safeguards, including the ongoing transformation of safeguards by the Agency.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Critical Design Issues of Tokamak Cooling Water System of ITER's Fusion Reactor

U.S. ITER is responsible for the design, engineering, and procurement of the Tokamak Cooling Water System (TCWS). The TCWS transfers heat generated in the Tokamak to cooling water during nominal pulsed operation 850 MW at up to 150 C and 4.2 MPa water pressure. This water contains radionuclides because impurities (e.g., tritium) diffuse from in-vessel components and the vacuum vessel by water baking at 200 240 C at up to 4.4MPa, and corrosion products become activated by neutron bombardment. The system is designated as safety important class (SIC) and will be fabricated to comply with the French Order concerning nuclear pressure equipment (December 2005) and the EU Pressure Equipment Directive using ASME Section VIII, Div 2 design codes. The complexity of the TCWS design and fabrication presents unique challenges. Conceptual design of this one-of-a-kind cooling system has been completed with several issues that need to be resolved to move to next stage of the design. Those issues include flow balancing between over hundreds of branch pipelines in parallel to supply cooling water to blankets, determination of optimum flow velocity while minimizing the potential for cavitation damage, design for freezing protection for cooling water flowing through cryostat (freezing) environment, requirements for high-energy piping design, and electromagnetic impact to piping and components. Although the TCWS consists of standard commercial components such as piping with valves and fittings, heat exchangers, and pumps, complex requirements present interesting design challenges. This paper presents a brief description of TCWS conceptual design and critical design issues that need to be resolved.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗