Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Outages”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 523 records · Page 29

Emerging Technologies Review: Water Microgrid

Project 69643 Task 10 - The Air Force Civil Engineer Center has tasked Pacific Northwest National Laboratory with investigating emerging technologies to inform the Air Force’s understanding of the technology and to guide key considerations for implementing technologies that are resilient and alternative sources to the traditional methods used in the Air Force today. This report explores the concept of a water microgrid for deployment at Air Force installations. A water microgrid is a local water system that supplies, treats, and distributes water, with the primary objective to meet mission critical water demand during a disruption of the primary supply. A water microgrid can advance an Air Force installation’s water infrastructure and water resilience by being at the ready for meeting critical missions during a utility outage.

42 ENGINEERING↗

Long-Duration Energy Storage: Resiliency for Military Installations

This report provides a quantitative techno-economic analysis of a long-duration energy storage (LDES) technology, when coupled to on-base solar photovoltaics (PV), to meet the U.S. Department of Defense's (DoD's) 14-day requirement to sustain critical electric loads during a power outage and significantly reduce an installation's carbon footprint. The LDES modeled is Antora Energy's battery energy storage system (BESS). It is currently at a technology readiness level (TRL) of 7 and not ready for full-scale deployment. To support decisions on the value of near-term demonstrations, this analysis looked at the potential value of Antora Energy's BESS if deployed in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantification of 238U Holdup using Iterative, Point-Cloud-Based Compton Imaging

U holdup has impacts on several aspects of operation: Worker dose, Criticality safety, Safeguards, Outage planning. Generalized Geometry Holdup (GGH) currently estimates U mass within a high uncertainty band (± 50%). This method seeks to improve this uncertainty via quantitative Compton imaging.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Enhanced Long-Duration Energy Storage Modeling [Slides]

As our power grid evolves toward a more renewable future, energy storage is poised to take a larger role in meeting growing energy needs. Energy storage could help keep the power system reliable even through potential outages, periods of extreme weather, and when generation from variable renewable technologies like wind and solar is low. Given the different durations of these stressors, grid analysts at the National Renewable Energy Laboratory (NREL) are working to better understand the role and benefits of long-duration energy storage - or storage technologies with 8-24 hours of storage capacity - in high variable renewable energy systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Corrosion Testing of Refractory in Contact with Molten Glasses Designed for Waste Vitrification

It is known that the predictive life of the refractory ceramic liner of nuclear waste glass melters is conservative, as demonstrated by performance of these materials such as in the Defense Waste Processing Facility (DWPF). The motivation for this task is to maximize the useful life of the melters that will be operated at the Waste Treatment and Immobilization Plant (WTP), which will in turn minimize procurement and disposal costs and melter outage times, as well as to identify maximum loadings in the waste glass of those species that corrode melter components. This task was initiated jointly with Pacific Northwest National Laboratory (PNNL) with the objective to develop a methodology and model to enable more accurate prediction of refractory service life under prototypic conditions from laboratory-scale material corrosion tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Process Anomaly Detection for Sparsely Labeled Events in Nuclear Power Plants

An essential aspect of online monitoring, subtle anomaly detection increases the detection lead time for equipment failure and enables a nuclear power plant (NPP) to mitigate unexpected partial or full outages, resulting in significant cost saving to the plant. Once an anomaly is detected by plant staff, its cause and severity are investigated. Because the vast majority of anomalies require some level of investigation, including some that require time-consuming examination, before they are passed over to the engineering organization for further analysis, plants are often equipped with tools to assist the staff in performing anomaly detection. Those tools operate as a black box and are often based on statistical methods that establish sensor correlations using preconfigured mathematical models and flag correlation deviations as anomalies. Due to the number of anomalies detected at a given NPP on a daily basis, a significant number of flagged anomalies usually await examination for days or weeks. A primary cause of this backlog is that the methods used by the tools generate many false positives. Though this is usually attributed to oversensitive model settings due to very narrow normal operation bands, it can also be associated with the model development being inadequate for the process being monitored, or with missing model inputs that could have explained misclassified positives. The performance of anomaly detection tools impacts their plant acceptance and utilization, especially when the effort to address false positives generated by the tool depletes the value or cost saved by using that tool. Thus, means to advance anomaly detection performance have been investigated by the Department of Energy’s Light Water Reactor Sustainability program. Previous and ongoing efforts have targeted unsupervised machine-learning (ML) methods, which do not require the labeling of any data fed into the ML model. By contrast, in supervised anomaly detection methods, every data point is labeled as either a normal or abnormal process condition, and the model is trained to replicate the classification process. Supervised methods usually outperform unsupervised methods, due to the added value in differentiating normal from anomalous states of the monitored process. An NPP’s corrective action program requires it to track and document, via a dedicated report, the resolution of any issues that occur within the plant. Once created, each report is reviewed by a plant screening committee, and several classifications and decisions are made. Recently, a collaborating NPP developed an artificial intelligence and ML-based classifier to categorize a condition report (CR) into classes that can serve to label the data as normal or anomalous. Applying CRs as labels represents a semi-supervised use case. Semi-supervised ML assumes that labels exist for some data points (i.e., labeled anomalies, in this case) but not for the rest. In this effort, semi-supervised ML methods were used to fuse data from CRs with anomaly detection methods in order to test the hypothesis that partially labeled anomalies would improve the accuracy of the anomaly detection methods. Specifically, two methods were used. The first is the deep Semi-supervised Anomaly Detection (deep SAD) method, which can handle labels ranging from fully unsupervised to fully supervised cases. The second is a newly designed ML method developed specifically for this effort and referred to as the high-order feature (HOF)-based method. To evaluate these two methods in controlled environments, synthetic data generators were developed and used. The first datasets used a spring-mass-damper (SMD) system simulator commonly found in mechanical engineering references. This was used to create two use cases: a one- and a three-mass system. Anomalies were introduced by changing the spring and damper coefficients while the system was actuated by random forces. The second datasets used the commercial Dymola-Modelica software to build a simplified nuclear reactor model. Anomalies were added in the form of corrupted sensor readings and/or control commands. The deep SAD method was tested using the SMD system, while the HOF method was tested using both datasets. Application of the deep SAD semi-supervised ML method demonstrated that labels can generate increased confidence in detecting true anomalies. This helped increase the number of true positives and decrease the number of false negatives—something that would aid in addressing the backlog of possible anomalies. Application of the HOF method demonstrated that labels can aid in down selecting from a candidate set of features to a more optimal subset in order to better differentiate between normal and anomalous conditions.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Accelerated Lifetime Testing of Main Shaft Seals for Tidal Turbine Rotors

This document will briefly discuss the observations and results from an NREL conducted accelerated lifetime testing of the main shaft seal for the Verdant Power fifth generation Gen5 underwater Tidal Energy Converter (TEC) turbine, which successfully performed at the RITE project in 2020-2021. In order to evaluate a 5-year Service Interval ( SI) for this component, testing at NREL operated the main shaft seal nearly continuously for over 135 (text says 130 days on page 5 and 125 days on page 7 and 137 days on page 11) days at a rotational velocity of 160 rpm while the test stand recorded water pressure, barrier fluid pressure, temperature, and number of cycles., representing ~ 40% of the SI. An additional separate test was conducted to measure the aging behavior of the rubber drive rings. The water pressure reservoir was held constant as 29 psi. Barrier fluid pressure remained relatively constant throughout the duration of the test but was seen to sink to as low as 10.1 psi. No barrier fluid leakage was observed throughout the test. A sudden failure occurred within the seal after the power to test machine was interrupted for a scheduled building maintenance procedure. Upon restarting, the main shaft seal lost all ability to prevent water ingress. The exact cause is not known but is believed to be either a seal assembly issue or a change in the alignment of the seal components during or following the power outage. Following seal disassembly, significant wear was seen on one of the graphite sealing rings. Based on these results it is recommended that a follow-on TEAMER be conducted to rectify protocol and assembly issues to further evaluate SI of this component. The support and participation of Verdant Power Inc, Dovetail Solutions LLC and Garlock Manufacturing Inc were instrumental in understanding the results. NREL thanks them for their significant effort.

13 HYDRO ENERGY↗

Rooftop Photovoltaics and Electric Vehicle Co-Adoption: Attitudes, Norms, Diffusion, and Economics

The overall objectives of the project were to (1) Identify personal and social norms, peer effects, demographics and contextual factors (such as household energy expenditures, experience with outages, charging infrastructure availability) that may facilitate or hinder Solar-EV co-adoption; (2) outline strategies for the design of programs and practices that will enable reasoned RPV and EV adoption and their co-adoption; and (3) assemble a dataset comprised of survey responses of RPV-EV co-adopters, RPV-only adopters, EV-only adopters, and non-adopters. These objectives were only partially fulfilled given the decision to terminate the project. The research team was able to complete the semi-structured interviews, the core BY1 task and summarize the results below. As well, once the team learned of the research project’s fate, it sought and obtained the DOE SETO Technical Manager’s approval to repurpose funds for BY2 tasks to the extent feasible. Rather than invest further resources in expanding the pool of potential survey respondents and having no budget to survey, the research team repurposed funds subject and undertook a more limited (geographically) survey, but also expanded to it to include contingent valuation questions. The analysis of the survey data will necessarily be delayed given the lack of budget support, although some information on the respondent sample is in the results. Given a lack of attention to co-adoption previously, the insights generated in this project should assist decision-makers and industry actors in the development of programs and practices that enable reasoned RPV adoption and EV adoption and their co-adoption.

14 SOLAR ENERGY↗

SPBMI Microgrid

The SPBMI Microgrid Project aims to achieve four primary objectives that support. the tribe’s strategic goals, plans, and mission: 1) Ensure the availability of resilient energy for five essential tribal facilities as identified in the San Pasqual Hazard Mitigation Plan and described in the San Pasqual Energy & Resiliency Plan; 2) Provide solar generation sufficient to achieve net-zero energy consumption at the five essential facilities; 3) Reduce the tribe’s lifetime levelized costs of energy (LCOE); and 4) Support tribal energy objectives including reducing greenhouse gas emissions. Secondary objectives include supporting local workforce development and employment, in part by utilizing commercially available and warranted technologies that can be operated and maintained by tribal staff. Expected outcomes from the project include substantially eliminating long-duration disruptions to essential tribal services due to utility outages (which totaled 34 hours in 2017); reducing lifetime energy costs by approximately $1.75 million; and producing approximately 6.5 GWh of renewable electricity over the system’s lifetime.

14 SOLAR ENERGY↗

Residential Water Heating Demand Side Management (DSM) - South Africa

The electricity crisis in South Africa has deteriorated significantly, with the country experiencing frequent and prolonged rolling blackouts. These outages have severe economic repercussions, leading to decreased growth and productivity. Demand Side Management (DSM), particularly focusing on electric water heaters due to their significant energy consumption and peak demand contribution, is identified as a key strategy. The study aims to assess opportunities for DSM programs targeting water heating to reduce energy consumption and peak demand. It entails developing a bottom-up simulation model to establish a baseline scenario of water heating electricity load demand in 2023 and 2033, identifying technologies for energy reduction, estimating the impacts of a selected number of measures and providing recommendations to inform policy makers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Analytics-at-scale of Sensor Data for Digital Monitoring in Nuclear Plants (4th Annual Report)

Nuclear plant sites collect and store large volumes of data collected from various equipment and systems. These datasets typically include plant process parameters, maintenance records, technical logs, online monitoring data, and equipment failure data. The collection of such data affords an opportunity to leverage data-driven machine learning and artificial intelligence technologies to provide diagnostic and prognostic capabilities within the nuclear power industry to reduce operating and maintenance costs. In this way, nuclear energy can become more economically competitive with other energy sources, and premature closures can be avoided. From a maintenance standpoint, savings can be achieved by leveraging machine learning and artificial intelligence technologies to develop data-driven algorithms to better diagnose and predict potential faults within the system. Improved model accuracy can lead to reductions in unnecessary maintenance and more efficient planning of future maintenance, thus lowering the costs associated with parts, labor, and unnecessary planned, forced, or extended outages. From an operations perspective, cost savings can be generated by shifting from route-based monitoring to wireless technologies for online monitoring, and by transitioning from onsite- to cloud-based computing and storage services. Wireless monitoring would reduce the operator manhours required for taking routine measurements, while cloud computing services would generate cost savings by reducing the amount of hardware needing to be purchased and maintained—all while scaling to both computational and storage demands. This report summarizes this project’s effort to shift from costly, labor-intensive preventative maintenance to cheaper predictive maintenance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

High Performance Adaptive Deep-Reinforcement-Learning-based Real-time Emergency Control (HADREC) to Enhance Power Grid Resilience in Stochastic Environment (Final Report)

The HADREC technology developed in this project features real-time, validated, and predictive emergency control capabilities needed to effectively safeguard the grid against costly disturbances from extreme weather and other disruptive events. It has the potential to revolutionize the emergency control by providing faster and more effective solution for power grid emergency control. The technology can reduce the grid emergency control action time from minutes to seconds and mitigate the impact of outages and reduce system recovery time. The evaluation results using the models and data from PacifiCorp system have shown ~20% improvement in responding time and 70% improved in tripped generator output, comparing against today’s industrial application. This performance can help reduce preventive measurements and improve network utilization and market efficiency, and help lead to a more reliable and resilient power grid with renewable integration. The project has generated significant interest from industry, academic and commercial companies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Clear Sky Toolkit: Decision Support User Guide

The Clear Sky Decision Support Template is a Microsoft Excel-based resource that enables users to screen and prioritize critical facilities for the addition of solar + storage. The Decision Support Template consolidates and streamlines the most relevant resources from the emergency management discipline, the electric utility sector, and national energy research institutions to assist in further site analysis and decision-making. The Decision Support Template is intended for use by local government and private sector decision-makers who aim to mitigate the effects of power outages on critical infrastructure, understand the potential for deploying photovoltaic (PV) and storage solutions on critical facilities, and align emergency management planning processes and utility needs with community resilience objectives. The Decision Support Template is divided into five modules that provide a structured, step-by-step approach users can follow and apply to unique circumstances. This process guides a more thorough and accurate assessment of a site's potential to accommodate a solar + storage system, provide grid benefits to utilities, and support community resilience and disaster mitigation for the broader region. After identifying potentially viable and preferred sites for solar + storage using the Decision Support Template, users should conduct a more detailed evaluation and consultation with a solar professional.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Utilizing HYSPLIT for Emergency Response Modeling at SRS

At SRS, emergency responders use a variety of tools to detect, track, and mitigate hazardous material releases into the atmosphere. Two models currently used at SRS are Puff-Plume and the Lagrangian Particle Dispersion Model (LPDM), a Gaussian and Lagrangian model, respectively. A decision has been made to replace LPDM with the more widely-supported Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) model for evaluating inhalation and ingestion doses following a release. HYSPLIT is designed to compute complex dispersion and deposition simulation To achieve the implementation of HYSPLIT, we have developed a preliminary UI framework that will allow HYSPLIT to be run on ATG computers without the need for active network connections, thus avoiding the loss of capabilities in the event of a network outage during an emergency.

Earley, Ian↗

EMP Testing of NAE Magnetic Motor Starters

Sandia National Laboratories (SNL) performed a high-altitude nuclear electromagnetic pulse (HEMP) critical generation station component vulnerability test campaign with a focus on high-frequency, conducted early-time (E1) HEMP for the Department of Energy (DOE) Office of Cybersecurity, Energy Security, and Emergency Response (CESER). This report provides vulnerability test results to investigate component response and/or damage thresholds to reasonable HEMP threat levels that will help to inform site vulnerability assessments, mitigation planning, and modeling calibrations. This work details testing of North American Electric (NAE) magnetic motor starters to determine the effects of conducted HEMP environments. Motor starters are the control elements that provide power to motors throughout a generating plant; a starter going offline would cause loss of power to critical pumps and compressors, which could lead to component damage or unplanned plant outages. Additionally, failed starters would be unable to support plant startup. Six industrial motor starters were tested: two 2 horsepower (HP) starters with breaker disconnects and typical protection equipment, two 20 HP starters with breaker disconnects, and two 20 HP starters with fused disconnects. Each starter was placed in a circuit with a generator and inductive motor matching the starter rating. The conducted EMP insult was injected on the power cables passing through the motor starter, with separate tests for the generator and motor sides of the starter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Resilience for Mission Assurance: Case Study Scoping Document

The Energy Resilience for Mission Assurance (ERMA) project—a Department of Energy Grid Modernization Lab Consortium effort carried out via a partnership among five national laboratories— seeks to develop metrics to quantify how improvements to energy system resilience translate to improved Department of Defense (DoD) mission assurance (MA) during wide-scale, long-duration outages of the bulk power system. DoD missions are integral to national security and highly dependent on electric power. However, energy system planners—both civilian and military—lack a clear and quantifiable mapping between electric power system resilience and MA, leaving a gap in their ability to understand and consider national security outcomes within their planning efforts. The ERMA project seeks to fill this gap, providing stakeholders with new capabilities to understand the impact of electric power system resilience on MA during hazard scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Spread Spectrum Time Domain Reflectometry (SSTDR) and Frequency Domain Reflectometry (FDR) for Detection of Cable Anomalies Using Machine Learning

Cables are initially qualified for nuclear power plant use for 40 years. As plants extend their operating license to 60 and 80 years, continued use of these cables must shift to a performance-based approach since it is cost prohibitive to completely replace cables that are likely still capable of performing their design function. A variety of cable tests are available and are commonly applied during outages when the cables can be taken out of service. Frequency domain reflectometry (FDR) is one of these test methods that is being more broadly accepted and used because it not only detects anomalies along the cable with a low-voltage signal that does not stress the cable insulation, but the technique also locates the anomalies. This supports follow-up local inspection and local repair or partial replacement of a damaged cable segment. Currently, FDR testing is only applied to cables that are taken out of service since the test instrument would be damaged by operational voltages.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

High-Burnup BWR LOCA Burst Analysis Framework Development and Demonstration

Nuclear power currently contributes approximately 20% of total electricity generation in the United States and more than 10% globally. Given the increasing reliance on nuclear energy to achieve our nation’s goal of reaching net-zero carbon emissions by 2050, there is significant pressure on the existing nuclear industry to extend plant operational licenses and improve efficiency. This is crucial as the existing nuclear fleet serves as a vital bridge until new light water and advanced reactors can be developed and deployed, bolstering the supply of carbon-free energy to meet domestic demands. Operational costs primarily consist of plant operation and maintenance and fuel costs, influenced by materials and reactor core designs. These factors, coupled with heavily subsidized renewable energy markets, create a challenging economic environment for the existing light water reactor fleet, as well as for new build projects. To address these economic challenges, the nuclear industry has developed a strategic blueprint aimed at enhancing nuclear power’s economic sustainability. Past initiatives, such as efforts to eliminate fuel failures by 2010 and reduce operating costs by 30% before 2020, have laid the groundwork. Optimizing core design parameters, including burnup limits and enrichment levels, can lengthen cycles, reduce outages, reduce batch reload batch fractions and spent fuel storage requirements, and lower maintenance and operating expenses, thereby enhancing economic viability. In the United States, boiling water reactors (BWRs) comprise approximately one-third of the fleet, although much of the research and development focus has traditionally been on pressurized water reactors (PWRs). Advances in modeling and simulation, particularly through the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, are crucial to the long-term viability of BWRs, just as they are for PWRs. A key research area of the high burnup/increased enriched fuel initiative is focused on addressing loss-of-coolant-accident (LOCA)-related issues. NEAMS has dedicated significant effort to enhancing tools to better support BWRs, with a current focus on showcasing the BWR framework for high-burnup LOCA analysis. This high-fidelity work will demonstrate a best estimate pin-by-pin high-burnup BWR LOCA analysis to assess full-core cladding rupture behavior. This modeling capability will help with better understanding and realistic evaluation of fuel fragmentation, relocation, and dispersal (FFRD) phenomena at BWRs, which then could be used to prevent FFRD at BWRs without penalizing operational parameters. In addition, the results of this work will help identify strategies to identify additional margins or to potentially limit cladding rupture through core design optimizations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗